Text

INSERT - Bases 3.7.1 Condition D 0.1!

If one RHRSW subsystem is inoperable or one RHRSW pump in one or two subsystems is inoperable and not restored within the provided Completion Time, the plant must be brought to a condition in which overall plant risk is minimized. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Remaining in the Applicability of the LCO is acceptable because the plant risk in MODE 3 is similar to or lower than the risk in MODE 4 (Ref. 7) and because the time spent in MODE 3 to perform the necessary repairs to restore the system to OPERABLE status will be short.

However, voluntary entry into MODE 4 may be made as it is also an acceptable low-risk state.

Required Action 0.1 is modified by a Note that states that LCO 3.0.4.a is not applicable when entering MODE 3. This Note prohibits the use of LCO 3.0.4.a to enter MODE 3 during startup with the LCO not met. However, there is no restriction on the use of LCO 3.0.4.b, if applicable, because LCO 3.0.4.b requires performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering MODE 3, and establishment of risk management actions, if appropriate. LCO 3.0.4 is not applicable to, and the Note does not preclude, changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

The allowed Completion Time is reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.

RHRSW System B83.7.1 BASES SURVEILLANCE SR 3.7.1.1 (continued)

REQUIREMENTS assurance that the proper flow paths will exist for RHRSW operation.

This SR does not apply to valves that are locked, sealed, or otherwise secured in position, since these valves are verified to be in the correct position prior to locking, sealing, or securing. A valve is also allowed to be in the nonaccident position, and yet considered in the correct position, provided it can be realigned to its accident position. This is acceptable because the RHRSW System is a manually initiated system. This SR does not require any testing or valve manipulation; rather, it involves verification that those valves capable of being mispositioned are in the correct position. This SR does not apply to valves that cannot be inadvertently misaligned, such as check valves.

The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

REFERENCES 1. FSAR, Subsection 9.2.7.

2. FSAR, Subsection 7.4.5.
3. FSAR, Chapter 15.
4. FSAR, Paragraph 6.2.1.4.3.
5. NRC No.93-102, "Final Policy Statement on Technical Specification Improvements," July 23, 1993.
6. GEH 0000-0126-6532-Ri, "Ultimate Heat Sink Temperature Increase to 97°F Impact on DBA-LOCA Analysis and DW Equipment Qualification Analysis," June 2011.
  • ,.INSERT l Reference- BASES 3.7.1 HATCH UNIT 2 B376FEIIN7 B 3.7-6

INSERT - Bases 3.7.1 Reference

7. NEDC-32988-A, Revision 2, Technical Justification to Support Risk-Informed Modification to Selected Required End States for BWR Plants, December 2002.

PSW System and UHS B 3.7.2 BASES ACTIONS 0.__11 (continued)

With one PSW pump inoperable in each subsystem, one inoperable pump must be restored to OPERABLE status within 7 days. With the unit in this condition, the remaining OPERABLE PSW pumps are adequate to perform the PSW heat removal function; however, the overall reliability is reduced. The 7 day Completion Time is based on the remaining PSW heat removal capability to accommodate an additional single failure and the low probability of an event occurring during this time period.

D.1 With one PSW turbine building isolation valve inoperable in each subsystem, one inoperable valve must be restored to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. With the unit in this condition, the remaining OPERABLE PSW valves are adequate to perform the PSW non-essential load isolation function; however, the overall reliability is reduced. The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time is based on the remaining PSW heat removal capability to accommodate an additional single failure and the low probability of an event occurring during this time period.

INSERT BASES 3.7.2 Condition- E

)-1E With orne PSW subsystem inoperable for reasons other than Condition A and Condition B (e.g., inoperable flow path, both pumps inoperable in a loop, or both turbine building isolation valves inoperable in a loop), the PSW subsystem must be restored to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. With the unit in this condition, the remaining OPERABLE PSW subsystem is adequate to perform the (continued)

HATCH UNIT 2 B371 B 3.7-10 EIIN5

INSERT - Bases 3.7.2 Condition E E__1 If one PSW pump in one or both subsystems is inoperable, or one PSW turbine building isolation valve in one or both subsystems is inoperable, and is not restored to OPERABLE status within the required Completion Times, the plant must be brought to a condition in which overall plant risk is minimized. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Remaining in the Applicability of the LCO is acceptable because the plant risk in MODE 3 is similar to or lower than the risk in MODE 4 (Ref. 5) and because the time spent in MODE 3 to perform the necessary repairs to restore the system to OPERABLE status will be short.

However, voluntary entry into MODE 4 may be made as it is also an acceptable low-risk state.

Required Action E. 1 is modified by a Note that states that LCO 3.0.4.a is not applicable when entering MODE 3. This Note prohibits the use of LCO 3.0.4.a to enter MODE 3 during startup with the LCO not met. However, there is no restriction on the use of LCO 3.0.4.b, if applicable, because LCO 3.0.4.b requires performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering MODE 3, and establishment of risk management actions, if appropriate. LCO 3.0.4 is not applicable to, and the Note does not preclude, changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

The allowed Completion Time is reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.

PSW System and UHS B 3.7.2 BASES ACTIONS (continued) heat removal function. However, the overall reliability is reduced because a single failure in the OPERABLE PSW subsystem could result in loss of PSW function.

The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time is based on the redundant PSW System capabilities afforded by the OPERABLE subsystem, the low probability of an accident occurring during this time period, and is consistent with the allowed Completion Time for restoring an inoperable DG.

Required Action *ls mifed by two Notes indicating that the applicable Conditions of LCO 3.8.1, "AC Sources -Operating,"

LCO 3.4.7, "Residual Heat Removal (RHR) Shutdown Cooling System - Hot Shutdown," be entered and Required Actions taken if the inoperable PSW subsystem results in an inoperable DG or RHR shutdown cooling subsystem, respectively. This is in accordance with LCO 3.0.6 and ensures the proper actions are taken for these components.

[G.1 and GF RequirReAction a a~ssociated Completion Time of Condition Icannot be met, or both PSW subsystems are inoperable for reasons other than Conditions C and D, or the UHS is determined inoperable, the unit must be placed in a MODE in which the LCO does not apply. To achieve this statu*, the unit must be placed in at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderly manner and without challenging unit systems.

SURVEILLANCE SR 3.7.2.1 REQUIREMENTS This SR verifies the UHS is OPERABLE by ensuring the water level in the pump well of the intake structure to be sufficient for the proper operation of the PSW pumps (net positive suction head and pump vortexing are considered in determining this limit). In addition, if a temporary weir is in place, the river level must also correspond to a level in the pump well of the intake structure of > 60.7 ft MSL with no weir in place. If the water level is > 61.7 ft MSL, there is sufficient (continued)

HATCH UNIT 2 B371 B3.7-11

PSW System and UHS B 3.7.2 BASES SURVEILLANCE SR 3.7.2.3 (continued)

REQUIREMENTS The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

REFERENCES 1. FSAR, Section 9.2.1.

2. FSAR, Chapter 6.
3. FSAR, Chapter 15.
4. NRC No.93-102, "Final Policy Statement on Technical Specification Improvements," July 23, 1993.

INSERT - BASES 3.7.2

  • < Reference HATCH UNIT 2 B371 B 3.7-13 EIIN7

INSERT - Bases 3.7.2 Reference

5. NEDC-32988-A, Revision 2, Technical Justification to Support Risk-Informed Modification to Selected Required End States for BWR Plants, December 2002.

MCREC System B 3.7.4 BASES ACTIONS B.t, B.2, and B.3 (continued) probability that CRE occupants will have to implement protective measures that may adversely affect their ability to control the reactor and maintain it in a safe shutdown condition in the event of a DBA. In addition, the 90 day Completion Time is a reasonable time to diagnose, plan and possibly repair, and test most problems with the ORE boundary.

over In MODE 1, boundary 2, or be cannot 3, ifrestored the inoperable MCREC status to OPERABLE subsystem ORE within orthetherequired ovrll pant omp~t~on Time, the unit must be placed in a MODE that minimizes I -c1c~risk. To achieve this status, the unit must be placed in at least MODE 3 withinj 12husJdiPq,,OE lq +/-,or. The allowed Completion *'!ccsrlleasonable, based on operating experience, to reach the requiri unit conditions from full power\

conditions in an orderly manner *nd. without challenging unit syst ins.

  • Time is I INSERT - BASES 3.7.4 I Dl1. D.2.1. 0.2.2. and D.2.3 ICondition C The Required Actions of Condition D are modified by a Note indicating that LCO 3.0.3 does not apply. If moving irradiated fuel assemblies while in MODE 1, 2, or 3, the fuel movement is independent of reactor operations. Therefdre, inability to suspend movement of irradiated fuel assemblies is not sufficient reason to require a reactor shutdown.

During movement of irradiated fuel assemblies in the secondary containment, during CORE ALTERATIONS, or during OPDRVs, if the inoperable MCREC subsystem cannot be restored to OPERABLE status within the required Completion Time, the OPERABLE MCREC subsystem may be placed in the pressurization mode. This action ensures that the remaining subsystem is OPERABLE, that no failures that would prevent automatic actuation have occurred, and that any active failure will be readily detected.

An alternative to Required Action D.1 is to immediately suspend activities that present a potential for releasing radioactivity that might require isolation of the CRE. This places the unit in a condition that minimizes the accident risk.

If applicable, CORE ALTERATIONS and movement of irradiated fuel assemblies in the secondary containment must be suspended (continued)

HATCH UNIT 2 B372 B 3.7-22

INSERT - Bases 3.7.4 Condition C Remaining in the Applicability of the LCO is acceptable because the plant risk in MODE 3 is similar to or lower than the risk in MODE 4 (Ref. 10), because the time spent in MODE 3 to perform the necessary repairs to restore the system to OPERABLE status will be short.

However, voluntary entry into MODE 4 may be made as it is also an acceptable low-risk state.

Required Action 0.1 is modified by a Note that states that LCO 3.0.4.a is not applicable when entering MODE 3. This Note prohibits the use of LCO 3.0.4.a to enter MODE 3 during startup with the LCO not met. However, there is no restriction on the use of LCO 3.0.4.b, if applicable, because LCO 3.0.4.b requires performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering MODE 3, and establishment of risk management actions, if appropriate. LCO 3.0.4 is not applicable to, and the Note does not preclude, changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

MCREC System B 3.7.4 BASES ACTIONS D.1, D.2.1, D.2.2, and 0.2.3 (continued) immediately. Suspension of these activities shall not preclude completion of movement of a component to a safe position. Also, if applicable, action must be initiated immediately to suspend OPDRVs to minimize the probability of a vessel draindown and the subsequent potential for fission product release. Actions must continue until the OPDRVs are suspended.

INSERT - BASES 3.7.4 E.1 Condition EI If both MCREC bsystems are inoperable in MODE 1, 2, or 3 for reasons othierthan an inoperable CRE boundary (i.e., Condition B),

the MCP System may not be capable of performing the intended F.1. F.2, and F.3 The Required Actions of Condition F are modified by a Note indicating that LCO 3.0.3 does not apply. If moving irradiated fuel assemblies while in MODE 1, 2, or 3, the fuel movement is independent of reactor operations.

Therefore, inability to suspend movement of irradiated fuel assemblies is not sufficient reason to require a reactor shutdown.

During movement of irradiated fuel assemblies in the secondary containment, during CORE ALTERATIONS, or during OPDRVs, with two MCREC subsystems inoperable or with one or more MCREC subsystems inoperable due to an inoperable CRE boundary, action I must be taken immediately to suspend activities that present a potential for releasing radioactivity that might require isolation of the CRE. This places the unit in a condition that minimizes the accident risk.

If applicable, CORE ALTERATIONS and movement of irradiated fuel assemblies in the secondary containment must be suspended immediately. Suspension of these activities shall not preclude completion of movement of a component to a safe position. If applicable, action must be initiated immediately to suspend OPDRVs to minimize the probability of a vessel draindown and subsequent potential for fission product release. Actions must continue until the OPDRVs are suspended.

(continued)

HATCH UNIT 2 B 3.7-23 B372

INSERT - Bases 3.7.4 Condition E Therefore, the plant must be brought to a MODE in which overall plant risk is minimized. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Remaining in the Applicability of the LCO is acceptable because the plant risk in MODE 3 is similar to or lower than the risk in MODE 4 (Ref. 10) and because the time spent in MODE 3 to perform the necessary repairs to restore the system to OPERABLE status will be short.

However, voluntary entry into MODE 4 may be made as it is also an acceptable low-risk state.

Required Action E.1 is modified by a Note that states that LCO 3.0.4.a is not applicable when entering MODE 3. This Note prohibits the use of LCO 3.0.4.a to enter MODE 3 during startup with the LCO not met. However, there is no restriction on the use of LCO 3.0.4.b, if applicable, because LCO 3.0.4.b requires performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering MODE 3, and establishment of risk management actions, if appropriate. LCO 3.0.4 is not applicable to, and the Note does not preclude, changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

The allowed Completion Time is reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.

MCREC System B 3.7.4 BASES SURVEILLANCE SR 3.7.4.4 (continued)

REQUI REM ENTS consequences is not more than 5 rem TEDE and the ORE occupants are protected from hazardous chemicals and smoke. This SR verifies that the unfiltered air inleakage into the ORE is no greater than the flow rate assumed in the licensing basis analyses of DBA consequences. When unfiltered air inleakage is greater than the assumed flow rate, Condition B must be entered. Required Actrion B.3 allows time to restore the ORE boundary to OPERABLE status provided mitigating actions can ensure that the ORE remains within the licensing basis habitability limits for the occupants following an accident. Compensatory measures are discussed in Regulatory Guide 1.196, Section C.2.7.3, (Ref. 9) which endorses, with exceptions, NEI 99-03, Section 8.4 and Appendix F (Ref. 10). These compensatory measures may also be used as mitigating actions as required by Required Action B.2. Temporary analytical methods may also be used as compensatory measures to restore OPERABILITY (Ref. 11). Options for restoring the ORE boundary to OPERABLE status include changing the licensing basis DBA consequence analysis, repairing the ORE boundary, or a combination of these actions. Depending upon the nature of the problem and the corrective action, a full scope inleakage test may not be necessary to establish that the ORE boundary has been restored to OPERABLE status.

REFERENCES 1. FSAR, Section 6.4.

2. FSAR, Section 9.4.1.
3. FSAR, Chapter 6.
4. FSAR, Chapter 15.
5. FSAR, Section 6.4.1.2.2.
6. FSAR, Table 15.1-28.
7. NRC No.93-102, "Final Policy Statement on Technical Specification Improvements," July 23, 1993.
8. Technical Requirements Manual, Table T2.1-1.
9. Regulatory Guide 1.196.
10. NEI 99-03, "Control Room Habitability Assessment," June 2001.
  • "'--.,,INSERT- BASES 3.7.4 Reference I(continued)

HATCH UNIT 2B3724 B 3.7-24b

INSERT - Bases 3.7.4 Reference

11. NEDC-32988-A, Revision 2, Technical Justification to Support Risk-Informed Modification to Selected Required End States for BWR Plants, December 2002.I

Control Room AC System B 3.7.5 BASES ACTIONS C.1 and C.2 (continued)

With three control room AC subsystems inoperable, the Control Room AC System may not be capable of performing its intended function.

Therefore, the control room area temperature is required to be monitored to ensure that temperature is being maintained such that equipment in the control room is not adversely affected. With the control room temperature being maintained within the temperature limit, 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is allowed to restore a Control Room AC subsystem to OPERABLE status. This Completion time is reasonable considering that the control room temperature is being maintained within limits and the low probability of an event occurring requiring control room isolation. Alternate methods of maintaining control room temperature, such as non-safety grade air conditioning systems or fans, can also be used to maintain control room temperature.

D. 1 .l=-- /--overall plant In MODE 1, 2, or 3, with any Requi d Action and associated Completion Time of Condition A, I*or C not met, the unit must be placed in a MODE that minimizes risk. To achieve this status, the unit must be placed in at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> i w[;h,3G ouslThe allowed Completion eTnsa asonbe based on operatig experience, to reach the required nit conditions from full power co ditions in an orderly manner and wi hout challenging unit sy .tems.\,.- *,

-- INSERT - BASES 3.7.5 Ti*lme isI E.1, E.2.1, E.2.2, and E.2.3 The Required Actions of Condition E are modified by a Note indicating that LCO 3.0.3 does not apply. If moving irradiated fuel assemblies while in MODE 1, 2, or 3, the fuel movement is independent of reactor operations. Therefore, inability to suspend movement of irradiated fuel assemblies is not sufficient reason to require a reactor shutdown.

During movement of irradiated fuel assemblies in the secondary containment, during CORE ALTERATIONS, or during OPDRVs, if Required Action and associated Completion Time for Condition A is not met, the OPERABLE control room AC subsystems may be placed immediately in operation. This action ensures that the remaining subsystems are OPERABLE, that no failures that would prevent actuation will occur, and that any active failure will be readily detected.

(continued)

HATCH UNIT 2 B 3.7-28 B372

INSERT - Bases 3.7.5 Condition D Remaining in the Applicability of the LCO is acceptable because the plant risk in MODE 3 is similar to or lower than the risk in MODE 4 (Ref. 4) and because the time spent in MODE 3 to perform the necessary repairs to restore the system to OPERABLE status will be short.

However, voluntary entry into MODE 4 may be made as it is also an acceptable low-risk state.

Required Action D.1 is modified by a Note that states that LCO 3.0.4.a is not applicable when entering MODE 3. This Note prohibits the use of [CO 3.0.4.a to enter MODE 3 during startup with the LCO not met. However, there is no restriction on the use of LCO 3.0.4.b, if applicable, because LCO 3.0.4.b requires performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering MODE 3, and establishment of risk management actions, if appropriate. LCO 3.0.4 is not applicable to, and the Note does not preclude, changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

Control Room AC System B 3.7.5 BASES SURVEILLANCE SR 3.7.5.1 REQ UIREM ENTS This SR verifies that the heat removal capability of the system is sufficient to remove the control room heat load assumed in the safety analysis. The SR consists of a combination of testing and calculation.

The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

REFERENCES 1. FSAR, Sections 6.4 and 9.4.1.

2. NRC No.93-102, "Final Policy Statement on Technical Specification Improvements," July 23, 1993.
3. Technical Requirements Manual, Table T2.1-1.

IINSERT - BASES 3.7.5 IReference[

l  !

HATCH UNIT 2 B 3.7-30 B373

INSERT - Bases 3.7.5 Reference

4. NEDC-32988-A, Revision 2, Technical Justification to Support Risk-Informed Modification to Selected Required End States for BWR Plants, December 2002.

Main Condenser Offgas B 3.7.6 BASES (continued)

APPLICABILITY The LCO is applicable when steam is being exhausted to the main condenser and the resulting noncondensables are being processed via the Main Condenser Offgas System. This occurs during MODE 1, and during MODES 2 and 3 with any main steam line not isolated and the SJAE in operation. In MODES 4 and 5, steam is not being exhausted to the main condenser and the requirements are not applicable.

ACTIONS A.__1 If the offgas radioactivity rate limit is exceeded, 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is allowed to restore the gross gamma activity rate to within the limit. The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time is reasonable, based on engineering judgment, the time required to complete the Required Action, the large margins associated with permissible dose and exposure limits, and the low probability of a Main Condenser Offgas System rupture.

  • .!, 1,.2.dand3.-"

9.2,.9.

If the gross gamma activity rate is not restored to within the limits in the associated Completion Time, all main steam lines or the SJAE must be isolated. This isolates the Main Condenser Offgas System from the source of the radioactive steam. The main steam lines are considered isolated if at least one main steam isolation valve in each main steam line is closed, and at least one main steam line drain valve in the drain line is closed. The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Completion Time is reasonable, based on operating experience, to perform the actions from full power conditions in an orderly manner and without overall plant risk is challenging unit systems.

minimized. An alternativek( Required Actions B.1 and B.2 is to place the unit in a MODEin l'*,c wicLC dos no s* To achieve this status, the unit must be placed in at least MODE 3 within 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />sl~~*i::

" " *The allowed Completion reasonable, based on op #ating experience, to re ith the required unit conditions from full powet conditions in an orderly manner and without challenging unit systems/.Ties (continued)

HATCH UNIT 2 B373 B 3.7-32

INSERT - Bases 3.7.6 Condition B Remaining in the Applicability of the LCO is acceptable because the plant risk in MODE 3 is similar to or lower than the risk in MODE 4 (Ref. 4), because the time spent in MODE 3 to perform the necessary repairs to restore the system to OPERABLE status will be short.

However, voluntary entry into MODE 4 may be made as it is also an acceptable low-risk state.

Required Action B.3 is modified by a Note that states that LCO 3.0.4.a is not applicable when entering MODE 3. This Note prohibits the use of LCO 3.0.4.a to enter MODE 3 during startup with the LCO not met. However, there is no restriction on the use of LCO 3.0.4.b, if applicable, because LCO 3.0.4b requires performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering MODE 3, and establishment of risk management actions, if appropriate. LCO 3.0.4 is not applicable to, and the Note does not preclude, changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

Main Condenser Offgas B 3.7.6 BASES (continued)

SURVEILLANCE SR 3.7.6.1 REQUIREMENTS This SR requires an isotopic analysis of an offgas sample to ensure that the required limits are satisfied. The noble gases to be sampled are Xe-133, Xe-135, Xe-138, Kr-85m, Kr-87, and Kr-88. If the measured rate of radioactivity increases significantly (by > 50% after correcting for expected increases due to changes in THERMAL POWER), an isotopic analysis is also performed within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after the increase is noted, to ensure that the increase is not indicative of a sustained increase in the radioactivity rate. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

This SR is modified by a Note indicating that the SR is not required to be performed until 31 days after any main steam line is not isolated and the SJAE is in operation. Only in this condition can radioactive fission gases be in the Main Condenser Offgas System at significant rates.

REFERENCES 1. FSAR, Sections 11.3 and 15.1.35.

2. 10 CFR 50.67.
3. NRC No. 93-1 02, "Final Policy Statement on Technical Specification Improvements," July 23, 1993.

INSERT - BASES 3.7.6 Reference HATCH UNIT 2 B373 B 3.7-33

INSERT - Bases 3.7.6 Reference

4. NEDC-32988-A, Revision 2, Technical Justification to Support Risk-Informed Modification to Selected Required End States for BWR Plants, December 2002.

AC Sources - Operating B 3.8.1 BASES ACTIONS F. 1 (continued)

Guide 1.93. In addition, the loss of a required Unit 1 DG concurrent with the loss of a Unit 2 or swing DG, is analogous to the loss of a single DG in the Regulatory Guide 1.93 assumptions, thus, entry into this Condition is not required in this case.)

G.1 With both Unit 1 DGs and the swing DG inoperable (or otherwise incapable of supplying power to the LPCI valve load centers), and an assumed loss of offsite electrical power, insufficient standby AC sources are available to power the LPCI valve load centers. Since the offsite electrical power system is the only source of AC power for the LPCI valve load centers at this level of degradation, the risk associated with operation for a very short time could be less than that associated with an immediate controlled shutdown. (The immediate shutdown could cause grid instability, which could result in a total loss of AC power.) Since any inadvertent unit generator trip could also result in a total loss of offsite AC power, the time allowed for continued operation is severely restricted. The intent here is to avoid the risk associated with an immediate controlled shutdown and minimize the risk associated with an immediate controlled shutdown and minimize the risk associated with this level of degradation.

According to Regulatory Guide 1.93 (Ref. 6), with two or more DGs inoperable, operation may continue for a period that should not exceed 2"hours. (Regulatory Guide 1.93 assumed the unit had twd DGs. Thus, a loss of both DGs results in a total loss of onsite power.)

Therefore, a loss of both Unit 1 DGs and the swing DG results in degradation no worse than that assumed in Regulatory Guide 1.93, and the 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> Completion Time is acceptable.

H.1 _.overall plant risk is If the inoperable AC electrical power sources cannot-b'e restored to OPERABLE status within the associ te ,Comleion Time, the unit must be brought to a MODE in which ,, . .osnoapY.I To ITime is achieve this status, the unit must be brought to at least MODE 3 within 12 Ilurs a, o MD' 4M,,*3 ,*u.The allowed CompletiooTms r reasonable, based on op lrating experience, to reach the reqluired plant conditions from full pow r conditions in an orderly manner and without challenging plant systems.

(continued)

HATCH UNIT 2 B3.8-17 B381

INSERT - Bases 3.8.1 Condition H Remaining in the Applicability of the LCO is acceptable because the plant risk in MODE 3 is similar to or lower than the risk in MODE 4 (Ref. 14) and because the time spent in MODE 3 to perform the necessary repairs to restore the system to OPERABLE status will be short.

However, voluntary entry into MODE 4 may be made as it is also an acceptable low-risk state.

Required Action H.1 is modified by a Note that states that LCO 3.0.4.a is not applicable when entering MODE 3. This Note prohibits the use of LCO 3.0.4.a to enter MODE 3 during startup with the LCO not met. However, there is no restriction on the use of LCO 3.0.4.b, if applicable, because LCO 3.0.4.b requires performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering MODE 3, and establishment of risk management actions, if appropriate. LCO 3.0.4 is not applicable to, and the Note does not preclude, changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

AC Sources - Operating B 3.8.1 No change. Included for information only.

BASES SURVEILLANCE SR 3.8.1.18 (continued)

REQUIREMENTS the DGs must be started from standby conditions, that is, with the engine coolant and oil continuously circulated and temperature maintained consistent with manufacturer recommendations. It is permissible to place all three DGs in test simultaneously, for the performance of this Surveillance.

The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

SR 3.8.1.19 With the exception of this Surveillance, all other Surveillances of this Specification (SR 3.8.1.1 through SR 3.8.1.18) are applied only to the Unit 2 DG and offsite circuits, and swing DG. This Surveillance is provided to direct that the appropriate Surveillances for the required Unit 1 DG and offsite circuit are governed by the Unit 1 Technical Specifications. Performance of the applicable Unit 1 Surveillances will satisfy both any Unit 1 requirements, as well as satisfying this Unit 2 SR. Several exceptions are noted to the Unit 1 SRs: SR 3.8.1.6 is excepted since only one Unit 1 circuit is required by the Unit 2 Specification (therefore, there is not necessarily a second circuit to transfer to); SRs 3.8.1.10, 15, and 17 are excepted since they relate to the DG response to a Unit 1 ECCS initiation signal, which is not a necessary function for support of the Unit 2 requirement for an OPERABLE Unit 1 DG.

The Frequency required by the applicable Unit 1 SR also governs performance of that SR for both Units.

REFERENCES 1. 10 CFR 50, Appendix A, GDC 17.

2. FSAR, Sections 8.2 and 8.3.
3. Regulatory Guide 1.9, March 1971.
4. FSAR, Chapter 6.
5. FSAR, Chapter 15.
6. Regulatory Guide 1.93, December 1974.

(continued)

HATCH UNIT 2 B 3.8-36 REVISION 79

AC Sources - Operating B 3.8.1 BASES REFERENCES 7. Generic Letter 84-15.

(continued)

8. 10 CFR 50, Appendix A, GDC 18.
9. Regulatory Guide 1.108, August 1977.
10. Regulatory Guide 1.137, October 1979.
11. IEEE Standard 387-1984.
12. IEEE Standard 308-1980.
13. NRC No. 93-1 02, "Final Policy Statement on Technical Specification Improvements," July 23, 1993.

INSERT Reference- BASES 38.1 HATCH UNIT 2 B383 B 3.8-37 EIIN7

INSERT - Bases 3.8.1 Reference

14. NEDC-32988-A, Revision 2, Technical Justification to Support Risk-Informed Modification to Selected Required End States for BWR Plants, December 2002.

DC Sources - Operating B 3.8.4 BASES ACTIONS B.1 (continued) case accident, continued power operation should not exceed 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Completion Time provides a period of time to correct the problem commensurate with the importance of maintaining the DG DC electrical power subsystem OPERABLE. (The DG DC electrical power subsystem affects both the OG and the offsite circuit, as well as the breaker closure power for various 4160 V AC loads, but does not affect 125/250 V DC station service loads.)

C.__

Condition C represents one Unit 2 station service division with a loss of ability to completely respond to an event, and a potential loss of ability to remain energized during normal operation. It is therefore imperative that the operator's attention focus on stabilizing the unit, minimizing the potential for complete loss of DC power to the affected division. The 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> limit is consistent with the allowed time for an inoperable DC Distribution System division.

If one of the required DC electrical power subsystems is inoperable (e.g., inoperable battery, inoperable battery charger(s), or inoperable battery charger and associated inoperable battery), the remaining DC electrical power subsystems have the capacity to support a safe shutdown and to mitigate an accident condition. Since a subsequent postulated worst case single failure could result in the loss of minimum necessary DC electrical subsystems to mitigate a postulated worst case accident, c*ontinued power operation should not exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. The 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> Completion Time is based on Regulatory Guide 1.93 (Ref. 7) and reflects a reasonable time to assess unit status as a function of the inoperable DC electrical power subsystem and, ifthe DC electrical power subsystem is not restored to OPERABLE status, to prepare to effect an orderly and safe unit shutdown.

DI

  • loverall plant risk isi

' .. 1 ~ Fminimized.

If the DC electrical power subsy tem cannot be restored to OPERABLE status within the r ~uired Completion Time, the unit must be brought to a MODE in whiChlu*-_,Ju 1 *,v *'.I To achieve this status, the unit must be brou ht to at least MODE 3 within -*

12 ous p.......*_............ .The allowed Completion ICondition D "" -" Icniud HATCH UNIT 2 B 3.8-56 '

INSERT - Bases 3.8.4 Condition D Remaining in the Applicability of the LCO is acceptable because the plant risk in MODE 3 is similar to or lower than the risk in MODE 4 (Ref. 11) and because the time spent in MODE 3 to perform the necessary repairs to restore the system to OPERABLE status will be short.

However, voluntary entry into MODE 4 may be made as it is also an acceptable low-risk state.

Required Action D.1 is modified by a Note that states that LCO 3.0.4.a is not applicable when entering MODE 3. This Note prohibits the use of LCO 3.0.4.a to enter MODE 3 during startup with the LCO not met. However, there is no restriction on the use of LCO 3.0.4.b, if applicable, because LCO 3.0.4.b requires performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering MODE 3, and establishment of risk management actions, if appropriate. LCO 3.0.4 is not applicable to, and the Note does not preclude, changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

DC Sources - Operating B 3.8.4 BASES ACTIONS ____.____ t^*;... 4 vL L L;,

Lu b~ iy tl ,= u~iii u MyODE 4 is ,u*,istebht~Ii w;[; i i.e, equi d iii E.1 Condition E corresponds to a level of degradation in the DC electrical power subsystems that causes a required safety function to be lost.

When more than one DC source is lost, and this results in the loss of a required function, the plant is in a condition outside the accident analysis. Therefore, no additional time is justified for continued operation. LCO 3.0.3 must be entered immediately to commence a controlled shutdown.

SURVEILLANCE The SRs are modified by a NOTE to indicate that SR 3.8.4.1 through REQUIREMENTS SR 3.8.4.8 apply only to the Unit 2 DC sources, and that SR 3.8.4.9 applies only to the Unit 1 DC sources.

SR 3.8.4.1 Verifying battery terminal voltage while on float charge for the batteries helps to ensure the effectiveness of the charging system and the ability of the batteries to perform their intended function. Float char'ge is the condition in which the charger is supplying the continuous charge required to overcome the internal losses of a battery (or battery cell) and maintain the battery (or a battery cell) in a fully charged state. Voltage requirements are based on the nominal design voltage of the battery and are consistent with the initial voltages assumed in the battery sizing calculations. The voltage requirement for battery terminal voltage is based on the open circuit voltage of a lead-calcium cell of nominal 1.215 specific gravity.

Without regard to other battery parameters, this voltage is indicative of a battery that is capable of performing its required safety function.

The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

SR 3.8.4.2 Visual inspection to detect corrosion of the battery cells and connections, or measurement of the resistance of each inter-cell, (continued)

HATCH UNIT 2 B385 B 3.8-57 EIIN7

DC Sources - Operating B 3.8.4 BASES REFERENCES 1. 100CFR 50,Appendix A, GDC 17.

2. Regulatory Guide 1.6.
3. IEEE Standard 308-1971.
4. FSAR, Paragraphs 8.3.2.1.1 and 8.3.2.1.2.
5. FSAR, Chapter 6.
6. ESAR, Chapter 15.
7. Regulatory Guide 1.93, December 1974.
8. IEEE Standard 450-1987.
9. Technical Requirements Manual, Section 9.0.
10. Regulatory Guide 1.32, February 1977.

INSERT Reference-BASES 3.8.4 *11 . Not, uso

12. IEEE Standard 485-1983.
13. NRC No. 93-1 02, "Final Policy Statement on Technical Specification Improvements," July 23, 1993.

HATCH UNIT2 B386 B 3.8-62

INSERT - Bases 3.8.4 Reference

11. NEDC-32988-A, Revision 2, Technical Justification to Support Risk-Informed Modification to Selected Required End States for BWR Plants, December 2002.

Distribution Systems - Operating B 3.8.7 BASES ACTIONS D. (continued)

This Completion Time allows for an exception to the normal "time zero" for beginning the allowed outage time "clock." This allowance results in establishing the "time zero" at the time LCO 3.8.7.a was initially not met, instead of at the time Condition D was entered. The 16 hour1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> Completion Time is an acceptable limitation on this potential of failing to meet the LCO indefinitely.

E.I

  • Ioverall plant risk is

, , \ Iminimized.I If the inoperable distribution subsystem cannot be restored to OPERABLE status within the associ ted Completion Time, the unit must be brought to a MODE in which ,'*h C oso p~JTo achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> *s-dt OE4w,~=n3 hu. *The allowed Completion

  • easonable, based on ope i~ng experience, to reach the required plairt conditions from full power c ~ditions in an orderly manner and wit ~out challenging plant systems.]

Tmis INSERT - BASES 3.8.7 F. 1 Condition E Condition F corresponds to a level of degradation in the electrical power distribution system that causes a required safety function to be lost. When more than one AC or DC electrical power distribution subsystem is lost, and this results in the loss of a required function, the plant is in a condition outside the accident analysis. Therefore, no additional time is justified for continued operation. LCO 3.0.3 must be entered immediately to commence a controlled shutdown.

SURVEILLANCE SR 3.8.7.1 REQUIREMENTS This Surveillance verifies that the AC and DC electrical power distribution systems are functioning properly, with the correct circuit breaker alignment. The correct breaker alignment ensures the appropriate separation and independence of the electrical buses are maintained, and the appropriate voltage is available to each required bus. The verification of proper voltage availability on the buses ensures that the required voltage is readily available for motive as well as control functions for critical system loads connected to these buses. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

(continued)

HATCH UNIT 2 B388 B 3.8-80

INSERT - Bases 3.8.7 Condition E Remaining in the Applicability of the LCO is acceptable because the plant risk in MODE 3 is similar to or lower than the risk in MODE 4 (Ref. 5) and because the time spent in MODE 3 to perform the necessary repairs to restore the system to OPERABLE status will be short.

However, voluntary entry into MODE 4 may be made as it is also an acceptable low-risk state.

Required Action E.1 is modified by a Note that states that LCO 3.0.4.a is not applicable when entering MODE 3. This Note prohibits the use of LCO 3.0.4.a to enter MODE 3 during startup with the LCO not met. However, there is no restriction on the use of LCO 3.0.4.b, if applicable, because LCO 3.0.4.b requires performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering MODE 3, and establishment of risk management actions, if appropriate. LCO 3.0.4 is not applicable to, and the Note does not preclude, changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

Distribution Systems - Operating B 3.8.7 BASES (continued)

REFERENCES 1. FSAR, Chapter 6.

2. FSAR, Chapter 15.
3. Regulatory Guide 1.93, December 1974.
4. NRC No. 93-1 02, "Final Policy Statement on Technical Specification Improvements," July 23, 1993.
  • "' .INSERT- BASES 3.8.7 Reference HATCH UNIT 2 B388 B 3.8-81

INSERT - Bases 3.8.7 Reference

5. NEDC-32988-A, Revision 2, Technical Justification to Support Risk-Informed Modification to Selected Required End States for BWR Plants, December 2002.

Edwin I. Hatch Nuclear Plant License Amendment Request for Adoption of TSTF-423-A, Rev. 1 Technical Specifications End States, NEDC-32988-A, Attachment 4 Revised (Clean) TS Pages

RPS Electric Power Monitoring 3.3.8.2 3.3 INSTRUMENTATION 3.3.8.2 Reactor Protection System (RPS) Electric Power Monitoring LCO 3.3.8.2 Two RPS electric power monitoring assemblies shall be OPERABLE for each inservice RPS motor generator set or alternate power supply.

APPLICABILITY: MODES 1, 2, and 3, MODES 4 and 5 with any control rod withdrawn from a core cell containing one or more fuel assemblies or with both residual heat removal (RHR) shutdown cooling (SDC) isolation valves open.

ACTIONS______ ___

CONDITION REQUIRED ACTION COMPLETION TIME A. One or both inservice A.1 Remove associated 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> power supplies with one inservice power electric power monitoring supply(s) from service.

assembly inoperable.

B. One or both inservice B.1 Remove associated 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> power supplies with both inservice power electric power monitoring supply(s) from service.

assemblies inoperable.

C. Required Action and C.1-----NOTE---

associated Completion LCO 3.0.4.a is not Time of Condition A or B applicable when not met in MODE 1, 2, or 3. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (continued)

HATCH UNIT 1 3.3-69 HATC UNI I 33-69Amendment No.

ECCS - Operating 3.5.1 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCiC) SYSTEM 3.5.1 ECCS - Operating LCO 3.5.1 Each ECCS injection/spray subsystem and the Automatic Depressurization System (ADS) function of six of seven safety/relief valves shall be OPERABLE.

APPLICABILITY: MODEl1, MODES 2 and 3, except high pressure coolant injection (HPCI) and ADS valves are not required to be OPERABLE with reactor steam dome pressure < 150 psig.

ACTIONS

,NOTE LCO 3.0.4.b is not applicable to HPCI.

CONDITION REQUIRED ACTION COMPLETION TIME A. One low pressure ECCS A.1 Restore low pressure 7 days injection/spray subsystem ECCS injection/spray inoperable, subsystem to OPERABLE status.

B. Required Action and B.1-----NOTE---

associated Completion LCO 3.0.4.a is not Time of Condition A not applicable when met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> C. HPCI System inoperable. C.1 Verify by administrative 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> means RCIC System is OPERABLE.

AND C.2 Restore HPCI System 14 days to OPERABLE status.

(continued)

HATCH UNIT 1 3.5-1 HATC 1 35-1Amendment UNI No.

ECCS - Operating 3.5.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D. HPCI System inoperable. D.1 Restore HPCI System 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to OPERABLE status.

AND OR One low pressure ECCS injection/spray subsystem D.2 Restore low pressure 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is inoperable. ECCS injection/spray subsystem to OPERABLE status.

E. Required Action and E.1---------NOTE-----

associated Completion LCO 3.0.4.a is not Time of Condition C or D applicable when not met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> F. Two or more ADS valves F.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> inoperable.

AND F.2 Reduce reactor steam 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> dome pressure to

< 150 psig.

G. Two or more low pressure G.1 Enter LCO 3.0.3. Immediately ECCS injection/spray subsystems inoperable.

OR HPCI System and two or more ADS valves inoperable.

HATCH UNIT 1 3.5-2 HATC 1 35-2Amendment UNI No.

RCIC System 3.5.3 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.3 RCIC System LCO 3.5.3 The RCIC System shall be OPERABLE.

APPLICABILITY: MODEl1, MODES 2 and 3 with reactor steam dome pressure > 150 psig.

ACTIONS LCO 3.0.4.b is not applicable to RCIC.

CONDITION REQUIRED ACTION COMPLETION TIME A. RCIC System inoperable. A.1 Verify by administrative 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> means high pressure coolant injection (HPCl)

System is OPERABLE.

AND A.2 Restore RCIC System 14 days to OPERABLE status.

B. Required Action and B.1------NOTE------...

associated Completion LCO 3.0.4.a is not Time not met. applicable when enitering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> HATCH UNIT 1 3.5-9 HATC UNI I 35-9Amendment No.

Reactor Building-to-Suppression Chamber Vacuum Breakers 3.6.1.7 3.6 CONTAINMENT SYSTEMS 3.6.1.7 Reactor Building-to-Suppression Chamber Vacuum Breakers LCO 3.6.1.7 OPERABLE.

APPLICABILITY: MODES 1,2, and 3.

ACTI ONS


NOT I:----------------------------

Separate Condition entry is allowed for each line.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more lines with one A.1 Close the open vacuum 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> reactor building-to- breaker.

suppression chamber vacuum breaker not closed.

B. One or more lines with two B.1 Close one open 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> reactor building-to- vacuum breaker..

suppression chamber vacuum breakers not closed.

C. One line with one or more C.1 Restore the vacuum 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> reactor building-to- breaker(s) to suppression chamber OPERABLE status.

vacuum breakers inoperable for opening.

D. Required Action and D.1---------NOTE-----

associated Completion .LCO 3.0.4.a is not Time of Condition C not applicable when met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (continued)

HATCH UNIT 1 3.6-17 HATC UNI I 36-17Amendment No.

Reactor Building-to-Suppression Chamber Vacuum Breakers 3.6.1.7 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME E. Two lines with one or more E.1 Restore all vacuum 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> reactor building-to- breakers in one line to suppression chamber OPERABLE status.

vacuum breakers inoperable for opening.

F. Required Action and F.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Associated Completion Time or Condition A, B, or AND E not met.

F.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.7.1-----------NOTES- ------

1. Not required to be met for vacuum breakers that are open during Surveillances.
2. Not required to be met for vacuum breakers open when performing their intended function.

Verify each vacuum breaker is closed. In accordance with the Surveillance Frequency Control Program SR 3.6.1.7.2 Perform a functional test of each vacuum breaker. In accordance with the Inservice Testing Program SR 3.6.1.7.3 Verify the opening setpoint of each vacuum In accordance with breaker is < 0.5 psid. the Surveillance Frequency ,Control Program HATCH UNIT 1 3.6-18 1 36-18Amendment UNI HATC No.

Suppression Chamber-to-Drywell Vacuum Breakers 3.6.1.8 3.6 CONTAINMENT SYSTEMS 3.6.1.8 Suppression Chamber-to-Drywell Vacuum Breakers LCO 3.6.1.8 Ten suppression chamber-to-drywell vacuum breakers shall be OPERABLE for opening.

AND Twelve suppression chamber-to-drywell vacuum breakers shall be closed, except when performing their intended function.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One required suppression A.1 Restore one vacuum 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> chamber-to-drywell vacuum breaker to OPERABLE breaker inoperable for status.

opening.

B. Required Action and B.1-----NOTE---

associated Completion LCO 3.0.4.a is not Time of Condition A not applicable when met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> C. One suppression chamber- C.1 Close the open vacuum 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to-drywell vacuum breaker breaker.

not closed.

D. Required Action and D.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition C not AND met.

D.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> HATCH UNIT 1 3.6-19 1 36-19Amendment UNI HATC No.

RHR Suppression Pool Cooling 3.6.2.3 3.6 CONTAINMENT SYSTEMS 3.6.2.3 Residual Heat Removal (RHR) Suppression Pool Cooling LCO 3.6.2.3 Two RHR suppression pool cooling subsystems shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One RHR suppression pool A.1 Restore RHR 7 days cooling subsystem suppression pool inoperable, cooling subsystem to OPERABLE status.

B. Required Action and B.1----------NOTE-----

associated Completion LCO 3.0.4.a is not Time of Condition A not applicable when met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> C. Two RHR suppression pool C.1 Restore one RHR 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> cooling subsystems suppression pool inoperable. cooling subsystem to OPERABLE status.

D. Required Action and D.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition C not AND met.

D.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> HATCH UNIT 1 3.6-25 HATC UNI I 36-25Amendment No.

RHR Suppression Pool Cooling 3.6.2.3 SURVEILLANCEREQUIREMENTS________

SURVEILLANCE FREQUENCY SR 3.6.2.3.1 Verify each RHR suppression pool cooling In accordance with subsystem manual, power operated, and automatic the Surveillance valve in the flow path that is not locked, sealed, or Frequency Control otherwise secured in position is in the correct Program position or can be aligned to the correct position.

SR 3.6.2.3.2 Verify each required RHR pump develops a flow In accordance with rate > 7700 gpm through the associated heat the lnservice exchanger while operating in the suppression pool Testing Program cooling mode.

HATCH UNIT 1 3.6-26 HATC UNI 1 36-26Amendment No.

RHR Suppression Pool Spray 3.6.2.4 3.6 CONTAINMENT SYSTEMS 3.6.2.4 Residual Heat Removal (RHR) Suppression Pool spray LCO 3.6.2.4 Two RHR suppression pool spray subsystems shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS ________

CONDITION REQUIRED ACTION COMPLETION TIME A. One RHR suppression pool A.1 Restore RHR 7 days spray subsystem suppression pool spray inoperable, subsystem to OPERABLE status.

B. Two RHR suppression pool B.1 Restore one RHR 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> spray subsystems suppression pool spray inoperable, subsystem to*

OPERABLE status.

C. Required Action and C.1------NOTE---

associated Completion LCO 3.0.4.a is not Time not met. applicable when entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SURVEILLANCEREQUIREMENTS________

SURVEILLANCE FREQUENCY SR 3.6.2.4.1 Verify each RHR suppression pool spray In accordance with subsystem manual, power operated, and the Surveillance automatic valve in the flow path that is not locked, Frequency Control sealed, or otherwise secured in position is in the Program correct position or can be aligned to the correct position.

(continued)

HATCH UNIT 1 3.6-27 HATC UNI I 36-27Amendment No.

Secondary Containment 3.6.4.1 3.6 CONTAINMENT SYSTEMS 3.6.4.1 Secondary Containment LCO 3.6.4.1 The secondary containment shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3, During movement of irradiated fuel assemblies in the secondary containment, During CORE ALTERATIONS, During operations with a potential for draining the reactor vessel (OPDRVs).

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Secondary containment A.1 Restore secondary 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> inoperable in MODE 1, 2, containment to or 3. OPERABLE status.

B. Required Action and B.1-----NOTE-.........

associated Completion LCO 3.0.4.a is not Time of Condition A not applicable when entering met. MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> C. Secondary containment C.1------NOTE----

inoperable during LCO 3.0.3 is not movement of irradiated fuel applicable.

assemblies in the secondary containment, during CORE Suspend movement of Immediately ALTERATIONS, or during irradiated fuel OPDRVs. assemblies in the secondary containment.

AND (continued)

HATCH UNIT 1 3.6-34 HATC UNI 1 36-34Amendment No.

SGT System 3.6.4:3 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and C.1----------NOTE----

associated Completion LCO 3.0.4.a is not Time of Condition A or B applicable when not met in MODE 1, 2, or 3. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> D. Required Action and---------------NOTE-------

associated Completion LCO 3.0.3 is not applicable.

Time of Condition Aor B not met during movement of irradiated fuel assemblies in D.1 Place remaining Immediately the secondary containment, OPERABLE SGT during CORE subsystem(s) in ALTERATIONS, or during operation.

OPDRVs.

ORR D.2.1 Suspend movement of Immediately irradiated fuel assemblies in secondary containment.

AND D.2.2 Suspend CORE Immediately ALTERATIONS.

AND D.2.3 Initiate action to Immediately suspend OPDRVs.

E. Two or more required SGT E.1-----NOTE---

subsystems inoperable in LCO 3.0.4.a is not MODE 1, 2, or 3. applicable when entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (continued)

HATCH UNIT 1 3.6-41 HATCHUNITI 3.-4 1Amendment No.

RHRSW System 3.7.1 3.7 PLANT SYSTEMS 3.7.1 Residual Heat Removal Service Water (RHRSW) System LCOG 3.7.1 Two RHRSW subsystems shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS _________

CONDITION REQUIRED ACTION COMPLETION TIME A. One RHRSW pump A.1 Restore RHRSW pump 30 days inoperable, to OPERABLE status.

B. One RHRSW pump in each B.1 Restore one RHRSW 7 days subsystem inoperable, pump to OPERABLE status.

C. One RHRSW subsystem-------NOTE--...........

inoperable for reasons Enter applicable Conditions and other than Condition A. Required Actions of LCO 3.4.7, "Residual Heat Removal (RHR)

Shutdown Cooling System - Hot Shutdown," for RHR shutdown cooling made inoperable by RHRSW System.

C.1 Restore RHRSW 7 days subsystem to OPERABLE status.

D. Required Action and D.1---------NOTE-----

associated Completion LCO 3.0.4.a is not Time of Condition A, B, or applicable when C not met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (continued)

HATCH UNIT 1 3.7-1 HATC UNI 1 37-1Amendment No.

RHRSW System 3.7.1 ACTIONS (continued) __________

CONDITION REQUIRED ACTION COMPLETION TIME E. Both RHRSW subsystems------NOTE-----

inoperable for reasons Enter applicable Conditions and other than Condition B. Required Actions of LCO 3.4.7 for RHR shutdown cooling made inoperable by RHRSW System.

E.1 Restore one RHRSW 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> subsystem to OPERABLE status.

F. Required Action and F.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition E not AND met.

F.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.1.1 Verify each RHRSW manual, power operated, and In accordance with automatic valve in the flow path, that is not locked, the Surveillance sealed, or otherwise secured in position, is in the Frequency Control correct position or can be aligned to the correct Program position.

HATCH UNIT 1 3.7-2 UNI I

HATC 37-2Amendment No.

PSW System and UHS 3.7.2 3.7 PLANT SYSTEMS 3.7.2 Plant Service Water (PSW)~System and Ultimate Heat Sink (UHS)

LCO 3.7.2 Two PSW subsystems and UHS shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One PSW pump inoperable. A.1 Restore PSW pump to 30 days OPERABLE status.

B. One PSW turbine building B.1 Restore PSW turbine 30 days isolation valve inoperable, building isolation valve to OPERABLE status.

C. One PSW pump in each C.1 Restore one PSW 7 days subsystem inoperable, pump to OPERABLE status.

D. One PSW turbine building D.1 Restore one PSW 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> isolation valve in each turbine building subsystem inoperable, isolation valve to OPERABLE status.

E. Required Action and E.1---------NOTE-----

associated Completion LCO 3.0.4.a is not Time of Condition A, B, C, applicable when or D not met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (continued)

HATCH UNIT 1 3.7-3 HATC UNI I 37-3Amendment No.

PSW System and 3.7.2 UHS

  • ACTIONS (continued)__________

CONDITION REQUIRED ACTION cOMPLETION TIME F. One P3W subsystem--------NOTES- ---

inoperable for reasons 1. Enter applicable Conditions other than Conditions A and Required Actions of and B. LCO 3.8.1, "AC Sources -

Operating," for diesel generator made inoperable by PSW System.

2. Enter applicable Conditions and Required Actions of LCO 3.4.7, "Residual Heat Removal (RHR) Shutdown Cooling System - Hot Shutdown," for RHR shutdown cooling made inoperable by PSW System.

F.1 Restore the PSW 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> subsystem to OPERABLE status.

G. Required Action and G.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition F not AND met.

G.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> O__R Both PSW subsystems inoperable for reasons other than Conditions C and D.

OR UHS inoperable.

HATCH UNIT 1 3.7-4 HATC UNI I 37-4Amendment No.

McREc System 3.7.4 ACTIONS (continued)__________________________

CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and C.1-----NOTE---

associated Completion LCO 3.0.4.a is not Time of Condition A or B applicable when not met in MODE 1, 2, or 3. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> D. Required Action and---------NOTE-----

associated Completion Time LCO 3.0.3 is not applicable.

of Condition A not met during movement of irradiated fuel assemblies in D.1 Place OPERABLE Immediately the secondary containment, MCREC subsystem in during CORE pressurization mode.

ALTERATIONS, or during OPDRVs. OR D.2.1 Suspend movement of Immediately irradiated fuel assemblies in the secondary containment.

AND D.2.2 Suspend CORE Immediately ALTERATIONS.

AND D.2.3 *Initiate action to Immediately suspend OPDRVs.

E. Two MCREC subsystems E.1---------NOTE-----

inoperable in MODE 1, 2, LCO 3.0.4.a is not or 3 for reasons other than applicable when Condition B. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (continued)

HATCH UNIT 1I 3.7-9 Amendment No.

Control Room AC System:

3.7.5 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and D.1----------NOTE----

associated Completion LCO 3.0.4.a is not Time of Condition A, B, or applicable when C not met in MODE 1, 2, or entering MODE 3.

3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> E. Required Action and---------------NOTE-------

associated Completion LCO 3.0.3 is not applicable.

Time of Condition A not met------------

during movement of irradiated fuel assemblies in E.1 Place OPERABLE Immediately the secondary containment, control room AC during CORE subsystems in ALTERATIONS, or during operation.

OPDR Vs.

ORR E.2.1 Suspend movement of Immediately irradiated fuel assemblies in the secondary containment.

AND E.2.2 Suspend CORE Immediately ALTERATIONS.

AND E.2.3 Initiate action to Immediately suspend OPDRVs.

(continued)

HATCH UNIT 1 3.7-13 HATC UNI I 37-13Amendment No.

Main Condenser Offgas 3.7.6 3.7 PLANT SYSTEMS 3.7.6 Main Condenser Offgas LCD 3.7.6 The gross gamma activity rate of the noble gases measured at the main condenser evacuation system pretreatment monitor station shall be

< 240 mCi/second.

APPLICABILITY: MODE 1, MODES 2 and 3 with any main steam line not isolated and steam jet air ejector (SJAE) in operation.

ACTIONS ________

CONDITION REQUIRED ACTION COMPLETION TIME A. Gross gamma activity rate A.1 Restore gross gamma 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of the noble gases not activity rate of the noble within limit, gases to within limit.

B. Required Action and B.1 Isolate all main steam 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion lines.

Time not met.

O._R B.2 Isolate SJAE. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OR B.3-------.....NOTE-- -

LCD 3.0.4.a is not applicable when entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> HATCH UNIT 1 3.7-16 HATC UNI I 37-16Amendment No.

AC Sources - Operating 3.8.1 ACTIONS (continued)_________________________

CONDITION REQUIRED ACTION COMPLETION TIME E. (continued) OR E.2 Restore required DG to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OPERABLE status.

F. Two or more (Unit 1 and F.1 Restore all but one 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> swing) DGs inoperable. Unit 1 and swing DGs to OPERABLE status G. No DGs capable of G.1 Restore one DG 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> supplying power to any capable of supplying Unit 1 LPCI valve load power to Unit I LPCI center. valve load center to OPERABLE status.

H. Required Action and H.1---------NOTE-----

Associated Completion LCO 3.0.4.a is not Time of Condition A, B, C, applicable when D, E, F, or G not met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> One or more required 1.1 Enter LCO 3.0.3. Immediately offsite circuits and two or more required DGs inoperable.

OR Two or more required offsite circuits and one required DG inoperable.

HATCH UNIT 1 3.8-6 HATC UNI I 38-6Amendment No.

DC Sources - Operating 3.8.4 ACTIONS (continued)_________________________

CONDITION REQUIRED ACTION COMPLETION TIME B. One Unit 1 DG DC B.1 Restore DG DC 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> electrical power subsystem electrical power inoperable, subsystem to OPERABLE status.

ORR Swing DG DC electrical power subsystem inoperable for reasons other than Condition A.

C. One Unit 1 station service C.1 Restore station service 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> DC electrical power DC electrical power Subsystem inoperable, subsystem to OPERABLE status.

D. Required Action and D.1-----NOTE---

Associated Completion LCO 3.0.4.a is not Time of Condition A, B, applicable when or C not met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> E. Two or more DC electrical E.1 Enter LCO 3.0.3. Immediately power subsystems inoperable that result in a loss of function.

HATCH UNIT 1 3.8-27 I 38-27Amendment UNI HATC No.

Distribution Systems - Operating 3.8.7 ACTIONS (continued) __________

CONDITION REQUIRED ACTION COMPLETION TIME B. One or more (Unit 1 or B.1 Restore DG DC 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> swing bus) DG DC electrical power electrical power distribution distribution subsystem AND subsystems inoperable, to OPERABLE status.

~16 hours from discovery of failure to meet LCO 3.8.7.a C. One or more (Unit 1 or C.1 Restore AC electrical 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> swing bus) AC electrical power distribution power distribution subsystem 'to AND subsystems inoperable. OPERABLE status.

16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> from discovery of failure to meet LCO 3.8.7.a D. One Unit 1 station service D.1 Restore Unit 1 station 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> DC electrical power service DC electrical distribution subsystem power distribution AND inoperable, subsystem to OPERABLE status. 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> from discovery of failure to meet LCO 3.8.7.a E. Required Action and E.1-----NOTE---

associated Completion LCO 3.0.4.a is not Time of Condition A, B, C, applicable when or D not met. entering MODE 3.

Be in MODE 3.. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> F. Two or more electrical F.1 Enter LCO 3.0.3. Immediately power distribution subsystems inoperable that result in a loss of function.

HATCH UNIT 1 3.8-37 HATC UNI I 38-37Amendment No.

RPS Electric Power Monitoring 3.3.8.2 3.3 INSTRUMENTATION 3.3.8.2 Reactor Protection System (RPS) Electric Power Monitoring LCO 3.3.8.2 Two RPS electric power monitoring assemblies shall be OPERABLE for each inservice RPS motor generator set or alternate power supply.*

APPLICABILITY: MODES 1,2, and 3, MODES 4 and 5 with any control rod withdrawn from a core cell containing one or more fuel assemblies or with both residual heat removal (RHR) shutdown cooling (SDC) isolation valves open.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or both inservice A.1 Remove associated 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> power supplies with one inservice power electric power monitoring 'supply(s) from service.

assembly inoperable.

B. One or both inservice B.1 Remove associated 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> power supplies with both inservice power electric power monitoring supply(s) from service.

assemblies inoperable.

C. Required Action and C.1---------..NOTE-----...

associated Completion LCO 3.0.4.a is not Time of Condition A or B applicable when not met in.MODE 1, 2, or 3. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (continued)

HATCH UNIT 2 3.3-69 HATC UNI 2 33-69Amendment No.

ECCS - Operating 3.5.1 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.1 ECCS - Operating LCO 3.5.1 Each ECCS injection/spray subsystem and the Automatic Depressurization System (ADS) function of six of seven safety/relief valves shall be OPERABLE.

MODEl1, APPLICABILITY:

MODES 2 and 3, except high pressure coolant injection (HPCi) and ADS valves are not required to be OPERABLE with reactor steam dome pressure < 150 psig.

ACTIONS


NOTE-.

LCO 3.0.4.b is not applicable to HPCI.

CONDITION REQUIRED ACTION COMPLETION TIME A. One low pressure ECCS A.1 Restore low pressure 7 days injection/spray subsystem ECCS injection/spray inoperable, subsystem to OPERABLE status.

B. Required Action and B.1- .......... NOTE-----...

associated Completion LCO 3.0.4.a is not Time of Condition A not applicable when met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> C. HPCI System inoperable. C.1 Verify by administrative 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> means RCIC System is OPERABLE.

AND C.2 Restore HPCI System 14 days to OPERABLE status.

(continued) 3.5-1 Amendment No.

ECCS - Operating 3.5.1 ACTIONS (continued) ______________

CONDITION REQUIRED ACTION COMPLETION TIME D. HPCI System inoperable. 0.1 Restore HPCI System 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to OPERABLE status.

AND ORR One low pressure ECCS injection/spray subsystem 0.2 Restore low pressure 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable. ECCS injection/spray subsystem to OPERABLE status.

E. Required Action and E.1---------..NOTE-----...

associated Completion LCO 3.0.4.a is not Time of Condition C or D applicable when entering not met. MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> F. Two or more ADS valves F.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> inoperable.

AND F.2 Reduce reactor steam 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />

  • dome pressure to

< 150 psig.

G. Two or more low pressure G.1 Enter LCO 3.0.3. Immediately ECCS injection/spray subsystems inoperable.

OR HPCI System and two or more ADS valves inoperable.

HATCH UNIT 2 3.5-2 HATC UNI 2 35-2Amendment No.

RCIC System 3.5.3 3.5 EMERGENCY CORE COOLING SYSTEMS (EGOS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.3 RCIC System LCO 3.5.3 The RCIC System shall be OPERABLE.

APPLICABILITY: MODEl1, MODES 2 and 3 with reactor steam dome pressure > 150 psig.

ACTIONS


NOTE-LCO 3.0.4.b is not applicable to RCIC.

CONDITION REQUIRED ACTION COMPLETION TIME A. RCIC System inoperable. A.1 Verify by administrative 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> means high pressure coolant injection (HPCI)

System is OPERABLE.

AND A.2 Restore RCIC System 14 days to OPERABLE status.

B. Required Action and B.I-- ..........NOTE-........

associated Completion LCO 3.0.4.a is not Time not met. applicable when entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> HATCH UNIT 2 3.5-10 HATC UNI 2 35-10Amendment No.

Reactor Building-to-Suppression Chamber Vacuum Breakers 3.6.1.7 3.6 CONTAINMENT SYSTEMS 3.6.1.7 Reactor Building-to-Suppression Chamber Vacuum Breakers LCO 3.6.1.7 OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS


NOT Separate Condition entry is allowed for each line.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more lines with one A.1 Close the open vacuum 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> reactor building-to- breaker.

suppression chamber vacuum breaker not closed.

B. One or more lines with two B.1 Close one open 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> reactor building-to- vacuum breaker.

suppression chamber vacuum breakers not closed.

C. One line with one or more C.1 Restore the vacuum 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> reactor building-to- breaker(s) to suppression chamber. OPERABLE status.

vacuum breakers inoperable for opening.

D. Required Action and D.1- .......... NOTE---

associated Completion LCO 3.0.4.a is not Time of Condition C not applicable when met. entering MODE 3.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Be in MODE 3.

(continued)

HATCH UNIT 2 3.6-18 HATC UNI 2 36-18Amendment No.

Reactor Building-to-Suppression Chamber Vacuum Breakers 3.6.1.7 ACTIONS (continued)

CONDITION] REQUIRED ACTION] COMPLETION TIME E. Two lines with one or more E.1I Restore all vacuum 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> reactor building-to- breakers in one line to suppression chamber OPERABLE status.

vacuum breakers inoperable for opening.

F. Required Action and F.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Associated Completion Time of Condition A, B, or AND E not met.

F.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCEREQUIREMENTS________

SURVEILLANCE FREQUENCY SR 3.6.1.7.1-----------NOTES- ------

1. Not required to be met for vacuum breakers that are open during
  • Surveillances.
2. Not required to be met for vacuum breakers open when performing their intended function.

Verify each vacuum breaker is closed. in accordance with the Surveillance Frequency Control Program SR 3.6.1.7.2 Perform a functional test of each vacuum breaker. In accordance with the Inservice Testing Program SR 3.6.1.7.3 Verify the opening setpoint of each vacuum In accordance with breaker is _<0.5 psid. the Surveillance Frequency Control Program HATCH UNIT 2 3.6-18 HATC UNI 2 36-18Amendment No.

Suppression Chamber-to-Drywell Vacuum Breakers 3.6.1.8 3.6 CONTAINMENT SYSTEMS 3.6.1.8 Suppression Chamber-to-Drywell Vacuum Breakers LCO 3.6.1.8 Ten suppression chamber-to-drywell vacuum breakers shall be OPERABLE for opening.

AND Twelve suppression chamber-to-drywell vacuum breakers shall be closed, except when performing their intended function.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One required suppression A.1 Restore one vacuum 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> chamber-to-drywell vacuum breaker to OPERABLE breaker inoperable for status.

opening.

B. Required Action and B.1- .......... NOTE-........

associated Completion LCO 3.0.4.a is not Time of Condition A not applicable when met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> C. One suppression chamber- C.1 Close the open vacuum 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to-drywell vacuum breaker breaker.

not closed.

D. Required Action and D.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition C not AND met.

D.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> HATCH UNIT 2 3.6-19 2 36-19Amendment UNI HATC No.

RHR Suppression Pool Cooling 3.6.2.3 3.6 CONTAINMENT SYSTEMS 3.6.2.3 Residual Heat Removal (RHR) Suppression Pool Cooling LCO 3.6.2.3 Two RHR suppression pool cooling subsystems shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS ________

CONDITION .REQUIRED ACTION COMPLETION TIME A. One RHR suppression pool A.1 Restore RHR 7 days cooling subsystem suppression pool inoperable, cooling subsystem to OPERABLE status.

B. Required Action and B.1---------NOTE-----

associated Completion LCO 3.O.4.a is not Time of Condition A not applicable when met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> C. Two RHR suppression pool C.1 Restore one RHR 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> cooling subsystems suppression pool inoperable, cooling subsystem to OPERABLE status.

D. Required Action and D.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition C not AND met. I D.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> I

HATCH UNIT 2 3.6-25 2 36-25Amendment UNI HATC No.

RHR Suppression Pool Cooling 3.6.2.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.2.3.1 Verify each RHR suppression pool cooling In accordance with subsystem manual, power operated, and automatic the Surveillance valve in the flow path that is not locked, sealed, or Frequency Control otherwise secured in position is in the correct Program position or can be aligned to the correct position.

SR 3.6.2.3.2 Verify each required RHR pump develops a flow In accordance with rate > 7700 gpm through the associated heat the Inservice exchanger while operating in the suppression pool Testing Program cooling mode.

HATCH UNIT 2 3.6-26 HATH UIT 3.-26Amendment No.

RHR Suppression Pool Spray 3.6.2.4 3.6 CONTAINMENT SYSTEMS 3.6.2.4 Residual Heat Removal (RHR) Suppression Pool Spray LCO 3.6.2.4 Two RHR suppression pool spray subsystems shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS ___________

CONDITION REQUIRED ACTION COMPLETION TIME A. One RHR suppression pool A.1 Restore RHR 7 days spray subsystem suppression pool spray inoperable, subsystem to OPERABLE status.

B. Two RHR suppression pool B.1 Restore one RHR 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> spray subsystems suppression pool spray inoperable, subsystem to OPERABLE status.

C. Required Action and C.1----------.NOTE-........

associated Completion LCO 3.0.4.a is not Time not met. applicable when entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.2.4.1 Verify each RHR suppression pool spray In accordance with subsystem manual, power operated, and the Surveillance automatic valve in the flow path that is not locked, Frequency Control sealed, or otherwise secured in position is in the Program correct position or can be aligned to the correct position.

(continued)

HATCH UNIT 2 3.6-27

Secondary Containment 3.6.4.1 3.6 CONTAINMENT SYSTEMS 3.6.4.1 Secondary Containment LCO 3.6.4.1 The secondary containment shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3, During movement of irradiated fuel assemblies in the secondary containment, During CORE ALTERATIONS, During operations with a potential for draining the reactor vessel (OPDRV).

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Secondary containment A.1 Restore secondary 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> inoperable in MODE 1, 2, containment to or 3. OPERABLE status.

B. Required Action and B.1- .......... NOTE-----...

associated Completion LCO 3.0.4.a is not Time of Condition A not applicable when met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> C. Secondary containment C.1-----NOTE- --

inoperable during LCO 3.0.3 is not movement of irradiated fuel .applicable.

assemblies in the secondary containment, during CORE Suspend movement of Immediately ALTERATIONS, or during irradiated fuel OPDRVs. assemblies in the secondary containment.

AND (continued)

HATCH UNIT 2 3.6-33 HATC UNI 2 36-33Amendment No.

SGT System 3.6.4.3 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. One required Unit 2 SOT B.1 Restore required SGT 7 days subsystem inoperable, subsystem to OPERABLE status. AND OR 30 days from One required Unit 1 SOT discovery of failure to subsystem inoperable for meet the LCO reasons other than Condition A.

C. Required Action and C.1- .......... NOTE-----...

associated Completion LCO 3.0.4.a is not Time of Condition A or B applicable when not met in MODE 1, 2, or 3. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> D. Required Action and---------NOTE- ---

associated Completion LCO 3.0.3 is not applicable.

Time of Condition A or B not met during movement of irradiated fuel D.1 Place remaining Immediately assemblies in the OPERABLE SGT secondary containment, subsystem(s) in during CORE operation.

ALTERATIONS, or during OPDRVs. OR D.2.1 Suspend movement of Immediately irradiated fuel assemblies in secondary containment.

AND D.2.2 Suspend CORE Immediately ALTERATIONS.

AND D.2.3 Initiate action to Immediately suspend OPDRVs.

(continued)

HATCH UNIT 2 3.6-40

SGT System 3.6.4.3 ACTIONS (continued)__________________________

CONDITION REQUIRED ACTION COMPLETION TIME E. Two or more required SGT E.1------NOTE- --

subsystems inoperable in LCO 3.0.4.a is not MODE 1, 2, or 3. applicable when entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> F. Two or more required SGT F.1 NOTE- --

subsystems inoperable LCO 3.0.3 is not during movement of applicable.

irradiated fuel assemblies in the secondary containment, during CORE Suspend movement of Immediately ALTERATIONS, or during irradiated fuel OPDRVs. assemblies in secondary containment.

AND F.2 Suspend CORE Immediately ALTERATIONS.

AND F.3 Initiate action to Immediately suspend OPDRVs.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.4.3.1 Operate each required SGT subsystem for In accordance with

> 15 continuous minutes. the Surveillance Frequency Control Program SR 3.6.4.3.2 Perform required SGT filter testing in accordance In accordance with with the Ventilation Filter Testing Program (VFTP). the VFTP (continued) 3.6-41 Amendment No.

RHRSW System 3.7.1 3.7 PLANT SYSTEMS 3.7.1 Residual Heat Removal Service Water (RHRSW) System LCO 3.7.1 Two RHRSW subsystems shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS ___________

CONDITION REQUIRED ACTION COMPLETION TIME A.. One RHRSW pump A.1 Restore RHRSW pump 30 days inoperable, to OPERABLE status.

B. One RHRSW pump in each B.1 Restore one RHRSW 7 days subsystem inoperable, pump to OPERABLE status.

C. One RHRSW subsystem-------------NOTE--------

inoperable for reasons Enter applicable Conditions and other than Condition A. Required Actions of LCO 3.4.7, "Residual Heat Removal (RHR)

Shutdown Cooling System - Hot Shutdown," for RHR shutdown cooling made inoperable by RHRSW System.

C.1 Restore RHRSW 7 days subsystem to OPERABLE status.

D. Required Action and D.1- .......... NOTE---

associated Completion LCO 3.0.4.a is not Time of Condition A, B, or applicable when C not met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (continued)

HATCH UNIT 2 371AedetN 3.7-1 Amendment No_

RHRSW System 3.7.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME E. Both RHRSW subsystems------NOTE-----

inoperable for reasons Enter applicable Conditions and other than Condition B. Required Actions of LCO 3.4.7 for RHR shutdown cooling made inoperable by RHRSW System.

E.1 Restore one RHRSW 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> subsystem to OPERABLE status.

F. Required Action and F.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition E not AND met.

F.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.1.1 Verify each RHRSW manual, power operated, and In accordance with automatic valve in the flow path, that is not locked, the Surveillance sealed, or otherwise secured in position, is in the Frequency Control correct position or can be aligned to the correct Program position.

HATCH UNIT 2 3.7-2 HATC UNI 2 37-2Amendment No.

PSW System and UHS 3.7.2 3.7 PLANT SYSTEMS 3.7.2 Plant Service Water (PSW) System and Ultimate Heat Sink (UHS)

LCO 3.7.2 Two PSW subsystems and UHS shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One PSW pump inoperable. A.1 Restore PSW pump to 30 days OPERABLE status.

B. One PSW turbine building B.1 Restore PSW turbine 30 days isolation valve inoperable, building isolation valve to OPERABLE status.

C. One PSW pump in each C.1 Restore one PSW 7 days subsystem inoperable, pump to OPERABLE status.

D. One PSW turbine building D.1 Restore one PSW 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> isolation valve in each turbine building subsystem inoperable, isolation valve to OPERABLE status.

E. Required Action and E.1----------..NOTE---

associated Completion LCO 3.0.4.a is not Time of Condition A, B, C, applicable when or D not met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (continued) 3.7-3 HATC UNI 2 37-3Amendment No.

PSW System and UHS 3.7.2 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME F. One PSW subsystem---------NOTES- ---

inoperable for reasons 1. Enter applicable Conditions I.

other than Conditions A and Required Actions of and B. LCO 3.8.1, "AC Sources -

Operating," for diesel generator made inoperable by PSW System.

2. Enter applicable Conditions and Required Actions of LCO 3.4.7, "Residual Heat Removal (RHR) Shutdown Cooling System - Hot Shutdown," for RHR shutdown cooling made inoperable by PSW System.

F.1 Restore the PSW 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> subsystem to OPERABLE status.

G. Required Action and G.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition F not AND met.

G.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> OR Both PSW subsystems inoperable for reasons other than Conditions C and D.

O__R UHS inoperable.

HATCH UNIT 2 3.7-4 HATC UNI 2 37-4Amendment No.

MCREC System 3.7.4 ACTIONS (continued) __________

CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and C.1------NOTE---

associated Completion LCO 3.0.4.a is not Time of Condition A or B applicable when not met in MODE 1, 2, or 3. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> D. Required Action and--------NOTE-----

associated Completion LCO 3.0.3 is not applicable.

Time of Condition A not met during movement of irradiated fuel assemblies D.1 Place OPERABLE Immediately in the secondary MCREC subsystem in containment, during CORE pressurization mode.

ALTERATIONS, or during OPDRVs. OR D.2.1 Suspend movement of Immediately irradiated fuel assemblies in the secondary containment.

AND D.2.2 Suspend CORE Immediately ALTERATIONS.

AND D.2.3 Initiate action to Immediately suspend OPDRVs.

E. Two MCREC subsystems E.1---------NOTE-----

inoperable in MODE 1, 2, LCO 3.0.4.a is not or 3 for reasons other than applicable when Condition B. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (continued)

HATCH UNIT 2 3.7-9 HATC UNI 2 37-9Amendment No.

Control Room AC System 3.7.5 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and D.1------NOTE---

associated Completion LCO 3.0.4.a is not Time of Condition A, B, or applicable when C not met in MODE 1, 2, or entering MODE 3.

3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> E. Required Action and---------NOTE- ---

associated Completion LCO 3.0.3 is not applicable.

Time of Condition A not met------------

during movement of.

irradiated fuel assemblies in E.1 Place OPERABLE Immediately the secondary containment, control room AC during CORE subsystems in ALTERATIONS, or during operation.

OPDR Vs.

OR E.2.1 Suspend movement of Immediately irradiated fuel assemblies in the secondary containment.

AND E.2.2 Suspend CORE Immediately ALTERATIONS.

AND E.2.3 Initiate action to Immediately suspend OPDRVs.

(continued)

HATCH UNIT 2 3.7-13 HATC UNI 2 37-13Amendment No.

Main Condenser Offgas 3.7.6 3.7 PLANT SYSTEMS 3.7.6 Main Condenser Offgas LCO 3.7.6 The gross gamma activity rate of the noble gases measured at the main condenser evacuation system pretreatment monitor station shall be

< 240 mCi/second.

APPLICABILITY: MODE 1, MODES 2 and 3 with any main steam line not isolated and steam jet air ejector (SJAE) in operation.

ACTI ONS CONDITION REQUIRED ACTION COMPLETION TIME A. Gross gamma activity rate A.1 Restore gross gamma 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of the noble gases not activity rate of the noble within limit, gases to within limit.

B. Required Action and B.1 Isolate all main steam 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion lines.

Time not met..

O__R B.2 Isolate SJAE. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OR B.3------NOTE---

LCO 3.0.4.a is not applicable when entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> HATCH UNIT 2 3.7-16 HATC UNI 2 37-16Amendment No.

AC Sources - Operating 3.8.1 ACTIONS (continued)

CONDITION .REQUIRED ACTION COMPLETION TIME E. (continued) OR E.2 Restore required DG 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> to OPERABLE status.

F. Two or more (Unit 2 and F.1 Restore all but one 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> swing) DGs inoperable. Unit 2 and swing DGs to OPERABLE status.

G. No DGs capable of G.1 Restore one DG 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> supplying power to any capable of supplying Unit 2 LPCI valve load power to Unit 2 LPCI center. valve load center to OPERABLE status.

H. Required Action and H.1---------NOTE-----

Associated Completion LCO 3.0.4.a is not Time of Condition A, B, C, applicable when D, E, F, or G not met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> One or more required 1.1 Enter LCO 3.0.3. Immediately offsite circuits and two or more required DGs inoperable.

O.RR Two or more required offsite circuits and one required DG inoperable.

HATCH UNIT 2 3.8-6 HATC UNI 2 38-6Amendment No.

DC Sources - Operating 3.8.4 ACTIONS (continued) __________

CONDITION REQUIRED ACTION COMPLETION TIME B. One Unit 2 DG DC B.1 Restore DG DC 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> electrical power subsystem electrical power inoperable, subsystem to OPERABLE status.

O.RR Swing DG DC electrical power subsystem inoperable for reasons other than Condition A.

C. One Unit 2 station service C.1 Restore station service 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> DC electrical power DC electrical power subsystem inoperable, subsystem to OPERABLE status.

D. Required Action and D.1-----NOTE---

Associated Completion LCO 3.0.4.a is not Time of Condition A, B, applicable when or C not met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> E. Two or more DC electrical E.1 Enter LCO 3.0.3. Immediately power subsystems inoperable that result in a loss of function.

HATCH UNIT 2 3.8-27 HATC UNI 2 38-27Amendment No.

Distribution Systems - Operating 3.8.7 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. One or more (Unit 2 or B.1 Restore DG DC 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> swing bus) DG DC electrical power electrical power distribution distribution subsystem AND subsystems inoperable, to OPERABLE status.

16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> from discovery of failure to meet LCO 3.8.7.a C. One or more (Unit 2 or C.1 Restore AC electrical 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> swing bus) AC electrical power distribution power distribution subsystem to AND subsystems inoperable. OPERABLE status.

16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> from discovery of failure to meet LCO 3.8.7.a D. One Unit 2 station service D.1 Restore Unit 2 station 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> DC electrical power service DC electrical distribution subsystem power distribution AND inoperable, subsystem to OPERABLE status. 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> from discovery of failure to meet LCO 3.8.7.a E. Required Action and E.1-----NOTE---

associated Completion LCO 3.0.4.a is not Time of Condition A, B, C, applicable when or D not met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> F. Two or more electrical F.1 Enter LCO 3.0.3. Immediately power distribution subsystems inoperable that result in a loss of function.

3.8-38 2 38-38Amendment UNI HATC No.

INSERT - Bases 3.7.1 Condition D 0.1!

If one RHRSW subsystem is inoperable or one RHRSW pump in one or two subsystems is inoperable and not restored within the provided Completion Time, the plant must be brought to a condition in which overall plant risk is minimized. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Remaining in the Applicability of the LCO is acceptable because the plant risk in MODE 3 is similar to or lower than the risk in MODE 4 (Ref. 7) and because the time spent in MODE 3 to perform the necessary repairs to restore the system to OPERABLE status will be short.

However, voluntary entry into MODE 4 may be made as it is also an acceptable low-risk state.

Required Action 0.1 is modified by a Note that states that LCO 3.0.4.a is not applicable when entering MODE 3. This Note prohibits the use of LCO 3.0.4.a to enter MODE 3 during startup with the LCO not met. However, there is no restriction on the use of LCO 3.0.4.b, if applicable, because LCO 3.0.4.b requires performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering MODE 3, and establishment of risk management actions, if appropriate. LCO 3.0.4 is not applicable to, and the Note does not preclude, changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

The allowed Completion Time is reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.

RHRSW System B83.7.1 BASES SURVEILLANCE SR 3.7.1.1 (continued)

REQUIREMENTS assurance that the proper flow paths will exist for RHRSW operation.

This SR does not apply to valves that are locked, sealed, or otherwise secured in position, since these valves are verified to be in the correct position prior to locking, sealing, or securing. A valve is also allowed to be in the nonaccident position, and yet considered in the correct position, provided it can be realigned to its accident position. This is acceptable because the RHRSW System is a manually initiated system. This SR does not require any testing or valve manipulation; rather, it involves verification that those valves capable of being mispositioned are in the correct position. This SR does not apply to valves that cannot be inadvertently misaligned, such as check valves.

The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

REFERENCES 1. FSAR, Subsection 9.2.7.

2. FSAR, Subsection 7.4.5.
3. FSAR, Chapter 15.
4. FSAR, Paragraph 6.2.1.4.3.
5. NRC No.93-102, "Final Policy Statement on Technical Specification Improvements," July 23, 1993.
6. GEH 0000-0126-6532-Ri, "Ultimate Heat Sink Temperature Increase to 97°F Impact on DBA-LOCA Analysis and DW Equipment Qualification Analysis," June 2011.
  • ,.INSERT l Reference- BASES 3.7.1 HATCH UNIT 2 B376FEIIN7 B 3.7-6

INSERT - Bases 3.7.1 Reference

7. NEDC-32988-A, Revision 2, Technical Justification to Support Risk-Informed Modification to Selected Required End States for BWR Plants, December 2002.

PSW System and UHS B 3.7.2 BASES ACTIONS 0.__11 (continued)

With one PSW pump inoperable in each subsystem, one inoperable pump must be restored to OPERABLE status within 7 days. With the unit in this condition, the remaining OPERABLE PSW pumps are adequate to perform the PSW heat removal function; however, the overall reliability is reduced. The 7 day Completion Time is based on the remaining PSW heat removal capability to accommodate an additional single failure and the low probability of an event occurring during this time period.

D.1 With one PSW turbine building isolation valve inoperable in each subsystem, one inoperable valve must be restored to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. With the unit in this condition, the remaining OPERABLE PSW valves are adequate to perform the PSW non-essential load isolation function; however, the overall reliability is reduced. The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time is based on the remaining PSW heat removal capability to accommodate an additional single failure and the low probability of an event occurring during this time period.

INSERT BASES 3.7.2 Condition- E

)-1E With orne PSW subsystem inoperable for reasons other than Condition A and Condition B (e.g., inoperable flow path, both pumps inoperable in a loop, or both turbine building isolation valves inoperable in a loop), the PSW subsystem must be restored to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. With the unit in this condition, the remaining OPERABLE PSW subsystem is adequate to perform the (continued)

HATCH UNIT 2 B371 B 3.7-10 EIIN5

INSERT - Bases 3.7.2 Condition E E__1 If one PSW pump in one or both subsystems is inoperable, or one PSW turbine building isolation valve in one or both subsystems is inoperable, and is not restored to OPERABLE status within the required Completion Times, the plant must be brought to a condition in which overall plant risk is minimized. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Remaining in the Applicability of the LCO is acceptable because the plant risk in MODE 3 is similar to or lower than the risk in MODE 4 (Ref. 5) and because the time spent in MODE 3 to perform the necessary repairs to restore the system to OPERABLE status will be short.

However, voluntary entry into MODE 4 may be made as it is also an acceptable low-risk state.

Required Action E. 1 is modified by a Note that states that LCO 3.0.4.a is not applicable when entering MODE 3. This Note prohibits the use of LCO 3.0.4.a to enter MODE 3 during startup with the LCO not met. However, there is no restriction on the use of LCO 3.0.4.b, if applicable, because LCO 3.0.4.b requires performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering MODE 3, and establishment of risk management actions, if appropriate. LCO 3.0.4 is not applicable to, and the Note does not preclude, changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

The allowed Completion Time is reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.

PSW System and UHS B 3.7.2 BASES ACTIONS (continued) heat removal function. However, the overall reliability is reduced because a single failure in the OPERABLE PSW subsystem could result in loss of PSW function.

The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time is based on the redundant PSW System capabilities afforded by the OPERABLE subsystem, the low probability of an accident occurring during this time period, and is consistent with the allowed Completion Time for restoring an inoperable DG.

Required Action *ls mifed by two Notes indicating that the applicable Conditions of LCO 3.8.1, "AC Sources -Operating,"

LCO 3.4.7, "Residual Heat Removal (RHR) Shutdown Cooling System - Hot Shutdown," be entered and Required Actions taken if the inoperable PSW subsystem results in an inoperable DG or RHR shutdown cooling subsystem, respectively. This is in accordance with LCO 3.0.6 and ensures the proper actions are taken for these components.

[G.1 and GF RequirReAction a a~ssociated Completion Time of Condition Icannot be met, or both PSW subsystems are inoperable for reasons other than Conditions C and D, or the UHS is determined inoperable, the unit must be placed in a MODE in which the LCO does not apply. To achieve this statu*, the unit must be placed in at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderly manner and without challenging unit systems.

SURVEILLANCE SR 3.7.2.1 REQUIREMENTS This SR verifies the UHS is OPERABLE by ensuring the water level in the pump well of the intake structure to be sufficient for the proper operation of the PSW pumps (net positive suction head and pump vortexing are considered in determining this limit). In addition, if a temporary weir is in place, the river level must also correspond to a level in the pump well of the intake structure of > 60.7 ft MSL with no weir in place. If the water level is > 61.7 ft MSL, there is sufficient (continued)

HATCH UNIT 2 B371 B3.7-11

PSW System and UHS B 3.7.2 BASES SURVEILLANCE SR 3.7.2.3 (continued)

REQUIREMENTS The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

REFERENCES 1. FSAR, Section 9.2.1.

2. FSAR, Chapter 6.
3. FSAR, Chapter 15.
4. NRC No.93-102, "Final Policy Statement on Technical Specification Improvements," July 23, 1993.

INSERT - BASES 3.7.2

  • < Reference HATCH UNIT 2 B371 B 3.7-13 EIIN7

INSERT - Bases 3.7.2 Reference

5. NEDC-32988-A, Revision 2, Technical Justification to Support Risk-Informed Modification to Selected Required End States for BWR Plants, December 2002.

MCREC System B 3.7.4 BASES ACTIONS B.t, B.2, and B.3 (continued) probability that CRE occupants will have to implement protective measures that may adversely affect their ability to control the reactor and maintain it in a safe shutdown condition in the event of a DBA. In addition, the 90 day Completion Time is a reasonable time to diagnose, plan and possibly repair, and test most problems with the ORE boundary.

over In MODE 1, boundary 2, or be cannot 3, ifrestored the inoperable MCREC status to OPERABLE subsystem ORE within orthetherequired ovrll pant omp~t~on Time, the unit must be placed in a MODE that minimizes I -c1c~risk. To achieve this status, the unit must be placed in at least MODE 3 withinj 12husJdiPq,,OE lq +/-,or. The allowed Completion *'!ccsrlleasonable, based on operating experience, to reach the requiri unit conditions from full power\

conditions in an orderly manner *nd. without challenging unit syst ins.

  • Time is I INSERT - BASES 3.7.4 I Dl1. D.2.1. 0.2.2. and D.2.3 ICondition C The Required Actions of Condition D are modified by a Note indicating that LCO 3.0.3 does not apply. If moving irradiated fuel assemblies while in MODE 1, 2, or 3, the fuel movement is independent of reactor operations. Therefdre, inability to suspend movement of irradiated fuel assemblies is not sufficient reason to require a reactor shutdown.

During movement of irradiated fuel assemblies in the secondary containment, during CORE ALTERATIONS, or during OPDRVs, if the inoperable MCREC subsystem cannot be restored to OPERABLE status within the required Completion Time, the OPERABLE MCREC subsystem may be placed in the pressurization mode. This action ensures that the remaining subsystem is OPERABLE, that no failures that would prevent automatic actuation have occurred, and that any active failure will be readily detected.

An alternative to Required Action D.1 is to immediately suspend activities that present a potential for releasing radioactivity that might require isolation of the CRE. This places the unit in a condition that minimizes the accident risk.

If applicable, CORE ALTERATIONS and movement of irradiated fuel assemblies in the secondary containment must be suspended (continued)

HATCH UNIT 2 B372 B 3.7-22

INSERT - Bases 3.7.4 Condition C Remaining in the Applicability of the LCO is acceptable because the plant risk in MODE 3 is similar to or lower than the risk in MODE 4 (Ref. 10), because the time spent in MODE 3 to perform the necessary repairs to restore the system to OPERABLE status will be short.

However, voluntary entry into MODE 4 may be made as it is also an acceptable low-risk state.

Required Action 0.1 is modified by a Note that states that LCO 3.0.4.a is not applicable when entering MODE 3. This Note prohibits the use of LCO 3.0.4.a to enter MODE 3 during startup with the LCO not met. However, there is no restriction on the use of LCO 3.0.4.b, if applicable, because LCO 3.0.4.b requires performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering MODE 3, and establishment of risk management actions, if appropriate. LCO 3.0.4 is not applicable to, and the Note does not preclude, changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

MCREC System B 3.7.4 BASES ACTIONS D.1, D.2.1, D.2.2, and 0.2.3 (continued) immediately. Suspension of these activities shall not preclude completion of movement of a component to a safe position. Also, if applicable, action must be initiated immediately to suspend OPDRVs to minimize the probability of a vessel draindown and the subsequent potential for fission product release. Actions must continue until the OPDRVs are suspended.

INSERT - BASES 3.7.4 E.1 Condition EI If both MCREC bsystems are inoperable in MODE 1, 2, or 3 for reasons othierthan an inoperable CRE boundary (i.e., Condition B),

the MCP System may not be capable of performing the intended F.1. F.2, and F.3 The Required Actions of Condition F are modified by a Note indicating that LCO 3.0.3 does not apply. If moving irradiated fuel assemblies while in MODE 1, 2, or 3, the fuel movement is independent of reactor operations.

Therefore, inability to suspend movement of irradiated fuel assemblies is not sufficient reason to require a reactor shutdown.

During movement of irradiated fuel assemblies in the secondary containment, during CORE ALTERATIONS, or during OPDRVs, with two MCREC subsystems inoperable or with one or more MCREC subsystems inoperable due to an inoperable CRE boundary, action I must be taken immediately to suspend activities that present a potential for releasing radioactivity that might require isolation of the CRE. This places the unit in a condition that minimizes the accident risk.

If applicable, CORE ALTERATIONS and movement of irradiated fuel assemblies in the secondary containment must be suspended immediately. Suspension of these activities shall not preclude completion of movement of a component to a safe position. If applicable, action must be initiated immediately to suspend OPDRVs to minimize the probability of a vessel draindown and subsequent potential for fission product release. Actions must continue until the OPDRVs are suspended.

(continued)

HATCH UNIT 2 B 3.7-23 B372

INSERT - Bases 3.7.4 Condition E Therefore, the plant must be brought to a MODE in which overall plant risk is minimized. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Remaining in the Applicability of the LCO is acceptable because the plant risk in MODE 3 is similar to or lower than the risk in MODE 4 (Ref. 10) and because the time spent in MODE 3 to perform the necessary repairs to restore the system to OPERABLE status will be short.

However, voluntary entry into MODE 4 may be made as it is also an acceptable low-risk state.

Required Action E.1 is modified by a Note that states that LCO 3.0.4.a is not applicable when entering MODE 3. This Note prohibits the use of LCO 3.0.4.a to enter MODE 3 during startup with the LCO not met. However, there is no restriction on the use of LCO 3.0.4.b, if applicable, because LCO 3.0.4.b requires performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering MODE 3, and establishment of risk management actions, if appropriate. LCO 3.0.4 is not applicable to, and the Note does not preclude, changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

The allowed Completion Time is reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.

MCREC System B 3.7.4 BASES SURVEILLANCE SR 3.7.4.4 (continued)

REQUI REM ENTS consequences is not more than 5 rem TEDE and the ORE occupants are protected from hazardous chemicals and smoke. This SR verifies that the unfiltered air inleakage into the ORE is no greater than the flow rate assumed in the licensing basis analyses of DBA consequences. When unfiltered air inleakage is greater than the assumed flow rate, Condition B must be entered. Required Actrion B.3 allows time to restore the ORE boundary to OPERABLE status provided mitigating actions can ensure that the ORE remains within the licensing basis habitability limits for the occupants following an accident. Compensatory measures are discussed in Regulatory Guide 1.196, Section C.2.7.3, (Ref. 9) which endorses, with exceptions, NEI 99-03, Section 8.4 and Appendix F (Ref. 10). These compensatory measures may also be used as mitigating actions as required by Required Action B.2. Temporary analytical methods may also be used as compensatory measures to restore OPERABILITY (Ref. 11). Options for restoring the ORE boundary to OPERABLE status include changing the licensing basis DBA consequence analysis, repairing the ORE boundary, or a combination of these actions. Depending upon the nature of the problem and the corrective action, a full scope inleakage test may not be necessary to establish that the ORE boundary has been restored to OPERABLE status.

REFERENCES 1. FSAR, Section 6.4.

2. FSAR, Section 9.4.1.
3. FSAR, Chapter 6.
4. FSAR, Chapter 15.
5. FSAR, Section 6.4.1.2.2.
6. FSAR, Table 15.1-28.
7. NRC No.93-102, "Final Policy Statement on Technical Specification Improvements," July 23, 1993.
8. Technical Requirements Manual, Table T2.1-1.
9. Regulatory Guide 1.196.
10. NEI 99-03, "Control Room Habitability Assessment," June 2001.
  • "'--.,,INSERT- BASES 3.7.4 Reference I(continued)

HATCH UNIT 2B3724 B 3.7-24b

INSERT - Bases 3.7.4 Reference

11. NEDC-32988-A, Revision 2, Technical Justification to Support Risk-Informed Modification to Selected Required End States for BWR Plants, December 2002.I

Control Room AC System B 3.7.5 BASES ACTIONS C.1 and C.2 (continued)

With three control room AC subsystems inoperable, the Control Room AC System may not be capable of performing its intended function.

Therefore, the control room area temperature is required to be monitored to ensure that temperature is being maintained such that equipment in the control room is not adversely affected. With the control room temperature being maintained within the temperature limit, 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is allowed to restore a Control Room AC subsystem to OPERABLE status. This Completion time is reasonable considering that the control room temperature is being maintained within limits and the low probability of an event occurring requiring control room isolation. Alternate methods of maintaining control room temperature, such as non-safety grade air conditioning systems or fans, can also be used to maintain control room temperature.

D. 1 .l=-- /--overall plant In MODE 1, 2, or 3, with any Requi d Action and associated Completion Time of Condition A, I*or C not met, the unit must be placed in a MODE that minimizes risk. To achieve this status, the unit must be placed in at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> i w[;h,3G ouslThe allowed Completion eTnsa asonbe based on operatig experience, to reach the required nit conditions from full power co ditions in an orderly manner and wi hout challenging unit sy .tems.\,.- *,

-- INSERT - BASES 3.7.5 Ti*lme isI E.1, E.2.1, E.2.2, and E.2.3 The Required Actions of Condition E are modified by a Note indicating that LCO 3.0.3 does not apply. If moving irradiated fuel assemblies while in MODE 1, 2, or 3, the fuel movement is independent of reactor operations. Therefore, inability to suspend movement of irradiated fuel assemblies is not sufficient reason to require a reactor shutdown.

During movement of irradiated fuel assemblies in the secondary containment, during CORE ALTERATIONS, or during OPDRVs, if Required Action and associated Completion Time for Condition A is not met, the OPERABLE control room AC subsystems may be placed immediately in operation. This action ensures that the remaining subsystems are OPERABLE, that no failures that would prevent actuation will occur, and that any active failure will be readily detected.

(continued)

HATCH UNIT 2 B 3.7-28 B372

INSERT - Bases 3.7.5 Condition D Remaining in the Applicability of the LCO is acceptable because the plant risk in MODE 3 is similar to or lower than the risk in MODE 4 (Ref. 4) and because the time spent in MODE 3 to perform the necessary repairs to restore the system to OPERABLE status will be short.

However, voluntary entry into MODE 4 may be made as it is also an acceptable low-risk state.

Required Action D.1 is modified by a Note that states that LCO 3.0.4.a is not applicable when entering MODE 3. This Note prohibits the use of [CO 3.0.4.a to enter MODE 3 during startup with the LCO not met. However, there is no restriction on the use of LCO 3.0.4.b, if applicable, because LCO 3.0.4.b requires performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering MODE 3, and establishment of risk management actions, if appropriate. LCO 3.0.4 is not applicable to, and the Note does not preclude, changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

Control Room AC System B 3.7.5 BASES SURVEILLANCE SR 3.7.5.1 REQ UIREM ENTS This SR verifies that the heat removal capability of the system is sufficient to remove the control room heat load assumed in the safety analysis. The SR consists of a combination of testing and calculation.

The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

REFERENCES 1. FSAR, Sections 6.4 and 9.4.1.

2. NRC No.93-102, "Final Policy Statement on Technical Specification Improvements," July 23, 1993.
3. Technical Requirements Manual, Table T2.1-1.

IINSERT - BASES 3.7.5 IReference[

l  !

HATCH UNIT 2 B 3.7-30 B373

INSERT - Bases 3.7.5 Reference

4. NEDC-32988-A, Revision 2, Technical Justification to Support Risk-Informed Modification to Selected Required End States for BWR Plants, December 2002.

Main Condenser Offgas B 3.7.6 BASES (continued)

APPLICABILITY The LCO is applicable when steam is being exhausted to the main condenser and the resulting noncondensables are being processed via the Main Condenser Offgas System. This occurs during MODE 1, and during MODES 2 and 3 with any main steam line not isolated and the SJAE in operation. In MODES 4 and 5, steam is not being exhausted to the main condenser and the requirements are not applicable.

ACTIONS A.__1 If the offgas radioactivity rate limit is exceeded, 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is allowed to restore the gross gamma activity rate to within the limit. The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time is reasonable, based on engineering judgment, the time required to complete the Required Action, the large margins associated with permissible dose and exposure limits, and the low probability of a Main Condenser Offgas System rupture.

  • .!, 1,.2.dand3.-"

9.2,.9.

If the gross gamma activity rate is not restored to within the limits in the associated Completion Time, all main steam lines or the SJAE must be isolated. This isolates the Main Condenser Offgas System from the source of the radioactive steam. The main steam lines are considered isolated if at least one main steam isolation valve in each main steam line is closed, and at least one main steam line drain valve in the drain line is closed. The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Completion Time is reasonable, based on operating experience, to perform the actions from full power conditions in an orderly manner and without overall plant risk is challenging unit systems.

minimized. An alternativek( Required Actions B.1 and B.2 is to place the unit in a MODEin l'*,c wicLC dos no s* To achieve this status, the unit must be placed in at least MODE 3 within 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />sl~~*i::

" " *The allowed Completion reasonable, based on op #ating experience, to re ith the required unit conditions from full powet conditions in an orderly manner and without challenging unit systems/.Ties (continued)

HATCH UNIT 2 B373 B 3.7-32

INSERT - Bases 3.7.6 Condition B Remaining in the Applicability of the LCO is acceptable because the plant risk in MODE 3 is similar to or lower than the risk in MODE 4 (Ref. 4), because the time spent in MODE 3 to perform the necessary repairs to restore the system to OPERABLE status will be short.

However, voluntary entry into MODE 4 may be made as it is also an acceptable low-risk state.

Required Action B.3 is modified by a Note that states that LCO 3.0.4.a is not applicable when entering MODE 3. This Note prohibits the use of LCO 3.0.4.a to enter MODE 3 during startup with the LCO not met. However, there is no restriction on the use of LCO 3.0.4.b, if applicable, because LCO 3.0.4b requires performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering MODE 3, and establishment of risk management actions, if appropriate. LCO 3.0.4 is not applicable to, and the Note does not preclude, changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

Main Condenser Offgas B 3.7.6 BASES (continued)

SURVEILLANCE SR 3.7.6.1 REQUIREMENTS This SR requires an isotopic analysis of an offgas sample to ensure that the required limits are satisfied. The noble gases to be sampled are Xe-133, Xe-135, Xe-138, Kr-85m, Kr-87, and Kr-88. If the measured rate of radioactivity increases significantly (by > 50% after correcting for expected increases due to changes in THERMAL POWER), an isotopic analysis is also performed within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after the increase is noted, to ensure that the increase is not indicative of a sustained increase in the radioactivity rate. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

This SR is modified by a Note indicating that the SR is not required to be performed until 31 days after any main steam line is not isolated and the SJAE is in operation. Only in this condition can radioactive fission gases be in the Main Condenser Offgas System at significant rates.

REFERENCES 1. FSAR, Sections 11.3 and 15.1.35.

2. 10 CFR 50.67.
3. NRC No. 93-1 02, "Final Policy Statement on Technical Specification Improvements," July 23, 1993.

INSERT - BASES 3.7.6 Reference HATCH UNIT 2 B373 B 3.7-33

INSERT - Bases 3.7.6 Reference

4. NEDC-32988-A, Revision 2, Technical Justification to Support Risk-Informed Modification to Selected Required End States for BWR Plants, December 2002.

AC Sources - Operating B 3.8.1 BASES ACTIONS F. 1 (continued)

Guide 1.93. In addition, the loss of a required Unit 1 DG concurrent with the loss of a Unit 2 or swing DG, is analogous to the loss of a single DG in the Regulatory Guide 1.93 assumptions, thus, entry into this Condition is not required in this case.)

G.1 With both Unit 1 DGs and the swing DG inoperable (or otherwise incapable of supplying power to the LPCI valve load centers), and an assumed loss of offsite electrical power, insufficient standby AC sources are available to power the LPCI valve load centers. Since the offsite electrical power system is the only source of AC power for the LPCI valve load centers at this level of degradation, the risk associated with operation for a very short time could be less than that associated with an immediate controlled shutdown. (The immediate shutdown could cause grid instability, which could result in a total loss of AC power.) Since any inadvertent unit generator trip could also result in a total loss of offsite AC power, the time allowed for continued operation is severely restricted. The intent here is to avoid the risk associated with an immediate controlled shutdown and minimize the risk associated with an immediate controlled shutdown and minimize the risk associated with this level of degradation.

According to Regulatory Guide 1.93 (Ref. 6), with two or more DGs inoperable, operation may continue for a period that should not exceed 2"hours. (Regulatory Guide 1.93 assumed the unit had twd DGs. Thus, a loss of both DGs results in a total loss of onsite power.)

Therefore, a loss of both Unit 1 DGs and the swing DG results in degradation no worse than that assumed in Regulatory Guide 1.93, and the 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> Completion Time is acceptable.

H.1 _.overall plant risk is If the inoperable AC electrical power sources cannot-b'e restored to OPERABLE status within the associ te ,Comleion Time, the unit must be brought to a MODE in which ,, . .osnoapY.I To ITime is achieve this status, the unit must be brought to at least MODE 3 within 12 Ilurs a, o MD' 4M,,*3 ,*u.The allowed CompletiooTms r reasonable, based on op lrating experience, to reach the reqluired plant conditions from full pow r conditions in an orderly manner and without challenging plant systems.

(continued)

HATCH UNIT 2 B3.8-17 B381

INSERT - Bases 3.8.1 Condition H Remaining in the Applicability of the LCO is acceptable because the plant risk in MODE 3 is similar to or lower than the risk in MODE 4 (Ref. 14) and because the time spent in MODE 3 to perform the necessary repairs to restore the system to OPERABLE status will be short.

However, voluntary entry into MODE 4 may be made as it is also an acceptable low-risk state.

Required Action H.1 is modified by a Note that states that LCO 3.0.4.a is not applicable when entering MODE 3. This Note prohibits the use of LCO 3.0.4.a to enter MODE 3 during startup with the LCO not met. However, there is no restriction on the use of LCO 3.0.4.b, if applicable, because LCO 3.0.4.b requires performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering MODE 3, and establishment of risk management actions, if appropriate. LCO 3.0.4 is not applicable to, and the Note does not preclude, changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

AC Sources - Operating B 3.8.1 No change. Included for information only.

BASES SURVEILLANCE SR 3.8.1.18 (continued)

REQUIREMENTS the DGs must be started from standby conditions, that is, with the engine coolant and oil continuously circulated and temperature maintained consistent with manufacturer recommendations. It is permissible to place all three DGs in test simultaneously, for the performance of this Surveillance.

The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

SR 3.8.1.19 With the exception of this Surveillance, all other Surveillances of this Specification (SR 3.8.1.1 through SR 3.8.1.18) are applied only to the Unit 2 DG and offsite circuits, and swing DG. This Surveillance is provided to direct that the appropriate Surveillances for the required Unit 1 DG and offsite circuit are governed by the Unit 1 Technical Specifications. Performance of the applicable Unit 1 Surveillances will satisfy both any Unit 1 requirements, as well as satisfying this Unit 2 SR. Several exceptions are noted to the Unit 1 SRs: SR 3.8.1.6 is excepted since only one Unit 1 circuit is required by the Unit 2 Specification (therefore, there is not necessarily a second circuit to transfer to); SRs 3.8.1.10, 15, and 17 are excepted since they relate to the DG response to a Unit 1 ECCS initiation signal, which is not a necessary function for support of the Unit 2 requirement for an OPERABLE Unit 1 DG.

The Frequency required by the applicable Unit 1 SR also governs performance of that SR for both Units.

REFERENCES 1. 10 CFR 50, Appendix A, GDC 17.

2. FSAR, Sections 8.2 and 8.3.
3. Regulatory Guide 1.9, March 1971.
4. FSAR, Chapter 6.
5. FSAR, Chapter 15.
6. Regulatory Guide 1.93, December 1974.

(continued)

HATCH UNIT 2 B 3.8-36 REVISION 79

AC Sources - Operating B 3.8.1 BASES REFERENCES 7. Generic Letter 84-15.

(continued)

8. 10 CFR 50, Appendix A, GDC 18.
9. Regulatory Guide 1.108, August 1977.
10. Regulatory Guide 1.137, October 1979.
11. IEEE Standard 387-1984.
12. IEEE Standard 308-1980.
13. NRC No. 93-1 02, "Final Policy Statement on Technical Specification Improvements," July 23, 1993.

INSERT Reference- BASES 38.1 HATCH UNIT 2 B383 B 3.8-37 EIIN7

INSERT - Bases 3.8.1 Reference

14. NEDC-32988-A, Revision 2, Technical Justification to Support Risk-Informed Modification to Selected Required End States for BWR Plants, December 2002.

DC Sources - Operating B 3.8.4 BASES ACTIONS B.1 (continued) case accident, continued power operation should not exceed 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Completion Time provides a period of time to correct the problem commensurate with the importance of maintaining the DG DC electrical power subsystem OPERABLE. (The DG DC electrical power subsystem affects both the OG and the offsite circuit, as well as the breaker closure power for various 4160 V AC loads, but does not affect 125/250 V DC station service loads.)

C.__

Condition C represents one Unit 2 station service division with a loss of ability to completely respond to an event, and a potential loss of ability to remain energized during normal operation. It is therefore imperative that the operator's attention focus on stabilizing the unit, minimizing the potential for complete loss of DC power to the affected division. The 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> limit is consistent with the allowed time for an inoperable DC Distribution System division.

If one of the required DC electrical power subsystems is inoperable (e.g., inoperable battery, inoperable battery charger(s), or inoperable battery charger and associated inoperable battery), the remaining DC electrical power subsystems have the capacity to support a safe shutdown and to mitigate an accident condition. Since a subsequent postulated worst case single failure could result in the loss of minimum necessary DC electrical subsystems to mitigate a postulated worst case accident, c*ontinued power operation should not exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. The 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> Completion Time is based on Regulatory Guide 1.93 (Ref. 7) and reflects a reasonable time to assess unit status as a function of the inoperable DC electrical power subsystem and, ifthe DC electrical power subsystem is not restored to OPERABLE status, to prepare to effect an orderly and safe unit shutdown.

DI

  • loverall plant risk isi

' .. 1 ~ Fminimized.

If the DC electrical power subsy tem cannot be restored to OPERABLE status within the r ~uired Completion Time, the unit must be brought to a MODE in whiChlu*-_,Ju 1 *,v *'.I To achieve this status, the unit must be brou ht to at least MODE 3 within -*

12 ous p.......*_............ .The allowed Completion ICondition D "" -" Icniud HATCH UNIT 2 B 3.8-56 '

INSERT - Bases 3.8.4 Condition D Remaining in the Applicability of the LCO is acceptable because the plant risk in MODE 3 is similar to or lower than the risk in MODE 4 (Ref. 11) and because the time spent in MODE 3 to perform the necessary repairs to restore the system to OPERABLE status will be short.

However, voluntary entry into MODE 4 may be made as it is also an acceptable low-risk state.

Required Action D.1 is modified by a Note that states that LCO 3.0.4.a is not applicable when entering MODE 3. This Note prohibits the use of LCO 3.0.4.a to enter MODE 3 during startup with the LCO not met. However, there is no restriction on the use of LCO 3.0.4.b, if applicable, because LCO 3.0.4.b requires performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering MODE 3, and establishment of risk management actions, if appropriate. LCO 3.0.4 is not applicable to, and the Note does not preclude, changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

DC Sources - Operating B 3.8.4 BASES ACTIONS ____.____ t^*;... 4 vL L L;,

Lu b~ iy tl ,= u~iii u MyODE 4 is ,u*,istebht~Ii w;[; i i.e, equi d iii E.1 Condition E corresponds to a level of degradation in the DC electrical power subsystems that causes a required safety function to be lost.

When more than one DC source is lost, and this results in the loss of a required function, the plant is in a condition outside the accident analysis. Therefore, no additional time is justified for continued operation. LCO 3.0.3 must be entered immediately to commence a controlled shutdown.

SURVEILLANCE The SRs are modified by a NOTE to indicate that SR 3.8.4.1 through REQUIREMENTS SR 3.8.4.8 apply only to the Unit 2 DC sources, and that SR 3.8.4.9 applies only to the Unit 1 DC sources.

SR 3.8.4.1 Verifying battery terminal voltage while on float charge for the batteries helps to ensure the effectiveness of the charging system and the ability of the batteries to perform their intended function. Float char'ge is the condition in which the charger is supplying the continuous charge required to overcome the internal losses of a battery (or battery cell) and maintain the battery (or a battery cell) in a fully charged state. Voltage requirements are based on the nominal design voltage of the battery and are consistent with the initial voltages assumed in the battery sizing calculations. The voltage requirement for battery terminal voltage is based on the open circuit voltage of a lead-calcium cell of nominal 1.215 specific gravity.

Without regard to other battery parameters, this voltage is indicative of a battery that is capable of performing its required safety function.

The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

SR 3.8.4.2 Visual inspection to detect corrosion of the battery cells and connections, or measurement of the resistance of each inter-cell, (continued)

HATCH UNIT 2 B385 B 3.8-57 EIIN7

DC Sources - Operating B 3.8.4 BASES REFERENCES 1. 100CFR 50,Appendix A, GDC 17.

2. Regulatory Guide 1.6.
3. IEEE Standard 308-1971.
4. FSAR, Paragraphs 8.3.2.1.1 and 8.3.2.1.2.
5. FSAR, Chapter 6.
6. ESAR, Chapter 15.
7. Regulatory Guide 1.93, December 1974.
8. IEEE Standard 450-1987.
9. Technical Requirements Manual, Section 9.0.
10. Regulatory Guide 1.32, February 1977.

INSERT Reference-BASES 3.8.4 *11 . Not, uso

12. IEEE Standard 485-1983.
13. NRC No. 93-1 02, "Final Policy Statement on Technical Specification Improvements," July 23, 1993.

HATCH UNIT2 B386 B 3.8-62

INSERT - Bases 3.8.4 Reference

11. NEDC-32988-A, Revision 2, Technical Justification to Support Risk-Informed Modification to Selected Required End States for BWR Plants, December 2002.

Distribution Systems - Operating B 3.8.7 BASES ACTIONS D. (continued)

This Completion Time allows for an exception to the normal "time zero" for beginning the allowed outage time "clock." This allowance results in establishing the "time zero" at the time LCO 3.8.7.a was initially not met, instead of at the time Condition D was entered. The 16 hour1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> Completion Time is an acceptable limitation on this potential of failing to meet the LCO indefinitely.

E.I

  • Ioverall plant risk is

, , \ Iminimized.I If the inoperable distribution subsystem cannot be restored to OPERABLE status within the associ ted Completion Time, the unit must be brought to a MODE in which ,'*h C oso p~JTo achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> *s-dt OE4w,~=n3 hu. *The allowed Completion

  • easonable, based on ope i~ng experience, to reach the required plairt conditions from full power c ~ditions in an orderly manner and wit ~out challenging plant systems.]

Tmis INSERT - BASES 3.8.7 F. 1 Condition E Condition F corresponds to a level of degradation in the electrical power distribution system that causes a required safety function to be lost. When more than one AC or DC electrical power distribution subsystem is lost, and this results in the loss of a required function, the plant is in a condition outside the accident analysis. Therefore, no additional time is justified for continued operation. LCO 3.0.3 must be entered immediately to commence a controlled shutdown.

SURVEILLANCE SR 3.8.7.1 REQUIREMENTS This Surveillance verifies that the AC and DC electrical power distribution systems are functioning properly, with the correct circuit breaker alignment. The correct breaker alignment ensures the appropriate separation and independence of the electrical buses are maintained, and the appropriate voltage is available to each required bus. The verification of proper voltage availability on the buses ensures that the required voltage is readily available for motive as well as control functions for critical system loads connected to these buses. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

(continued)

HATCH UNIT 2 B388 B 3.8-80

INSERT - Bases 3.8.7 Condition E Remaining in the Applicability of the LCO is acceptable because the plant risk in MODE 3 is similar to or lower than the risk in MODE 4 (Ref. 5) and because the time spent in MODE 3 to perform the necessary repairs to restore the system to OPERABLE status will be short.

However, voluntary entry into MODE 4 may be made as it is also an acceptable low-risk state.

Required Action E.1 is modified by a Note that states that LCO 3.0.4.a is not applicable when entering MODE 3. This Note prohibits the use of LCO 3.0.4.a to enter MODE 3 during startup with the LCO not met. However, there is no restriction on the use of LCO 3.0.4.b, if applicable, because LCO 3.0.4.b requires performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering MODE 3, and establishment of risk management actions, if appropriate. LCO 3.0.4 is not applicable to, and the Note does not preclude, changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

Distribution Systems - Operating B 3.8.7 BASES (continued)

REFERENCES 1. FSAR, Chapter 6.

2. FSAR, Chapter 15.
3. Regulatory Guide 1.93, December 1974.
4. NRC No. 93-1 02, "Final Policy Statement on Technical Specification Improvements," July 23, 1993.
  • "' .INSERT- BASES 3.8.7 Reference HATCH UNIT 2 B388 B 3.8-81

INSERT - Bases 3.8.7 Reference

5. NEDC-32988-A, Revision 2, Technical Justification to Support Risk-Informed Modification to Selected Required End States for BWR Plants, December 2002.

Edwin I. Hatch Nuclear Plant License Amendment Request for Adoption of TSTF-423-A, Rev. 1 Technical Specifications End States, NEDC-32988-A, Attachment 4 Revised (Clean) TS Pages

RPS Electric Power Monitoring 3.3.8.2 3.3 INSTRUMENTATION 3.3.8.2 Reactor Protection System (RPS) Electric Power Monitoring LCO 3.3.8.2 Two RPS electric power monitoring assemblies shall be OPERABLE for each inservice RPS motor generator set or alternate power supply.

APPLICABILITY: MODES 1, 2, and 3, MODES 4 and 5 with any control rod withdrawn from a core cell containing one or more fuel assemblies or with both residual heat removal (RHR) shutdown cooling (SDC) isolation valves open.

ACTIONS______ ___

CONDITION REQUIRED ACTION COMPLETION TIME A. One or both inservice A.1 Remove associated 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> power supplies with one inservice power electric power monitoring supply(s) from service.

assembly inoperable.

B. One or both inservice B.1 Remove associated 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> power supplies with both inservice power electric power monitoring supply(s) from service.

assemblies inoperable.

C. Required Action and C.1-----NOTE---

associated Completion LCO 3.0.4.a is not Time of Condition A or B applicable when not met in MODE 1, 2, or 3. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (continued)

HATCH UNIT 1 3.3-69 HATC UNI I 33-69Amendment No.

ECCS - Operating 3.5.1 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCiC) SYSTEM 3.5.1 ECCS - Operating LCO 3.5.1 Each ECCS injection/spray subsystem and the Automatic Depressurization System (ADS) function of six of seven safety/relief valves shall be OPERABLE.

APPLICABILITY: MODEl1, MODES 2 and 3, except high pressure coolant injection (HPCI) and ADS valves are not required to be OPERABLE with reactor steam dome pressure < 150 psig.

ACTIONS

,NOTE LCO 3.0.4.b is not applicable to HPCI.

CONDITION REQUIRED ACTION COMPLETION TIME A. One low pressure ECCS A.1 Restore low pressure 7 days injection/spray subsystem ECCS injection/spray inoperable, subsystem to OPERABLE status.

B. Required Action and B.1-----NOTE---

associated Completion LCO 3.0.4.a is not Time of Condition A not applicable when met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> C. HPCI System inoperable. C.1 Verify by administrative 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> means RCIC System is OPERABLE.

AND C.2 Restore HPCI System 14 days to OPERABLE status.

(continued)

HATCH UNIT 1 3.5-1 HATC 1 35-1Amendment UNI No.

ECCS - Operating 3.5.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D. HPCI System inoperable. D.1 Restore HPCI System 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to OPERABLE status.

AND OR One low pressure ECCS injection/spray subsystem D.2 Restore low pressure 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is inoperable. ECCS injection/spray subsystem to OPERABLE status.

E. Required Action and E.1---------NOTE-----

associated Completion LCO 3.0.4.a is not Time of Condition C or D applicable when not met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> F. Two or more ADS valves F.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> inoperable.

AND F.2 Reduce reactor steam 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> dome pressure to

< 150 psig.

G. Two or more low pressure G.1 Enter LCO 3.0.3. Immediately ECCS injection/spray subsystems inoperable.

OR HPCI System and two or more ADS valves inoperable.

HATCH UNIT 1 3.5-2 HATC 1 35-2Amendment UNI No.

RCIC System 3.5.3 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.3 RCIC System LCO 3.5.3 The RCIC System shall be OPERABLE.

APPLICABILITY: MODEl1, MODES 2 and 3 with reactor steam dome pressure > 150 psig.

ACTIONS LCO 3.0.4.b is not applicable to RCIC.

CONDITION REQUIRED ACTION COMPLETION TIME A. RCIC System inoperable. A.1 Verify by administrative 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> means high pressure coolant injection (HPCl)

System is OPERABLE.

AND A.2 Restore RCIC System 14 days to OPERABLE status.

B. Required Action and B.1------NOTE------...

associated Completion LCO 3.0.4.a is not Time not met. applicable when enitering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> HATCH UNIT 1 3.5-9 HATC UNI I 35-9Amendment No.

Reactor Building-to-Suppression Chamber Vacuum Breakers 3.6.1.7 3.6 CONTAINMENT SYSTEMS 3.6.1.7 Reactor Building-to-Suppression Chamber Vacuum Breakers LCO 3.6.1.7 OPERABLE.

APPLICABILITY: MODES 1,2, and 3.

ACTI ONS


NOT I:----------------------------

Separate Condition entry is allowed for each line.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more lines with one A.1 Close the open vacuum 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> reactor building-to- breaker.

suppression chamber vacuum breaker not closed.

B. One or more lines with two B.1 Close one open 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> reactor building-to- vacuum breaker..

suppression chamber vacuum breakers not closed.

C. One line with one or more C.1 Restore the vacuum 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> reactor building-to- breaker(s) to suppression chamber OPERABLE status.

vacuum breakers inoperable for opening.

D. Required Action and D.1---------NOTE-----

associated Completion .LCO 3.0.4.a is not Time of Condition C not applicable when met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (continued)

HATCH UNIT 1 3.6-17 HATC UNI I 36-17Amendment No.

Reactor Building-to-Suppression Chamber Vacuum Breakers 3.6.1.7 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME E. Two lines with one or more E.1 Restore all vacuum 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> reactor building-to- breakers in one line to suppression chamber OPERABLE status.

vacuum breakers inoperable for opening.

F. Required Action and F.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Associated Completion Time or Condition A, B, or AND E not met.

F.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.7.1-----------NOTES- ------

1. Not required to be met for vacuum breakers that are open during Surveillances.
2. Not required to be met for vacuum breakers open when performing their intended function.

Verify each vacuum breaker is closed. In accordance with the Surveillance Frequency Control Program SR 3.6.1.7.2 Perform a functional test of each vacuum breaker. In accordance with the Inservice Testing Program SR 3.6.1.7.3 Verify the opening setpoint of each vacuum In accordance with breaker is < 0.5 psid. the Surveillance Frequency ,Control Program HATCH UNIT 1 3.6-18 1 36-18Amendment UNI HATC No.

Suppression Chamber-to-Drywell Vacuum Breakers 3.6.1.8 3.6 CONTAINMENT SYSTEMS 3.6.1.8 Suppression Chamber-to-Drywell Vacuum Breakers LCO 3.6.1.8 Ten suppression chamber-to-drywell vacuum breakers shall be OPERABLE for opening.

AND Twelve suppression chamber-to-drywell vacuum breakers shall be closed, except when performing their intended function.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One required suppression A.1 Restore one vacuum 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> chamber-to-drywell vacuum breaker to OPERABLE breaker inoperable for status.

opening.

B. Required Action and B.1-----NOTE---

associated Completion LCO 3.0.4.a is not Time of Condition A not applicable when met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> C. One suppression chamber- C.1 Close the open vacuum 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to-drywell vacuum breaker breaker.

not closed.

D. Required Action and D.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition C not AND met.

D.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> HATCH UNIT 1 3.6-19 1 36-19Amendment UNI HATC No.

RHR Suppression Pool Cooling 3.6.2.3 3.6 CONTAINMENT SYSTEMS 3.6.2.3 Residual Heat Removal (RHR) Suppression Pool Cooling LCO 3.6.2.3 Two RHR suppression pool cooling subsystems shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One RHR suppression pool A.1 Restore RHR 7 days cooling subsystem suppression pool inoperable, cooling subsystem to OPERABLE status.

B. Required Action and B.1----------NOTE-----

associated Completion LCO 3.0.4.a is not Time of Condition A not applicable when met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> C. Two RHR suppression pool C.1 Restore one RHR 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> cooling subsystems suppression pool inoperable. cooling subsystem to OPERABLE status.

D. Required Action and D.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition C not AND met.

D.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> HATCH UNIT 1 3.6-25 HATC UNI I 36-25Amendment No.

RHR Suppression Pool Cooling 3.6.2.3 SURVEILLANCEREQUIREMENTS________

SURVEILLANCE FREQUENCY SR 3.6.2.3.1 Verify each RHR suppression pool cooling In accordance with subsystem manual, power operated, and automatic the Surveillance valve in the flow path that is not locked, sealed, or Frequency Control otherwise secured in position is in the correct Program position or can be aligned to the correct position.

SR 3.6.2.3.2 Verify each required RHR pump develops a flow In accordance with rate > 7700 gpm through the associated heat the lnservice exchanger while operating in the suppression pool Testing Program cooling mode.

HATCH UNIT 1 3.6-26 HATC UNI 1 36-26Amendment No.

RHR Suppression Pool Spray 3.6.2.4 3.6 CONTAINMENT SYSTEMS 3.6.2.4 Residual Heat Removal (RHR) Suppression Pool spray LCO 3.6.2.4 Two RHR suppression pool spray subsystems shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS ________

CONDITION REQUIRED ACTION COMPLETION TIME A. One RHR suppression pool A.1 Restore RHR 7 days spray subsystem suppression pool spray inoperable, subsystem to OPERABLE status.

B. Two RHR suppression pool B.1 Restore one RHR 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> spray subsystems suppression pool spray inoperable, subsystem to*

OPERABLE status.

C. Required Action and C.1------NOTE---

associated Completion LCO 3.0.4.a is not Time not met. applicable when entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SURVEILLANCEREQUIREMENTS________

SURVEILLANCE FREQUENCY SR 3.6.2.4.1 Verify each RHR suppression pool spray In accordance with subsystem manual, power operated, and the Surveillance automatic valve in the flow path that is not locked, Frequency Control sealed, or otherwise secured in position is in the Program correct position or can be aligned to the correct position.

(continued)

HATCH UNIT 1 3.6-27 HATC UNI I 36-27Amendment No.

Secondary Containment 3.6.4.1 3.6 CONTAINMENT SYSTEMS 3.6.4.1 Secondary Containment LCO 3.6.4.1 The secondary containment shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3, During movement of irradiated fuel assemblies in the secondary containment, During CORE ALTERATIONS, During operations with a potential for draining the reactor vessel (OPDRVs).

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Secondary containment A.1 Restore secondary 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> inoperable in MODE 1, 2, containment to or 3. OPERABLE status.

B. Required Action and B.1-----NOTE-.........

associated Completion LCO 3.0.4.a is not Time of Condition A not applicable when entering met. MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> C. Secondary containment C.1------NOTE----

inoperable during LCO 3.0.3 is not movement of irradiated fuel applicable.

assemblies in the secondary containment, during CORE Suspend movement of Immediately ALTERATIONS, or during irradiated fuel OPDRVs. assemblies in the secondary containment.

AND (continued)

HATCH UNIT 1 3.6-34 HATC UNI 1 36-34Amendment No.

SGT System 3.6.4:3 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and C.1----------NOTE----

associated Completion LCO 3.0.4.a is not Time of Condition A or B applicable when not met in MODE 1, 2, or 3. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> D. Required Action and---------------NOTE-------

associated Completion LCO 3.0.3 is not applicable.

Time of Condition Aor B not met during movement of irradiated fuel assemblies in D.1 Place remaining Immediately the secondary containment, OPERABLE SGT during CORE subsystem(s) in ALTERATIONS, or during operation.

OPDRVs.

ORR D.2.1 Suspend movement of Immediately irradiated fuel assemblies in secondary containment.

AND D.2.2 Suspend CORE Immediately ALTERATIONS.

AND D.2.3 Initiate action to Immediately suspend OPDRVs.

E. Two or more required SGT E.1-----NOTE---

subsystems inoperable in LCO 3.0.4.a is not MODE 1, 2, or 3. applicable when entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (continued)

HATCH UNIT 1 3.6-41 HATCHUNITI 3.-4 1Amendment No.

RHRSW System 3.7.1 3.7 PLANT SYSTEMS 3.7.1 Residual Heat Removal Service Water (RHRSW) System LCOG 3.7.1 Two RHRSW subsystems shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS _________

CONDITION REQUIRED ACTION COMPLETION TIME A. One RHRSW pump A.1 Restore RHRSW pump 30 days inoperable, to OPERABLE status.

B. One RHRSW pump in each B.1 Restore one RHRSW 7 days subsystem inoperable, pump to OPERABLE status.

C. One RHRSW subsystem-------NOTE--...........

inoperable for reasons Enter applicable Conditions and other than Condition A. Required Actions of LCO 3.4.7, "Residual Heat Removal (RHR)

Shutdown Cooling System - Hot Shutdown," for RHR shutdown cooling made inoperable by RHRSW System.

C.1 Restore RHRSW 7 days subsystem to OPERABLE status.

D. Required Action and D.1---------NOTE-----

associated Completion LCO 3.0.4.a is not Time of Condition A, B, or applicable when C not met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (continued)

HATCH UNIT 1 3.7-1 HATC UNI 1 37-1Amendment No.

RHRSW System 3.7.1 ACTIONS (continued) __________

CONDITION REQUIRED ACTION COMPLETION TIME E. Both RHRSW subsystems------NOTE-----

inoperable for reasons Enter applicable Conditions and other than Condition B. Required Actions of LCO 3.4.7 for RHR shutdown cooling made inoperable by RHRSW System.

E.1 Restore one RHRSW 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> subsystem to OPERABLE status.

F. Required Action and F.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition E not AND met.

F.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.1.1 Verify each RHRSW manual, power operated, and In accordance with automatic valve in the flow path, that is not locked, the Surveillance sealed, or otherwise secured in position, is in the Frequency Control correct position or can be aligned to the correct Program position.

HATCH UNIT 1 3.7-2 UNI I

HATC 37-2Amendment No.

PSW System and UHS 3.7.2 3.7 PLANT SYSTEMS 3.7.2 Plant Service Water (PSW)~System and Ultimate Heat Sink (UHS)

LCO 3.7.2 Two PSW subsystems and UHS shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One PSW pump inoperable. A.1 Restore PSW pump to 30 days OPERABLE status.

B. One PSW turbine building B.1 Restore PSW turbine 30 days isolation valve inoperable, building isolation valve to OPERABLE status.

C. One PSW pump in each C.1 Restore one PSW 7 days subsystem inoperable, pump to OPERABLE status.

D. One PSW turbine building D.1 Restore one PSW 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> isolation valve in each turbine building subsystem inoperable, isolation valve to OPERABLE status.

E. Required Action and E.1---------NOTE-----

associated Completion LCO 3.0.4.a is not Time of Condition A, B, C, applicable when or D not met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (continued)

HATCH UNIT 1 3.7-3 HATC UNI I 37-3Amendment No.

PSW System and 3.7.2 UHS

  • ACTIONS (continued)__________

CONDITION REQUIRED ACTION cOMPLETION TIME F. One P3W subsystem--------NOTES- ---

inoperable for reasons 1. Enter applicable Conditions other than Conditions A and Required Actions of and B. LCO 3.8.1, "AC Sources -

Operating," for diesel generator made inoperable by PSW System.

2. Enter applicable Conditions and Required Actions of LCO 3.4.7, "Residual Heat Removal (RHR) Shutdown Cooling System - Hot Shutdown," for RHR shutdown cooling made inoperable by PSW System.

F.1 Restore the PSW 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> subsystem to OPERABLE status.

G. Required Action and G.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition F not AND met.

G.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> O__R Both PSW subsystems inoperable for reasons other than Conditions C and D.

OR UHS inoperable.

HATCH UNIT 1 3.7-4 HATC UNI I 37-4Amendment No.

McREc System 3.7.4 ACTIONS (continued)__________________________

CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and C.1-----NOTE---

associated Completion LCO 3.0.4.a is not Time of Condition A or B applicable when not met in MODE 1, 2, or 3. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> D. Required Action and---------NOTE-----

associated Completion Time LCO 3.0.3 is not applicable.

of Condition A not met during movement of irradiated fuel assemblies in D.1 Place OPERABLE Immediately the secondary containment, MCREC subsystem in during CORE pressurization mode.

ALTERATIONS, or during OPDRVs. OR D.2.1 Suspend movement of Immediately irradiated fuel assemblies in the secondary containment.

AND D.2.2 Suspend CORE Immediately ALTERATIONS.

AND D.2.3 *Initiate action to Immediately suspend OPDRVs.

E. Two MCREC subsystems E.1---------NOTE-----

inoperable in MODE 1, 2, LCO 3.0.4.a is not or 3 for reasons other than applicable when Condition B. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (continued)

HATCH UNIT 1I 3.7-9 Amendment No.

Control Room AC System:

3.7.5 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and D.1----------NOTE----

associated Completion LCO 3.0.4.a is not Time of Condition A, B, or applicable when C not met in MODE 1, 2, or entering MODE 3.

3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> E. Required Action and---------------NOTE-------

associated Completion LCO 3.0.3 is not applicable.

Time of Condition A not met------------

during movement of irradiated fuel assemblies in E.1 Place OPERABLE Immediately the secondary containment, control room AC during CORE subsystems in ALTERATIONS, or during operation.

OPDR Vs.

ORR E.2.1 Suspend movement of Immediately irradiated fuel assemblies in the secondary containment.

AND E.2.2 Suspend CORE Immediately ALTERATIONS.

AND E.2.3 Initiate action to Immediately suspend OPDRVs.

(continued)

HATCH UNIT 1 3.7-13 HATC UNI I 37-13Amendment No.

Main Condenser Offgas 3.7.6 3.7 PLANT SYSTEMS 3.7.6 Main Condenser Offgas LCD 3.7.6 The gross gamma activity rate of the noble gases measured at the main condenser evacuation system pretreatment monitor station shall be

< 240 mCi/second.

APPLICABILITY: MODE 1, MODES 2 and 3 with any main steam line not isolated and steam jet air ejector (SJAE) in operation.

ACTIONS ________

CONDITION REQUIRED ACTION COMPLETION TIME A. Gross gamma activity rate A.1 Restore gross gamma 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of the noble gases not activity rate of the noble within limit, gases to within limit.

B. Required Action and B.1 Isolate all main steam 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion lines.

Time not met.

O._R B.2 Isolate SJAE. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OR B.3-------.....NOTE-- -

LCD 3.0.4.a is not applicable when entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> HATCH UNIT 1 3.7-16 HATC UNI I 37-16Amendment No.

AC Sources - Operating 3.8.1 ACTIONS (continued)_________________________

CONDITION REQUIRED ACTION COMPLETION TIME E. (continued) OR E.2 Restore required DG to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OPERABLE status.

F. Two or more (Unit 1 and F.1 Restore all but one 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> swing) DGs inoperable. Unit 1 and swing DGs to OPERABLE status G. No DGs capable of G.1 Restore one DG 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> supplying power to any capable of supplying Unit 1 LPCI valve load power to Unit I LPCI center. valve load center to OPERABLE status.

H. Required Action and H.1---------NOTE-----

Associated Completion LCO 3.0.4.a is not Time of Condition A, B, C, applicable when D, E, F, or G not met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> One or more required 1.1 Enter LCO 3.0.3. Immediately offsite circuits and two or more required DGs inoperable.

OR Two or more required offsite circuits and one required DG inoperable.

HATCH UNIT 1 3.8-6 HATC UNI I 38-6Amendment No.

DC Sources - Operating 3.8.4 ACTIONS (continued)_________________________

CONDITION REQUIRED ACTION COMPLETION TIME B. One Unit 1 DG DC B.1 Restore DG DC 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> electrical power subsystem electrical power inoperable, subsystem to OPERABLE status.

ORR Swing DG DC electrical power subsystem inoperable for reasons other than Condition A.

C. One Unit 1 station service C.1 Restore station service 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> DC electrical power DC electrical power Subsystem inoperable, subsystem to OPERABLE status.

D. Required Action and D.1-----NOTE---

Associated Completion LCO 3.0.4.a is not Time of Condition A, B, applicable when or C not met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> E. Two or more DC electrical E.1 Enter LCO 3.0.3. Immediately power subsystems inoperable that result in a loss of function.

HATCH UNIT 1 3.8-27 I 38-27Amendment UNI HATC No.

Distribution Systems - Operating 3.8.7 ACTIONS (continued) __________

CONDITION REQUIRED ACTION COMPLETION TIME B. One or more (Unit 1 or B.1 Restore DG DC 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> swing bus) DG DC electrical power electrical power distribution distribution subsystem AND subsystems inoperable, to OPERABLE status.

~16 hours from discovery of failure to meet LCO 3.8.7.a C. One or more (Unit 1 or C.1 Restore AC electrical 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> swing bus) AC electrical power distribution power distribution subsystem 'to AND subsystems inoperable. OPERABLE status.

16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> from discovery of failure to meet LCO 3.8.7.a D. One Unit 1 station service D.1 Restore Unit 1 station 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> DC electrical power service DC electrical distribution subsystem power distribution AND inoperable, subsystem to OPERABLE status. 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> from discovery of failure to meet LCO 3.8.7.a E. Required Action and E.1-----NOTE---

associated Completion LCO 3.0.4.a is not Time of Condition A, B, C, applicable when or D not met. entering MODE 3.

Be in MODE 3.. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> F. Two or more electrical F.1 Enter LCO 3.0.3. Immediately power distribution subsystems inoperable that result in a loss of function.

HATCH UNIT 1 3.8-37 HATC UNI I 38-37Amendment No.

RPS Electric Power Monitoring 3.3.8.2 3.3 INSTRUMENTATION 3.3.8.2 Reactor Protection System (RPS) Electric Power Monitoring LCO 3.3.8.2 Two RPS electric power monitoring assemblies shall be OPERABLE for each inservice RPS motor generator set or alternate power supply.*

APPLICABILITY: MODES 1,2, and 3, MODES 4 and 5 with any control rod withdrawn from a core cell containing one or more fuel assemblies or with both residual heat removal (RHR) shutdown cooling (SDC) isolation valves open.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or both inservice A.1 Remove associated 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> power supplies with one inservice power electric power monitoring 'supply(s) from service.

assembly inoperable.

B. One or both inservice B.1 Remove associated 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> power supplies with both inservice power electric power monitoring supply(s) from service.

assemblies inoperable.

C. Required Action and C.1---------..NOTE-----...

associated Completion LCO 3.0.4.a is not Time of Condition A or B applicable when not met in.MODE 1, 2, or 3. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (continued)

HATCH UNIT 2 3.3-69 HATC UNI 2 33-69Amendment No.

ECCS - Operating 3.5.1 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.1 ECCS - Operating LCO 3.5.1 Each ECCS injection/spray subsystem and the Automatic Depressurization System (ADS) function of six of seven safety/relief valves shall be OPERABLE.

MODEl1, APPLICABILITY:

MODES 2 and 3, except high pressure coolant injection (HPCi) and ADS valves are not required to be OPERABLE with reactor steam dome pressure < 150 psig.

ACTIONS


NOTE-.

LCO 3.0.4.b is not applicable to HPCI.

CONDITION REQUIRED ACTION COMPLETION TIME A. One low pressure ECCS A.1 Restore low pressure 7 days injection/spray subsystem ECCS injection/spray inoperable, subsystem to OPERABLE status.

B. Required Action and B.1- .......... NOTE-----...

associated Completion LCO 3.0.4.a is not Time of Condition A not applicable when met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> C. HPCI System inoperable. C.1 Verify by administrative 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> means RCIC System is OPERABLE.

AND C.2 Restore HPCI System 14 days to OPERABLE status.

(continued) 3.5-1 Amendment No.

ECCS - Operating 3.5.1 ACTIONS (continued) ______________

CONDITION REQUIRED ACTION COMPLETION TIME D. HPCI System inoperable. 0.1 Restore HPCI System 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to OPERABLE status.

AND ORR One low pressure ECCS injection/spray subsystem 0.2 Restore low pressure 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable. ECCS injection/spray subsystem to OPERABLE status.

E. Required Action and E.1---------..NOTE-----...

associated Completion LCO 3.0.4.a is not Time of Condition C or D applicable when entering not met. MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> F. Two or more ADS valves F.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> inoperable.

AND F.2 Reduce reactor steam 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />

  • dome pressure to

< 150 psig.

G. Two or more low pressure G.1 Enter LCO 3.0.3. Immediately ECCS injection/spray subsystems inoperable.

OR HPCI System and two or more ADS valves inoperable.

HATCH UNIT 2 3.5-2 HATC UNI 2 35-2Amendment No.

RCIC System 3.5.3 3.5 EMERGENCY CORE COOLING SYSTEMS (EGOS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.3 RCIC System LCO 3.5.3 The RCIC System shall be OPERABLE.

APPLICABILITY: MODEl1, MODES 2 and 3 with reactor steam dome pressure > 150 psig.

ACTIONS


NOTE-LCO 3.0.4.b is not applicable to RCIC.

CONDITION REQUIRED ACTION COMPLETION TIME A. RCIC System inoperable. A.1 Verify by administrative 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> means high pressure coolant injection (HPCI)

System is OPERABLE.

AND A.2 Restore RCIC System 14 days to OPERABLE status.

B. Required Action and B.I-- ..........NOTE-........

associated Completion LCO 3.0.4.a is not Time not met. applicable when entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> HATCH UNIT 2 3.5-10 HATC UNI 2 35-10Amendment No.

Reactor Building-to-Suppression Chamber Vacuum Breakers 3.6.1.7 3.6 CONTAINMENT SYSTEMS 3.6.1.7 Reactor Building-to-Suppression Chamber Vacuum Breakers LCO 3.6.1.7 OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS


NOT Separate Condition entry is allowed for each line.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more lines with one A.1 Close the open vacuum 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> reactor building-to- breaker.

suppression chamber vacuum breaker not closed.

B. One or more lines with two B.1 Close one open 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> reactor building-to- vacuum breaker.

suppression chamber vacuum breakers not closed.

C. One line with one or more C.1 Restore the vacuum 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> reactor building-to- breaker(s) to suppression chamber. OPERABLE status.

vacuum breakers inoperable for opening.

D. Required Action and D.1- .......... NOTE---

associated Completion LCO 3.0.4.a is not Time of Condition C not applicable when met. entering MODE 3.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Be in MODE 3.

(continued)

HATCH UNIT 2 3.6-18 HATC UNI 2 36-18Amendment No.

Reactor Building-to-Suppression Chamber Vacuum Breakers 3.6.1.7 ACTIONS (continued)

CONDITION] REQUIRED ACTION] COMPLETION TIME E. Two lines with one or more E.1I Restore all vacuum 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> reactor building-to- breakers in one line to suppression chamber OPERABLE status.

vacuum breakers inoperable for opening.

F. Required Action and F.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Associated Completion Time of Condition A, B, or AND E not met.

F.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCEREQUIREMENTS________

SURVEILLANCE FREQUENCY SR 3.6.1.7.1-----------NOTES- ------

1. Not required to be met for vacuum breakers that are open during
  • Surveillances.
2. Not required to be met for vacuum breakers open when performing their intended function.

Verify each vacuum breaker is closed. in accordance with the Surveillance Frequency Control Program SR 3.6.1.7.2 Perform a functional test of each vacuum breaker. In accordance with the Inservice Testing Program SR 3.6.1.7.3 Verify the opening setpoint of each vacuum In accordance with breaker is _<0.5 psid. the Surveillance Frequency Control Program HATCH UNIT 2 3.6-18 HATC UNI 2 36-18Amendment No.

Suppression Chamber-to-Drywell Vacuum Breakers 3.6.1.8 3.6 CONTAINMENT SYSTEMS 3.6.1.8 Suppression Chamber-to-Drywell Vacuum Breakers LCO 3.6.1.8 Ten suppression chamber-to-drywell vacuum breakers shall be OPERABLE for opening.

AND Twelve suppression chamber-to-drywell vacuum breakers shall be closed, except when performing their intended function.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One required suppression A.1 Restore one vacuum 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> chamber-to-drywell vacuum breaker to OPERABLE breaker inoperable for status.

opening.

B. Required Action and B.1- .......... NOTE-........

associated Completion LCO 3.0.4.a is not Time of Condition A not applicable when met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> C. One suppression chamber- C.1 Close the open vacuum 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to-drywell vacuum breaker breaker.

not closed.

D. Required Action and D.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition C not AND met.

D.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> HATCH UNIT 2 3.6-19 2 36-19Amendment UNI HATC No.

RHR Suppression Pool Cooling 3.6.2.3 3.6 CONTAINMENT SYSTEMS 3.6.2.3 Residual Heat Removal (RHR) Suppression Pool Cooling LCO 3.6.2.3 Two RHR suppression pool cooling subsystems shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS ________

CONDITION .REQUIRED ACTION COMPLETION TIME A. One RHR suppression pool A.1 Restore RHR 7 days cooling subsystem suppression pool inoperable, cooling subsystem to OPERABLE status.

B. Required Action and B.1---------NOTE-----

associated Completion LCO 3.O.4.a is not Time of Condition A not applicable when met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> C. Two RHR suppression pool C.1 Restore one RHR 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> cooling subsystems suppression pool inoperable, cooling subsystem to OPERABLE status.

D. Required Action and D.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition C not AND met. I D.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> I

HATCH UNIT 2 3.6-25 2 36-25Amendment UNI HATC No.

RHR Suppression Pool Cooling 3.6.2.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.2.3.1 Verify each RHR suppression pool cooling In accordance with subsystem manual, power operated, and automatic the Surveillance valve in the flow path that is not locked, sealed, or Frequency Control otherwise secured in position is in the correct Program position or can be aligned to the correct position.

SR 3.6.2.3.2 Verify each required RHR pump develops a flow In accordance with rate > 7700 gpm through the associated heat the Inservice exchanger while operating in the suppression pool Testing Program cooling mode.

HATCH UNIT 2 3.6-26 HATH UIT 3.-26Amendment No.

RHR Suppression Pool Spray 3.6.2.4 3.6 CONTAINMENT SYSTEMS 3.6.2.4 Residual Heat Removal (RHR) Suppression Pool Spray LCO 3.6.2.4 Two RHR suppression pool spray subsystems shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS ___________

CONDITION REQUIRED ACTION COMPLETION TIME A. One RHR suppression pool A.1 Restore RHR 7 days spray subsystem suppression pool spray inoperable, subsystem to OPERABLE status.

B. Two RHR suppression pool B.1 Restore one RHR 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> spray subsystems suppression pool spray inoperable, subsystem to OPERABLE status.

C. Required Action and C.1----------.NOTE-........

associated Completion LCO 3.0.4.a is not Time not met. applicable when entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.2.4.1 Verify each RHR suppression pool spray In accordance with subsystem manual, power operated, and the Surveillance automatic valve in the flow path that is not locked, Frequency Control sealed, or otherwise secured in position is in the Program correct position or can be aligned to the correct position.

(continued)

HATCH UNIT 2 3.6-27

Secondary Containment 3.6.4.1 3.6 CONTAINMENT SYSTEMS 3.6.4.1 Secondary Containment LCO 3.6.4.1 The secondary containment shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3, During movement of irradiated fuel assemblies in the secondary containment, During CORE ALTERATIONS, During operations with a potential for draining the reactor vessel (OPDRV).

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Secondary containment A.1 Restore secondary 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> inoperable in MODE 1, 2, containment to or 3. OPERABLE status.

B. Required Action and B.1- .......... NOTE-----...

associated Completion LCO 3.0.4.a is not Time of Condition A not applicable when met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> C. Secondary containment C.1-----NOTE- --

inoperable during LCO 3.0.3 is not movement of irradiated fuel .applicable.

assemblies in the secondary containment, during CORE Suspend movement of Immediately ALTERATIONS, or during irradiated fuel OPDRVs. assemblies in the secondary containment.

AND (continued)

HATCH UNIT 2 3.6-33 HATC UNI 2 36-33Amendment No.

SGT System 3.6.4.3 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. One required Unit 2 SOT B.1 Restore required SGT 7 days subsystem inoperable, subsystem to OPERABLE status. AND OR 30 days from One required Unit 1 SOT discovery of failure to subsystem inoperable for meet the LCO reasons other than Condition A.

C. Required Action and C.1- .......... NOTE-----...

associated Completion LCO 3.0.4.a is not Time of Condition A or B applicable when not met in MODE 1, 2, or 3. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> D. Required Action and---------NOTE- ---

associated Completion LCO 3.0.3 is not applicable.

Time of Condition A or B not met during movement of irradiated fuel D.1 Place remaining Immediately assemblies in the OPERABLE SGT secondary containment, subsystem(s) in during CORE operation.

ALTERATIONS, or during OPDRVs. OR D.2.1 Suspend movement of Immediately irradiated fuel assemblies in secondary containment.

AND D.2.2 Suspend CORE Immediately ALTERATIONS.

AND D.2.3 Initiate action to Immediately suspend OPDRVs.

(continued)

HATCH UNIT 2 3.6-40

SGT System 3.6.4.3 ACTIONS (continued)__________________________

CONDITION REQUIRED ACTION COMPLETION TIME E. Two or more required SGT E.1------NOTE- --

subsystems inoperable in LCO 3.0.4.a is not MODE 1, 2, or 3. applicable when entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> F. Two or more required SGT F.1 NOTE- --

subsystems inoperable LCO 3.0.3 is not during movement of applicable.

irradiated fuel assemblies in the secondary containment, during CORE Suspend movement of Immediately ALTERATIONS, or during irradiated fuel OPDRVs. assemblies in secondary containment.

AND F.2 Suspend CORE Immediately ALTERATIONS.

AND F.3 Initiate action to Immediately suspend OPDRVs.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.4.3.1 Operate each required SGT subsystem for In accordance with

> 15 continuous minutes. the Surveillance Frequency Control Program SR 3.6.4.3.2 Perform required SGT filter testing in accordance In accordance with with the Ventilation Filter Testing Program (VFTP). the VFTP (continued) 3.6-41 Amendment No.

RHRSW System 3.7.1 3.7 PLANT SYSTEMS 3.7.1 Residual Heat Removal Service Water (RHRSW) System LCO 3.7.1 Two RHRSW subsystems shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS ___________

CONDITION REQUIRED ACTION COMPLETION TIME A.. One RHRSW pump A.1 Restore RHRSW pump 30 days inoperable, to OPERABLE status.

B. One RHRSW pump in each B.1 Restore one RHRSW 7 days subsystem inoperable, pump to OPERABLE status.

C. One RHRSW subsystem-------------NOTE--------

inoperable for reasons Enter applicable Conditions and other than Condition A. Required Actions of LCO 3.4.7, "Residual Heat Removal (RHR)

Shutdown Cooling System - Hot Shutdown," for RHR shutdown cooling made inoperable by RHRSW System.

C.1 Restore RHRSW 7 days subsystem to OPERABLE status.

D. Required Action and D.1- .......... NOTE---

associated Completion LCO 3.0.4.a is not Time of Condition A, B, or applicable when C not met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (continued)

HATCH UNIT 2 371AedetN 3.7-1 Amendment No_

RHRSW System 3.7.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME E. Both RHRSW subsystems------NOTE-----

inoperable for reasons Enter applicable Conditions and other than Condition B. Required Actions of LCO 3.4.7 for RHR shutdown cooling made inoperable by RHRSW System.

E.1 Restore one RHRSW 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> subsystem to OPERABLE status.

F. Required Action and F.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition E not AND met.

F.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.1.1 Verify each RHRSW manual, power operated, and In accordance with automatic valve in the flow path, that is not locked, the Surveillance sealed, or otherwise secured in position, is in the Frequency Control correct position or can be aligned to the correct Program position.

HATCH UNIT 2 3.7-2 HATC UNI 2 37-2Amendment No.

PSW System and UHS 3.7.2 3.7 PLANT SYSTEMS 3.7.2 Plant Service Water (PSW) System and Ultimate Heat Sink (UHS)

LCO 3.7.2 Two PSW subsystems and UHS shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One PSW pump inoperable. A.1 Restore PSW pump to 30 days OPERABLE status.

B. One PSW turbine building B.1 Restore PSW turbine 30 days isolation valve inoperable, building isolation valve to OPERABLE status.

C. One PSW pump in each C.1 Restore one PSW 7 days subsystem inoperable, pump to OPERABLE status.

D. One PSW turbine building D.1 Restore one PSW 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> isolation valve in each turbine building subsystem inoperable, isolation valve to OPERABLE status.

E. Required Action and E.1----------..NOTE---

associated Completion LCO 3.0.4.a is not Time of Condition A, B, C, applicable when or D not met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (continued) 3.7-3 HATC UNI 2 37-3Amendment No.

PSW System and UHS 3.7.2 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME F. One PSW subsystem---------NOTES- ---

inoperable for reasons 1. Enter applicable Conditions I.

other than Conditions A and Required Actions of and B. LCO 3.8.1, "AC Sources -

Operating," for diesel generator made inoperable by PSW System.

2. Enter applicable Conditions and Required Actions of LCO 3.4.7, "Residual Heat Removal (RHR) Shutdown Cooling System - Hot Shutdown," for RHR shutdown cooling made inoperable by PSW System.

F.1 Restore the PSW 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> subsystem to OPERABLE status.

G. Required Action and G.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition F not AND met.

G.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> OR Both PSW subsystems inoperable for reasons other than Conditions C and D.

O__R UHS inoperable.

HATCH UNIT 2 3.7-4 HATC UNI 2 37-4Amendment No.

MCREC System 3.7.4 ACTIONS (continued) __________

CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and C.1------NOTE---

associated Completion LCO 3.0.4.a is not Time of Condition A or B applicable when not met in MODE 1, 2, or 3. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> D. Required Action and--------NOTE-----

associated Completion LCO 3.0.3 is not applicable.

Time of Condition A not met during movement of irradiated fuel assemblies D.1 Place OPERABLE Immediately in the secondary MCREC subsystem in containment, during CORE pressurization mode.

ALTERATIONS, or during OPDRVs. OR D.2.1 Suspend movement of Immediately irradiated fuel assemblies in the secondary containment.

AND D.2.2 Suspend CORE Immediately ALTERATIONS.

AND D.2.3 Initiate action to Immediately suspend OPDRVs.

E. Two MCREC subsystems E.1---------NOTE-----

inoperable in MODE 1, 2, LCO 3.0.4.a is not or 3 for reasons other than applicable when Condition B. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (continued)

HATCH UNIT 2 3.7-9 HATC UNI 2 37-9Amendment No.

Control Room AC System 3.7.5 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and D.1------NOTE---

associated Completion LCO 3.0.4.a is not Time of Condition A, B, or applicable when C not met in MODE 1, 2, or entering MODE 3.

3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> E. Required Action and---------NOTE- ---

associated Completion LCO 3.0.3 is not applicable.

Time of Condition A not met------------

during movement of.

irradiated fuel assemblies in E.1 Place OPERABLE Immediately the secondary containment, control room AC during CORE subsystems in ALTERATIONS, or during operation.

OPDR Vs.

OR E.2.1 Suspend movement of Immediately irradiated fuel assemblies in the secondary containment.

AND E.2.2 Suspend CORE Immediately ALTERATIONS.

AND E.2.3 Initiate action to Immediately suspend OPDRVs.

(continued)

HATCH UNIT 2 3.7-13 HATC UNI 2 37-13Amendment No.

Main Condenser Offgas 3.7.6 3.7 PLANT SYSTEMS 3.7.6 Main Condenser Offgas LCO 3.7.6 The gross gamma activity rate of the noble gases measured at the main condenser evacuation system pretreatment monitor station shall be

< 240 mCi/second.

APPLICABILITY: MODE 1, MODES 2 and 3 with any main steam line not isolated and steam jet air ejector (SJAE) in operation.

ACTI ONS CONDITION REQUIRED ACTION COMPLETION TIME A. Gross gamma activity rate A.1 Restore gross gamma 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of the noble gases not activity rate of the noble within limit, gases to within limit.

B. Required Action and B.1 Isolate all main steam 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion lines.

Time not met..

O__R B.2 Isolate SJAE. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OR B.3------NOTE---

LCO 3.0.4.a is not applicable when entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> HATCH UNIT 2 3.7-16 HATC UNI 2 37-16Amendment No.

AC Sources - Operating 3.8.1 ACTIONS (continued)

CONDITION .REQUIRED ACTION COMPLETION TIME E. (continued) OR E.2 Restore required DG 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> to OPERABLE status.

F. Two or more (Unit 2 and F.1 Restore all but one 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> swing) DGs inoperable. Unit 2 and swing DGs to OPERABLE status.

G. No DGs capable of G.1 Restore one DG 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> supplying power to any capable of supplying Unit 2 LPCI valve load power to Unit 2 LPCI center. valve load center to OPERABLE status.

H. Required Action and H.1---------NOTE-----

Associated Completion LCO 3.0.4.a is not Time of Condition A, B, C, applicable when D, E, F, or G not met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> One or more required 1.1 Enter LCO 3.0.3. Immediately offsite circuits and two or more required DGs inoperable.

O.RR Two or more required offsite circuits and one required DG inoperable.

HATCH UNIT 2 3.8-6 HATC UNI 2 38-6Amendment No.

DC Sources - Operating 3.8.4 ACTIONS (continued) __________

CONDITION REQUIRED ACTION COMPLETION TIME B. One Unit 2 DG DC B.1 Restore DG DC 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> electrical power subsystem electrical power inoperable, subsystem to OPERABLE status.

O.RR Swing DG DC electrical power subsystem inoperable for reasons other than Condition A.

C. One Unit 2 station service C.1 Restore station service 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> DC electrical power DC electrical power subsystem inoperable, subsystem to OPERABLE status.

D. Required Action and D.1-----NOTE---

Associated Completion LCO 3.0.4.a is not Time of Condition A, B, applicable when or C not met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> E. Two or more DC electrical E.1 Enter LCO 3.0.3. Immediately power subsystems inoperable that result in a loss of function.

HATCH UNIT 2 3.8-27 HATC UNI 2 38-27Amendment No.

Distribution Systems - Operating 3.8.7 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. One or more (Unit 2 or B.1 Restore DG DC 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> swing bus) DG DC electrical power electrical power distribution distribution subsystem AND subsystems inoperable, to OPERABLE status.

16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> from discovery of failure to meet LCO 3.8.7.a C. One or more (Unit 2 or C.1 Restore AC electrical 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> swing bus) AC electrical power distribution power distribution subsystem to AND subsystems inoperable. OPERABLE status.

16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> from discovery of failure to meet LCO 3.8.7.a D. One Unit 2 station service D.1 Restore Unit 2 station 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> DC electrical power service DC electrical distribution subsystem power distribution AND inoperable, subsystem to OPERABLE status. 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> from discovery of failure to meet LCO 3.8.7.a E. Required Action and E.1-----NOTE---

associated Completion LCO 3.0.4.a is not Time of Condition A, B, C, applicable when or D not met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> F. Two or more electrical F.1 Enter LCO 3.0.3. Immediately power distribution subsystems inoperable that result in a loss of function.