Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML19254E80318 October 1979Forwards Past Correspondence to Jp O'Reilly Re IE Bulletins 79-12,79-12A & 79-12B.W/o Encl
ML19254E99610 September 1979Forwards Deficiency Rept Re Loss of Function of Control Grade Instrumentation
ML19256B81731 August 1979Forwards Revised Response to Branch Technical Position, Auxiliary & Power Conversion Sys Branch,9.5-1,App a Re Fire Protection Review
ML19256F06430 October 1979Responds to IE Bulletin 79-14, Seismic Analysis for As-Built Safety-Related Piping Sys. No Sys at Completion Stage,Therefore Reinsp Unnecessary
ML19256F34913 December 1979Forwards Final Deficiency Rept Re Deficient Weld in Steam Generator Lower Lateral Support & Oversize Drawing of Reactor Bldg
ML19257A01526 December 1979Forwards Significant Deficiency Rept IE-79-05-SDD-413/414 Re Unqualified Main Steam Power Operated Relief Valves
ML19257D66421 December 1979Ack Receipt of IE Insp Repts 50-413/79-20 & 50-414/79-20.No Proprietary Info
ML19260A4581 November 1979Responds to IE Bulletin 79-23, Emergency Diesel Generator Lube Oil Coolers. Design Review Conducted.No Connections Between High Kva & Low Kva Emergency Diesel Generators W/O Adequate Circulatory Current Limitations
ML19260D0381 February 1980Forwards Deficiency Rept SD 413-414/80-01
ML19261C81612 March 1979Ack Receipt of IE Insp Repts 50-413/79-02 & 50-414/79-02 on 790206-09.No Proprietary Info
ML19261E11818 May 1979Ack Receipt of IE Insp Repts 50-413/79-07 & 50-414/79-07 on 790423-26.No Proprietary Info
ML19262C46731 December 1979Ack Receipt of IE Insp Repts 50-413/79-21 & 50-414/79-21 on 791113-16.No Proprietary Info
ML19263E37720 April 1979Responds to IE Bulletin 79-03.Site Has Received 310 Ft of Pipe Mfg by Youngstown Welding & Engineering Co.Pipe Will Receive Field Hydrostatic TestHydrostatic
Liquid penetrant
ML19269D37424 April 1979Responds to IE Bulletin 79-04.Design of Facility Has Been Reviewed.No Velan Valves in Use
ML19270F95015 March 1979Ack Receipt of IE Insp Repts 50-413/79-03 & 50-414/79-03.No Proprietary Info
ML19274E48021 March 1979Forwards Environ Rept-OL Stage, Vols 1&2.Security Plan Forthcoming,Pending NRC Determination of Amend AcceptabilityAffidavit
ML19274G0041 August 1979Ack Receipt of IE Insp Repts 50-413/79-13 & 50-414/79-13 on 790627-29.No Proprietary Info
ML19275A67227 September 1979Ack Receipt of IE Insp Repts 50-413/79-15 & 50-414/79-15. No Proprietary Info
ML19275A68528 September 1979Ack Receipt of IE Insp Repts 50-413/79-17 & 50-414/79-17.No Proprietary Info
ML19276E97621 March 1979Forwards Electrical Schematics, Vols 1-5Affidavit
ML19276F75127 March 1979Ack Receipt of IE Insp Repts 50-413/79-04 & 50-414/79-04 on 790227-0302.No Proprietary Info
ML19276G92214 August 1979Forwards Final Deficiency Rept Re safety-related Valve/Operator Natural Frequency Analysis
ML19284A68428 February 1979Ack Receipt of IE Insp Repts 50-413/79-01 & 50-414/79-01 on 790108-09.No Proprietary Info
ML19290G6157 November 1980Responds to NRC 801008 Ltr Re Violation Noted in IE Insp Repts 50-413/80-24 & 50-414/80-24.Corrective Actions: Measures Established to Ensure Equipment Removed from Warehouse Is Maintained at Designated Storage Levels
ML19291C27116 January 1980Forwards Deficiency Rept 79-07 Re Refueling Water Storage Tank Capacity
ML19296D6227 March 1980Forwards Significant Deficiency Rept Re Diesel Generator Heat Exchanger Incorrect Segmental Baffling
ML19305B94411 February 1980Responds to NRC 80118 Ltr Re Violations Noted in IE Insp Repts 50-413/79-23 & 50-414/79-23.Corrective Actions: Procedures to Provide Instruction for Matl Handling & Protection Have Been Implemented
ML19305D8971 April 1980Ack Receipt of IE Insp Repts 50-413/80-02 & 50-414/80-02 on 800212-14.No Proprietary Info
ML19308C61231 December 1979Ack Receipt of IE Insp Repts 50-413/79-22 & 50-414/79-22 on 791119-21.No Proprietary Info
ML19308C6517 January 1980Forwards Revision 1 of Util Response to IE Bulletin 79-02, Revision 2, Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts. Util Will Account for Base Plate Flexibility in Expansion Anchor Bolt Load CalculationsFinite Element Analysis
ML19309G04523 April 1980Forwards Deficiency Rept Re Control Rod Guide Tube Support Pin Cracking
ML19312B9772 April 1974Forwards Proposed Organization Chart of QA Program Effective May 1974.Notification of Change Per Supplemental Decision of Appeal Board on 730906
ML19312D13822 February 1980Ack Receipt of IE Insp Repts 50-413/80-01 & 50-414/80-01, on 800123-25.No Proprietary Info
ML19312D21014 March 1980Advises That Rept Re 800214 Containment Equipment Hatch Const Deficiency Will Be Forwarded by 800404
ML19312D2744 February 1980Responds to IE Bulletin 79-28.Review Revealed That 64 Namco Model EA180 Limit Switches Used in safety-related Equipment May Be of Production Lot Specified in Bulletin. Corrective Actions Will Be Completed by 800701
ML19312D50729 February 1980Forwards Significant Deficiency Rept 413-414/80-02 Re Three Relays & Trip Devices Not Meeting Relay time-current Characteristic Specs for Application
ML19312E5751 April 1980Forwards Significant Deficiency Repts 413/80-04 & 414/80-04 Re Improper Radiography of Containment Vessel Equipment Hatch
ML19318A8639 June 1980Responds to IE Bulletin 80-05, Vacuum Conditions Resulting in Damage to Chemical Vol Control Sys Holdup Tanks. Lists Low Pressure & Holdup Tanks Which Are Normally Valved to Contain Primary Sys Water
ML19318A93818 June 1980Informs That All Unit 1 safety-related Motor Control Ctr Equipment Has Been Inspected for Proper Power Wire Connections.Necessary Mods Were Completed.Insp of Unit 2 Is Scheduled for Completion by 801231
ML19320B46228 May 1980Responds to NRC 800505 Ltr Re Violations Noted in IE Insp Repts 50-413/80-05 & 50-414/80-05. Corrective Actions: Individual Cited in Insp Rept Has Met All Requirements for Level 2 & Has Been So Certified
ML19320C24211 July 1980Forwards Deficiency Rept Re Rejectable Indications in Welding of Containment Vessel Equipment Hatch
ML19320D3417 July 1980Responds to IE Bulletin 80-08, Examination of Containment Liner Penetration Welds. Welds in 13 Penetrations Repaired as Result of Nondestructive Examination.Summary of Types & Sizes of Penetrations EnclNondestructive Examination
ML19320D53114 July 1980Forwards Revised Application for Amend to CPPR-116 Adding co-owners & co-applicants
ML19322E62220 March 1980Discusses Completed Diesel Generator Factory Test Per IE Bulletin 79-23.Voltage & Frequency Requirements Maintained During Test & Cooling Sys Functioned within Design Limits
ML19323A38624 March 1980Responds to IE Bulletin 80-03, Loss of Charcoal from Std Type II,Two-Inch,Tray Adsorber Cells. Containment Cleanup Is Only Unit Using Design Described in Bulletin.No Sign of Sagging Screens or Other Defect That Would Permit Leakage
ML19323A44928 March 1980Ack Receipt of IE Insp Repts 50-413/80-03 & 50-414/80-03, on 800214-15.No Proprietary Info
ML19323C16923 April 1980Ack Receipt of IE Insp Repts 50-413/80-04 & 50-414/80-04 on 800219-29.No Proprietary Info
ML19323G9732 June 1980Forwards Significant Deficiency 413-414/80-06 Re Improper Radiography on Steam Generator Enclosures
ML19323H49820 May 1980Responds to NRC 800424 Ltr Re Violations Noted in IE Insp Repts 50-413/80-06 & 50-414/80-06.Corrective Actions:Weld Control Sheet re-examined & Legible Heat Code re-established
ML19324B6401 November 1989Responds to Generic Ltr 88-20 & Suppl.Util Conducted PRA for Plant W/Methodology Consistent w/NUREG-2300