Category:CONTRACTED REPORT - RTA
MONTHYEARML17229B0671999-03-16016 March 1999 Technical Evaluation Rept, Florida Power & Light Co, Unit 1 Third Ten-Year Interval Pump & Valve Inservice Testing Program,Unit 2 Second Ten-Year Interval Pump & Valve Inservice Testing Program. ML17355A2801998-09-30030 September 1998 Rev 1,Ltr Rept, Technical Evaluation of Florida Power & Light Fire Barrier Ampacity Derating Assessment for St.Lucie & Turkey Point. ML17229B0011998-01-31031 January 1998 Technical Evaluation Rept on 'Submittal-Only' Review of IPEEE at St Lucie Nuclear Plant,Units 1 & 2. ML17229A4151997-05-27027 May 1997 Technical Evaluation Rept of IPE Submittal & RAI Responses for St Lucie Nuclear Plant. ML17228B1261995-03-31031 March 1995 Technical Evaluation Rept on Second 10-Year Interval Insp Program Plan. ML17309A7471994-09-30030 September 1994 Technical Evaluation Rept;Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001:St.Lucie-1/-2. ML17228A8851994-09-30030 September 1994 Errata to TER, Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001,St Lucie 1 & 2, Replacing Every Other Missing Page in Original Rept ML20138E1481993-06-22022 June 1993 Pump & Valve Inservice Testing Program St Lucie Unit 2 FPL, Technical Evaluation Rept ML20105D0871992-08-31031 August 1992 Auxiliary Feedwater System RISK-BASED Inspection Guide for the St. Lucie Unit 1 Nuclear Power Generation Station ML17309A6651991-11-30030 November 1991 Technical Evaluation Rept Pump & Valve Inservice Testing Program,St Lucie-Unit 1. ML17223B3231991-08-31031 August 1991 TER of Topical Rept CEN-396-P (Verification of Acceptability of a 1-PIN Burnup Limit of 60 Mwd/Kg for St Lucie Unit 2). ML17308A5041990-08-17017 August 1990 Final Technical Evaluation Rept St Lucie Unit 1 Station Blackout Evaluation. ML17308A4821989-05-31031 May 1989 Conformance to Generic Ltr 83-28,Item 2.2.1,Equipment Classification for All Other Safety-Related Components,St Lucie 1/2, Technical Evaluation Rept ML17222A7411989-01-31031 January 1989 Technical Evaluation Rept on Second Ten-Year Interval Inservice Insp Program Plan:Florida Power & Light Co,St Lucie Plant,Unit 1. ML17223A1321988-12-31031 December 1988 Technical Evaluation Rept TMI Action NUREG-0737 (II.D.1) Relief & Safety Valve Testing,St Lucie,Unit 2. ML17223A1291988-12-31031 December 1988 Technical Evaluation Rept TMI Action NUREG-0737 (II.D.1) Relief & Safety Valve Testing,St Lucie,Unit 1. ML20244C2931988-11-30030 November 1988 Review of Florida Power & Light Co Safety Evaluations for Extending St Lucie Plant,Unit 2,ESFAS Subgroup Relay Test Interval, Technical Evaluation Rept ML17308A4461988-03-31031 March 1988 Technical Evaluation Rept for Natural Circulation,Boron Mixing & Cooldown at St Lucie Unit 2. ML20196G2921988-02-29029 February 1988 Technical Evaluation Rept,Evaluation of High Density Spent Fuel Rack Structural Analysis for St Lucie Plant - Unit 1 ML17347A5931987-07-31031 July 1987 Retran Code:Transient Analysis Model Qualification, Technical Evaluation Rept ML17308A2391987-06-30030 June 1987 Integrated Leak Rate Test for St Lucie Nuclear Power Plant (Unit 2) Apr 1987-June 1987, Technical Evaluation Rept ML17219A6871987-06-30030 June 1987 Conformance to Generic Ltr 83-28,Item 2.2.2, 'Vendor Interface Program for All Other Safety-Related Components:St Lucie 1 & 2,' Final Rept ML20214R1531987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Maine Yankee,St Lucie 1 & 2 & Waterford 3, Informal Rept ML20215G2741987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface Maine Yankee,St Lucie Units 1 & 2 & Waterford 3 ML20214R7431987-03-31031 March 1987 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3 ML17308A2891987-01-31031 January 1987 Review of Tech Spec Changes Supporting NUREG-0737 Accident Instrumentation,St Lucie Units 1 & 2, Technical Evaluation Rept ML20210Q4481987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept ML17308A2421986-05-31031 May 1986 Rev 1 to Conformance to Reg Guide 1.97,St Lucie Plant,Units 1 & 2. ML17308A2151986-04-30030 April 1986 First Interval Inservice Insp Program,St Lucie Unit 2, Technical Evaluation Rept ML20197C6021986-04-30030 April 1986 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3,St Lucie Units 1 & 2 & Waterford Unit 3 ML17216A4331986-01-13013 January 1986 SPDS Progress Review,St Lucie 1 & 2. ML17301A1841985-06-17017 June 1985 Masonry Wall Design (B-59),Florida Power & Light Co,St Lucie Unit 1, Technical Evaluation Rept ML17301A1671985-02-28028 February 1985 Conformance to Reg Guide 1.97,St Lucie Plant,Units 1 & 2. ML20080E0711984-01-13013 January 1984 Evaluations of Detailed Control Room Design Reviews for St Lucie Units 1 & 2 & Turkey Point Units 3 & 4, Technical Evaluation Rept ML17301A0621983-10-31031 October 1983 Control of Heavy Loads at Nuclear Power Plants,St Lucie Plant,Unit 2 (Phase Ii). ML17214A6931983-10-31031 October 1983 Conformance to NRR Generic Ltr 82-16,St Lucie Plant,Units 1 & 2, Preliminary Rept ML17214A2041983-04-30030 April 1983 Draft Control of Heavy Loads at Nuclear Power Plants,St Lucie Plant,Unit 2 (Phase I), Technical Evaluation Rept ML17214A1581983-04-29029 April 1983 Control of Heavy Loads (C-10) St Lucie Unit 1, Draft Technical Evaluation Rept ML17214A1551983-04-26026 April 1983 Radiological Effluent Tech Specs (RETS) Implementation - St Lucie Unit 1 Nuclear Generating Plant. ML17214A4541983-03-0202 March 1983 Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML17301A0131982-11-24024 November 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),St Lucie Unit 1, Technical Evaluation Rept ML20065U2351982-10-31031 October 1982 Technical Evaluation Rept of Overpressure Mitigation Sys for St Lucie,Unit 1 ML20127A2891982-10-0505 October 1982 Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 ML17301A0011982-09-28028 September 1982 ECCS Repts (F-47),TMI Action Plan Requirements,St Lucie Unit 1, Technical Evaluation Rept ML17213A7321982-09-17017 September 1982 Seismic Qualification of Auxiliary Feedwater Sys, Technical Evaluation Rept ML20066B3231982-08-31031 August 1982 Audit of Environ Qualification of Safety-Related Electrical Equipment at St Lucie Unit 2 Nuclear Generating Station, Interim Rept ML20126F2541982-08-26026 August 1982 Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 ML20062E2041982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Saint Lucie Case Study.Docket Nos. 50-335 and 50-389.(Florida Power and Light Company) ML17212B7831982-05-31031 May 1982 Control of Heavy Loads at Nuclear Power Plants,St Lucie Plant Unit 2,FL Power & Light Co, Draft Technical Evaluation Rept ML20052B5341982-02-28028 February 1982 Tech Specs for Redundant Decay Heat Removal Capability, St Lucie,Unit 1, Technical Evaluation Rept 1999-03-16
[Table view] Category:QUICK LOOK
MONTHYEARML17229B0671999-03-16016 March 1999 Technical Evaluation Rept, Florida Power & Light Co, Unit 1 Third Ten-Year Interval Pump & Valve Inservice Testing Program,Unit 2 Second Ten-Year Interval Pump & Valve Inservice Testing Program. ML17355A2801998-09-30030 September 1998 Rev 1,Ltr Rept, Technical Evaluation of Florida Power & Light Fire Barrier Ampacity Derating Assessment for St.Lucie & Turkey Point. ML17229B0011998-01-31031 January 1998 Technical Evaluation Rept on 'Submittal-Only' Review of IPEEE at St Lucie Nuclear Plant,Units 1 & 2. ML17229A4151997-05-27027 May 1997 Technical Evaluation Rept of IPE Submittal & RAI Responses for St Lucie Nuclear Plant. ML17228B1261995-03-31031 March 1995 Technical Evaluation Rept on Second 10-Year Interval Insp Program Plan. ML17309A7471994-09-30030 September 1994 Technical Evaluation Rept;Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001:St.Lucie-1/-2. ML17228A8851994-09-30030 September 1994 Errata to TER, Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001,St Lucie 1 & 2, Replacing Every Other Missing Page in Original Rept ML20138E1481993-06-22022 June 1993 Pump & Valve Inservice Testing Program St Lucie Unit 2 FPL, Technical Evaluation Rept ML20105D0871992-08-31031 August 1992 Auxiliary Feedwater System RISK-BASED Inspection Guide for the St. Lucie Unit 1 Nuclear Power Generation Station ML17309A6651991-11-30030 November 1991 Technical Evaluation Rept Pump & Valve Inservice Testing Program,St Lucie-Unit 1. ML17223B3231991-08-31031 August 1991 TER of Topical Rept CEN-396-P (Verification of Acceptability of a 1-PIN Burnup Limit of 60 Mwd/Kg for St Lucie Unit 2). ML17308A5041990-08-17017 August 1990 Final Technical Evaluation Rept St Lucie Unit 1 Station Blackout Evaluation. ML17308A4821989-05-31031 May 1989 Conformance to Generic Ltr 83-28,Item 2.2.1,Equipment Classification for All Other Safety-Related Components,St Lucie 1/2, Technical Evaluation Rept ML17222A7411989-01-31031 January 1989 Technical Evaluation Rept on Second Ten-Year Interval Inservice Insp Program Plan:Florida Power & Light Co,St Lucie Plant,Unit 1. ML17223A1321988-12-31031 December 1988 Technical Evaluation Rept TMI Action NUREG-0737 (II.D.1) Relief & Safety Valve Testing,St Lucie,Unit 2. ML17223A1291988-12-31031 December 1988 Technical Evaluation Rept TMI Action NUREG-0737 (II.D.1) Relief & Safety Valve Testing,St Lucie,Unit 1. ML20244C2931988-11-30030 November 1988 Review of Florida Power & Light Co Safety Evaluations for Extending St Lucie Plant,Unit 2,ESFAS Subgroup Relay Test Interval, Technical Evaluation Rept ML17308A4461988-03-31031 March 1988 Technical Evaluation Rept for Natural Circulation,Boron Mixing & Cooldown at St Lucie Unit 2. ML20196G2921988-02-29029 February 1988 Technical Evaluation Rept,Evaluation of High Density Spent Fuel Rack Structural Analysis for St Lucie Plant - Unit 1 ML17347A5931987-07-31031 July 1987 Retran Code:Transient Analysis Model Qualification, Technical Evaluation Rept ML17308A2391987-06-30030 June 1987 Integrated Leak Rate Test for St Lucie Nuclear Power Plant (Unit 2) Apr 1987-June 1987, Technical Evaluation Rept ML17219A6871987-06-30030 June 1987 Conformance to Generic Ltr 83-28,Item 2.2.2, 'Vendor Interface Program for All Other Safety-Related Components:St Lucie 1 & 2,' Final Rept ML20214R1531987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Maine Yankee,St Lucie 1 & 2 & Waterford 3, Informal Rept ML20215G2741987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface Maine Yankee,St Lucie Units 1 & 2 & Waterford 3 ML20214R7431987-03-31031 March 1987 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3 ML17308A2891987-01-31031 January 1987 Review of Tech Spec Changes Supporting NUREG-0737 Accident Instrumentation,St Lucie Units 1 & 2, Technical Evaluation Rept ML20210Q4481987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept ML17308A2421986-05-31031 May 1986 Rev 1 to Conformance to Reg Guide 1.97,St Lucie Plant,Units 1 & 2. ML17308A2151986-04-30030 April 1986 First Interval Inservice Insp Program,St Lucie Unit 2, Technical Evaluation Rept ML20197C6021986-04-30030 April 1986 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3,St Lucie Units 1 & 2 & Waterford Unit 3 ML17216A4331986-01-13013 January 1986 SPDS Progress Review,St Lucie 1 & 2. ML17301A1841985-06-17017 June 1985 Masonry Wall Design (B-59),Florida Power & Light Co,St Lucie Unit 1, Technical Evaluation Rept ML17301A1671985-02-28028 February 1985 Conformance to Reg Guide 1.97,St Lucie Plant,Units 1 & 2. ML20080E0711984-01-13013 January 1984 Evaluations of Detailed Control Room Design Reviews for St Lucie Units 1 & 2 & Turkey Point Units 3 & 4, Technical Evaluation Rept ML17301A0621983-10-31031 October 1983 Control of Heavy Loads at Nuclear Power Plants,St Lucie Plant,Unit 2 (Phase Ii). ML17214A6931983-10-31031 October 1983 Conformance to NRR Generic Ltr 82-16,St Lucie Plant,Units 1 & 2, Preliminary Rept ML17214A2041983-04-30030 April 1983 Draft Control of Heavy Loads at Nuclear Power Plants,St Lucie Plant,Unit 2 (Phase I), Technical Evaluation Rept ML17214A1581983-04-29029 April 1983 Control of Heavy Loads (C-10) St Lucie Unit 1, Draft Technical Evaluation Rept ML17214A1551983-04-26026 April 1983 Radiological Effluent Tech Specs (RETS) Implementation - St Lucie Unit 1 Nuclear Generating Plant. ML17214A4541983-03-0202 March 1983 Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML17301A0131982-11-24024 November 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),St Lucie Unit 1, Technical Evaluation Rept ML20065U2351982-10-31031 October 1982 Technical Evaluation Rept of Overpressure Mitigation Sys for St Lucie,Unit 1 ML20127A2891982-10-0505 October 1982 Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 ML17301A0011982-09-28028 September 1982 ECCS Repts (F-47),TMI Action Plan Requirements,St Lucie Unit 1, Technical Evaluation Rept ML17213A7321982-09-17017 September 1982 Seismic Qualification of Auxiliary Feedwater Sys, Technical Evaluation Rept ML20066B3231982-08-31031 August 1982 Audit of Environ Qualification of Safety-Related Electrical Equipment at St Lucie Unit 2 Nuclear Generating Station, Interim Rept ML20126F2541982-08-26026 August 1982 Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 ML20062E2041982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Saint Lucie Case Study.Docket Nos. 50-335 and 50-389.(Florida Power and Light Company) ML17212B7831982-05-31031 May 1982 Control of Heavy Loads at Nuclear Power Plants,St Lucie Plant Unit 2,FL Power & Light Co, Draft Technical Evaluation Rept ML20052B5341982-02-28028 February 1982 Tech Specs for Redundant Decay Heat Removal Capability, St Lucie,Unit 1, Technical Evaluation Rept 1999-03-16
[Table view] Category:ETC. (PERIODIC
MONTHYEARML17229B0671999-03-16016 March 1999 Technical Evaluation Rept, Florida Power & Light Co, Unit 1 Third Ten-Year Interval Pump & Valve Inservice Testing Program,Unit 2 Second Ten-Year Interval Pump & Valve Inservice Testing Program. ML17355A2801998-09-30030 September 1998 Rev 1,Ltr Rept, Technical Evaluation of Florida Power & Light Fire Barrier Ampacity Derating Assessment for St.Lucie & Turkey Point. ML17229B0011998-01-31031 January 1998 Technical Evaluation Rept on 'Submittal-Only' Review of IPEEE at St Lucie Nuclear Plant,Units 1 & 2. ML17229A4151997-05-27027 May 1997 Technical Evaluation Rept of IPE Submittal & RAI Responses for St Lucie Nuclear Plant. ML17228B1261995-03-31031 March 1995 Technical Evaluation Rept on Second 10-Year Interval Insp Program Plan. ML17309A7471994-09-30030 September 1994 Technical Evaluation Rept;Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001:St.Lucie-1/-2. ML17228A8851994-09-30030 September 1994 Errata to TER, Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001,St Lucie 1 & 2, Replacing Every Other Missing Page in Original Rept ML20138E1481993-06-22022 June 1993 Pump & Valve Inservice Testing Program St Lucie Unit 2 FPL, Technical Evaluation Rept ML20105D0871992-08-31031 August 1992 Auxiliary Feedwater System RISK-BASED Inspection Guide for the St. Lucie Unit 1 Nuclear Power Generation Station ML17309A6651991-11-30030 November 1991 Technical Evaluation Rept Pump & Valve Inservice Testing Program,St Lucie-Unit 1. ML17223B3231991-08-31031 August 1991 TER of Topical Rept CEN-396-P (Verification of Acceptability of a 1-PIN Burnup Limit of 60 Mwd/Kg for St Lucie Unit 2). ML17308A5041990-08-17017 August 1990 Final Technical Evaluation Rept St Lucie Unit 1 Station Blackout Evaluation. ML17308A4821989-05-31031 May 1989 Conformance to Generic Ltr 83-28,Item 2.2.1,Equipment Classification for All Other Safety-Related Components,St Lucie 1/2, Technical Evaluation Rept ML17222A7411989-01-31031 January 1989 Technical Evaluation Rept on Second Ten-Year Interval Inservice Insp Program Plan:Florida Power & Light Co,St Lucie Plant,Unit 1. ML17223A1321988-12-31031 December 1988 Technical Evaluation Rept TMI Action NUREG-0737 (II.D.1) Relief & Safety Valve Testing,St Lucie,Unit 2. ML17223A1291988-12-31031 December 1988 Technical Evaluation Rept TMI Action NUREG-0737 (II.D.1) Relief & Safety Valve Testing,St Lucie,Unit 1. ML20244C2931988-11-30030 November 1988 Review of Florida Power & Light Co Safety Evaluations for Extending St Lucie Plant,Unit 2,ESFAS Subgroup Relay Test Interval, Technical Evaluation Rept ML17308A4461988-03-31031 March 1988 Technical Evaluation Rept for Natural Circulation,Boron Mixing & Cooldown at St Lucie Unit 2. ML20196G2921988-02-29029 February 1988 Technical Evaluation Rept,Evaluation of High Density Spent Fuel Rack Structural Analysis for St Lucie Plant - Unit 1 ML17347A5931987-07-31031 July 1987 Retran Code:Transient Analysis Model Qualification, Technical Evaluation Rept ML17308A2391987-06-30030 June 1987 Integrated Leak Rate Test for St Lucie Nuclear Power Plant (Unit 2) Apr 1987-June 1987, Technical Evaluation Rept ML17219A6871987-06-30030 June 1987 Conformance to Generic Ltr 83-28,Item 2.2.2, 'Vendor Interface Program for All Other Safety-Related Components:St Lucie 1 & 2,' Final Rept ML20214R1531987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Maine Yankee,St Lucie 1 & 2 & Waterford 3, Informal Rept ML20215G2741987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface Maine Yankee,St Lucie Units 1 & 2 & Waterford 3 ML20214R7431987-03-31031 March 1987 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3 ML17308A2891987-01-31031 January 1987 Review of Tech Spec Changes Supporting NUREG-0737 Accident Instrumentation,St Lucie Units 1 & 2, Technical Evaluation Rept ML20210Q4481987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept ML17308A2421986-05-31031 May 1986 Rev 1 to Conformance to Reg Guide 1.97,St Lucie Plant,Units 1 & 2. ML17308A2151986-04-30030 April 1986 First Interval Inservice Insp Program,St Lucie Unit 2, Technical Evaluation Rept ML20197C6021986-04-30030 April 1986 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3,St Lucie Units 1 & 2 & Waterford Unit 3 ML17216A4331986-01-13013 January 1986 SPDS Progress Review,St Lucie 1 & 2. ML17301A1841985-06-17017 June 1985 Masonry Wall Design (B-59),Florida Power & Light Co,St Lucie Unit 1, Technical Evaluation Rept ML17301A1671985-02-28028 February 1985 Conformance to Reg Guide 1.97,St Lucie Plant,Units 1 & 2. ML20080E0711984-01-13013 January 1984 Evaluations of Detailed Control Room Design Reviews for St Lucie Units 1 & 2 & Turkey Point Units 3 & 4, Technical Evaluation Rept ML17301A0621983-10-31031 October 1983 Control of Heavy Loads at Nuclear Power Plants,St Lucie Plant,Unit 2 (Phase Ii). ML17214A6931983-10-31031 October 1983 Conformance to NRR Generic Ltr 82-16,St Lucie Plant,Units 1 & 2, Preliminary Rept ML17214A2041983-04-30030 April 1983 Draft Control of Heavy Loads at Nuclear Power Plants,St Lucie Plant,Unit 2 (Phase I), Technical Evaluation Rept ML17214A1581983-04-29029 April 1983 Control of Heavy Loads (C-10) St Lucie Unit 1, Draft Technical Evaluation Rept ML17214A1551983-04-26026 April 1983 Radiological Effluent Tech Specs (RETS) Implementation - St Lucie Unit 1 Nuclear Generating Plant. ML17214A4541983-03-0202 March 1983 Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML17301A0131982-11-24024 November 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),St Lucie Unit 1, Technical Evaluation Rept ML20065U2351982-10-31031 October 1982 Technical Evaluation Rept of Overpressure Mitigation Sys for St Lucie,Unit 1 ML20127A2891982-10-0505 October 1982 Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 ML17301A0011982-09-28028 September 1982 ECCS Repts (F-47),TMI Action Plan Requirements,St Lucie Unit 1, Technical Evaluation Rept ML17213A7321982-09-17017 September 1982 Seismic Qualification of Auxiliary Feedwater Sys, Technical Evaluation Rept ML20066B3231982-08-31031 August 1982 Audit of Environ Qualification of Safety-Related Electrical Equipment at St Lucie Unit 2 Nuclear Generating Station, Interim Rept ML20126F2541982-08-26026 August 1982 Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 ML20062E2041982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Saint Lucie Case Study.Docket Nos. 50-335 and 50-389.(Florida Power and Light Company) ML17212B7831982-05-31031 May 1982 Control of Heavy Loads at Nuclear Power Plants,St Lucie Plant Unit 2,FL Power & Light Co, Draft Technical Evaluation Rept ML20052B5341982-02-28028 February 1982 Tech Specs for Redundant Decay Heat Removal Capability, St Lucie,Unit 1, Technical Evaluation Rept 1999-03-16
[Table view] Category:TEXT-PROCUREMENT & CONTRACTS
MONTHYEARML17229B0671999-03-16016 March 1999 Technical Evaluation Rept, Florida Power & Light Co, Unit 1 Third Ten-Year Interval Pump & Valve Inservice Testing Program,Unit 2 Second Ten-Year Interval Pump & Valve Inservice Testing Program. ML17355A2801998-09-30030 September 1998 Rev 1,Ltr Rept, Technical Evaluation of Florida Power & Light Fire Barrier Ampacity Derating Assessment for St.Lucie & Turkey Point. ML17229B0011998-01-31031 January 1998 Technical Evaluation Rept on 'Submittal-Only' Review of IPEEE at St Lucie Nuclear Plant,Units 1 & 2. ML17229A4151997-05-27027 May 1997 Technical Evaluation Rept of IPE Submittal & RAI Responses for St Lucie Nuclear Plant. ML17228B1261995-03-31031 March 1995 Technical Evaluation Rept on Second 10-Year Interval Insp Program Plan. ML17309A7471994-09-30030 September 1994 Technical Evaluation Rept;Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001:St.Lucie-1/-2. ML17228A8851994-09-30030 September 1994 Errata to TER, Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001,St Lucie 1 & 2, Replacing Every Other Missing Page in Original Rept ML20138E1481993-06-22022 June 1993 Pump & Valve Inservice Testing Program St Lucie Unit 2 FPL, Technical Evaluation Rept ML20105D0871992-08-31031 August 1992 Auxiliary Feedwater System RISK-BASED Inspection Guide for the St. Lucie Unit 1 Nuclear Power Generation Station ML17309A6651991-11-30030 November 1991 Technical Evaluation Rept Pump & Valve Inservice Testing Program,St Lucie-Unit 1. ML17223B3231991-08-31031 August 1991 TER of Topical Rept CEN-396-P (Verification of Acceptability of a 1-PIN Burnup Limit of 60 Mwd/Kg for St Lucie Unit 2). ML17308A5041990-08-17017 August 1990 Final Technical Evaluation Rept St Lucie Unit 1 Station Blackout Evaluation. ML17308A4821989-05-31031 May 1989 Conformance to Generic Ltr 83-28,Item 2.2.1,Equipment Classification for All Other Safety-Related Components,St Lucie 1/2, Technical Evaluation Rept ML17222A7411989-01-31031 January 1989 Technical Evaluation Rept on Second Ten-Year Interval Inservice Insp Program Plan:Florida Power & Light Co,St Lucie Plant,Unit 1. ML17223A1321988-12-31031 December 1988 Technical Evaluation Rept TMI Action NUREG-0737 (II.D.1) Relief & Safety Valve Testing,St Lucie,Unit 2. ML17223A1291988-12-31031 December 1988 Technical Evaluation Rept TMI Action NUREG-0737 (II.D.1) Relief & Safety Valve Testing,St Lucie,Unit 1. ML20244C2931988-11-30030 November 1988 Review of Florida Power & Light Co Safety Evaluations for Extending St Lucie Plant,Unit 2,ESFAS Subgroup Relay Test Interval, Technical Evaluation Rept ML17308A4461988-03-31031 March 1988 Technical Evaluation Rept for Natural Circulation,Boron Mixing & Cooldown at St Lucie Unit 2. ML20196G2921988-02-29029 February 1988 Technical Evaluation Rept,Evaluation of High Density Spent Fuel Rack Structural Analysis for St Lucie Plant - Unit 1 ML17347A5931987-07-31031 July 1987 Retran Code:Transient Analysis Model Qualification, Technical Evaluation Rept ML17308A2391987-06-30030 June 1987 Integrated Leak Rate Test for St Lucie Nuclear Power Plant (Unit 2) Apr 1987-June 1987, Technical Evaluation Rept ML17219A6871987-06-30030 June 1987 Conformance to Generic Ltr 83-28,Item 2.2.2, 'Vendor Interface Program for All Other Safety-Related Components:St Lucie 1 & 2,' Final Rept ML20206K6331987-04-0808 April 1987 Mod 3,changing Billing Address,To Quantify Performance of Waterborne Intruder Detection Sys Installed at St Lucie Nuclear Power Plant ML20206K6111987-04-0808 April 1987 Notification of Contract Execution,Mod 3,to Quantify Performance of Waterborne Intruder Detection Sys Installed at St Lucie Nuclear Power Plant. Contractor:Univ of Tx at Austin Applied Research Labs ML20214R7431987-03-31031 March 1987 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3 ML20214R1531987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Maine Yankee,St Lucie 1 & 2 & Waterford 3, Informal Rept ML20215G2741987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface Maine Yankee,St Lucie Units 1 & 2 & Waterford 3 ML17308A2891987-01-31031 January 1987 Review of Tech Spec Changes Supporting NUREG-0737 Accident Instrumentation,St Lucie Units 1 & 2, Technical Evaluation Rept ML20210Q4481987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept ML20211L3111986-12-0808 December 1986 Notification of Contract Execution,Mod 2,to Quantify Performance of Waterborne Intruder Detection Sys Installed at St Lucie Nuclear Power Plant. Contractor: Univ of Texas, Applied Research Labs ML20211L3381986-12-0808 December 1986 Mod 2,extending Period of Performance to 870630 at No Addl Cost, to Quantify Performance of Waterborne Intruder Detection Sys Installed at St Lucie Nuclear Power Plant ML20205D3581986-08-0606 August 1986 Mod 1,extending Period of Performance Until 861130 at No Addl Cost,To Quantify Performance of Waterborne Intruder Detection Sys at St Lucie Nuclear Power Plant ML20205D3411986-08-0606 August 1986 Notification of Contract Execution,Mod 1,to Quantify Performance of Waterborne Intruder Detection Sys at St Lucie Nuclear Power Plant. Contractor:Univ of Texas ML20206H4421986-06-23023 June 1986 Contract: Quantify Performance of Waterborne Intruder Detection Sys Installed at St Lucie Nuclear Power Plant, Awarded to Univ of Texas at Austin ML20206H4171986-06-23023 June 1986 Notification of Contract Execution: Quantify Performance of Waterborne Intruder Detection Sys Installed at St Lucie Nuclear Power Plant, Awarded to Univ of Texas at Austin ML17308A2421986-05-31031 May 1986 Rev 1 to Conformance to Reg Guide 1.97,St Lucie Plant,Units 1 & 2. ML17308A2151986-04-30030 April 1986 First Interval Inservice Insp Program,St Lucie Unit 2, Technical Evaluation Rept ML20197C6021986-04-30030 April 1986 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3,St Lucie Units 1 & 2 & Waterford Unit 3 ML17216A4331986-01-13013 January 1986 SPDS Progress Review,St Lucie 1 & 2. ML17301A1841985-06-17017 June 1985 Masonry Wall Design (B-59),Florida Power & Light Co,St Lucie Unit 1, Technical Evaluation Rept ML17301A1671985-02-28028 February 1985 Conformance to Reg Guide 1.97,St Lucie Plant,Units 1 & 2. ML20080E0711984-01-13013 January 1984 Evaluations of Detailed Control Room Design Reviews for St Lucie Units 1 & 2 & Turkey Point Units 3 & 4, Technical Evaluation Rept ML17214A6931983-10-31031 October 1983 Conformance to NRR Generic Ltr 82-16,St Lucie Plant,Units 1 & 2, Preliminary Rept ML17301A0621983-10-31031 October 1983 Control of Heavy Loads at Nuclear Power Plants,St Lucie Plant,Unit 2 (Phase Ii). ML17214A2041983-04-30030 April 1983 Draft Control of Heavy Loads at Nuclear Power Plants,St Lucie Plant,Unit 2 (Phase I), Technical Evaluation Rept ML17214A1581983-04-29029 April 1983 Control of Heavy Loads (C-10) St Lucie Unit 1, Draft Technical Evaluation Rept ML17214A1551983-04-26026 April 1983 Radiological Effluent Tech Specs (RETS) Implementation - St Lucie Unit 1 Nuclear Generating Plant. ML17214A4541983-03-0202 March 1983 Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML17301A0131982-11-24024 November 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),St Lucie Unit 1, Technical Evaluation Rept ML20065U2351982-10-31031 October 1982 Technical Evaluation Rept of Overpressure Mitigation Sys for St Lucie,Unit 1 1999-03-16
[Table view] |
Text
CONFORMANCE TO REGULATORY GUIDE 1.97 ST. LUCIE PLANT, UNIT NOS. 1 AND 2 J. W. Stoffel Published February 1985 EG&G Idaho, Inc.
Idaho Falls, Idaho 83415 Prepared for the U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Under DOE Contract No. DE-AC07-76ID01570 FIN No. A6483 g5p4160b2~ ~~ggQ+35 GF ADOCK 05
ABSTRACT This EGKG Idaho, Inc., report provides a review of the St. Lucie. Plant, Unit Nos. 1 and 2, submittals for Regulatory Guide 1;97 and identifies areas of nonconformance to the guide. Any exception to the guidelines are evaluated and those areas where sufficient basis for acceptability is not provided are identified.
FOREWORD This report is supplied as part of the "Program for Evaluating Licensee/
Applicant Conformance to RG'1.97," being conducted for the U.S. Nuclear Regu-latory Commission, Office of Nuclear Reactor Regulation, Division of Systems Integration, by EGEG Idaho, Inc., NRC Licensing Support Section.
The U.S. Nuclear Regulatory Commission funded the work under authoriza-tion 20-19-10-11-3.
Docket.Nos. 50-335 and 50-389 TAC Nos. 51135 and 51136
CONTENTS BSTRACT ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ o ~ ~ ~ ~ ~ ~ ~ ~
F OREWORD ...............................................................
- 1. INTRODUCTION ......................................................
- 2. REVIEW REQUIREMENTS ...............................................
3 EVALUATION .......................................................,
- 3. 1 Adherence to Regulatory Guide 1.97 ..........................
Type A Variables ............................................
l 3.2 3.3 Exceptions to Regulatory Guide 1.97 .........................
4 CONCLUSIONS .......................... 1.......................1....
5 REFERENCES ........................................................
CONFORMANCE TO REGULATORY GUIDE 1.97 ST. LUCIE PLANT UNIT NOS. 1 AND 2
- 1. INTRODUCTION On December 17, 1982, Generic Letter No. 82-33 (Reference 1) was issued by D. G. Eisenhut, Director of the Division of Licensing, Nuclear Reactor Reg-ulation, to all licensees of operating reactors, applicants for operating licenses and holders of construction permits. This letter included additional clarification regarding Regulatory Guide 1.97, Revision 2 (Reference 2) re-lating to the requirements for emergency response capability. These require-ments have been pub'lished as Supplement 1 to NUREG-0737, "TMI Action Plan Requirements" (Reference 3).
Florida Power and Light Company, the licensee for the St. Lucie Plant, provided responses to the Regulatory Guide 1.97 portion of the generic letter on November 30, 1983 (Reference 4), for Unit No. 2 and on December 30, 1983 (Reference 5), for Unit No. 1.
This report provides an evaluation of these submittals.
- 2. REVIEW REQUIREMENTS Section 6.2 of NUREG-0737, Supplement 1, sets forth the documentation to be submitted in a report to the NRC describing how the licensee meets the-guidance of .Regulatory Guide 1.97 as applied to emergency response facili-ties. The submittal should include documentation that provides the following information for each variable shown in the applicable table of Regulatory Guide 1.97.
- 1. Instrument range
- 2. Environmental qualification
- 3. Seismic qualification
- 4. Quality assurance
- 5. Redundance and sensor location
- 6. Power supply
- 7. Location of display
- 8. Schedule of installation or upgrade.
Furthermore, the submittal should identify deviations from the guidance in the regulatory guide and provide supporting justification or alternatives.
Subsequent to the issuance of the generic letter, the NRC held regional meetings in February and March 1983, to answer licensee and applicant ques-tions and concerns regarding the NRC policy on this matter. At these meet-ings, it was noted that the NRC review would only address exceptions taken to the guidance of Regulatory Guide 1.97. Furthermore, where licensees or appli-cants explicitly state that instrument systems conform to the provisions of the guide, it was noted that no further staff review would be necessary.
Therefore, this report only addresses exceptions to the guidance of Regulatory Guide 1.97; The following evaluation is an audit of the licensee's submittal based on the review policy described in the NRC regional meetings.
h 3
- 3. EVALUATION The licensee provided responses to the NRC Generic Letter 82-33 on November 30, 1983 and December 30, 1983. This evaluation is based on these submittals.
3.1 Adherence to Re ulator Guide 1.97 The licensee stated that based on the information presented in their sub-mittals, the St. Lucie Plant will conform with the recommendations of Regula-tory Guide 1.97, Revision 3 (Reference 6), by the end of the next refueling outage. Therefore,',it is concluded that the licensee has provided an explicit commitment on conformance to the guidance of Regulatory Guide 1.97. Excep-tions to the regulatory guide are noted in Section 3.3.
3.2 T e A Variables Regulatory Guide 1.97 does not specifically identify Type A variables, i.e., those variables that provide information required to permit the control room operator to take specific manually controlled safety actions. The licen-see classifies the following instrumentation as Type A. This instrumentation for Unit 2 is Category 1 as recommended by Regulatory Guide 1.97. Exceptions for Unit 1 are noted in Section 3.3.
- 1. Pressurizer pressure
- 2. Reactor coolant system (RCS) hot leg temperature
- 3. RCS cold leg temperature
- 4. Steam generator level (narrow range)
- 5. Containment hydrogen concentration.
3.3 Exce tions to Re ulator Guide 1.97 The licensee identified the following exceptions to the requirements of Regulatory Guide 1.97.
3.3.1 Neutron Flux The licensee takes exception to the environmental qualification recom-mended by Regulatory Guide 1.97 for this variable. The licensee states that the detectors and their amplifiers are qualified for short term post-LOCA en-vironment and they perform the intended RPS actuation within a short time period.
Environmental qualification has been subsequently clarified by the en-vironmental qualification rule, 10 CFR 50.49. It is concluded that the guid-ance of Regulatory Guide 1.97 has been superseded by a regulatory'require-
,ment. Any exception to this rule is beyond the scope of this review and should be addressed in accordance with 10 CFR 50.49.
3.3.2 RCS Soluble Boron Concentration I
Regulatory Guide 1.97 recommends continuous reading instrumentation with a range of 0 to 6000 PPM for this variable. The licensee has provided instru-mentation that covers ranges of 0 to 2050 PPM (Unit No. 1) and 0 to 1250/5000 PPM (Unit No. 2). The licensee justifies these deviations by:stating that there are two additional boron concentration measurement possibilities.
- 1. Manual grab sample.
- 2. Post accident sampling.
The licensee takes exception to the guidance of Regulatory Guide 1.97 with respect to post-accident sampling capability. This exception goes beyond the scope of this review and is being addressed by the NRC as part of the review of NUREG-0737, Item II.B.3.
3.3.3 RCS Hot Le and Cold Le Water Tem erature The licensee, for Unit Ho. 1, provides instrumentation with a range of 212'F to 705'F. The licensee's justification for this deviation is that the existing range is licensed for the subcooled margin monitor.
This justification is not adequate. The licensee has additional cold leg instrumentation that has a temperature range of O'F to 600'F; however, this is Category 3 instrumentation. The licensee should provide Category 1-instrumen-tation with the 50 to 700'F range recommended for these variables.
3.3.4 RCS Pressure'ressurizer Pressure The pressure range of the existing instrumentation is not as recommended by Regulatory Guide 1.97 (0 to 4000 psig). The instrumentation provided covers 0 .to 3000 psig. The licensee considers the existing range acceptable pending the resolution of the anticipated transient without scram (ATWS) issue.
The existing pressure range of 0 to 3000 psig is adequate to monitor all expected RCS pressures based on the accident analysis presented in the plant FSAR. Therefore, we find this deviation acceptable, but require a commitment from the licensee to install Category 1 instrumentation with a range in ac-cordance with the resolution of the ATWS issue, if. pressures are found to ex-ceed those currently presented in the FSAR.
3.3.5 Containment Isolation Valve Position From the information provided, we find the licensee deviates from a strict interpretation of the Category 1 redundancy recommendation. Only the active valves have position indication (i.e., check valves have no position indication). Since redundant isolation valves are provided, we find that redundant indication per valve .is not intended by the regulatory guide.
Position indication of check valves is specifically excluded by Table 3 of Regulatory Guide 1.97. Therefore, we find that the instrumentation for this variable is acceptable.
3.3.6 Radioactivit Concentration or Radiation Level in Circulatin Primar Coolant The licensee has not addressed this variable. The licensee should provide the -information required by Section 6.2 of Supplement No. 1 to NUREG-0737.
3.3.7 Accumulator Tank Level and Pressure The licensee has instrumentation that does not meet the following recom-mendations of Regulatory Guide 1.97: (a) the level range of Unit 1 (10 to 90 percent volume),:,(b) the pressure range (0 to 750 psig), or (c) the:en-vironmental qualification for these variables.
The licensee states that Unit 1 level range is 20 to 60 percent volume; however, they have not provided any justification for this deviation. The
" licensee should either expand the range to comply with the guidance of Regula-tory Guide 1.97 or submit justification for the deviation.
The licensee states that the Unit 1 pressure range is 0 to 300 psig.
Their justification for this deviation is that the safety injection tanks are designed for 300 psig. Since the tank pressure required by the plant techni-cal specifications is 200 to 250 psig and the pressure is manually maintained, we find that the installed range is adequate. Therefore, this, is an accept-able deviation from Regulatory Guide 1.97.
The licensee states that the Unit 2 pressure range is 0 to 700 psig.
Their justification for this deviation is that 700 psig exceeds the tank de-sign pressure and the tank safety valve setpoint. Since the tank pressure re-quired by the plant technical specifications is 600 to 625 and the pressure is manually maintained, we find that the range is adequate. Therefore, this range is an acceptable deviation from Regulatory Guide 1.97.
The licensee takes exception to the environmental qualification that is recommended by the guide for these variables and states that the sensor is located in a harsh environment post-accident. The licensee states that it is
not required to perform a safety function or mitigate the consequences of an accident..It is provided for plant surveillance during normal operation.
Environmental qualification has been subsequently clarified by the environmental qualification rule, 10 CFR 50.49. It is concluded that the guidance of Regulatory Guide 1.97 has been superseded by a regulatory require-ment. Any exception to this rule is beyond the scope of this review and should be addressed in accordance with 10 CFR 50.49.
3.3.8 Refuelin Water Stora e Tank Level Regulatory Guide 1.97 recommends instrumentation with a range of top to bottom. The instrumentation covers a level range of 0 to 50 ft. The licensee states that this range covers the useful volume of the tank (2.6 percent to 100 percent of the total tank height). We find that this instrumentation is adequate to monitor the operation of the storage tank. Therefore, this is an acceptable deviation.
3.3.9 Pressurizer Level The narrow range pressurizer level instrumentation meets the Category 1 recommendations of Regulatory Guide 1.97. However, it does not meet the recommended range (top to bottom). A wide range non-safety channel is avail-able that meets the recommended range, but it is not Category 1 instrumenta-tion. We find this deviation unacceptable. The licensee should commit to the installation of redundant channels of Category 1 instrumentation that meets the top to bottom range recommended by Regulatory Guide 1.97.
3.3.10 Pressurizer Heater Status The licensee has the recommended instrumentation, but has provided only local ingication for Unit No. 1.Section II.E.3.1 of NUREG-0737 requires a number of the pressurizer heaters to have the capability of being powered by the emergency power sources. Instrumentation is to be provided to prevent overloading a diesel generator. Also, technical specifications are to be changed accordingly. The Standard Technical Specifications, Section 4.4.3.2,
require that the emergency pressurizer heater current be measured quarterly.. These heaters, as required by NUREG-0737, should have the current instrumentation recommended by Regulatory Guide 1.97,'with the display in the control room.
3.Lll g hT kL Regulatory Guide 1.97 recommends a range of top to bottom for this vari-able. The licensee has provided instrumentation that indicates 9.5 to 90.5 percent of the tank volume.
The level maintained in this tank is approximately 60 percent volume.
The existing low limit of this instrumentation is adequate to insure that the sparger is covered and that sufficient fluid volume exists to quench the de-sign basis steam release. The existing high limit of this instrumentation is adequate to indicate sufficient gas volume to accept a pressurizer steam re-lease without becoming overpressurized and to indicate in-leakage from the re-lief discharge system. Based on this, we find this in'strumentation adequate.
Therefore, this is an acceptable deviation.
3.3. 12 uench Tank Tem erature Regulatory Guide 1.97 recommends a range of 50 to 750'or this variable. The licensee has provided instrumentation with a range of 0 to 350'F. The licensee states that this range is acceptable based on the tank rupture disk causing saturated steam conditions.
The quench tank has a rupture disk that is set to relieve at 85 psig.
Saturated steam at this pressure is less than 350'F. The temperature range is adequate to monitor this tank. Therefore, this is an acceptable deviations.
3.3.13 Steam Generator Level The licensee has narrow range steam generator level instrumentation that meets the Category 1 recommendations of Regulatory Guide 1.97. However, it does not meet the recommended level range (from tube sheet to separators). A
wide range non-safety channel is available and meets the recommended range, but it is not Category 1 instrumentation.
The licensee should install Category 1 instrumentation that meets the tube sheet to separator range recommended by Regulatory Guide 1.97 for both of their steam generators.
3.3.14 Safet Relief Valve Positions or Main Steam Flow The licensee uses steam flow instrumentation for this variable that does not have environmental qualification. The licensee states that the sensor is located in a harsh environment post-accident. The licensee's equipment was provided for plant surveillance during normal operation and non-accident tran-sients. The licensee states that this type of equipment has been generically qualified to a lesser environment than in-containment accident environment for this plant.
The environmental qualification guidance of Regulatory Guide 1.97 has been superseded by the environmental qualification rule, 10 CFR 50.49. There-fore, environmental qualification is beyond the scope of this review and should be addressed in accordance with 10 CFR 50.49.
3.3.15 Main Feedwater Flow The licensee has provided instrumentation for this variable with a range of 0 to 6 x 10 6 lb/hr. Regulatory Guide 1.97 recommends 0 to 110 percent of design flow for this, variable. The licensee states that the existing range is close to the required range of 0 to 6.2 x 10 lb/hr, and that it is considered adequate.,
The existing range wiT1 adequately monitor the operation of this system in post-accident conditions. Therefore, this is an acceptable deviation from Regulatory Guide 1.97.
10
3.3. 16 Heat Removal B the Containment Fan Heat Removal S stem The licensee takes exception to the environmental qualification (Cate-gory 2) recommended by Regulatory Guide 1.97 for this variable. The licensee states that, the thermocouple assemblies have been purchased as non-safety equipment and that they do not perform a safety function during or after an accident. After an accident the licensee states that all four containment fan coolers are started and remain operational.
The environmental qualification guidance of Regulatory Guide 1.97 has been superseded by the environmental qualification rule, 10 CFR 50.49. There-fore, environmental; qualification is beyond the scope of this review and should be addressed in accordance with 10 CFR 50.49.
3.3.17 Containment Atmos here Tem erature Unit 1 onl Regulatory Guide 1.97 recommends instrumentation with a range to 400'F for this variable. The licensee has provided instrumentation with a range to 350'F. The licensee states that the range provided is adequate because the maximum main steamline break (MSLB) temperature is 290'F.
Since the maximum expected temperature occurs after a MSLB, we consider this temperature range adequate to monitor normal, operating and accident temperatures in the containment. Therefore, this is an acceptable deviation from Regulatory Guide 1.97.
3.3.18 Letdown Flow-Out Unit 1 onl Regulatory Guide 1.97 recommends a range of 0 to 110 percent of design flow for this variable. The design flow at this unit is 132 GPM. The licen-see has provided instrumentation with a range of 0 to 140 GPM (106 percent of design flow).
Although the installed range does not comply with the guidance of Regula-tory Guide 1.97, considering its use during and following an accident, the 11
existing range is adequate. Therefore, this is an acceptable deviation from Regulatory 'Guide 1.97.
3.3.19 Volume Control Tank Level The licensee, for Unit 2, takes exception to the recommended range (top to bottom) and the environmental qualification for this variable. The licen-see states that the existing range covers 14.1 to 85.9 percent of the tank volume. No justification was provided for this deviation.
The licensee should show that this level range is adequate to monitor the tank operation.
The licensee takes exception to the environmental qualification that is recommended by the guide for this variable and states that the sensor in a harsh environment post-accident. The licensee states that is'ocated it is not required to perform a safety function or mitigate the consequences of an accident. It is provided for plant surveillance during normal operation.
The environmental qualification guidance of Regulatory Guide 1.97 has been superseded by the environmental qualification rule, 10 CFR 50.49. There-fore, environmental qualification is beyond the scope of this review and should be addressed in accordance with 10 CFR 50.49.
3.3.20 Hi h Level Radioactive Li uid Tank Level Regulatory Guide 1.97 recommends instrumentation for this tank that reads from top to bottom. The indicated range for this variable corresponds to 5.2 to 93 percent of the tank volume.
This range is adequate to indicate the storage volume. Therefore, this is an acceptable deviation.
12
3.3.21 Radiation Ex osure Rate inside buildin s or areas where access is re uired to service e ui ment im ortant to safet Regulatory Guide 1.97 recommends Category 3 instrumentation with a range of 10 to 10 R/hr. The licensee states that fixed high range area radiation monitors that are located in areas important to safety will not be useful to an operator;. that he will be carrying a portable high range area detector on the trip to, at, and from the area important to safety. Furthermore, the licensee states that there is a complete low range area radiation monitoring system in the auxiliary building; however, the range of this system has not been identified.
While the operator preparing to enter one of these areas would be equip-ped with portable instrumentation, portable instrumentation cannot adequately accomplish the functions outlined for this instrumentation in the regulatory guide. The licensee should provide the ranges of the instrumentation identi-fied above.
3.3.22 Containment or Pur e Effluent Regulatory Guide 1.97 recommends a range of 10 to 10 yCi/cc for this variable. The licensee has provided instrumentation with a range of 8 x 10 to 5 x 10" pCi/cc. The licensee states that the flow is diluted, therefore, the existing range is adequate.
The existing range is adequate for detection of significant releases and release assessment. The deviation in the upper limit of the range is minor.
Therefore, this is an acceptable deviation from Regulatory Guide 1.97.
3.3.23 Estimation of Atmos heric Stabilit Regulatory Guide 1.97 recommends a temperature range of -9 to +18'F for this variable. The licensee has provided instrumentation with a range of -15 to +15'F, which is the difference between the 60 meter temperature and the 10 meter temperature.
13
The existing tower temperature system provides sufficient resolution to specify delta temperatures for the determination of atmospheric stability categories, as defined in Regulatory Guide 1.23 (Reference 7). Therefore, this is an acceptable deviation from Regulatory Guide 1.97.
14
- 4. CONCLUSIONS Based on our review, we find that the licensee conforms to, or is justi-fied in deviating from the guidance of Regulatory Guide 1.97 with the following exceptions:
- 1. Neutron flux environmental qualification should be addressed in ac-cordance with 10 CFR 50.49 (Section 3.3.1).
- 2. RCS hot leg water temperature (unit 1 only) the licensee should supply Category 1 instrumentation that provides the recommended range (Section 3.3.3).
- 3. RCS cold leg water temperature (unit 1 only) the licensee should supply Category 1 instrumentation that provides the recommended range (Section 3.3.3).
- 4. RCS pressure (pressurizer pressure) the licensee should commit to install instrumentation with a range in accordance with the ATWS resolution (Section 3.3.4).
- 5. Radiation level in circulating primary cooling the licensee should provide the information required by Section 6.2 of Supplement 1. to NUREG-0737 (Section 3.3.6).
- 6. Accumulator tank level and pressure the licensee should provide justification for the level range of Unit No. 1, or provide the recommended range; environmental qualification should be addressed in accordance with 10 CFR 50.49 (Section 3.3.7).
- 7. Pressurizer level the licensee should install instrumentation that meets the recommendations of Regulatory Guide 1.97 (Section 3.3.9).
- 8. Pressurizer heater status the licensee should provide the recom-mended instrumentation in the control room (Section 3.3.10).
15
- 9. Steam generator level the licensee should install instrumentation for this variable that meets the recommendations of Regulatory Guide 1.97 (Section 3.3.13).
- 10. Safety/Relief valve positions or main steam flowenvironmental qualification should be addressed in accordance with 10 CFR 50.49 (Section 3.3.14).
- 11.
Heat removal by the containment fan heat removal system environ-mental qualification should be addressed in accordance with 10 CFR 50.49 (Section 3.3. 16).
- 12. Volume control tank level (Unit 2) the licensee should provide justification for the deviation in range; environmental qualifica-tion should be addressed in accordance with 10 CFR 50.49 (Sec-tion 3.3.19).
- 13. Radiation exposure rate the licensee should identify the range of the instrumentation for this variable (Section 3.3.21).
16
- 5. REFERENCES
- 1. NRC letter, D. G. Eisenhut to all licensees of operating reactors, appli-cants for operating licenses. and holders of construction permits, "Sup-plement No. 1 to NUREG-0737 Requirements- for Emergency Response Capability (Generic Letter No. 82-33)," December 17, 1982.
- 2. Instrumentation for Li ht-Water-Cooled Nuclear Power Plants to Assess Plant and Environs Conditions Durin and Followin an Accident, Regulatory Guide .97, Revision 2, U.S. Nuclear Regulatory Commission NRC), Office of Standards Development, December 1980.
- 3. Clarification of TMI Action Plan Re uirements Re uirements for Emer enc Res onse Ca abi lit , NUREG-0737 Supplement No. , NRC, Office of Nuclear Reactor Regulation, January 1983.
- 4. Florida Power and Light Company letter, J. W. Williams, Jr. to Director, Office of Nuclear Reactor Regulation, November 30, 1983.
- 5. Florida Power and Light Company letter, J. W. Williams, Jr. to Director, Office of Nuclear Reactor Regulation, December 30, 1983.
- 6. Instrumentation for Li ht-Water-Cooled Nuclear Power Plants to Assess Plant and Environs Conditions Durin and Followin an Accident, Regulatory Guide .97, Revision 3, U.S. Nuclear Regulatory Commission NRC), Office of Nuclear Regulatory Research, May 1983.
- 7. -
Regulatory Guide 1.23 (Safety Guide 23), On-site Meteorolo ical Pro rams, NRC, February 17, 1972 or Proposed Revision . to Regulatory Guide .23,
- Meteorolo ical Pro rams in Su ort of Nuclear Power Plants, NRC, Office of Standards Development, September 1980.
17
~]c,, 'P 1
p4