DUKE POWEll COMPANY
[O' ELEcTitle CENTElc, Hox 33180, Cll AltLOTTE. N. C.
28242 oJh. b5$6 79 APR25 A8: 56 April 20, 1979 Mr. J. P. O'Reilly, Director U. S. Nuclear Regulatory Comission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re: Catawba Nuclear Station Docket Nos: 50-413 and 50-414 IE Bulletin:
79-03 Duke File: CN-1412.ll-1
Dear Mr. O'Reilly:
Enclosed is Duke Power's response to IE Bulletin 79-03 which was transmitted by your letter of March 12, 1979.
Very truly yours,
)
L. C, Dail JDW/sr 2357 152 Enclosure
'{9003/
[Dment. con
'7906130 %
k
9 DUKE POWER COMPANY CATAWBA NUCLEAR STATION Response to IE Bulletin No. 79-03 i
Duke has determined that the Catawba Project site has received 310 feet of ASME SA-312 welded pipe manufactured by Youngstown Welding and Engineering Company. This pipe may be used in safety-related systens. Per the ASME Code,Section III, Paragraph NC 2551, the required NDE includes either surface or volumetric examination. Liquid penetrant testing was performed, satisfying these requirements.
Duke representatives have inspected the Youngstown shops, reviewed Youngstown's method of liquid penetrant examination, and determined that their method meets the requirements of the ASME Code. The subject pipe has also passed a shop hydrostatic test and will receive a field hydrostatic test. No additional inspections are planned at this time.
When details of the imperfections already discovered, or which may be dis-covered by this program, are available, Duke Power Company would like to review that information as a possible basis for further action.
2357 153 sr/4/19/79
.