05000219/LER-1982-060, Forwards LER 82-060/03L-0.Detailed Event Analysis Encl | 11 January 1983 | Forwards LER 82-060/03L-0.Detailed Event Analysis Encl | |
05000219/LER-1983-001, Forwards LER 83-001/03L-0.Detailed Event Analysis Encl | 25 February 1983 | Forwards LER 83-001/03L-0.Detailed Event Analysis Encl | |
05000219/LER-1983-002, Forwards LER 83-002/03L-0.Detailed Event Analysis Encl | 4 March 1983 | Forwards LER 83-002/03L-0.Detailed Event Analysis Encl | |
05000219/LER-1983-003, Forwards LER 83-003/03L-0.Detailed Event Analysis Encl | 15 February 1983 | Forwards LER 83-003/03L-0.Detailed Event Analysis Encl | Reactor Vessel Water Level |
05000219/LER-1983-005, Forwards LER 83-005/03L-0.Detailed Event Analysis Encl | 4 March 1983 | Forwards LER 83-005/03L-0.Detailed Event Analysis Encl | |
05000219/LER-1983-006, Forwards LER 83-006/03L-0.Detailed Event Analysis Encl | 4 March 1983 | Forwards LER 83-006/03L-0.Detailed Event Analysis Encl | |
05000219/LER-1983-008, Forwards LER 83-008/03L-0.Detailed Event Analysis Encl | 12 April 1983 | Forwards LER 83-008/03L-0.Detailed Event Analysis Encl | |
05000219/LER-1983-009, Forwards LER 83-009/01T-0.Detailed Event Analysis Encl | 15 March 1983 | Forwards LER 83-009/01T-0.Detailed Event Analysis Encl | |
05000219/LER-1983-010, Forwards LER 83-010/01T-0.Detailed Event Analysis Encl | 23 March 1983 | Forwards LER 83-010/01T-0.Detailed Event Analysis Encl | |
05000219/LER-1983-011, Forwards LER 83-011/03L-0.Detailed Event Analysis Encl | 23 March 1983 | Forwards LER 83-011/03L-0.Detailed Event Analysis Encl | |
05000219/LER-1983-012, Forwards LER 83-012/01T-0.Detailed Event Analysis Encl | 4 April 1983 | Forwards LER 83-012/01T-0.Detailed Event Analysis Encl | |
05000219/LER-1983-013, Forwards LER 83-013/01T-0.Detailed Event Analysis Encl | 8 April 1983 | Forwards LER 83-013/01T-0.Detailed Event Analysis Encl | |
05000219/LER-1983-014, Forwards LER 83-014/01T-0.Detailed Event Analysis Encl | 20 April 1983 | Forwards LER 83-014/01T-0.Detailed Event Analysis Encl | |
05000219/LER-1985-018, Responds to 860106 Request for Reevaluation of long-term Corrective Actions Re LER 85-018, Emergency Svc Water Pipe Coating Failure. Util Intends to Optically Inspect Essential Svc Water Sys on Refueling Outage Basis | 15 September 1986 | Responds to 860106 Request for Reevaluation of long-term Corrective Actions Re LER 85-018, Emergency Svc Water Pipe Coating Failure. Util Intends to Optically Inspect Essential Svc Water Sys on Refueling Outage Basis | |
05000219/LER-1986-001, Responds to Request for Info Re Reactor Protection Sys Switch Replacement Per Amend 95 to License DPR-16 & LER 86-01.Static-o-ring Switches Will Be Replaced.Tech Spec Change Request Will Be Submitted by 860815 | 27 May 1986 | Responds to Request for Info Re Reactor Protection Sys Switch Replacement Per Amend 95 to License DPR-16 & LER 86-01.Static-o-ring Switches Will Be Replaced.Tech Spec Change Request Will Be Submitted by 860815 | |
05000219/LER-1987-030, Forwards Rev 1 to LER 87-030.Event Date Incorrectly Reported in Two Places on LER Due to Administrative Oversight | 5 November 1987 | Forwards Rev 1 to LER 87-030.Event Date Incorrectly Reported in Two Places on LER Due to Administrative Oversight | |
05000219/LER-1988-013, Responds to NRC Request for Addl Info Re LER 88-013, MSIV Failure Caused by MSIV Poppet Vibration Dtd 880808.All Four MSIVs Will Be Tested in Two Refueling Cycles.Penetrant Testing Will Be Performed Anytime Valve Stem Removed | 9 February 1989 | Responds to NRC Request for Addl Info Re LER 88-013, MSIV Failure Caused by MSIV Poppet Vibration Dtd 880808.All Four MSIVs Will Be Tested in Two Refueling Cycles.Penetrant Testing Will Be Performed Anytime Valve Stem Removed | |
0CAN108807, Forwards Securities & Exchange Commission Application to Assume Responsibility for Licensed Operations at Plants,Per 880615 Meeting | 17 October 1988 | Forwards Securities & Exchange Commission Application to Assume Responsibility for Licensed Operations at Plants,Per 880615 Meeting | Safe Shutdown Earthquake |
2CAN038910, Discusses NRC Re Denial of Request for Partial Exemption to 10CFR50.62 requirement.C-E Owner Group Has Reconsidered Alternate Design Options to Satisfy Requirement & Scheduled Followup Meeting to End Reevaluation Effort | 29 March 1989 | Discusses NRC Re Denial of Request for Partial Exemption to 10CFR50.62 requirement.C-E Owner Group Has Reconsidered Alternate Design Options to Satisfy Requirement & Scheduled Followup Meeting to End Reevaluation Effort | Exemption Request |
3F0789-05, Forwards Financial Repts for Kissimmee Util Authority, Orlando Utils Commission & Cities of Bushnell & Ocala | 7 July 1989 | Forwards Financial Repts for Kissimmee Util Authority, Orlando Utils Commission & Cities of Bushnell & Ocala | |
3F1285-12, Confirms 850125 Notification to Adopt Gpu Approach to Analyzing Natural Circulation Cooldown (Generic Ltr 81-21).TMI Topical Rept on Subj Encl | 20 December 1985 | Confirms 850125 Notification to Adopt Gpu Approach to Analyzing Natural Circulation Cooldown (Generic Ltr 81-21).TMI Topical Rept on Subj Encl | |
A01328, Forwards Response to SER Open Items Re NUREG-0737,Item II.B.1, Reactor Coolant Sys Vents & Insp Rept 50-336/84-07 | 25 November 1987 | Forwards Response to SER Open Items Re NUREG-0737,Item II.B.1, Reactor Coolant Sys Vents & Insp Rept 50-336/84-07 | Hot Short |
A02375, Forwards Supplemental Info in Response to Generic Ltr 82-05 Re Status of NUREG-0737,Items II.B.2, Plant Shielding, II.B.3, Post-Accident Sampling, II.F.1.1,II.F.1.2 & II.F.1.6, Effluent & Hydrogen Monitoring | 10 June 1982 | Forwards Supplemental Info in Response to Generic Ltr 82-05 Re Status of NUREG-0737,Items II.B.2, Plant Shielding, II.B.3, Post-Accident Sampling, II.F.1.1,II.F.1.2 & II.F.1.6, Effluent & Hydrogen Monitoring | |
A02468, Comments on Draft Branch Technical Position Re Radwaste Classification | 10 May 1982 | Comments on Draft Branch Technical Position Re Radwaste Classification | |
A02477, Forwards Response to Generic Ltr 82-10 Requesting Info Re Implementation Dates for Selected TMI Action Plan Items in NUREG-0737 | 4 June 1982 | Forwards Response to Generic Ltr 82-10 Requesting Info Re Implementation Dates for Selected TMI Action Plan Items in NUREG-0737 | |
A02608, Submits Addl Clarifications of 820301 App R Review for Facilities,In Response to NRC 820625 & 0707 Requests | 30 July 1982 | Submits Addl Clarifications of 820301 App R Review for Facilities,In Response to NRC 820625 & 0707 Requests | |
A02611, Informs That Documentation for Compliance w/NUREG-0737,Item II.B.3 Criterion Re post-accident Sampling Sys Will Be Provided by 820917 | 19 July 1982 | Informs That Documentation for Compliance w/NUREG-0737,Item II.B.3 Criterion Re post-accident Sampling Sys Will Be Provided by 820917 | |
A02644, Submits Comments on SEP Phase Ii,To Assist NRC in Development of Proposed Program for Phase III | 30 July 1982 | Submits Comments on SEP Phase Ii,To Assist NRC in Development of Proposed Program for Phase III | |
A04790, Requests Extension to 860104 for Haddam Neck Re Environ Qualification of Electrical Equipment,Per Generic Ltr 85-15, 10CFR50.49(g) & Integrated Safety Assessment Program.Further Evaluation Proposed for Millstone.Fee Paid | 30 September 1985 | Requests Extension to 860104 for Haddam Neck Re Environ Qualification of Electrical Equipment,Per Generic Ltr 85-15, 10CFR50.49(g) & Integrated Safety Assessment Program.Further Evaluation Proposed for Millstone.Fee Paid | Reactor Vessel Water Level Anchor Darling Exemption Request Backfit |
A04820, Forwards Rev 0 to Nuclear Engineering & Operating Procedure Neo 2.17, Secondary Water Chemistry Program, Per Generic Ltr 85-02 Request for Description of Overall Program for Assuring Steam Generator Tube Integrity | 25 June 1985 | Forwards Rev 0 to Nuclear Engineering & Operating Procedure Neo 2.17, Secondary Water Chemistry Program, Per Generic Ltr 85-02 Request for Description of Overall Program for Assuring Steam Generator Tube Integrity | Foreign Material Exclusion |
A04824, Submits ATWS Rule Schedule Required by 10CFR50.62(d),per Generic Ltr 85-06.Facilities Participating in NRC Integrated Safety Assessment Program.Justification for Absence of Schedules for Haddam Neck & Millstone Unit 1 Provided | 11 October 1985 | Submits ATWS Rule Schedule Required by 10CFR50.62(d),per Generic Ltr 85-06.Facilities Participating in NRC Integrated Safety Assessment Program.Justification for Absence of Schedules for Haddam Neck & Millstone Unit 1 Provided | Hydrostatic Backfit |
A04858, Requests Exemption from Schedular Requirements of 10CFR50.71 Re FSAR Updates,Due to Significant Burden on Engineering Resources.Fsar Update Efforts Listed.Fee Paid | 13 September 1985 | Requests Exemption from Schedular Requirements of 10CFR50.71 Re FSAR Updates,Due to Significant Burden on Engineering Resources.Fsar Update Efforts Listed.Fee Paid | Probabilistic Risk Assessment Exemption Request |
A04880, Responds to Generic Ltr 85-07 Re Implementation of Integrated Schedule for Plant Mods.Integrated Schedules Endorsed.Integrated Safety Assessment Program Evaluation Process Will Also Be Applied to Millstone 2 | 5 August 1985 | Responds to Generic Ltr 85-07 Re Implementation of Integrated Schedule for Plant Mods.Integrated Schedules Endorsed.Integrated Safety Assessment Program Evaluation Process Will Also Be Applied to Millstone 2 | Backfit |
A04906, Forwards Response to SALP Repts for 18-month Period Ending 850228,per 850604 Meeting W/Nrc.Util Initiatives to Reemphasize Importance of Quality in Design Change Activities Listed | 5 July 1985 | Forwards Response to SALP Repts for 18-month Period Ending 850228,per 850604 Meeting W/Nrc.Util Initiatives to Reemphasize Importance of Quality in Design Change Activities Listed | Fire Barrier Systematic Assessment of Licensee Performance |
A05276, Forwards Safety & Safeguards Insp Fees for 841223-850330 | 23 October 1985 | Forwards Safety & Safeguards Insp Fees for 841223-850330 | |
A05394, Forwards Final Summary Rept Addressing IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures. No Addl Work W/ Respect to Bulletin Suppl Necessary for Millstone Unit 1 | 27 June 1988 | Forwards Final Summary Rept Addressing IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures. No Addl Work W/ Respect to Bulletin Suppl Necessary for Millstone Unit 1 | Boric Acid Stroke time |
A05442, Submits Addl Info Re Compliance W/Atws Rule Schedule,Per 10CFR50.62,in Context of Isap.Isap Review Will Be Submitted by 860625.Request for Permanent Exemption Will Be Submitted by 860530 | 18 February 1986 | Submits Addl Info Re Compliance W/Atws Rule Schedule,Per 10CFR50.62,in Context of Isap.Isap Review Will Be Submitted by 860625.Request for Permanent Exemption Will Be Submitted by 860530 | Exemption Request |
A05610, Responds to Generic Ltr 86-04 Re Policy Statement on Engineering Expertise on Shift.Comparison of INPO Shift Technical Advisor Guidelines W/Established Bachelors Degree Programs in Engineering Encl | 13 June 1986 | Responds to Generic Ltr 86-04 Re Policy Statement on Engineering Expertise on Shift.Comparison of INPO Shift Technical Advisor Guidelines W/Established Bachelors Degree Programs in Engineering Encl | Reactor Vessel Water Level Ultimate heat sink Fuel cladding Power change |
A05836, Responds to IE Info Notice 86-047, Erratic Behavior of Static O-Ring Differential Pressure Switches. Based on Util Investigations,Switches Not Used in Integrated Safety Application.Issue Inapplicable to Plants | 3 July 1986 | Responds to IE Info Notice 86-047, Erratic Behavior of Static O-Ring Differential Pressure Switches. Based on Util Investigations,Switches Not Used in Integrated Safety Application.Issue Inapplicable to Plants | |
A05911, Responds to IE Bulletin 86-002, Static O-Ring Differential Pressure Switches. Switches Will Not Be Used in safety- Related Applications,Per 860703 Response to IE Info Notice 86-047, Erratic Behavior of Static O-Ring.. | 25 July 1986 | Responds to IE Bulletin 86-002, Static O-Ring Differential Pressure Switches. Switches Will Not Be Used in safety- Related Applications,Per 860703 Response to IE Info Notice 86-047, Erratic Behavior of Static O-Ring.. | |
A05959, Forwards Draft Version of Spec for Insp,Evaluation & Repair of Cracks in Safety-Related Concrete Masonry Walls, Per IE Bulletin 80-11.Spec Should Be Incorporated Into Plant Procedures by Jul 1987 | 12 March 1987 | Forwards Draft Version of Spec for Insp,Evaluation & Repair of Cracks in Safety-Related Concrete Masonry Walls, Per IE Bulletin 80-11.Spec Should Be Incorporated Into Plant Procedures by Jul 1987 | High Radiation Area |
A06023, Forwards Estimated Schedules for Operator Licensing Exams for FY87-90,in Response to Generic Ltr 86-14 | 1 October 1986 | Forwards Estimated Schedules for Operator Licensing Exams for FY87-90,in Response to Generic Ltr 86-14 | |
A06150, Responds to IE Bulletin 86-003, Potential Failure of Multiple ECCS Pumps Due to Single Failure of Air-Operated Valve in Min Flow Recirculation Line. Safety Concerns Inapplicable to Plants | 20 November 1986 | Responds to IE Bulletin 86-003, Potential Failure of Multiple ECCS Pumps Due to Single Failure of Air-Operated Valve in Min Flow Recirculation Line. Safety Concerns Inapplicable to Plants | |
A06244, Ack Receipt of Invoices for Second Installment of Annual Fees,Per 10CFR171.Fee Will Be Wire Transferred on 870130 in Payment of Invoices.Invoices & Procedures for Electronic Transfer of Funds Encl | 7 January 1987 | Ack Receipt of Invoices for Second Installment of Annual Fees,Per 10CFR171.Fee Will Be Wire Transferred on 870130 in Payment of Invoices.Invoices & Procedures for Electronic Transfer of Funds Encl | |
A06447, Advises That Third Quarterly Installment of FY87 Annual Fee Per 10CFR171 Will Be Transferred on 870430 in Payment of Encl Invoices | 24 April 1987 | Advises That Third Quarterly Installment of FY87 Annual Fee Per 10CFR171 Will Be Transferred on 870430 in Payment of Encl Invoices | |
A06518, Ack Receipt of Listed Invoices for Cost Incurred for Review of Facility Submittals.Fee Paid.License Number for Millstone Unit 3 Incorrect on Invoice 1099A | 18 May 1987 | Ack Receipt of Listed Invoices for Cost Incurred for Review of Facility Submittals.Fee Paid.License Number for Millstone Unit 3 Incorrect on Invoice 1099A | |
A06539, Ack Receipt of Encl NRC Invoices for Costs Incurred in Review of Util Submittals for Plants.Fee Will Be Sent to J Rodriquez,Per 10CFR50,55 & 170 | 29 May 1987 | Ack Receipt of Encl NRC Invoices for Costs Incurred in Review of Util Submittals for Plants.Fee Will Be Sent to J Rodriquez,Per 10CFR50,55 & 170 | |
A06584, Responds to NRC 870527,0602 & 25 Requests for Addl Info Re Util Responses to Generic Ltr 83-28,Item 2.2.Util Will Perform Generic Review of Issue for Haddam Neck & Millstone Units 1,2 & 3 & Submit Addl Info by 871002 | 30 July 1987 | Responds to NRC 870527,0602 & 25 Requests for Addl Info Re Util Responses to Generic Ltr 83-28,Item 2.2.Util Will Perform Generic Review of Issue for Haddam Neck & Millstone Units 1,2 & 3 & Submit Addl Info by 871002 | |
A06595, Forwards Addl Info Re Generic Ltr 83-28,Item 2.2,per NRC 870527,0602 & 25 Requests | 25 September 1987 | Forwards Addl Info Re Generic Ltr 83-28,Item 2.2,per NRC 870527,0602 & 25 Requests | |
A06635, Advises That Fourth Quarterly Installment of 1987 Annual Fee Will Be Wire Transferred on 870731.Invoices F1269,F1302, F1303 & F1304 Encl | 14 July 1987 | Advises That Fourth Quarterly Installment of 1987 Annual Fee Will Be Wire Transferred on 870731.Invoices F1269,F1302, F1303 & F1304 Encl | |