Text
., dazs DUKE POWER COMPANY M
Powzu Busi.nswo b E.'I'l O R i~ 3 r ;,-
422 Sourn Cnuncan STazzT, Cruun.oTTE, N.'C.'b a'4a
] f 4 f,3 wiwAM o, PARKER. JR.
g '/
e Vice Patsiotut
- ( ltitP*eoNE: Anta 704 SitAM PaoouctioN 273-4083 March 13, 1980 Mr. J. P. O'Reilly, Director f
U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re: RII:JPO Catawba Nuclear Station Docket Nos.:
50-413 and 50-414
Dear Mr. O'Reilly:
On November 1, 1979, Duke Power Company provided a response to IE Bulletin 79-23 for the Catawba Nuclear Station. However, at that time, the diesel-g'enerator factory test had not been completed.
?
A sustained full-load operation test has now been completed for the Catawba emergency diesel generators for a duration in excess of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. The test demonstrated full-load carrying capability for an interval of not less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of which 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> were at a load equivalent to the two-hour rating of the diesel generator.
The voltage and frequency requirements were maintained during the test and the cooling systems functioned within design limits.
Ve truly yours, A/
^
- m,_ _ (b.
William O. Parker, Jr.