Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML19323D031 | 14 February 1980 | Emergency Operating Procedure EP/1/A/5000/07, Steam Line Rupture. | Shutdown Margin |
ML19323D033 | 18 February 1980 | Emergency Operating Procedure EP/1/A/5000/19, Feedwater Line Rupture. | Shutdown Margin |
ML19325F193 | 1 November 1989 | Public Version of Rev 32 to, Crisis Mgt Plan for Nuclear Stations. | Safe Shutdown |
ML19332C845 | 1 November 1989 | Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 31 to CMIP-1,Rev 28 to CMIP-4,Rev 32 to CMIP-5,Rev 37 to CMIP-6,Rev 36 to CMIP-7,Rev 25 to CMIP-8,Rev 31 to CMIP-9 & Rev 19 to CMIP-13 | Health Physics Network |
ML19338F557 | 10 October 1980 | Draft Special Low Power Testing procedure,TP/1/A/2150/20, Natural Circulation Verification. | |
ML19338F558 | 10 October 1980 | Draft Special Low Power Testing procedures,TP/1/A/2150/21, Effect of Steam Generator Isolation on Natural Circulation. | |
ML19338F561 | 10 October 1980 | Draft Special Low Power Testing procedures,TP/1/A/2150/23, Natural Circulation W/Simulated Loss of Offsite Power. | |
ML19338F564 | 10 October 1980 | Draft Special Low Power Testing Procedure TP/1/A/2150/26, Simulated Loss of All Onsite & Offsite AC Power. | Shutdown Margin |
ML19344B241 | 21 August 1980 | Offsite Dose Calculation Manual, Revision 1 | Offsite Dose Calculation Manual |
ML19344B242 | 22 August 1980 | Process Control Program for Cnsi Mobile Solidification Units Using Dow Process. Proprietary Version Withheld (Ref 10CFR2.790) | Process Control Program |
ML19345E272 | 3 December 1980 | Public Version of Revised Emergency Procedure EP/1/A/5000/01, Immediate Actions & Diagnostics. | Shutdown Margin |
ML19345E276 | 3 December 1980 | Public Version of Revised Emergency Procedure EP/1/A/5000/02, Loss of Reactor Coolant. | |
ML19345E279 | 3 December 1980 | Public Version of Revised Emergency Procedure EP/1/A/5000/04, Steam Generator Tube Rupture. | |
ML19345E281 | 3 December 1980 | Public Version of Revised Abnormal Operating Procedure AP/1/A/5500/05, Inadequate Core Cooling. | |
ML19345E282 | 3 December 1980 | Public Version of Revised Abnormal Operating Procedure AP/1/A/5500/06, Loss of Steam Generator Feedwater. | |
ML19353B097 | 7 December 1989 | Rev 6 to CMIP-11, Classification of Emergency for McGuire Nuclear Station. W/891207 Ltr | Earthquake |
ML20003B105 | 30 January 1981 | Rev 1 to Facility Inservice Pump & Valve Testing Program | |
ML20003C615 | 30 January 1981 | Connector Assembly Test Plan for Duke Power,Catawba Units 1 & 2,Connectors. | |
ML20004E778 | 8 April 1981 | Preservice Insp Plan,Revision 0 | Hydrostatic Nondestructive Examination Liquid penetrant |
ML20004F119 | 8 June 1981 | to Pump Inservice Testing Program | Boric Acid |
ML20006C057 | 18 January 1990 | Public Version of Rev 33 to Crisis Mgt Implementing Procedure CMIP-1, Recovery Manager & Immediate Staff & Rev 24 to CMIP-2, News Group Plan. | |
ML20010E434 | 18 August 1981 | Venting of Noncondensible Gases from Reactor Vessel Head. | |
ML20011D244 | 1 December 1989 | Crisis Mgt Implementing Procedures. | |
ML20012A369 | 5 December 1989 | Rev 8 to, Process Control Program,Mcguire Nuclear Station. | Process Control Program |
ML20012A372 | 27 November 1989 | Rev 4 to, Process Control Program,Cawtaba Nuclear Station. | Boric Acid Process Control Program |
ML20012A373 | 15 November 1989 | Rev 4 to, Process Control Program Oconee Nuclear Station. | Process Control Program |
ML20012A375 | 1 January 1990 | Rev 25 to, Offsite Dose Calculation Manual,Cawtaba Nuclear Station. | Offsite Dose Calculation Manual |
ML20012A377 | 1 January 1990 | Rev 26 to, Offsite Dose Calculation Manual McGuire Nuclear Station. | Boric Acid Offsite Dose Calculation Manual |
ML20012A379 | 1 January 1990 | Rev 27 to, Offsite Dose Calculation Manual,Oconee Nuclear Station. | Offsite Dose Calculation Manual |
ML20012A380 | 1 January 1990 | Rev 28 to, Offsite Dose Calculation Manual,Oconee,Mcguire & Catawba Nuclear Stations. | Offsite Dose Calculation Manual |
ML20012D820 | 6 March 1990 | Public Version of Rev 3 to Crisis Mgt Implementation Procedure CMIP-10, Classification of Emergency for Catawba Nuclear Station. | Earthquake Fuel cladding Pressure Boundary Leakage |
ML20023B128 | 29 November 1982 | Public Version of Revised Crisis Mgt Plan Implementing Procedures,Including Procedures 5.3.2 Re Crisis News Group Plan & 5.3.11 Re McGuire Crisis Phone Directory | Boric Acid B.5.b Mitigating Strategies |
ML20023D191 | 21 October 1982 | Rev 0 to Project Instruction PI-LS-42, Review of QC Documentation for LaSalle County Station Units 1 & 2. | |
ML20023D386 | 15 April 1983 | Rev 1 to Offsite Dose Calculation Manual. | Offsite Dose Calculation Manual |
ML20024B788 | 28 April 1983 | Procedure IB-8307, Instructions for Installation of Close Latch Anti-Shock Spring in Hk Mechanism (Used in Breakers Less than 1,000 Mva). | |
ML20024D195 | 29 July 1983 | Rev 5 to Pump & Valve Inservice Testing. | Stroke time |
ML20024D201 | 29 July 1983 | Rev 1 to Pump & Valve Inservice Testing. | Stroke time |
ML20024D536 | 1 June 1983 | Public Version of Emergency Plan Implementing Procedure 1102, Duties of Recovery Manager,Offsite Emergency Organization. | |
ML20024H315 | 31 May 1991 | Revised McGuire Nuclear Station Fire Protection Review Manual. | |
ML20027C720 | 13 September 1982 | Public Version of Revised Emergency Plan Implementing Procedures,Including Procedure EP/0/A/5000/05 Re Notification of Unusual event,EP/0/A/5000/06 Re Alert & EP/0/A/5000/08 Re General Emergency | Safe Shutdown Earthquake Failure to Scram |
ML20027D267 | 8 October 1982 | Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP 1.1.1 Re Corporate Emergency Response Organization,Epip 1.1.2 Re Notifications & EPIP 1.1.3 Re Public Info | |
ML20027D778 | 6 October 1982 | Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP/0/A/5000/05 Re Notification of Unusual event,EP/0/A/5000/06 Re Alert & EP/0/A/5000/07 Re Site Area Emergency | |
ML20028A942 | 22 October 1982 | Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures 5.3.1 Re Recovery Manager & Immediate Staff Group Plan & 5.3.6 Re Radiological Support Group | Safe Shutdown Boric Acid Health Physics Network High Radiation Area Offsite Dose Calculation Manual |
ML20028C027 | 22 December 1982 | Vol 1 of Inservice Insp Plan for Unit 1.Unit 2 Relief Requests for Preservice Exam & One Oversize Drawing Encl. Aperture Card Available in PDR | Hydrostatic VT-2 Stress corrosion cracking Liquid penetrant |
ML20028F700 | 20 January 1983 | Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP 1.1.5 Re Startup Operation of Emergency Offsite Facility & EPIP 1.1.6 Re Emergency Organization Shift Turnover | |
ML20028G030 | 3 February 1983 | Steam Generator Monitoring Programs | Eddy Current Testing |
ML20028H221 | 31 October 1990 | Public Versions of Revised Crisis Mgt Implementing Procedures,Including Rev 37 to CMIP-1,Rev 27a to CMIP-2,Rev 33 to CMIP-4,Rev 37 to CMIP-5 & Rev 42 to CMIP-6 | |
ML20029A424 | 28 February 1991 | Rev 3 to Selected Licensee Commitments manual.W/910214 Ltr | Earthquake |
ML20039F095 | 15 November 1981 | Public Version of Revised Crisis Mgt Plan Implementing Procedures,Including Procedures 5.3.1 Re Recovery Manager & Immediate Staff Implementing Plan & 5.3.2 Re Crisis News Group Plan | |
ML20042B237 | 1 February 1982 | Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures 1101 Re Duties of Emergency Control Officer for Offsite Emergency Organization & 1301 Re Emergency Roster for Offsite Emergency Organization |