Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML023100387 | 4 October 2002 | Final - RO & SRO Written | Safe Shutdown High Radiation Area Half scram Stroke time Squib Scram Discharge Volume Overtravel Fuel cladding Continuous fire watch Hourly Fire Watch |
ML023100411 | 4 October 2002 | Final - Section a Operating | Offsite Dose Calculation Manual Squib Fire Watch |
ML023100440 | 4 October 2002 | Final - Section B Operating | Squib |
ML023100451 | 4 October 2002 | Final - Section C Operating | |
ML023220614 | 12 November 2002 | Certificate Ltr Dtd. 11/12/02 | |
ML030770806 | 29 January 2003 | Requalification Program Inspection Notification Letter Dated 01/29/03 | |
ML032130625 | 1 August 2003 | NRC Ltr Dated 8/1/03: Requalification Program Inspection - Limerick Generating Station, Units 1 and 2 | |
ML033100472 | 6 November 2003 | NRC Response to Eligibility Waiver Request Dtd 11/6/03 (55-62804) | |
ML033490468 | 27 June 2003 | Facility Eligibility Waiver Request W/O Enclosures Dtd 06/27/2003 (55-62804) | |
ML043030143 | 29 October 2004 | Exam Certificate Ltr Dtd 7/22/04 | |
ML050190330 | 19 January 2005 | Requalification Program Evaluation | License Renewal |
ML050200008 | 20 January 2005 | Assignment Letter (Written) Dated 01/20/2005 | |
ML050350294 | 4 February 2005 | Operator Licensing Examination Approval for Peach Bottom, February 2005 | License Renewal |
ML050350324 | 15 November 2004 | Draft - Limerick, NRC Comments on Operating Test and Written (401-9) (Folder 2) | Safe Shutdown |
ML050350330 | 15 November 2004 | Draft - Limerick Outlines (Folder 2) | Scram Discharge Volume |
ML050350333 | 15 November 2004 | Draft - Limerick RO & SRO Written Exam (Folder 2) | Shutdown Margin High Radiation Area Half scram Squib Locked High Radiation Area Scram Discharge Volume Fuel cladding |
ML050350339 | 15 November 2004 | Draft - Limerick, Section a Operating (Folder 2) | Job Performance Measure Overtravel |
ML050350342 | 15 November 2004 | Draft - Limerick, Section B Operating (Folder 2) | Half scram Job Performance Measure Scram Discharge Volume |
ML050350345 | 15 November 2004 | Draft - Section C Operating (Folder 2) | Half scram Scram Discharge Volume |
ML050380150 | 5 January 2005 | Final - Outlines (Folder 3) | Safe Shutdown Scram Discharge Volume |
ML050380262 | 5 January 2005 | Final - Limerick RO & SRO Written (Folder 3) | Shutdown Margin High Radiation Area Half scram Squib Locked High Radiation Area Scram Discharge Volume Fuel cladding |
ML050380271 | 5 January 2005 | Final - Section a Operating (Folder 3) - Job Performance Measure, Erp Classification and Reporting (Time Critical) | Safe Shutdown Job Performance Measure Overtravel |
ML050380275 | 5 January 2005 | Final - Section B Operating (Folder 3) | Half scram Job Performance Measure Scram Discharge Volume |
ML050380285 | 5 January 2005 | Final - Section C Operating (Folder 3) | |
ML050420372 | 11 February 2005 | Limited Senior Reactor Operator Initial Examinations - Peach Bottom and Limerick Plants | License Renewal |
ML050830137 | 18 February 2005 | Final - Outlines (Folder 3), Peach Bottom, Units 2 & 3 | Half scram |
ML050830162 | 18 February 2005 | Final - RO & SRO Written (Folder 3) | High Radiation Area Half scram Squib Scram Discharge Volume |
ML050830166 | 18 February 2005 | Final - Section a Operating (Folder 3) | Job Performance Measure |
ML050830182 | 18 February 2005 | Final - Section B Operating (Folder 3) | Loop seal Job Performance Measure |
ML050830185 | 18 February 2005 | Final - Section C Operating (Folder 3) | Boric Acid Half scram |
ML050920003 | 1 April 2005 | Exam Certificates Ltr. Dtd 4/1/05 for Peach Bottom | |
ML051030151 | 19 November 2004 | Draft - Nrc/Facility Comments - Operating Test and Written (401-9) (Folder 2) | |
ML051030155 | 19 November 2004 | Draft - Outlines (Folder 2) | Scram Discharge Volume |
ML051030157 | 19 November 2004 | Draft - RO & SRO Written Exam (Folder 2) | High Radiation Area Half scram Squib Scram Discharge Volume |
ML051030161 | 19 November 2004 | Draft - Section B Operating (Folder 2) | Loop seal Job Performance Measure |
ML051030163 | 19 November 2004 | Draft - Section C Operating (Folder 2) | Boric Acid Half scram Scram Discharge Volume Power change |
ML051100544 | 8 March 2005 | NRC Final Exam Results Ltr. W/O Enclosures Dated 3/8/05 (Folder 1) | |
ML051230480 | 6 January 2005 | Operator Licensing Examination Approval (Operating Test) Ltr. Dtd 1/6/05 | |
ML051320109 | 7 February 2005 | Final Qa/Related Forms (Folder 1) | Job Performance Measure |
ML051380556 | 26 January 2005 | Final Qa/Related Forms (Folder 1) | Job Performance Measure |
ML051390101 | 22 April 2005 | Limited SRO Initial Exam Materials Ltr. Dated 04/22/2005 | |
ML052060101 | 13 June 2005 | Final Outlines (Folder 3) | Shutdown Margin |
ML052060104 | 10 June 2005 | Final - Lsro Written Examination with Answer Key (Folder 3) | Shutdown Margin Reactor Vessel Water Level High Radiation Area Half scram Double blade guide Overtravel |
ML052060110 | 10 June 2005 | Written Exam Handouts to Applicants (Folder 3) | |
ML052060114 | 10 June 2005 | Final - Lsro Operating Exam Sections a & B (Folder 3) | Shutdown Margin Double blade guide Job Performance Measure |
ML052060136 | 11 May 2005 | Draft - NRC Comments on Licensee Developed Material (Written & Operating Tests) (Folder 2) | Test box |
ML052060140 | 10 June 2005 | Written Examination Review Worksheet, ES-401-9 (Folder 2) | Shutdown Margin |
ML052060142 | 1 April 2005 | Draft - Outlines (Folder 2); Limerick Units 1 and 2, Peach Bottom Units 2 and 3, Submittal of Lsro Licensed Operator Examination Outline | Test box |
ML052060210 | 1 May 2005 | Draft - Lsro Written Exam (Folder 2) | Shutdown Margin Reactor Vessel Water Level High Radiation Area Half scram Double blade guide Overtravel |
ML052060212 | 1 May 2005 | Draft - Lsro Operating Exam Sections a & B (Folder 2) | Shutdown Margin Test box Double blade guide Job Performance Measure |