Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML14328A32316 December 2014Edwin I Hatch Nuclear Plant, Unit Nos. 1 and 2, Issuance of Amendments for Degraded Voltage Protection Modification ScheduleSafe Shutdown
Anticipated operational occurrence
Enforcement Discretion
Backfit
ML14349A71523 December 2014Edwin I Hatch Nuclear Plant, Unit Nos. 1 and 2, Issuance of Amendments Regarding a Critical Instrumentation BusReactor Vessel Water Level
FLEX
Spent Fuel Pool Instrumentation
Hardened vent
Fire Protection Program
ML15054A40024 February 2015(HNP-2), Correction for Amendments Regarding Reactor Core Safety LimitsReactor Vessel Water Level
ML15180A3343 August 2015Issuance of AmendmentsSafe Shutdown
Enforcement Discretion
Cyber Security
Fire Protection Program
ML15342A39829 January 2016Issuance of Amendment Regarding Minimum Critical Power RatioReactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Fuel cladding
Fire Protection Program
ML15350A40915 December 2015License Amendment Request for Adoption of TSTF-423-A, Rev. 1, Technical Specification End States, NEDC-32988-A, Using the Consolidated Line Item Improvement Process. Part 1 of 4Ultimate heat sink
Anticipated operational occurrence
Surveillance Frequency Control Program
Offsite Circuit
ML15350A41015 December 2015Technical Specifications. Part 2 of 4Ultimate heat sink
Surveillance Frequency Control Program
Containment Hardened Vent
Offsite Circuit
ML15350A41115 December 2015Technical Specifications. Part 3 of 4
ML16043A1017 March 2016Edwin I Hatch Nuclear Plant, Unit Nos. 1 and 2, Issuance of Amendments Regarding Typographical Errors in the Facility Operating License and Technical Specifications (CAC Nos. MF6580 and MF6581)Surveillance Frequency Control Program
Fire Protection Program
ML16062A09923 March 2016Issuance of Amendments Regarding the Relocation of the Pressure Temperature Limit Curves Following TSTF-419High Radiation Area
Post Accident Monitoring
Hydrostatic
Finite Element Analysis
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
Fire Protection Program
ML16090A17414 April 2016Issuance of Amendments Regarding Managing Gas AccumulationSurveillance Frequency Control Program
Fire Protection Program
ML17076A43423 March 2017TSTF-542 Marked-Up Technical Specifications and Bases for Hatch Nuclear PlantSafe Shutdown
Reactor Vessel Water Level
High Radiation Area
Stroke time
Water Inventory Control
Post Accident Monitoring
Hydrostatic
Operating Basis Earthquake
Qualified Offsite Circuit
Surveillance Frequency Control Program
Power Operated Valves
Hardened vent
Fuel cladding
Offsite Circuit
Scaffolding
ML18222A29629 August 2018Issuance of Amendments to Revise Technical Specification 3.7.7, ECCS - Operating (CAC Nos. MF9997 and MF9998; EPID L-2017-LLA-0263)Safe Shutdown
Surveillance Frequency Control Program
Feedwater Controller Failure
Fire Protection Program
ML19091A29130 April 2019Issuance of Amendments 296 and 241 to Revise Technical Specifications 3.6.2.5, Condition C, Residual Heat Removal Drywell Spray End StateProbabilistic Risk Assessment
Large early release frequency
Fire Protection Program
ML19164A01721 June 2019Correction of Amendment No. 223 Multiple Technical Specification Changes (CAC Nos. MF5026 and MF5027)
ML19198A1044 September 2019Issuance of Amendments Regarding Revision to Technical Specification 3.6.4.1 - Secondary ContainmentSurveillance Frequency Control Program
Fire Protection Program
ML19212A05420 September 2019Issuance of Amendments 299 and 244 Regarding Revision to Technical Specifications to Adopt Tstf-564, Safety Limit (Minimum Critical Power Ratio) MCPRReactor Vessel Water Level
Anticipated operational occurrence
Annual Radiological Environmental Operating Report
Process Control Program
Fuel cladding
Fire Protection Program
ML19337C32229 January 2020Issuance of Amendments Revision to Technical Specifications to Adopt TSTF-563Shutdown Margin
Anticipated operational occurrence
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Large early release frequency
Pressure Boundary Leakage
Fire Protection Program
ML20066F59211 June 2020Issuance of Amendments Nos. 304 and 249, Regarding License Amendment Request to Adopt NFPA-805 Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition)Hot Short
Safe Shutdown
Ultimate heat sink
Fire Barrier
Probabilistic Risk Assessment
Operator Manual Action
Cyber Security
Multiple Spurious Operation
Emergency Lighting
B.5.b
Aging Management
Significance Determination Process
Thermoset
Large early release frequency
Safeguards Contingency Plan
Hemyc
Continuous fire watch
Fire Protection Program
ML20303A18129 September 2020Rev. 117 to Technical Requirement Manual, Unit 1, Part 2
ML21109A35922 April 2021Issuance of Amendment No. 254, Regarding Revision to Technical Specifications for One-Time Extension of Completion Times Related to Residual Heat Removal System (Emergency Circumstances)Time of Discovery
High winds
Water Inventory Control
Internal Flooding
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Containment Hardened Vent
Maintenance Rule Program
Hardened vent
Fuel cladding
Fire Protection Program
Fatality
ML21270A08618 November 2021Issuance of Amendments Regarding Revision to Technical Specifications 5.7, High Radiation, Administrative ControlsHigh Radiation Area
Fire Protection Program
ML21349A5182 February 2022Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-554, Revise RCS LeakageSurveillance Frequency Control Program
Pressure Boundary Leakage
Fire Protection Program
ML22101A09420 May 2022Issuance of Amendments Nos. 315 and 260, Regarding Request to Eliminate Automatic Main Steam Line Isolation on High Turbine Building Area TemperatureReactor Vessel Water Level
Surveillance Frequency Control Program
Fire Protection Program
ML22192A19919 August 2022Issuance of Amendments Nos. 316 and 261, Regarding Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown CoolingFire Protection Program
ML22346A1489 February 2023Issuance of Amendments 320 and 265, Regarding LAR to Revise Technical Specifications to Adopt TSTF-208 and Administrative Correction for Duplicate Technical Specifications 3.4.10Fire Protection Program
ML23018A00424 January 2023Correction of Amendment Nos. 319 and 264 Regarding Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTFHigh Radiation Area
NL-03-0696, Technical Specifications Revision to DC Electrical System Requirements20 July 2004Technical Specifications Revision to DC Electrical System RequirementsSafe Shutdown
Shutdown Margin
Ultimate heat sink
Anticipated operational occurrence
Post Accident Monitoring
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Temporary Modification
Large early release frequency
Containment Hardened Vent
Battery sizing
Hardened vent
Offsite Circuit
NL-04-1204, Application for Technical Specification Improvement to Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports28 July 2004Application for Technical Specification Improvement to Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure ReportsShutdown Margin
Offsite Dose Calculation Manual
Incorporated by reference
Annual Radiological Environmental Operating Report
Process Control Program
NL-04-2401, Request to Revise Technical Specifications Limiting Condition for Operation 3.0.4 and Surveillance Requirement 3.0.4 Using the Consolidated Line Item Improvement Process25 May 2005Request to Revise Technical Specifications Limiting Condition for Operation 3.0.4 and Surveillance Requirement 3.0.4 Using the Consolidated Line Item Improvement ProcessSafe Shutdown
Ultimate heat sink
Grab sample
Stroke time
Post Accident Monitoring
Incorporated by reference
Missed surveillance
Offsite Circuit
NL-05-1362, Supplement to Technical Specifications Revision Request to Standby Liquid Control Figure 3.1.7-116 September 2005Supplement to Technical Specifications Revision Request to Standby Liquid Control Figure 3.1.7-1Safe Shutdown
Shutdown Margin
Power change
NL-05-1699, Application for Technical Specification Amendment to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process17 February 2006Application for Technical Specification Amendment to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement ProcessTime of Discovery
Incorporated by reference
Missed surveillance
NL-06-2046, Technical Specifications Revision Request Section 5.3.1 - Unit Staff Qualifications30 October 2006Technical Specifications Revision Request Section 5.3.1 - Unit Staff Qualifications
NL-06-2872, Technical Specifications Revision to Adopt TSTF-484, Revision 0 Use of TS 3.10.1 for Scram Time Testing Activities2 February 2007Technical Specifications Revision to Adopt TSTF-484, Revision 0 Use of TS 3.10.1 for Scram Time Testing ActivitiesHydrostatic
Incorporated by reference
NL-07-0084, License Amendment Request to Revise Technical Specifications, Southern Nuclear Operating Company Reorganization30 January 2007License Amendment Request to Revise Technical Specifications, Southern Nuclear Operating Company ReorganizationReactor Vessel Water Level
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
NL-07-0258, Technical Specifications Revision to Allow File Movement with Refueling Interlocs Inoperable13 February 2007Technical Specifications Revision to Allow File Movement with Refueling Interlocs InoperableShutdown Margin
High Radiation Area
Ultimate heat sink
Hydrostatic
NL-07-0731, Application for Technical Specification Improvement to Revise Control Rod Scram Time Testing Frequency5 June 2007Application for Technical Specification Improvement to Revise Control Rod Scram Time Testing FrequencyIncorporated by reference
NL-07-1079, Edwin I. Hatch Nuclear Plant, Vogtle Electric Generating Plant, License Amendment Request to Technical Specification 5.2, Organization17 July 2007Edwin I. Hatch Nuclear Plant, Vogtle Electric Generating Plant, License Amendment Request to Technical Specification 5.2, Organization
NL-07-1130, Technical Specifications Revision to Add a 72 Hour Completion Time for an Inoperable Swing Diesel Generator5 October 2007Technical Specifications Revision to Add a 72 Hour Completion Time for an Inoperable Swing Diesel GeneratorOffsite Circuit
NL-07-1709, Technical Specifications Revision Request to Adopt TSTF-476, Improved BPWS Control Rod Insertion Process3 October 2007Technical Specifications Revision Request to Adopt TSTF-476, Improved BPWS Control Rod Insertion ProcessIncorporated by reference
NL-07-1925, Revised Technical Specifications Revision Request, Section 5.3.1 - Unit Staff Qualifications18 October 2007Revised Technical Specifications Revision Request, Section 5.3.1 - Unit Staff Qualifications
NL-08-0832, Southern Nuclear Operating Company, Inc., Revision to License Amendment Request to Technical Specification 5.2, Organization, and License Amendment Request to TS 5.3. Unit Staff Qualifications.12 June 2008Southern Nuclear Operating Company, Inc., Revision to License Amendment Request to Technical Specification 5.2, Organization, and License Amendment Request to TS 5.3. Unit Staff Qualifications.
NL-11-0816, Supplement to Licensing Amendment Request for Adoption of TSTF - 425 - a, Rev. 3, Risk - Informed Justification for Relocation of Specific Frequency Requirements to a Licensee Controlled Program Using the Consolidated..27 May 2011Supplement to Licensing Amendment Request for Adoption of TSTF - 425 - a, Rev. 3, Risk - Informed Justification for Relocation of Specific Frequency Requirements to a Licensee Controlled Program Using the Consolidated..
NL-11-2038, Supplement to Licensing Amendment Request for Adoption of TSTF-425-A, Rev. 3, Risk-Informed Justification for the Relocation of Specific Frequency Requirements to a Licensee Controlled Program Using the Consolidated Line..13 October 2011Supplement to Licensing Amendment Request for Adoption of TSTF-425-A, Rev. 3, Risk-Informed Justification for the Relocation of Specific Frequency Requirements to a Licensee Controlled Program Using the Consolidated Line..Shutdown Margin
High Radiation Area
Ultimate heat sink
Post Accident Monitoring
Hydrostatic
Surveillance Frequency Control Program
Scram Discharge Volume
NL-12-1078, Edwin I. Hatch, Units 1 and 2, License Amendment Request to Revise the Minimum Water Level in the Plant Service Water Pump Well5 July 2012Edwin I. Hatch, Units 1 and 2, License Amendment Request to Revise the Minimum Water Level in the Plant Service Water Pump WellSafe Shutdown
Ultimate heat sink
Surveillance Frequency Control Program
License Renewal
NL-13-1751, Application to Revise Tech Specs to Adopt TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs.17 March 2014Application to Revise Tech Specs to Adopt TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs.Shutdown Margin
Anticipated operational occurrence
Power change
NL-14-1075, E.I. Hatch, Units 1 and 2 - Technical Specifications. Part 2 of 415 December 2015E.I. Hatch, Units 1 and 2 - Technical Specifications. Part 2 of 4Ultimate heat sink
Surveillance Frequency Control Program
Hardened vent
Offsite Circuit
NL-14-1075, E.I. Hatch, Units 1 and 2 - Technical Specifications. Part 3 of 415 December 2015E.I. Hatch, Units 1 and 2 - Technical Specifications. Part 3 of 4
NL-14-1075, Technical Specifications. Part 4 of 415 December 2015Technical Specifications. Part 4 of 4Safe Shutdown
Ultimate heat sink
Surveillance Frequency Control Program
Battery sizing
Offsite Circuit
NL-15-0407, Request to Revise Typographical Error in Unit 1 Operating License and in Unit 2 Technical Specifications, and to Add Staggered Test Basis to Unit 1 and Unit 2 Technical Specifications4 August 2015Request to Revise Typographical Error in Unit 1 Operating License and in Unit 2 Technical Specifications, and to Add Staggered Test Basis to Unit 1 and Unit 2 Technical SpecificationsSurveillance Frequency Control Program