Issue date | Title | Topic | |
---|---|---|---|
IR 05000461/1986001 | 27 March 1986 | Insp Rept 50-461/86-01 on 851104-08 & 860127-0306.No Violations or Deviations Noted.Major Areas Inspected: Preoperational Radwaste & Radiation Protection Programs, Including Organization,Staffing & Qualifications | Offsite Dose Calculation Manual |
IR 05000461/1986002 | 5 February 1986 | Insp Rept 50-461/86-02 on 860113-23.No Violation Noted.Major Areas Inspected:Licensee Action on Previous Insp Items, Part 21 Repts & 50.55(e) Repts | |
IR 05000461/1986003 | 17 March 1986 | Insp Rept 50-461/86-03 on 860127-30,0203-07,10-13 & 24-27. No Violation or Deviation Noted. Major Areas Inspected: Previous Insp Findings & Const Records Verification Program | |
IR 05000461/1986004 | 10 March 1986 | Insp Rept 50-461/86-04 on 860121-24.No Violations or Deviations Noted.Major Areas Inspected:Review of Safeteam Major Program Elements,Verification of Implementation,Review of Corrective Actions & Sample Review of Program Results | |
IR 05000461/1986005 | 28 November 1986 | SALP Rept 50-461/86-05 for Sept 1985 - Aug 1986 | Safe Shutdown Fitness for Duty Systematic Assessment of Licensee Performance |
IR 05000461/1986006 | 19 March 1986 | Insp Rept 50-461/86-06 on 860203-27.Violation Noted: Inadequate Protection of Safeguards Info Documents.Details Withheld (Ref 10CFR73.21) | Safeguards Contingency Plan |
IR 05000461/1986007 | 30 January 1986 | Safety Insp Rept 50-461/86-07 on 860121-24.No Violation or Deviation Noted.Major Areas Inspected:Progress in Implementing Fire Protection Program,Fire Protection Const, Preoperational Test Program & Followup on Previous Insp | Safe Shutdown Fire Barrier Fire Protection Program |
IR 05000461/1986008 | 5 March 1986 | Safety Insp Rept 50-461/86-08 on 860127-0224.Violations Noted:Maint Contractor Activities Not Properly Controlled & Shift Technical Advisor Training & Qualification Program Inadequate | Temporary Modification |
IR 05000461/1986009 | 19 February 1986 | Safety Insp Rept 50-461/86-09 on 860129 & 30.No Violation or Deviation Noted.Major Areas Inspected:Previous Insp & Const Appraisal Team Findings | |
IR 05000461/1986010 | 3 March 1986 | Safety Insp Rept 50-461/86-10 on 860127-31 & 0203-07.No Violations,Deviations or Safety Significant Issues Noted. Major Areas Inspected:Tmi Action Plan Requirements & Action on Previous Insp Findings | |
IR 05000461/1986011 | 19 March 1986 | Insp Rept 50-461/86-11 on 860224-28.No Violations or Deviations Noted.Major Areas Inspected:Radiochemistry & Chemistry,Including Mgt Controls,Water Chemistry Control, Training & Qualifications & QA & QC | Grab sample |
IR 05000461/1986012 | 25 March 1986 | Safety Insp Rept 50-461/86-12 on 860127-0303.No Violations or Deviations Noted.Major Areas Inspected:Const Completion Activities,Including IE Bulletin Followup,Review of Allegation & Functional or Program Areas | Safe Shutdown Earthquake Operating Basis Earthquake |
IR 05000461/1986013 | 11 April 1986 | Insp Rept 50-461/86-13 on 860224-0313.Violations Noted: Failure to Correct Deficiency Re Recording Battery Specific Gravities & Failure to Preserve safety-related Equipment. Deviation Noted:Security Battery Capacity Not Determined | |
IR 05000461/1986014 | 21 March 1986 | Insp Rept 50-461/86-14 on 860224-0310.No Violation or Deviation Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Part 21 Repts & 10CFR50.55(e) Repts | |
IR 05000461/1986015 | 2 October 1986 | Insp Rept 50-461/86-15 on 860909-12 & 17-18.No Violation or Deviation Noted.Major Areas Inspected:Readiness of Fire Protection Program in Preparation to Load Fuel & Followup of Previous Insp Items | Safe Shutdown Fire Barrier Fire Protection Program Hourly Fire Watch |
IR 05000461/1986016 | 19 March 1986 | Insp Rept 50-461/86-16 on 850303-06.No Violation Noted. Major Areas Inspected:Consistency & Compatibility Between Draft Tech Specs,FSAR,as-built Configurations & Associated Surveillance Requirements | |
IR 05000461/1986017 | 29 April 1986 | Insp Rept 50-461/86-17 on 860224-0407.Violation Noted: Temporary Procedure Change Re Nonconformance Repts Used Improperly & Activities Affecting Quality Not Accomplished Per Applicable Procedures | |
IR 05000461/1986018 | 25 March 1986 | Safety Insp Rept 50-461/86-18 on 860224-28 & 0303-07. Deviation Noted:Lack of Periodic Testing of Instrument Air Quality to Verify Cleanliness Requirements | |
IR 05000461/1986019 | 28 April 1986 | Safety Insp Rept 50-461/86-19 on 860303-0414.No Violation or Deviation Noted.Major Areas Inspected:Const Completion Activities,Including Applicant Action on Previous Insp Activities & Review of Allegation | Fire Barrier |
IR 05000461/1986020 | 3 April 1986 | Insp Rept 50-461/86-20 on 860310-14.Violation Noted: Inadequate Protection of Safeguards Info.Details Withheld (Ref 10CFR73.21) | Safeguards Contingency Plan |
IR 05000461/1986021 | 26 March 1986 | Insp Rept 50-461/86-21 on 860310-14.No Violation or Deviation Noted.Major Area Inspected:Emergency Preparedness Program to Evaluate Actions on Previously Identified Emergency Preparedness Items | Siren |
IR 05000461/1986023 | 5 June 1986 | Safety Insp Rept 50-461/86-23 on 860408-0512.Violation Noted:Failure of Util & S&W Contract Maint Personnel to Follow Procedures & Instructions in Performance of safety-related Maint Activities | Fitness for Duty Anchor Darling Nondestructive Examination Temporary Modification |
IR 05000461/1986024 | 23 April 1986 | Insp Rept 50-461/86-24 on 860318-0416.No Violations or Deviations Noted.Major Areas Inspected:Preoperational Radwaste & Radiation Protection Programs,Including Organization,Staffing,Qualifications & ALARA | Process Control Program |
IR 05000461/1986026 | 16 April 1986 | Safety Insp Rept 50-461/86-26 on 860324-28 & 31-0404.No Violations or Deviations Noted.Major Areas Inspected: Evaluation of Action Re TMI Action Plan Requirements, Independent Insp Activities & Review of Maint Procedures | |
IR 05000461/1986028 | 27 June 1986 | Insp Rept 50-461/86-28 on 860428-0606.Violation Noted: Failure to Install Solid Stream Nozzle on Fire Hose in Fuel Bldg as Required by License SNM-1886 | Safe Shutdown Ultimate heat sink Fire Barrier Hydrostatic Emergency Lighting Earthquake Fuel cladding Fire Protection Program Fire Watch |
IR 05000461/1986029 | 16 July 1986 | Insp Rept 50-461/86-29 on 860414-0527.No Violation or Deviation Noted.Major Areas Inspected:Const Completion Activities,Including Action on Previous Insp Activities & Functional or Program Areas | |
IR 05000461/1986030 | 26 June 1986 | Insp Rept 50-461/86-30 on 860428-0502.No Violation or Deviation Noted.Major Areas Inspected:Actions on Findings in Insp Rept 50-461/85-61 | |
IR 05000461/1986031 | 12 June 1986 | Insp Rept 50-461/86-31 on 860520-23.No Violations or Deviations Noted.Major Areas Inspected:Preoperational Radiation Protection Program Re Status of TMI Action Plan & HVAC Open & Unresolved Items | Loop seal |
IR 05000461/1986032 | 28 May 1986 | Insp Rept 50-461/86-32 on 860505-09 & 12-16.No Violation or Deviation Noted.Major Areas Inspected:Previous Insp Findings,Applicant Action Re TMI Action Plan Requirements & Review of Allegations | |
IR 05000461/1986033 | 27 June 1986 | Insp Rept 50-461/86-33 on 860519-22.No Violation or Deviation Noted.Major Areas Inspected:Allegations Re Sys Turnover Packages.Allegations Unsubstantiated | |
IR 05000461/1986034 | 18 June 1986 | Insp Rept 50-461/86-34 on 860513-16,27-30 & 0603-05.No Violation or Deviation Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Part 21 Repts & 10CFR50.55(e) Items | Anchor Darling Nondestructive Examination Scram Discharge Volume Liquid penetrant |
IR 05000461/1986035 | 4 June 1986 | Insp Rept 50-461/86-35 on 860513-16.No Violation or Deviation Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings & QA Records | |
IR 05000461/1986036 | 3 July 1986 | Partially Withheld Insp Repts 50-461/86-36 & 70-2947/86-01 on 860512-30 & 0616 (Ref 10CFR73.21).Violation Noted:Two Instances of Unlocked Security Door.Security Program Cannot Be Completely Evaluated Until Plan Fully Implemented | Safeguards Contingency Plan |
IR 05000461/1986037 | 17 July 1986 | Safety Insp Rept 50-461/86-37 on 860512-0701.Violation Noted:Procedure Did Not Contain Sufficient Acceptance Criteria to Ensure LPCS Injection Valve Would Open | Fitness for Duty Reactor Vessel Water Level Packing leak Stroke time Temporary Modification Depleted uranium |
IR 05000461/1986038 | 26 June 1986 | Safety Insp Rept 50-461/86-38 on 860519-21 & 0603-04.No Violation or Deviation Noted.Major Areas Inspected: Allegations & Resolution of 10CFR50.55(e) Items & Previous Insp Finding | Hydrostatic |
IR 05000461/1986039 | 6 August 1986 | Insp Rept 50-461/86-39 on 860515-0801.No Violations Noted. Major Areas Inspected:Previous Insp Findings,Part 21 Repts, 50.55(e) Repts & IE Bulletins | |
IR 05000461/1986040 | 16 June 1986 | Insp Rept 50-461/86-40 on 860527-30.No Violation or Deviation Noted.Major Areas Inspected:Training & Qualifications,Qa/Qc & Water Chemistry Control.Tables Re Criteria for Comparing Measurements Encl | Grab sample |
IR 05000461/1986041 | 28 July 1986 | Insp Rept 50-461/86-41 on 860602-0709.Violations Noted: Inadequate Housekeeping,Failure to Follow Procedure & Inadequate Test Control | Test box Scaffolding |
IR 05000461/1986042 | 30 June 1986 | Safety Insp Rept 50-461/86-42 on 860602-06 & 09-13.No Violations,Deviations or Safety Significant Issues Noted. Major Areas Inspected:Actions on Previous Insp Findings, IE Bulletins & Circulars & Review of Allegations | Hydrostatic Anchor Darling Scram Discharge Volume |
IR 05000461/1986043 | 15 July 1986 | Safety Insp Rept 50-461/86-43 on 860527-0707.No Violation or Deviation Noted.Major Areas Inspected:Site Surveillance Tours,Installation of CRD Hydraulic Control Units & MSIV Springs | Nondestructive Examination Design basis earthquake |
IR 05000461/1986044 | 9 July 1986 | Insp Rept 50-461/86-44 on 860610-12.No Violations or Deviations Noted.Major Areas Inspected:Allegations from Former Electrical QC Inspector on Concerns Re Electrical Cable Installation.Concerns Unsubstantiated | |
IR 05000461/1986045 | 30 July 1986 | Safety Insp Rept 50-461/86-45 on 860616-20 & 0630-0702.No Violation or Deviation Noted.Major Areas Inspected: Allegation on motor-operated Valve Limit Switch Gear Greasing & Licensee Action on IE Bulletin 85-003 | |
IR 05000461/1986047 | 27 August 1986 | Partially Withheld Physical Protection Insp Rept 50-461/86-47 on 860624-0806 (Ref 10CFR73.21).No Noncompliance Noted.Major Areas Inspected:Security Plan & Implementing Procedures & Security Program Audit | Safeguards Contingency Plan |
IR 05000461/1986048 | 21 August 1986 | Insp Rept 50-461/86-48 on 860701-28.Violation & Deviation Noted:Failure of Plant Maint Technicians to Pay Attention to Details of Work & Safety Evaluation Ineffective in Assuring FSAR Commitments Met,Respectively | Grab sample Hydrostatic Tornado Generated Missile Backfit Power change |
IR 05000461/1986050 | 6 August 1986 | Insp Rept 50-461/86-50 on 860707-11.No Violations or Deviations Noted.Major Areas Inspected:Preoperational Radiation Protection & Radwaste Programs | Process Control Program Depleted uranium |
IR 05000461/1986051 | 20 August 1986 | Insp Rept 50-461/86-51 on 860707-0809.No Violations or Deviations Noted.Major Areas Inspected:Const Completion Activities,Including Action on 10CFR50.55(e) Repts & Functional or Program Areas | |
IR 05000461/1986052 | 15 September 1986 | Insp Rept 50-461/86-52 on 860707-0829.Violations Noted: Failure to Follow Procedures,To Document Engineering Evaluation & to Make Corrective Actions to Preclude Recurrence | Safe Shutdown Emergency Lighting Overtravel |
IR 05000461/1986053 | 26 November 1986 | Insp Rept 50-461/86-53 on 860804-1010.Violation Noted: Failure of Mgt to Implement Programs to Control Maint & Mod Programs | Time of Discovery Fitness for Duty Temporary Modification Condition Adverse to Quality |
IR 05000461/1986054 | 26 September 1986 | Safety Insp Rept 50-461/86-54 on 860728-0908.Violation Noted:Failure to Initiate Condition Rept When Mgt Walkdown Identified Steel Plate Installed W/O Approved Design & Work Documentation | Temporary Modification Earthquake Backfit |
IR 05000461/1986055 | 26 August 1986 | Safety Insp Rept 50-461/86-55 on 860729-0801,04-08 & 11. Violation Noted:Failure to Implement Corrective Actions Re QA Audit Finding Concerning Personnel Training on Changes to Plant Procedures |