January 29, 2003 Mr. John L. Skolds Chief Operating Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3

Dear Mr. Skolds:

In a telephone conversation on January 23, 2003, Mr. J. H. Williams, Examiner/Inspector, and Mr. T. Van Wyen, Manager, Operator Licensing Training, made arrangements for the NRC to inspect the licensed operator requalification program at the Peach Bottom facility. The inspection is planned for the week of March 3, 2003, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their comprehensive requalification written examinations or annual operating tests as necessary to support the NRCs inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the examination schedule, sample plan, and operating tests scheduled for the week of the inspection to the NRC by February 17, 2003. Mr. Van Wyen has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on April 30, 2003.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at SLF@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Mr. John L. Skolds Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact H. W. Williams at (610) 337-6967 or (717) 335-3293.

Sincerely,

/RA/

Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket Nos. 50-277/278 License Nos. DPR-44/DPR-56 cc w/encl:

Senior Vice President, Mid-Atlantic Regional Operating Group Chief, Operating Officer, Exelon Generation Company, LLC Senior Vice President, Operations Support Vice President, Mid-Atlantic Operations Support Senior Vice President, Nuclear Services Site Vice President, Peach Bottom Atomic Power Station Plant Manager, Peach Bottom Atomic Power Station Vice President - Licensing Director, Licensing, Mid-Atlantic Regional Operating Group Director, Nuclear Oversight Regulatory Assurance Manager - Exelon Generation Company, LLC Vice President and General Counsel M. Alfonso, Director - Training D. Quinlan, Manager, Financial Control, PSEG R. McLean, Power Plant Siting, Nuclear Evaluations D. Levin, Acting Secretary of Harford County Council R. Ochs, Maryland Safe Energy Coalition Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance Mr. & Mrs. Kip Adams D. Allard, Director, Pennsylvania Bureau of Radiation Protection R. Janati, Chief, Division of Nuclear Safety, Pennsylvania Bureau of Radiation Protection Correspondence Control Desk Commonwealth of Pennsylvania State of Maryland TMI - Alert (TMIA)

Board of Supervisors, Peach Bottom Township R. Fletcher, Department of Environment, Radiological Health Program J. Johnsrud, National Energy Committee, Sierra Club Public Service Commission of Maryland, Engineering Division Manager, Licensing - Limerick and Peach Bottom Manager, License Renewal Distribution:

Mr. John L. Skolds Region I Docket Room (with concurrences)

A. McMurtray, SRI - NRC Resident Inspector H. Miller, RA J. Wiggins, DRA M. Shanbaky, DRP D. Florek, DRP S. Iyer, DRP H. Nieh, RI EDO Coordinator J. Clifford, NRR J. Boska, PM, NRR S. Wall, PM, NRR (Backup)

J. Williams, DRS Examiner, DRS C. Buracker, DRS (OL Facility File)

L. Vick, HOHB, NRR R. Conte, DRS DOCUMENT NAME: C:\ORPCheckout\FileNET\ML030770806.wpd ADAMS PKG: ML030230036 After declaring this document An Official Agency Record it will be released to the Public.