Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML0231003874 October 2002Final - RO & SRO WrittenSafe Shutdown
High Radiation Area
Half scram
Stroke time
Squib
Scram Discharge Volume
Overtravel
Fuel cladding
Continuous fire watch
Hourly Fire Watch
ML0231004114 October 2002Final - Section a OperatingOffsite Dose Calculation Manual
Squib
Fire Watch
ML0231004404 October 2002Final - Section B OperatingSquib
ML0231004514 October 2002Final - Section C Operating
ML02322061412 November 2002Certificate Ltr Dtd. 11/12/02
ML03077080629 January 2003Requalification Program Inspection Notification Letter Dated 01/29/03
ML0321306251 August 2003NRC Ltr Dated 8/1/03: Requalification Program Inspection - Limerick Generating Station, Units 1 and 2
ML0331004726 November 2003NRC Response to Eligibility Waiver Request Dtd 11/6/03 (55-62804)
ML03349046827 June 2003Facility Eligibility Waiver Request W/O Enclosures Dtd 06/27/2003 (55-62804)
ML04303014329 October 2004Exam Certificate Ltr Dtd 7/22/04
ML05019033019 January 2005Requalification Program EvaluationLicense Renewal
ML05020000820 January 2005Assignment Letter (Written) Dated 01/20/2005
ML0503502944 February 2005Operator Licensing Examination Approval for Peach Bottom, February 2005License Renewal
ML05035032415 November 2004Draft - Limerick, NRC Comments on Operating Test and Written (401-9) (Folder 2)Safe Shutdown
ML05035033015 November 2004Draft - Limerick Outlines (Folder 2)Scram Discharge Volume
ML05035033315 November 2004Draft - Limerick RO & SRO Written Exam (Folder 2)Shutdown Margin
High Radiation Area
Half scram
Squib
Locked High Radiation Area
Scram Discharge Volume
Fuel cladding
ML05035033915 November 2004Draft - Limerick, Section a Operating (Folder 2)Job Performance Measure
Overtravel
ML05035034215 November 2004Draft - Limerick, Section B Operating (Folder 2)Half scram
Job Performance Measure
Scram Discharge Volume
ML05035034515 November 2004Draft - Section C Operating (Folder 2)Half scram
Scram Discharge Volume
ML0503801505 January 2005Final - Outlines (Folder 3)Safe Shutdown
Scram Discharge Volume
ML0503802625 January 2005Final - Limerick RO & SRO Written (Folder 3)Shutdown Margin
High Radiation Area
Half scram
Squib
Locked High Radiation Area
Scram Discharge Volume
Fuel cladding
ML0503802715 January 2005Final - Section a Operating (Folder 3) - Job Performance Measure, Erp Classification and Reporting (Time Critical)Safe Shutdown
Job Performance Measure
Overtravel
ML0503802755 January 2005Final - Section B Operating (Folder 3)Half scram
Job Performance Measure
Scram Discharge Volume
ML0503802855 January 2005Final - Section C Operating (Folder 3)
ML05042037211 February 2005Limited Senior Reactor Operator Initial Examinations - Peach Bottom and Limerick PlantsLicense Renewal
ML05083013718 February 2005Final - Outlines (Folder 3), Peach Bottom, Units 2 & 3Half scram
ML05083016218 February 2005Final - RO & SRO Written (Folder 3)High Radiation Area
Half scram
Squib
Scram Discharge Volume
ML05083016618 February 2005Final - Section a Operating (Folder 3)Job Performance Measure
ML05083018218 February 2005Final - Section B Operating (Folder 3)Loop seal
Job Performance Measure
ML05083018518 February 2005Final - Section C Operating (Folder 3)Boric Acid
Half scram
ML0509200031 April 2005Exam Certificates Ltr. Dtd 4/1/05 for Peach Bottom
ML05103015119 November 2004Draft - Nrc/Facility Comments - Operating Test and Written (401-9) (Folder 2)
ML05103015519 November 2004Draft - Outlines (Folder 2)Scram Discharge Volume
ML05103015719 November 2004Draft - RO & SRO Written Exam (Folder 2)High Radiation Area
Half scram
Squib
Scram Discharge Volume
ML05103016119 November 2004Draft - Section B Operating (Folder 2)Loop seal
Job Performance Measure
ML05103016319 November 2004Draft - Section C Operating (Folder 2)Boric Acid
Half scram
Scram Discharge Volume
Power change
ML0511005448 March 2005NRC Final Exam Results Ltr. W/O Enclosures Dated 3/8/05 (Folder 1)
ML0512304806 January 2005Operator Licensing Examination Approval (Operating Test) Ltr. Dtd 1/6/05
ML0513201097 February 2005Final Qa/Related Forms (Folder 1)Job Performance Measure
ML05138055626 January 2005Final Qa/Related Forms (Folder 1)Job Performance Measure
ML05139010122 April 2005Limited SRO Initial Exam Materials Ltr. Dated 04/22/2005
ML05206010113 June 2005Final Outlines (Folder 3)Shutdown Margin
ML05206010410 June 2005Final - Lsro Written Examination with Answer Key (Folder 3)Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Half scram
Double blade guide
Overtravel
ML05206011010 June 2005Written Exam Handouts to Applicants (Folder 3)
ML05206011410 June 2005Final - Lsro Operating Exam Sections a & B (Folder 3)Shutdown Margin
Double blade guide
Job Performance Measure
ML05206013611 May 2005Draft - NRC Comments on Licensee Developed Material (Written & Operating Tests) (Folder 2)Test box
ML05206014010 June 2005Written Examination Review Worksheet, ES-401-9 (Folder 2)Shutdown Margin
ML0520601421 April 2005Draft - Outlines (Folder 2); Limerick Units 1 and 2, Peach Bottom Units 2 and 3, Submittal of Lsro Licensed Operator Examination OutlineTest box
ML0520602101 May 2005Draft - Lsro Written Exam (Folder 2)Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Half scram
Double blade guide
Overtravel
ML0520602121 May 2005Draft - Lsro Operating Exam Sections a & B (Folder 2)Shutdown Margin
Test box
Double blade guide
Job Performance Measure