ML06269043528 September 2006Relief Request No. PRR-10 Risk-Informed Fourth 10-year Interval Inservice Inspection Program PlanProbabilistic Risk Assessment
Exemption Request
ML0703204865 February 2007Revision to Emergency Plan to Change Emergency Support Organization Staffing (TAC No. MD2814). Docket No. 50-293
ML07053038426 March 2007License Amendment, Issuance of Amendment Extension of Pressure-Temperature Limits Specified in Technical Specifications
ML07053064626 March 2007Issuance of License Amendment 226 Adoption of Technical Specification Task Force (TSTF) Change TSTF-484 Use of TS 3.10.1 for Scram Time Testing Activities.Anticipated operational occurrence
Hydrostatic
ML07074041925 April 2007License Amendment, Issuance of Amendment Single Control Rod Withdrawal AllowancesShutdown Margin
Anticipated operational occurrence
ML07087116514 May 2007Issuance of Amendment Adoption of Technical Specification Task Force (TSTF) Change TSTF-372, the Addition of Limiting Condition for Operation (LCO) 3.0.8 on the Inoperability of SnubbersSafe Shutdown Earthquake
Probabilistic Risk Assessment
Large early release frequency
Earthquake
ML07234000823 August 2007Conforming License Amendment to Incorporate the Mitigation Strategies Required by Section B.5.b. of Commission Order EA-02-026 (Tac No. MD4555)B.5.b
Severe Accident Management Guideline
Safeguards Contingency Plan
B.5.b Mitigating Strategies
ML07242016127 September 2007Relief for the Reactor Core Shroud Stabilizer AssembliesFinite Element Analysis
Fuel cladding
EVT-1
Flow Induced Vibration
ML0727503945 November 2007License Amendment, Issuance of Amendment Control Rod Operability, Scram Insertion Time, and Control Rod Accumulator Requirements
ML08108035228 July 2008Safety Evaluation Application for Indirect Transfer of Facility Operating Licenses Due to Entergy Corporation Restructuring, Encl 2
ML08130040827 May 2008Relief Request No. RV-07, Alternate to the ASME OM Code 5-Year Test Interval for Main Steam Safety Relief Valves - Pilgrim Nuclear Power StationIncorporated by reference
Foreign Material Exclusion
ML08130041527 June 2008Third 10-Year Interval Inspection Program Plan Request for Relief No. PRR-42, Revision 1Weld Overlay
VT-2
Incorporated by reference
Liquid penetrant
Dissimilar Metal Weld
DM weld
ML08157036620 November 2008License Amendment, Issuance of Amendment Adoption of TSTF-448, Revision 3, Control Room Envelope HabitabilitySafe Shutdown
Shutdown Margin
High Radiation Area
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Earthquake
Recently irradiated fuel
Fire Protection Program
ML08207012027 August 2008Fourth 10-Year Interval Inservice Inspection Program Plan Request for Relief No. PR-03, Revision 3- Pilgrim Nuclear Power Station
ML09064022426 March 2009License Amendment, Revised Technical Specifications (TS) Section 2.1.2, Safety Limit Minimum Critical Power Ratio (SLMCPR) for Two-Loop and Single-Loop OperationSafe Shutdown
Anticipated operational occurrence
Abnormal operational transient
Minimum Critical Power Ratio
Fuel cladding
Fire Protection Program
ML09113045630 April 2009Relief Request ISI-2008-1, Use of Later ASME Section XI Code Edition and Addenda for Repair and Replacement, Pressure Testing, and Destructive Testing Activities-Pilgrim Nuclear Power StationNondestructive Examination
Incorporated by reference
ML09237054911 September 2009Relief Request (PRR)19, Install a Weld Overlay on Jet Pump Instrumentation Nozzle Weld RPV-N9A-1- Pilgrim Nuclear Power StationNon-Destructive Examination
Weld Overlay
Hydrostatic
Incorporated by reference
Finite Element Analysis
Liquid penetrant
Dissimilar Metal Weld
ML0927301379 October 2009Safety Evaluation by the Office of Nuclear Reactor Regulation Corporate Restructuring Conversion of Companies and Stock Split-Off by Entergy Nuclear Operations, Inc and Subsidiaries
ML09287064729 October 2009Request for Threshold Determination Under 10 CFR 50.80-Big Rock Point, James A. FitzPatrick Nuclear Power Plant, Indian Point Nuclear Generating Nos. 1, 2 and 3, Palisades, Pilgrim, Vermont Yankee
ML09362080722 January 2010Cover Letter, (Non-Proprietary) Order Extending the Effectiveness of the Approval of the Indirect Transfer of Facility Operating Licenses for Big Rock Point, Fitzpatrick, Indian Point, Palisades, Pilgrim, and Vermont Yankee Nuclear Power St
ML09362089522 January 2010Safety Evaluation,(Non-Proprietary) Order Extending the Effectiveness of the Approval of the Indirect Transfer of Facility Operating Licenses for Big Rock Point, Fitzpatrick, Indian Point,Palisades,Pilgrim, and Vermont Yankee Nuclear Power
ML10229016325 August 2010Relief Request PRR-20, Alternative Examination Requirements for Nozzle-To-Shell and Inner Radii Welds Using ASME Code Case N-702 and BWRVIP-108 - Pilgrim Nuclear Power StationIncorporated by reference
ML11005029826 January 2011Issuance of Amendment Regarding Revised Pressure and Temperature (P-T) Limit Curves and Relocation of P-T Curves to the PTLRSafe Shutdown
Anticipated operational occurrence
Hydrostatic
Pressure and Temperature Limits Report
Fire Protection Program
ML11065000928 March 2011Issuance of Amendment No. 235 Revised Technical Specifications for Setpoint and Setpoint Tolerance Increases for Safety Relief Valves and Spring Safety ValvesSafe Shutdown
Stroke time
Anticipated operational occurrence
Probabilistic Risk Assessment
MELLLA
Fire Protection Program
Weak link
ML11152A04322 July 2011License Amendment, Cyber Security PlanSafe Shutdown
Cyber Security
Fire Protection Program
ML12174A14710 July 2012Safety Evaluation for Relief Request PRR-21, Rev 4, to Install a Weld Overlay on RPV-n14-1 Standby Liquid Control Safe-End Nozzle Weld at PilgrimNon-Destructive Examination
Weld Overlay
Hydrostatic
Incorporated by reference
Finite Element Analysis
Liquid penetrant
Dissimilar Metal Weld
ML1220100487 August 2012Issuance of Amendment No. 237 Revision to Condensate Storage Tank Low Level Trip SetpointSafe Shutdown
Cyber Security
Overtravel
Fire Protection Program
ML12261A13013 November 2012Issuance of Amendments to Renewed Facility Operating License Changes in Cyber Security Plan Implementation MilestoneSafe Shutdown
Cyber Security
Fire Protection Program
ML13025A30614 March 2013ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Correction to Amendments Issued on 12/28/12, Revise QA Program Manual and Staff Qualification Technical SpecificationsSafeguards Contingency Plan
ML13127A17921 May 2013Staff Assessment in Response to Recommendation 9.3 of the Near-Term Task Force Related to the Fukushima Dai-ichi Nuclear Power Plant AccidentHigh winds
FLEX
Fukushima Dai-Ichi
ML13149A21529 May 2013Correction to Staff Assessment Letter to Recommendation 9.3 of the Near-Term Task Force Related to the Fukushima Dai-Ichi Nuclear Power Plant AccidentFukushima Dai-Ichi
ML14083A63127 March 2014Relief Request PRR-22 Regarding a Risk-Informed Inservice Inspection Program for Class 1 and 2 Piping WeldsProbabilistic Risk Assessment
Nondestructive Examination
VT-2
Incorporated by reference
ML14198A1571 August 2014Relief Requests PR-03 and PR-05 Regarding the Inservice Testing Program (Tac MF0370)
ML14210A2668 August 2014Arkansas, Units 1 & 2, Big Rock Point, James A. Fitzpatrick, Grand Gulf, Unit 1, Indian Point, Units 1, 2 & 3, Palisades, Pilgrim, River Bend, Unit 1, Vermont Yankee, Waterford, Safety Evaluation Quality Assurance Program Manual, Rev. 24 &
ML14272A07012 March 2015Issuance of Amendment 242 Re Revision to Technical Specification 2.1, Safety Limits to Resolve Pressure Regulator Fail-Open TransientSafe Shutdown
Unanalyzed Condition
Anticipated operational occurrence
Cyber Security
Fuel cladding
Fire Protection Program
ML14295A68531 October 2014Issuance of Amendment Regarding Heavy Loads to Facilitate Dry Storage Handling OperationsSafe Shutdown
Safe Shutdown Earthquake
Cyber Security
Safeguards Contingency Plan
Earthquake
Control of Heavy Loads
Fire Protection Program
Affidavit
ML14336A66111 December 2014Issuance of Amendment Regarding Cyber Security Plan Implementation Schedule Milestone 8 (Tac No. MF3482)Safe Shutdown
Cyber Security
Fire Protection Program
ML15084A02523 March 2015Non-Proprietary - Safety Evaluation - Fourth 10-Year Interval Inservice Inspection - Request for Relief PRR-24Incorporated by reference
ML15103A06921 April 2015Relief Request PRR-24 Regarding Nozzle-to-Vessel Welds and Nozzle Inner Radii ExaminationIncorporated by reference
ML15114A0216 May 2015Issuance of Amendment Regarding the Minimum Critical Power Ratio License Amendment RequestSafe Shutdown
Anticipated operational occurrence
Cyber Security
Minimum Critical Power Ratio
Fuel cladding
Fire Protection Program
ML15166A40119 June 2015Request for Alternative PRR-26 for the Fifth 10-year Inservice Inspection IntervalIncorporated by reference
ML15338A3095 January 2016Relief Request PRR-50, Relief from the Requirement of the ASME Code, Implementation of Code Case N-702Nondestructive Examination
Incorporated by reference
ML16008B0773 March 2016Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051High winds
Shutdown Margin
High Radiation Area
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Emergency Lighting
Locked High Radiation Area
FLEX
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
B.5.b Mitigating Strategies
Earthquake
Hardened vent
Fire Protection Program
ML16042A29115 March 2016Issuance of Proposed Alternative Relief Request PRR-51, Relief from the Requirements of the ASME CodeIncorporated by reference
Pressure and Temperature Limits Report
ML16082A4606 June 2016Issuance of Amendment Cyber Security Plan Implementation ScheduleSafe Shutdown
Cyber Security
Fire Protection Program
ML16093A02831 May 2016Entergy Services, Inc., Proposed Alternative to Utilize ASME Code Case N-789-1, Relief Request RR-EN-15-1, Revision 1Liquid penetrant
ML16096A2696 June 2016Arkansas; Grand Gulf; James A. Fitzpatrick; Indian Point; Palisades; Pilgrim; River Bend; and Waterford - Relief Request RR-EN-15-2, Proposed Alternative to Use ASME Boiler and Pressure Vessel Code Case N-786-1Functionality Assessment
Liquid penetrant
ML16124B0873 May 2016E-mail Review of Safety Evaluation for Proposed Alternative Relief Request No. PRR-51Incorporated by reference
Pressure and Temperature Limits Report
ML16250A22328 October 2016Issuance of Amendments Proposed Changes to Emergency Plan to Revise Training for the on - Shift Chemistry TechnicianSafe Shutdown
Cyber Security
Fire Protection Program
ML16251A62013 September 2016Entergy Fleet Request for Approval of Change to the Entergy Quality Assurance Program Manual (CAC Nos. MF7086 - MF7097)