Category:License-Operator
MONTHYEARML23249A1002023-09-0606 September 2023 Requalification Program Inspection ML23178A0352023-06-27027 June 2023 Senior Reactor and Reactor Operator Initial License Examinations RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23005A1062023-01-0505 January 2023 Requalification Program Inspection ML23017A1122022-12-0505 December 2022 Final QA Related Forms ML22235A7202022-06-14014 June 2022 Administrative Files ML22299A0102022-05-11011 May 2022 Final Qa/Related Forms RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML20115E4612022-02-14014 February 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML22045A9412022-02-14014 February 2022 Senior Reactor and Reactor Operator Initial License Examinations ML22025A3722022-01-25025 January 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21307A2872021-11-0303 November 2021 September 8, 2021, NRC Generic Fundamentals Examination Results for Limerick Generating Station, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML21231A1052021-08-19019 August 2021 Requalification Program Inspection ML21257A4462021-08-18018 August 2021 Final QA Related Forms (Folder 1) ML21105A5352021-04-20020 April 2021 March 10, 2021, NRC Generic Fundamentals Examination Results for Limerick Generating Station, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML21105A6592021-04-20020 April 2021 March 10, 2021, NRC Generic Fundamentals Examination Results for Peach Bottom Atomic Power Station, Units 2 and 3 (Cover Letter Publicly Available, Enclosures Withheld from Public) LG-21-019, 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2)2021-04-0909 April 2021 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2) ML21069A1432021-03-10010 March 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21062A1952021-03-0303 March 2021 Revised Written Examination (Parent Questions File) (Regional Audit Corrective Action)(Folder 2) ML21050A0842021-02-19019 February 2021 Final Qa/Related Forms (Folder 1) ML21050A1192021-02-19019 February 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21050A1812021-02-19019 February 2021 Revised NRC Comments on Draft Licensee-Developed Written Exam (Regional Audit Corrective Action)(Folder 2) ML21050A2272021-02-19019 February 2021 Revised Final Written Examination with Answer Key (401-5 Format)(Regional Audit Corrective Action)(Folder 3) ML21043A2072021-02-12012 February 2021 Handouts to Applicants (Folder 3) ML21043A2202021-02-12012 February 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21040A4712021-02-0909 February 2021 Revised Form ES-301-5 (Regional Audit Corrective Action)(Folder 1) ML21040A4832021-02-0909 February 2021 Revised Form ES-401-4 (Regional Audit Corrective Action)(Folder 2) ML21012A0542021-01-12012 January 2021 Requalification Program Inspection ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20261H4032020-09-17017 September 2020 Senior Reactor and Reactor Operator Initial License Examinations ML21056A2232020-06-30030 June 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20184A2472020-06-30030 June 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20184A2482020-06-30030 June 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20260H1632020-06-30030 June 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20260H1642020-06-30030 June 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20260H1652020-06-30030 June 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20260H1662020-06-30030 June 2020 Draft Written Examination (Folder 2), Test Answer Key ML20260H1672020-06-30030 June 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21056A2202020-06-30030 June 2020 Final Qa/Related Forms (Folder 1) ML21056A2212020-06-30030 June 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML20147A1662020-05-26026 May 2020 Operator Licensing Examination Approval ML20105A1822020-04-14014 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Peach Bottom Atomic Power Station, Units 2 and 3 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20105A1472020-04-14014 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Limerick Generating Station, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19325C1432019-11-19019 November 2019 Operator Licensing Examination Approval ML19275E4622019-09-30030 September 2019 Senior Reactor and Reactor Operator Initial License Examinations RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19120A3312019-04-29029 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for Peach Bottom Atomic Power Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML19107A3822019-04-17017 April 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19079A0232019-03-19019 March 2019 Licensed Operator Positive Fitness-For-Duty Test 2023-09-06
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23178A0352023-06-27027 June 2023 Senior Reactor and Reactor Operator Initial License Examinations RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23017A1122022-12-0505 December 2022 Final QA Related Forms ML22235A7202022-06-14014 June 2022 Administrative Files ML22299A0102022-05-11011 May 2022 Final Qa/Related Forms RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML20115E4612022-02-14014 February 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML22045A9412022-02-14014 February 2022 Senior Reactor and Reactor Operator Initial License Examinations ML22025A3722022-01-25025 January 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21257A4462021-08-18018 August 2021 Final QA Related Forms (Folder 1) LG-21-019, 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2)2021-04-0909 April 2021 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2) ML21069A1432021-03-10010 March 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21062A1952021-03-0303 March 2021 Revised Written Examination (Parent Questions File) (Regional Audit Corrective Action)(Folder 2) ML21050A0842021-02-19019 February 2021 Final Qa/Related Forms (Folder 1) ML21050A1192021-02-19019 February 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21050A1812021-02-19019 February 2021 Revised NRC Comments on Draft Licensee-Developed Written Exam (Regional Audit Corrective Action)(Folder 2) ML21050A2272021-02-19019 February 2021 Revised Final Written Examination with Answer Key (401-5 Format)(Regional Audit Corrective Action)(Folder 3) ML21043A2072021-02-12012 February 2021 Handouts to Applicants (Folder 3) ML21043A2202021-02-12012 February 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21040A4712021-02-0909 February 2021 Revised Form ES-301-5 (Regional Audit Corrective Action)(Folder 1) ML21040A4832021-02-0909 February 2021 Revised Form ES-401-4 (Regional Audit Corrective Action)(Folder 2) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20261H4032020-09-17017 September 2020 Senior Reactor and Reactor Operator Initial License Examinations ML21056A2212020-06-30030 June 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML20184A2472020-06-30030 June 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20184A2482020-06-30030 June 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20260H1632020-06-30030 June 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20260H1642020-06-30030 June 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20260H1652020-06-30030 June 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20260H1662020-06-30030 June 2020 Draft Written Examination (Folder 2), Test Answer Key ML20260H1672020-06-30030 June 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21056A2202020-06-30030 June 2020 Final Qa/Related Forms (Folder 1) ML21056A2232020-06-30030 June 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20147A1662020-05-26026 May 2020 Operator Licensing Examination Approval ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19325C1432019-11-19019 November 2019 Operator Licensing Examination Approval ML19275E4622019-09-30030 September 2019 Senior Reactor and Reactor Operator Initial License Examinations RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19107A3822019-04-17017 April 2019 Senior Reactor and Reactor Operator Initial License Examinations ML18323A3152018-11-19019 November 2018 Operator Licensing Examination Approval ML18128A0062018-05-0707 May 2018 Senior Reactor and Reactor Operator Initial License Examinations RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18116A0542018-04-25025 April 2018 Senior Reactor and Reactor Operator Initial License Examinations ML18067A4302018-03-27027 March 2018 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML18079A5462018-03-27027 March 2018 Final Qa/Related Forms (Folder 1) ML18079A8122018-03-27027 March 2018 Final Qa/Related Forms - Form ES-401-6 and Form ES-401-9 (Folder 1) ML18088A6622018-03-27027 March 2018 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML18088A6642018-03-27027 March 2018 Final Written Examination and Operating Test Outlines (Folder 3) ML18067A4172018-03-0808 March 2018 Draft Written Examination and Operating Test Outlines (Folder 2) ML18067A4162018-03-0808 March 2018 Draft Written Examination (Folder 2) 2023-06-27
[Table view] |
Text
February 11, 2005 Mr. Christopher M. Crane President and CNO Exelon Nuclear Exelon Generation Company, LLC 200 Exelon Way Kennett Square, PA 19348
SUBJECT:
LIMITED SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS -
PEACH BOTTOM ATOMIC POWER STATION AND LIMERICK GENERATING STATION
Dear Mr. Crane:
In a telephone conversation on February 9, 2005, between Mr. John G. Caruso, Senior Operations Engineer (Chief Examiner) and Mr. Craig Fritz, Lead LSRO Exams, arrangements were made for the administration of licensing examinations at Limerick Generating Station and Peach Bottom Atomic Power Station during the week of June 13, 2005.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRCs regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by March 30, 2005. The written examinations, operating tests, and the supporting reference materials identified in Attachment 2 of ES-201 will be due by April 29, 2005.
Pursuant to Title 10, Section 55.40(b)(3) of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials should be complete and ready-to-use. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
Mr. Christopher M. Crane To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the OMB, under approval number 3150-0018, which expires on June 30, 2006. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U. S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at BJS1@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. C. Fritz has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. John Caruso at (610) 337-5389, or me at (610) 337-5183.
Sincerely,
/RA by John W. Lubinski Acting For/
Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket Nos. 50-352, 50-353 50-277, 50-278 License Nos. NPF-39, NPF-85 DPR-44, DPR-56
Mr. Christopher M. Crane cc:
Chief Operating Officer, Exelon Generation Company, LLC Site Vice President - Limerick Generating Station Plant Manager, Limerick Generating Station Regulatory Assurance Manager, Limerick Generating Station Senior Vice President - Nuclear Services Vice President - Mid-Atlantic Operations Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs, Exelon Generation Company, LLC Manager, Licensing - Limerick Generating Station Director, Training - Limerick Generating Station, Exelon Generation Company Vice President, General Counsel and Secretary, Exelon Generation Company Associate General Counsel, Exelon Generation Company Correspondence Control Desk J. Johnsrud, National Energy Committee Chairman, Board of Supervisors of Limerick Township R. Janati, Chief, Division of Nuclear Safety, Pennsylvania Bureau of Radiation Protection J. Bradley Fewell, Assistant General Counsel, Exelon Nuclear D. Allard, Director, Dept. of Environmental Protection, Bureau of Radiation Protection (SLO)
Site Vice President, Peach Bottom Atomic Power Station Plant Manager, Peach Bottom Atomic Power Station Regulatory Assurance Manager - Peach Bottom Vice President - Operations Support Manager, Licensing - Peach Bottom Atomic Power Station Manager License Renewal D. Quinlan, Manager, Financial Control, PSEG R. McLean, Power Plant and Environmental Review Division Director, Nuclear Training R. Fletcher, Department of Environment, Radiological Health Program Public Service Commission of Maryland, Engineering Division Board of Supervisors, Peach Bottom Township B. Ruth, Council Administrator of Harford County Council Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance TMI - Alert (TMIA)
Mr. & Mrs. Kip Adams T. Snyder, Director, Air and Radiation Management Administration, Maryland Department of the Environment (SLO)
Director, Nuclear Training, Exelon Generation Company, LLC, Peach Bottom Manager, Operations Training, Exelon Generation Company, LLC, Peach Bottom
Mr. Christopher M. Crane Distribution: (Via E-Mail)
S. Collins, RA J. Wiggins, DRA S. Lee, RI OEDO D. Roberts, NRR J. Clifford, NRR T. Tate, PM, NRR G. Wunder, PM, NRR M. Shanbaky, DRP A. Burritt, DRP S. Hansell, SRI B. Bickett, RI T. Haverkamp, OA F. Bower, SRI D. Schroeder, RI S. Schmitt, OA W. Lanning, DRS C. Bixler, DRS R. Conte, DRS J. Caruso, DRS SISP Review Complete: JWL DOCUMENT NAME: E:\Filenet\ML050420372.wpd ADAMS PKG: ML042440215 After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OSB RI/DRS/OSB RI/DRS/OSB NAME CJBixler/CJB JGCaruso/JGC RJConte/JWL for DATE 02/10/05 02/10/05 02/11/05 OFFICIAL RECORD COPY