ML19312D274

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 79-28.Review Revealed That 64 Namco Model EA180 Limit Switches Used in safety-related Equipment May Be of Production Lot Specified in Bulletin. Corrective Actions Will Be Completed by 800701
ML19312D274
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 02/04/1980
From: Parker W
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-79-28, NUDOCS 8003240102
Download: ML19312D274 (1)


Text

f/0 I

'y'

  • 1~m t
  1. p4O-,

, DincE..;-PO,WER COMPMY n' y w,

'Powen Dt:stmixo 422 Sorin Citrucu Srnrer, CnAnt.ortz, N. C. ca242

D TEB il all:gl wlLLIAM O. PA R K E R, J R.

v,ec e.c..oc,

February 4, 1980 Tctc -o~c: Aard ro.

Secam Paoouction 373-4083 i

Mr. J. P. O'Reilly, Director.

U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, GA 30303 Re: RII:JPO Catawba Nuclear Station Docket Nos.:

50-413 and 50-414

Dear Mr. O'Reilly:

i In response to your December 7, 1979 letter which transmitted IE Bulletin 79-28, we wish to advise that a review of' Catawba Nuclear Station has been conducted. This review has revealed that 64 NAMCO Model EA 100 Limit Switches used in safety-related equipment at this station may be of the production lot specified in the bulletin. The four digit number stamped n-the conduit boss of the switch housings will be checked and the top gasket of the switch replaced if this number falls between 02-79 and 08-29.

These corrective actions will be completed by July 1, 1980.

Ve truly yours,

~

i

- A.

William O. Parker, Jr.

ROS/sch t

cc: Office of Inspection and Enforcement 4-Division of Reactor Operations Inspections f

4 k

I.

t s-

.f.

po* SPRooppg%,

t.

,f o

s a

2 W

r Anniversary

.T*.

h',, '

%,aoun #,$

.ft-I

  • W " WWAmery,,

y

.