ML19290G615

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violation Noted in IE Insp Repts 50-413/80-24 & 50-414/80-24.Corrective Actions: Measures Established to Ensure Equipment Removed from Warehouse Is Maintained at Designated Storage Levels
ML19290G615
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 11/07/1980
From: Parker W
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19290G609 List:
References
NUDOCS 8012180139
Download: ML19290G615 (2)


Text

A I

l)lT H E l 'OW E lf ( ', O SI I'A N Y l N PW t. ld 151 11 I)1 M.

42 * $4 )I' 111 ('ill lit 'll S'i lil 1 : I, i. '11.\\ l(I ( b l' I I:, N ( 5. U%' 12 s - -

~ n u a. s a November 7, 1980' e. n c#.,

c

't r - James P.

O'Reilly, Director l'

S.

Suelear Regulatory Commission I:e g i o n 1I 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re:

R I I : '.JP K 50-413/80-24 50-414/80-24

Dear Mr. O'Reilly:

Please find attached a response to Infraction No. 413-414/80-24-01 which was identified in the above referenced Inspection Report.

Duke Power Company does not consider any information contained in this inspection report to be proprietary.

i. rv truly yours, William O.

Parker, Jr.

l.J0 : s c s

.\\ttachment ec:

NRC Resident Inspector Catawba uc l ea r Station sJofh.

c02. x

Di!KG POWER COMPASY CATAWBA SUCLI..R STATION Response to Infractlon 50-413-44/80-24-01 Infraction As required by 10CFR 50, Appendix B, Criterion itII and implemented by Duke i' owe r Company (DPC) Topical Report " DURE l-A",

Section 17, Pa rap,raph 17.1.13 "w asures shall be established to control the handliny,, storage and preservation of material and equipment to prevent damage Duke

(:oality A surance Pro.; ram Procedure P-3, Revision 12 " Storage inspection",

Paragraph 4.1.1 requires s t o ra >;e to be in accordance with A;WI S45.2.2.

ASSI.e'd. 2. 2-19 7 2, " Packaging, Shipping and llanaling of items for Nuclear Power Plant (During the Cons t ruc t ion Phase)", Pa ragraph 6.1.1 and 6.1.2 ( 3) requ res indoor cLorage tor Level C i t e rm, until they are placed in their tinal location (e.g installation).

Contrary to the above, on September 3, 1960, Duke Construction Procedure CP-371, Revision 3, " Protection and Preservation of Installed Equipment" was inadequate in that it (CP-371) permitted preinstal. lotion outdoor storage of six saf e ty -rela ted "alves.

gesponse The s i.v safety-related valves stored outdoors not in accordance with proper

,torage requirements were nonconformed.

The nonceaformance was evaluated and proper 4torage established.

Duke Construction Proc +1ure CP-371, Protection and Preservation of Installed Equipment," has been revised to establish measures to ensure equipment removed from the warehouse is maintained in its deeignated storage levels prior to installation in its final location.

This revision complies with the require-ments of Paragrapn 6.1.1 of ASSI N45.2.2.

Foi1 compiiance was achieved October 15, 1980