Equipment Environ Qualification,Review of Licensees' Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment, Request for Addl Info
ML17212B417
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 02/01/1982
From:
FRANKLIN INSTITUTE
To:
NRC
Shared Package
ML17212B416 List:
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.B.3, TASK-2.D.3, TASK-2.E.1.2, TASK-2.E.3.1, TASK-2.E.4.1, TASK-2.E.4.2, TASK-2.F.2, TASK-2.G.1, TASK-2.K.2.10, TASK-2.K.3.09, TASK-2.K.3.12, TASK-TM IEB-79-01B, IEB-79-1B, RAI-C5257-516, NUDOCS 8203030109
Download: ML17212B417 (13)


Text

REQUEST FOR ADDITIONAL INFORMATION EQUIPMENT ENVIRONMENTAL QUALIFICATION (EEQ)

REVIEW OF LICENSEES'ESOLUTION OF OUTSTANDING ISSUES FROM NRC EQUIPMENT ENVIRONMENTAL QUALIFICATION SAFETy EVALUATION REPORTS (SER) AND TMI ACTION PLAN INSTALLED EQUIPMENT Florida power and Light Company St. Lucie Unit 1 NRC Docket No. 50-335 November 30, 1981 NRC TAC No. 42492 Rev. 1, February 1, 1982 5 Franklin Research Center A Division of The Franklin institUte The Benjamin Franklin Parkway, Phila.. Po. 19l03 (2l5) 448. I 000 j;,8203030109 8202 i PDR',ADOCK 05000335,

~,"P'".~', '"'~" ,,'< 'PDR-".~'l 7't'.:

y1 w' I lt lt s 4

I,

RAIM5257-516 BACKGROUND Franklin Research Center (FRC) of Philadelphia< Pa. is providing assis-tance to the U.S. Nuclear Regulatory Commission (NRC) for the equipment environmental qualification (EEQ) r'eview of operating reactors. FRC will perform an EEQ review of the Licensee's 90May response to outstanding issues from the NRC Equipment Environmental Qualification Safety Evaluation Report (SER) and the installed TMI Action Plan equipment. The review will be limited to safety-related equipment potentially exposed to a harsh environment. The results will be presented in the form of a technical evaluation report for each plant.

This request for additional information (RAI) is the result of an evaluation of the information provided by letters dated June 1, 1980 [1] and September 30, 1981 [2].* FRC previously requested TMI Action Plan information by telephone memoranda dated September 4, 1981 and October 13, 1981 [3,4].

On,Januar 22 1982'RC received Phase

/

II of Florida Power and Li ht, Co.'s res nse to IE Bulletin 79-01B 8 **

A FRC REVIEW OF THE LICENSEE'S 90-DAY RESPONSE TO THE NRC EEQ SER INFORMATION REQUESTED DATE RECEIVED BY FRC+**

l. Zn reference to the L'icensee's 90May response [2] to the NRC SER [5], a legible single copy of each of the following qualification documents is requested in order that the FRC evaluation may proceeds
a. EPRZ reports for Davis Besse I, Rancho Seco, Maine Yankee, Arkansas I; for motor operators
b. FP&L Engineering Analysis Nos. E-9, Z-15, Z-24, and M-18
  • Numbers in brackets refer to citations found in the list of references.
    • Underlining indicates text added in Revision l.
      • This column will be completed by FRC as the requested information is received.

00 Franklin Research Center A Division ol The FrankNn Insotutc

RAIM5257-516 DATE RECEIVED BY PRC***

c. General Electric Co. Pamphlet GEP 840
d. Ameron letter dated 20>>Nov-72
e. Rosemount Test Report 12756B
f. Rosemount Report 4117415, 19-Sep-75
g. Victoreen Technical Manual 8770-6761RO Section 2-3.2
h. Rosemount Similarity Report 67912A dated 6-22-79
i. Rosemount Test Report 1762
j. Buffalo Porge letter dated 1-14-74
k. Topical Report IEEE-323 class 1E Induction Motors models 5K828840C81 and 5K811043C16, Horizontal Class B Insulated, January 1977 (PP4102) and Rev.

1 (FF4102A)

1. Raychem Test Report 1010
m. SL-1 Qualification Data for General Cable Co. Cable (FFf28)
n. General Cable Certified Test Report (PF$ 750)
o. General Cable letter dated 12/17/74

'FF489)

p. BIW Test 9298 on Silicone Insulation
q. BIW Test 9299 on XLPE Insulation
r. BIW Engineering Comments 33388-EP
s. Conax Test IPS-27
t. Conax Test IPS-30
u. Conax Test IPS-49
v. Conax Test IPS-73.2 till Franklin Research Center A Divhron of The Franiriin Insrrnrre

RAIM5257-516 DATE RECEIVED BY FRC***

w. Conax Test IPS-78 Xo Conax transmittal letters of 1/6/75 and 1/31/75 R. H. Kanter, NAMCO Letter to Sushil K. Sinha, Ebasco July 3, 1980 Z~ ualification b En ineerin Anal sis I-1 3 5 7 10

-12 >>13 17 23 30 E-1 -lA 29; M-3 -4, 7 -8 19 21J

-9 -10 -ll -13 V-1 3 5 -6 -7 -8 -9 as 0 Pn ineerin Anal sis PSL-1 79-01B PE-003, -004 -005 -006

-007 -009 -012 -013 -014 -017 -018 bb. Ra chem Re rt EDR 5011 FF 497 cod Ra chem Interim Re rt'of Flamtrol Thermal A in Stud Januar 1974 FF 430 dd- Ra chem letter dated November 27 1974 FSAR attachment: 5 to A endix 3A Part ee. BIW Test Data FF 485 Continental Wire & Cable data sheet dated 3 71, received with uotation No.

27057 dated 10-18-71 FF 482 Continental Wire and Cable letter to Dennis Cronin dated December 3 1974 transmittin test data FF 4104 hh. Okonite Re rt X-Olene insulated cable transmitted with letter dated June 24 1980 FF 481 Okonite Com an Radiation Certification dated Januar 3 1972 FF 475A jj. Conax re rt, IP-325 FF 420 l)ll Franklin Research Center A Dhnrion d'The Frsnrdin Tnserure

RAI&5257 516 DATE RECEIVED BY PRC***

kk. ITT Barton Re rt No. R3-288A-1 10 27 79

11. ITT Barton Re rt No. R3-580-1 Dated 5 79 Gulf Electronics S stem ts. E-115-173 E-ll5-176 E-115-180 and E-115-181 FF 413 14 15 16 nn. Intelcom Rad Tech 7-15-74 re rt and Gulf Atomic letter 6-28-74 transmittin Gulf 6-26-74 Test FP 433 OOo General Atomic Au ust 1974 "Desi n Re rt Environmental Conditions for St.

Lucie 1 Secondar Electric Penetration Assemblies" FP 417 Ra chem Heat A in Stud of WCSF Com und 4EDR2001 FF 495 GE letter to Ebasco No. 07-18-80 . FF 496 Westin house alification test re rt on three terminal blocks for use in BWR nuclear wer lants FF 493 ss ~ GE 12968 moldin com und descri tion and ro erties data FF 494 GE Letter of Ma 2 1979 to Ebasco relative to terminal blocks material FP

~498 QUo GE seismic ca abilit data for rela s and accessories. GEZ-6675 Rev. 5 GE letter to Ebasco Ma 9 1979 relative to radiation tests of rela s and terminal blocks FF $ 99 To ical Re rt of General Electric Vertical Induction Motors for Class IE Intake Coolin Water Pum s for St. Lucie Nuclear Power Plant Unit 2 Rev. 2 '

31 79 FF $ 103 I Franklin Research Center A Owoion d The Fronkln Institute

RAIM5257-516 DATE RECEIVED BY FRC**+

Am henol Sams technical re ort 123-1243 "Thermal cle testin of Electrical Penetration Assembl Com nent" FF 484 Am henol Sams technical re rt 123-1257 "Radiation Testin of Electrical Penetration Assembl Com nent" FF 484 zz ~ Am henol Sams technical re rt 123-1260 "Radiation Testin of Electrical Penetration Assembl Com onents FF 484 aaa. Am henol Sams technical re rt 123-1247 "LOCA Testin of unitized netration assembl " FF 484 bbb. 300 Series Pressure Control S ecifications of United Electric Controls Com an coca Westin house Telex dated 7 8 1980 ddd. Westin house Data 7' 90" eee. Boiler Colman Tech. Data 7 2 80 Namco Controls letter Jul 3 1980

~e PEECO Tech. Data info. 7 9 80 hhh. INDEECO mail ram dated 7 3 80 ill e INDEECO IEEE 323-71 Job Data for Com liance with INDEECO Drawin 14423 6 2 76 kkk. Ph s-Chemical Research Cor ration catal B-80 Instruments for measurement and control of Relative Humidit Ph s-Chemical Research Cor ration Data June 20 Technical Data-Gordon Com an 00I) Franklin Research Center A Divison d %bc Frankhn Insole+

RAIM5257-516 B FRC REVIEW OF INSTALLED TMZ ACTION PLAN ITEMS INFORMATION REQUESTED DATE RECEIVED BY FRC+**

1. Reference 6 does not provide adequate detail with respect to identification of TMI Action Plan equipment installed as of 1/1/81.
a. Identification of all TMI Action Plan equipment installed as of 1/1/81 is requested.
b. Identification of TMI Action Plan equipment installed with implementation dates after 1/1/81 is requested.
c. The correlation of these equipment items with the specific sections of NUREG-0737

[7] presented below (as applicable) is requested.

IIE1. 2 i IIE4. 2, IIE3. 1 r IIGli IIF2 i IID3, IIK3.12 (Wx) IIK3,9 (Wx)

IIK2 10(BOW) IIB3g IIE4.1.

g

'[The correlation is needed to ensure that all items are included in the review, e.g., if a transmitter is identified as a TMI Action Plan item, are the cable and terminal blocks associated with the device also identified?]

d. For all installed TMI Action Plan equipment identified, a System Component Evaluation Worksheet (SCEW) (in accordance with 79W1B format) is requested.
e. The approximate installation date for the TMI Action Plan equipment items is requested so that the appropriate qualification criteria (NUREG-0588 or DOR Guidelines) can be used in the EEQ evaluation.
2. The qualification documents, e.g., the actual test reports and associated correspondence cited as evidence of qualification listed on the SCEW sheets, for all identified TMI (ll Franklin Research Center A Dnesion d The Fnel4n Irseutc

RAIM5257-516 DATE RECEIVED BY PRC***

Action Plan equipment are requested. [The identification of those reports considered to be proprietary is requested so that proper control of documents can be maintained.]

h

3. Where the Licensee has a standard position with respect, to a NUREG-0737 Owners'roup

~e technical area or has requested extensions of implementation dates, this information is requested in order to incorporate it into the review.

l)ll Franklin Research Center A (&sion oi The Franktin Inaatu(e

~,

4 RAIM5257-516 REFERENCES

1. St. Lucie Unit 1, NRC IE Bulletin 79-01B Phase I Component Evaluation Sheets and Master List Florida Power 6 Light Co., 01Mun-80
2. St. Lucie Unit 1, Response to IE Bulletin 79-01B SER Florida Power a Light Co., 30-Sep-81
3. Telephone memorandum dated 9/4/81 R. J. Krapf (FRC) conversation with J. Kennedy (NRC)

Subject:

RFI St. Lucie Unit 1 Plant, EEQ Review of TMI-AP Items

4. Telephone memorandum dated 10/13/81 C. J. Crane, J. A. Murphy (FRC) conversation with C. Nelson, H. Walker (Nt(C) and D. Evans (FPL)

Subject:

Follow-up on RFI, St. Lucie Unit 1 I

5. Office of Nuclear Reactor Regulation Safety Evaluation Report for St. Lucie Unit 1 Environmental Qualification of Safety-Related Electrical Equipment NRC, 29-May-81 ~
6. R. E. Uhrig Lerter to J. P. O'Reilly, NRC.

Subject:

Supplement to response to IE Bulletin 79-01B Florida Power a Light Co., 06-Feb-81 L-81-42

'. NUREG-0737, "Clarification NRC, November 1980 of TMI Action Plan Requirements"

8. Res onse to IE Bulletin 79-01B Phase II Action Items 4-6) for St.

Lucie Unit No. 1:

in Environraental uglification of Electrical E i ment a Harsh Environment.... Florida Power and Li ht Co. 31-Jul-80 99 Franklin Research Center A GMsion d The Frank'nsaNte P

4

T

~ ~

a')