Discusses Completed Diesel Generator Factory Test Per IE Bulletin 79-23.Voltage & Frequency Requirements Maintained During Test & Cooling Sys Functioned within Design Limits
ML19322E622
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 03/20/1980
From: Parker W
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-79-23, NUDOCS 8004020019
Download: ML19322E622 (1)


Text

., dazs DUKE POWER COMPANY M

Powzu Busi.nswo b E.'I'l O R i~ 3 r ;,-

422 Sourn Cnuncan STazzT, Cruun.oTTE, N.'C.'b a'4a

] f 4 f,3 wiwAM o, PARKER. JR.

g '/

e Vice Patsiotut

  • ( ltitP*eoNE: Anta 704 SitAM PaoouctioN 273-4083 March 13, 1980 Mr. J. P. O'Reilly, Director f

U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re: RII:JPO Catawba Nuclear Station Docket Nos.:

50-413 and 50-414

Dear Mr. O'Reilly:

On November 1, 1979, Duke Power Company provided a response to IE Bulletin 79-23 for the Catawba Nuclear Station. However, at that time, the diesel-g'enerator factory test had not been completed.

?

A sustained full-load operation test has now been completed for the Catawba emergency diesel generators for a duration in excess of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. The test demonstrated full-load carrying capability for an interval of not less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of which 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> were at a load equivalent to the two-hour rating of the diesel generator.

The voltage and frequency requirements were maintained during the test and the cooling systems functioned within design limits.

Ve truly yours, A/

^

- m,_ _ (b.

William O. Parker, Jr.