Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Report dateSiteEvent description
05000269/LER-1950-269, Notifies of Delay in Submitting Schedule for Implementation of Corrective Actions Identified in LER 50-269/86-02 Re Noncompliance of Low Pressure Svc Water & Emergency Feedwater Sys.Schedule Will Be Submitted by 870320Oconee
05000269/LER-1981-001, Forwards LER 81-001/03L-0.Detailed Event Analysis EnclOconee
05000269/LER-1981-025, Forwards LER 81-025/03L-0.Detailed Event Analysis EnclOconee
05000269/LER-1982-005, Forwards LER 82-005/03L-0.Detailed Event Analysis EnclOconee
05000269/LER-1982-007, Forwards LER 82-007/01T-0.Detailed Event Analysis EnclOconee
05000269/LER-1982-008, Forwards Updated LER 82-008/01X-1.Detailed Event Analysis EnclOconee
05000269/LER-1982-011, Forwards LER 82-011/03L-0.Detailed Event Analysis EnclOconee
05000269/LER-1982-012, Forwards LER 82-012/01T-0.Detailed Event Analysis EnclOconee
05000269/LER-1982-013, Forwards LER 82-013/01T-0.Detailed Event Analysis EnclOconee
05000269/LER-1982-014, Forwards LER 82-014/03L-0.Detailed Event Analysis EnclOconee
05000269/LER-1982-015, Forwards LER 82-015/03L-0.Detailed Event Analysis EnclOconee
05000269/LER-1982-016, Forwards LER 82-016/01T-0.Detailed Event Analysis EnclOconee
05000269/LER-1982-017, Forwards LER 82-017/01T-0.Detailed Event Analysis EnclOconee
05000269/LER-1983-001, Forwards LER 83-001/01T-0.Detailed Event Analysis EnclOconee
05000269/LER-1983-002, Forwards LER 83-002/01T-0.Detailed Event Analysis EnclOconee
05000269/LER-1983-003, Forwards LER 83-003/03L-0.Detailed Event Analysis EnclOconee
05000269/LER-1983-004, Forwards LER 83-004/03L-0.Detailed Event Analysis EnclOconee
05000269/LER-1983-005, Forwards LER 83-005/03L-0.Detailed Event Analysis EnclOconee
05000269/LER-1983-006, Forwards LER 83-006/01T-0Oconee
05000269/LER-1983-007, Forwards LER 83-007/01T-0.Detailed Event Analysis EnclOconee
05000269/LER-1983-008, Forwards LER 83-008/01T-0.Detailed Event Analysis EnclOconee
05000269/LER-1983-010, Forwards LER 83-010/01T-0.Detailed Event Analysis EnclOconee
05000269/LER-1984-007, Advises of Reliability of Auxiliary Oil Pumps Per LER 84-007-00.No Insp of Unit 2 Pump During Outage Warranted. Util Deleting CommitmentOconee
05000269/LER-1986-011, Advises That LER 86-011 Re Loss of Condenser Cooling Water Gravity Flow Will Be Submitted by 861201Oconee
05000269/LER-1986-012, Notifies That LER 86-012 Re Inoperability of Standby Shutdown Facility Due to Be Submitted by 861114 Will Be Provided by 870120Oconee
05000269/LER-1987-002, Informs That LER 87-002 Re App R Review Concerning Valve Operability Will Be Submitted by 870316.LER Due on 870302Oconee
05000269/LER-1987-008, Advises That LER-87-008 Re Breach of Containment Integrity Resulting in Tech Spec Violation Due by 871111 Will Be Submitted by 871125.Rept in PreparationOconee
05000269/LER-1996-008, Forwards Suppl to LER 96-008 Concerning Missed Valve Surveillance Which Resulted in Borated Water Storage Tank Technical InoperabilityOconee
05000269/LER-1997-003, Forwards LER 97-003-01 Re post-LOCA Boron Dilution Design Basis Not Being Met.Rept Includes Updated Info & Revised Corrective ActionOconee
05000269/LER-1998-002, Forwards LER 98-002-01 Re non-isolable Weld Leak on Pressurizer Surge Line Drain Pipe Which Resulted in Unit ShutdownOconee
05000269/LER-1998-012, Forwards LER 98-012-01,re RB Spray Pumps Being Declared Inoperable Due to Npsh.Rept Has Been Revised to Indicate Results of Testing & Corrective Actions Taken to DateOconee
05000269/LER-1998-013, Forwards LER 98-013-00 Re Condition Prohibited by Ts,Per 10CFR50.73(a)(1)(d).Circumstances & Causes for Event Have Not Been Fully Determined & Will Be Provided in Supplemental LER on or Before 981202Oconee
05000269/LER-2002-001Oconee

On 03/07/2002 Site Engineering concluded that ambient heat losses from the Pressurizer (PZR) on all three Oconee units exceeded the capacity of PZR heaters powered from the Standby Shutdown Facility (SSF). 9 Therefore, the ability to maintain a steam bubble in the PZR for system pressure control during SSF events (Fire, Flood, and Security) might be lost and the existing procedural guidance would not fully address some expected conditions. 9 Normal system operation or other emergency scenarios were not affected because additional PZR heaters are available in those conditions.

PZR heaters support operability of the SSF Auxiliary Service Water System (SSF ASW). 9 Per Technical Specification 3.10.1, the SSF ASW was declared inoperable for all three Oconee units. 9 Abnormal Procedures were subsequently revised to provide adequate guidance and all on-coming Operators received simulator training on the new guidance prior to accepting shift duties.

Additional corrective actions are planned.

The apparent cause was a fundamental lack of appreciation for the potential impact of PZR insulation deficiencies. 9 This event is considered to have no significance with respect to the health and safety of the public.

05000269/LER-2002-002Oconee

On March 22, 2002, with all three Oconee units operating in Mode 1 at 100% Rated Power, an engineering evaluation identified the potential for an adverse valve actuation during a design basis fire. T This valve actuation involves the inadvertent opening of either of two valves in the low pressure injection (LPI) system due to an assumed failure in the valve control circuitry. T The opening of either valve would cause the Borated Water Storage Tank (BWST) to empty its contents to the Reactor Building Emergency Sump. T The water from the BWST would flood the Reactor Coolant Make-Up (RCMU) Pump resulting in its failure. T The RCMU pump supplies reactor coolant pump seal and make-up flow during some design basis fire scenarios.

Roving fire watches have been implemented as compensatory measures in the area of the affected cables. T These fire watches are required while the unit is in Modes 1, 2, or 3 and will remain in place until modifications are implemented to mitigate this condition.

The apparent cause of this condition is a historic design deficiency. A An engineering risk assessment concludes that the likelihood of the actual spurious actuation of these valves is extremely low. A This event is considered to have minimal safety significance with respect to the health and safety of the public.

05000269/LER-2002-005Oconee

On 11-28-97, during a Unit 1 refueling outage, 1MS-156, - "lB MS Line Atmospheric Vent Block Valve" was replaced with a flexible wedge gate valve design. - On 7-8-02, as part of a project to review manual valves for pressure locking (PL) vulnerability, Engineering identified that 1MS-156, was potentially susceptible to PL. - Valves in this application on other trains/units are solid wedge design. - On 7-10-02 a vent line was installed on the valve bonnet, ending the potential for PL.

At 1600 hours on 7-18-02, with Unit 1 operating in Mode 1 at 100 per cent, 1MS-156 was determined to have been inoperable from 11-28-97 until 7-10-02 due to the potential for PL to prevent opening during postulated events. - At 1843 hours on 7-18-02, an 8-hour Non-Emergency Notification was made to the NRC under 10 CFR 50.72(b)(3)(v).

The root cause of this event is deficient design, due to an unanticipated system interaction, which resulted from a lack of awareness of pressure locking as a concern for manual valves. - This event is considered to have no significance with respect to the health and safety of the public.

05000269/LER-2003-001Oconee

On June 4, 2003, with Oconee Units 1 and 2 operating in Mode 1 at 100% Rated Power and Unit 3 in Mode 5 (start-up after refueling), an engineering evaluation identified a cable routed contrary to 10CFR 50, Appendix R separation criteria. Consequently, a low probability hot short due to a hypothetical fire could spuriously operate any one of six (6) valves in each Unit. 1 Depending on the location of the design basis fire, one, two, or all three Oconee Units could be affected. This was considered a previously unanalyzed condition.

A fire watch patrol has been established on a once per 6 hour frequency and will remain in place until appropriate permanent corrective actions are in place to mitigate this condition.

The apparent cause of this event is an unanalyzed condition resulting from a historic design deficiency. 1 Engineering risk assessment concludes that the likelihood of the actual spurious actuation of these valves is low. 1 This event is considered to have minimal safety significance with respect to the health and safety of the public.

05000269/LER-2013-0018 April 2013Oconee

On 2/6/2013, with all three Oconee Units at 100 percent power, Oconee Nuclear Station (ONS) personnel concluded that emergency power equipment could be adversely impacted by a licensee identified original design issue involving inadequate analysis of electrical equipment heat loads and weaknesses in the Heating Ventilation & Air Conditioning (HVAC) system design.

The investigation determined that the principle causes were associated with inadequate and incomplete inputs and methods in development of HVAC systems during original plant design and Blockhouse, and the 230kV Switchyard Relay House susceptible to single failures.

Compensatory measures were put into place. Corrective actions include modifications to resolve the inadequacies with the original plant design issues.

This event is reportable under the following criteria: Operations Prohibited by Technical Specifications, Unanalyzed Condition, Event that could have prevented Fulfillment of a Safety Function, and Common Cause.

05000269/LER-2013-00226 August 2013Oconee
05000269/LER-2013-003Oconee

On September 4, 2013, the Keowee Hydroelectric Station Unit 2 (KHU-2) experienced an emergency lockout that rendered it inoperable. The Keowee Hydroelectric Station is one of Oconee Nuclear Station's (ONS) emergency power sources. Following troubleshooting activities it was determined that from August 17, 2013 until September 4, 2013, KHU-2 had previously been susceptible to this type of emergency lockout resulting in a condition that exceeded the allowed outage time given in the plant's technical specifications.

An investigation of the event determined that the cause of the event was vibration from a Governor Oil pump that caused relay 86E2X to "chatter." The chatter generated a spurious signal that activated the emergency lockout relay.

A completed corrective action included the replacement of relay 86E2X and relocating it to an environment not susceptible to vibration.

This event is reportable under 10 CFR 50.73(a)(2)(i)(B) as an operation or condition prohibited by the plant's technical specifications. This event is considered to have minimal safety significance and no consequences with respect to the health and safety of the public.

05000269/LER-2013-004Oconee

On November 8, 2013, the Oconee Unit 1 Control Room received an alarm associated with the containment atmosphere particulate radiation monitor. Reactor Coolant System (RCS) leakage of system pressure boundary leakage on the 1B2 High Pressure Injection (HPI) Injection line, Oconee Unit 1 was shut down as required by Technical Specifications. The shutdown was orderly and without complication. The cause evaluation determined that mechanical, high-cycle fatigue resulted in a through wall crack in the stainless steel butt weld between the HPI nozzle safe end and HPI piping. Ownership and oversight of the augmented examination program was inadequate, as was guidance to the examiners for actions to be taken when full weld volume coverage could not be achieved.

This event is reportable under 10 CFR 50.73(a)(2)(i)(A), as completion of a shutdown required by Technical Specifications, 10 CFR 50.73(a)(2)(i)(B), operation or condition prohibited by Technical Specifications, and 10 CFR 50.73(a)(2)(ii)(A), degradation of a principal safety barrier. High pressure injection capability was maintained, and containment integrity was not impacted. This report has been revised to reflect the results of the completed root cause evaluation.

05000269/LER-2014-00127 May 2014Oconee

For the 13.8kV Keowee Hydroelectric Station (KHS) power cables contained in the underground trench to both transformer CT-4 and to the Protected Service Water (PSW) system, single failure analysis considered a three-phase bolted fault at the end connections and a phase-to-ground fault as bounding conditions. This single failure analysis was questioned in a recent NRC inspection as not being bounding. Duke Energy evaluated the issue and concludes the cables to be operable but nonconforming with the current licensing basis due to a lack of documentation. Additional cable analysis and/or testing is needed. The results of planned power cable analysis and/or testing will provide the necessary information needed to update the licensing basis documentation. This condition is conservatively being reported in accordance with 10 CFR 50.73(a)(2)(ii)(B) as an event or condition that resulted in the nuclear power plant being in an unanalyzed condition that significantly degraded plant safety.

The preliminary apparent cause of this event is a missed opportunity to update the licensing basis in 2002 when the underground trench and cables were modified, and again in 2013, when the PSW system 13.8kV power cables and control cables were placed in service. Duke will complete the causal evaluation and as necessary, supplemented the report following the conclusion of that evaluation. Duke Energy used a risk-informed approach to determine the risk significance associated with the condition. The analysis results concluded that the postulated single failure of the Keowee emergency power supply represents an insignificant impact to plant risk.

05000269/LER-2014-00226 January 2015Oconee

On November 25, 2014, Duke Energy Carolinas, LLC (Duke Energy) reviewed AREVA 10 CFR 50.46 Notification Letter FAB 14-00631, which indicated a deficiency had been discovered in the uranium thermal conductivity models used in the Oconee Nuclear Station (ONS) Loss of Coolant Accident (LOCA) analysis of record. When the model deficiency was corrected, the ONS Large Break LOCA Peak Cladding Temperature (PCT) exceeded 2200 degrees F. The Oconee licensing basis PCT is evaluated for compliance with the criterion in 10 CFR 50.46(b)(1) and must not exceed a PCT of 2200 degrees F. This issue was reported to the NRC as an 8-hour non-emergency notification on November 25, 2014 (NRC Event Notification EN 50640). On December 17, 2014, Duke Energy submitted a Special Report as required by 10 CFR 50.46 (ML14353A214).

Once notified, Duke Energy implemented administrative restrictions to ensure that the Oconee Units would not violate the reduced linear heat rate (LHR) limits specified by AREVA.

There are no new regulatory commitments contained within this Licensee Event Report.

05000269/LER-2016-0015 May 2016Oconee

At 1512 on March 6, 2016, Oconee Nuclear Station (ONS) Unit 1 experienced a Reactor Trip, initiated by an electrical bushing failure on the Unit 1 Main Step-up Transformer that resulted in a transformer fire. The plant response to the trip was evaluated, and was found to be acceptable. The reactor trip is a RPS actuation and requires an LER per 10 CFR 50.73(a)(2)(iv)(A).

Due to the transformer fire a "Notification Of Unusual Event" was declared at 1520. The fire eventually led to a transformer overhead line failure that caused a switchyard bus lockout and the loss of one emergency power path for the site. The second emergency power path and multiple offsite sources remained operable during the event. The emergency classification was upgraded to an "Alert" condition at 1658, upon determining that the fire had an impact on safety related equipment.

The 4-hour notification related to this reactor trip was bounded by the notifications made for the Emergency Classifications described above (See Event Notification 51770).

Post trip conditions and Emergency event conditions were controlled and maintained within the allowances of Technical Specifications with no personnel injuries or challenges to other safety system actuations. The transformer deluge system activation along with the response of onsite and offsite fire teams promptly contained the fire.

05000270/LER-1979-009, Forwards LER 79-009/01T-0Oconee
05000270/LER-1981-019, Forwards LER 81-019/01T-0.Detailed Event Analysis EnclOconee
05000270/LER-1982-009, Forwards LER 82-009/03L-0.Detailed Event Analysis EnclOconee
05000270/LER-1982-010, Forwards LER 82-010/01T-0.Detailed Event Analysis EnclOconee
05000270/LER-1982-012, Forwards LER 82-012/03L-0.Detailed Event Analysis EnclOconee
05000270/LER-1982-013, Forwards LER 82-013/03L-0.Detailed Event Analysis EnclOconee
05000270/LER-1983-004, Forwards LER 83-004/01T-0.Detailed Event Analysis EnclOconee