EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET I
Signature I Title Date Signature I Title Date 6
APPROVED FOR USE:
I Signature I Title Date EFFECTIVE DATE:
I NAME:
ISSUE DATE:
Last First M.I.
SOC. SEC. NO.
COMPLETION DATE:
COMMENTS:
Training Review for Completeness:
SignaturdDate D WC W -RBCC W JPM.doc Page 1 of 6
TEMPORARY CHANGE FORM LOG CODE NO.: PLOR-NEW REV. NO.: -
000 TITLE:
Verify Isolation of Drywell Chilled Water and RBCCW
- 9.
I O.
- 11.
- 12.
- 13.
- 14.
- 15.
4 DWCW-RBCCW JPM.dOC Page 2 of 6
EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE:
TASK-JPM DESIGNATOR: 21 3022O401/ PLOR-NEW WA:
295024EA1.07 Unit Reactor Operator/Senior Reactor Operator URO: 3.8 SRO: 3.9 TASK DE S C R I PT I 0 N :
Verify Isolation of Drywell Chilled Water and RBCCW A.
NOTES TO EVALUATOR:
- 1.
An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
- 2.
System cues included in the performance checklist are to be provided to the examinee when no system response is available.
- 3.
JPM Performance
- a..
Control Room JPMs are designed to be performed in the simulator. If a Control Room JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
- b.
When performing In-Plant JPMs, no equipment will be operated without Shift Management approval.
- 4.
Satisfactory performance of this JPM is accomplished if:
- a.
The task standard is met.
- b.
JPM completion time requirement is met.
- 1)
For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
- 2)
For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
- 5.
The estimated time to complete this JPM, though listed in the task standard, is not to be L
given to the examinee.
DWCW-RBCCW JPM.dOC Page 3 of 6
B.
C.
D.
E.
F.
G.
TOOLS AND EQUIPMENT None REFERENCES GP-8.B, Rev. 17, "PCIS Isolation - Groups II and 111" (R)
TASK STANDARD
- 1.
Satisfactory task completion is indicated when the Drywell Chilled Water isolation valves, MO-2200A & B and M0-2201A & B are closed, The Drywell Chillers are tripped, and the DWCW Pump control switches are in "PULL TO LOCK".
- 2.
Estimated time to complete: 12 minutes Non-Time Critical DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps of GP 8.B Section 3.5 "PCIS Isolation -
Groups II and 111". I will describe initial plant conditions and provide you access to the materials required to complete this task.
TASK CONDITIONS/PREREQUISlTES
- 1.
- 3.
- 4.
INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to perform step 3.5 of GP-8.B, "PCIS Isolation - Groups It and 111".
The Reactor has just been scrammed.
DWCW Return Header pressure as read on P1-2-0262 is 32 psig.
Drywell pressure is approximately 24 psig.
\\
DWCW-RBCCW JPM.dOC Page 4 of 6
H.
PERFORMANCE CHECKLIST NO STEP I 1 (Obtain a copy of procedure GP-8.B.
2 Verify MO-20245 AND MO-20246 aligned in the "CHILLED WATER" position.
(Cue: MO-20245 AND MO-20246 red "CHILLED WATER" lights are lit. MO-20245 AND MO-20246 red "RX BLDG CLG WATER" lights are out.)
'3 Calculate corrected RBCCW pressure (CRP) by taking indicated RBCCW pressure on Pl-2350 - 25 psig.
(Cue: Pl-2350 is indicating 40 psig.)
Compare Drywell pressure to DWCW Return Header pressure.
(Cue: Comparison acknowledged) 4 i_
ompare Drywell pressure to Corrected BCCW Pressure (CRP) to determine which pressure is greater.
(Cue: PR-2508 indicates 24 psig.)
(Cue: Both Recirc pumps breaker green lights are on and red lights are off.
Annunciators 214 C-3 and H-3 are lit.)
(Cue: Both Recirc pumps breaker green lights are on and red lights are off.
Annunciators 214 C-3 and H-3 are lit.)
- 6 Close MO-2373, RBCCW Isolation valve.
(Cue: Acknowledge control switch I-operation.)
ACT STANDARD P
(A copy of procedure GP-8.B is obtained.
P MO-20245 AND MO-20246 red "CHILLEC WATER" lights are lit. MO-20245 AND MO-20246 red "M BLDG CLG WATER lights are out at Panel 20C005A.
P Indicated RBCCW pressure is checked, then 25 psig is subtracted to determine a CRP of approximately 15 psig.
P Recognize that DWCW Return Header pressure is greater than Drywelt pressure and DWCW isotation is not required and not performed.
P Corrected RBCCW Pressure (CRP) is determined to be less than PR-2508 or PR-4805 or PR-8102A(B) at panels 20C003/ 20C004C.
P The control switches for the Drive Motor Breakers on both A and B Recirc "DRIVE MOTOR" breakers are placed in TRJP at panel 20C004A.
P A and B Recirc "DRIVE MOTOR" breaker green lights are verified to be ON at panel 20C004A.
P MO-2373 control switch is momentarily placed in the "CLOSE" position at panel 20c012.
DWCW-RBCCW JPM.dOC Page 5 of 6
1 STEP NO STEP the MO-2373, the RBCCW Isolation valve is closed.
(Cue: MO-2373 green light is on, red light is off.)
- 8 Close MO-2374, the RBCCW Isolation valve.
(Cue: Acknowledge control switch operation.)
9 Verify the MO-2374, the RBCCW Isolation valve is closed.
(Cue: MO-2374 green light is on, red light is off.)
10 Inform Control Room Supervisor of task completion.
(Cue: Control Room Supervisor acknow-ledges report.)
provided to the examinee (Task Condition s/Prerequ isites) AND Under "ACT" P - must perform S - must simulate ACT P
P P
P P
STANDARD MO-2373 green light is verified ON and red light is verified OFF at panel 20C012.
MO-2374 control switch is momentarily placed in the "CLOSE" position at panel 20c012.
MO-2374 green light is verified ON and red light is verified OFF at panel 2OCO12.
Task completion reported.
Positive control established.
- 1.
TERMINATING CUE When step 3.5 of GP-8.B has been completed, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.
DWCW-RBCCW JPM.dm Page 6 of 6
TASK CONDITIONS/PREREQUISlTES
- 1.
- 2.
The Reactor has just been scrammed.
DWCW Return Header pressure as read on PI-2-0262 is 32 psig.
Drywell pressure is 24 psig.
\\
- 3.
INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to perform step 3.5 of GP-8.B, PCIS Isolation - Groups II and 111.
EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET U
s i t w e ~ r i Date Signature I Title Date APPROVED FOR USE:
Signature I Titla Date I
EFFECTIVE DATE:
I NAME:
ISSUE DATE:
Last First M.I.
SOC. SEC. NO.
I COMPLETION DATE:
COMMENTS:
I I Training Review for Completeness:
I PlMS CODE:
ti t
I I
Signature/Date I
ENTRY:
1 PLOR034C R e d l 1.doc Page 1 of 6
TEMPORARY CHANGE FORM LOG CODE NO.: PLOR-034C REV. NO.: -
011 TITLE:
CAD System Nitrogen Addition To Containment During Normal Operations
- 2.
- 3.
- 4.
1 I
- 5.
- 6.
- 7.
- 8.
- 9.
I O.
- 11.
1 I
- 12.
1 I
I
- 13.
- 14.
- 15.
PLOR034C RevOl 1.doc Page 2 of 6
EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE:
TASK-JPM DESIGNATOR: 2240130101 / PLOR-OMC WA:
223001A4.10 Unit Reactor Operator/Senior Reactor Operator URO: 3.2 SRO: 3.2 TASK DE SCR I PTI 0 N :
CAD System Nitrogen Addition To Containment During Normal Operations A.
NOTES TO EVALUATOR:
- 1.
An asterisk (*)before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
- 2.
System cues included in the performance checklist are to be provided to the examinee when no system response is available.
- 3.
JPM Performance
- a.
"Control Room" JPMs are designed to be performed in the simulator. If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
- b.
When performing "In-Plant" JPMs, no equipment will be operated without Shift Management approval.
- 4.
Satisfactory performance of this JPM is accomplished if:
- a.
The task standard is met.
- b.
JPM completion time requirement is met.
- 1)
For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
- 2)
For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
~
- 5.
The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.
PLOR034C Rev01 1.doc Page 3 of 6
B.
C.
D.
E.
F.
G.
I TOOLS AND EQUIPMENT None REFERENCES Procedure SO 7C.1.B-2, Rev. 18, CAD System Nitrogen Addition to Containment During Normal Operations (R)
TASK STANDARD
- 1.
Satisfactory task completion is indicated when Nitrogen has been added to containment with an N, flow of 55-65 sdm.
- 2.
Estimated time to complete: 14 minutes (A.5) Non-Time Critical DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to perform a normal nitrogen addition to the Drywell from the CAD system using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.
TASK CONDITIONS/PREREQUISlTES
- 1.
All SO 7C.1.B-2, CAD System Nitrogen Addition to Containment During Normal Operations procedural prerequisites are met.
- 2.
Primary Containment venting is NOT required.
- 3.
CAD Tank level is 45 inches.
INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to add nitrogen to the Drywell using A loop of the CAD system at 60 sdm in accordance with SO 7C.1.B-2, CAD System Nitrogen Addition to Containment During Normal Operations.
L PLOR034C Rev01 1.doc Page 4 of 6
H.
PERFORMANCE CHECKLIST
" STEP NO 1
- 2 3
- 4 5
- 6 7
8 Obtain a copy of procedure SO 7C.1.B-2.
Open SV4948A Drywell Nitrogen Supply valve.
(Cue: Acknowledge control switch operation.)
Verify SV4948A Drywell Nitrogen Supply valve is open.
(Cue: SV4948A red light is on and green light is off.)
Open SV4949A Drywell Nitrogen Supply Valve.
(Cue: Acknowledge control switch operation.)
Verify SV4949A Drywell Nitrogen Supply Valve is open.
(Cue: SV4949A red light is on and green light is off.)
Open CV4947A using HCS4947A to obtain a flow rate of 60 scfm on FI4947A.
(Cue: [CLOCKWISE HCS-4947A manual adjustment knob is rotated.] HCS4947A indicates 55% controller output; FI4947A indicates 60 sdm; FR-4947A indicates 62 scfm.
Inform the Control Room Supervisor of task completion.
c (Cue: Control Room Supervisor acknow-ledges report.)
As an evaluator, ensure that you have positive control of all exam material provided to the examinee (Task Conditions/Prerequisites) AND procedures.
ACT P
P P
P P
P P
P STANDARD A copy of procedure SO 7C.1.B-2 is obtained.
SV-4948A control switch is placed in the OPEN position at panel 20C484A.
SV4948A red light is verified ON at panel 20C484A.
SV4949A control switch is placed in the OPEN position at panel 20C484A.
SV4949A red light is verified ON at panel 20C484A.
HCS-4947A manual adjustment knob is rotated clockwise until 50 to 70 scfm is obtained on FI4947A at panel 20C484A.
Task completion reported.
Positive control established.
PLOR034C Rev01 1.doc Page 5 of 6
Under "ACT" P - must perform S - must simulate
- 1.
TERMINATING CUE When nitrogen is being added to the Drywell at a flow rate of 60 scfm, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.
PLOR034C Rev01 1.doc Page 6 of 6
TASK CONDITIONS/PREREQUISITES
- 1.
All SO 7C.l.B-2, CAD System Nitrogen Addition to Containment During Normal Operations procedural prerequisites are met.
- 2.
Primary Containment venting is NOT required.
- 3.
CAD Tank level is 45 inches.
INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to add nitrogen to the Drywell using A loop of the CAD system at 60 scfm in accordance with SO 7C.l.B-2, CAD System Nitrogen Addition to Containment During Normal Operations.
I EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET S:
signaturn I Title Date Signatwe I Title Date APPROVED FOR USE:
signature I Title Date I
I EFFECTIVE DATE:
I I
NAME:
ISSUE DATE:
SOC. SEC. NO.
COMPLETION DATE:
COMMENTS:
Last First M.I.
Training Review for Completeness:
I PlMS CODE:
1 PlMS ENTRY:
Signature/Date RClC JPM Rev000.doc Page 1 of 7
TEMPORARY CHANGE FORM LOG CODE NO.: PLOR-3??CA REV. NO.: 000 TITLE:
Manually Initiate RClC (Alternate Path - Cooling Water Fails to Automatically Align)
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
- 7.
- 8.
1 1
1
- 9.
1 I O.
- 11.
- 12.
- 13.
- 14.
- 15.
RClC JPM Rev000.doc Page 2 of 7
EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE:
Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2008070501 / PLOR-3??CA WA:
295031 EA1.05 URO: 4.3 SRO: 4.3 TASK DESCRl PTION:
Manually Initiate RClC (Alternate Path - Cooling Water Fails to Automatically Align)
A.
NOTES TO EVALUATOR:
- 1.
An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
- 2.
System cues included in the performance checklist are to be provided to the examinee when no system response is available.
- 3.
JPM Performance
- a.
"Control Room" JPMs are designed to be performed in the simulator. If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
- b.
When performing "In-Plant" JPMs, no equipment will be operated without Shift Management approval.
- 4.
Satisfactory performance of this JPM is accomplished if:
- a.
The task standard is met.
- b.
JPM completion time requirement is met.
- 1)
For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
- 2)
For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
- 5.
The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.
RClC JPM Rev000.doc Page 3 of 7
B.
- C.
D.
E.
F.
G.
I TOOLS AND EQUIPMENT
- 1.
None REFERENCES
- 1.
RRC 13.1 -2 Rev. 0, RCIC System Operation During A Plant Event TASK STANDARD
- 1.
Satisfactory task completion is indicated when RClC is injecting to the RPV with cooling water properly aligned.
- 2.
Estimated time to complete: 6 minutes Non-Time Critical DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to manually initiate the RClC system and inject into the Reactor vessel at a flow rate of approximately 600 gpm using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.
TASK CONDITIONS/PREREQUISlTES
- 1.
Reactor Scram has occurred on low level due to a loss of all Feedwater.
- 2.
INITIATING CUE Reactor level is -25 and dropping slowly.
The Control Room Supervisor directs you, the Plant Reactor Operator, to initiate the RClC System using the RClC Manual Initiation pushbutton and inject to the Reactor vessel at approximately 600 gpm using RRC 13.1-2 RCIC System Operation During a Plant Event.
RClC JPM Rev000.doc Page 4 of 7
H.
PERFORMANCE CHECKLIST I
I ACT STEP NO 1 STANDARD STEP
- 3 Obtain a copy of procedure RRC 13.1-2.
1-Depress the RClC Manual Initiation pushbutton, 13A-S80.
(Cue: Acknowledge Manual Initiation
(Cue: Acknowledge pushbutton collar operation; annunciator A-2 on alarm panel 222 is alarming.)
4 5
Acknowledge the "RCIC BAROMETRIC CONDENSER VACUUM PUMP RUNNING" annunciator.
(Cue: Annunciator 222 C-5 is lit solid.
V e m MO-2-13-131, RCIC Turbine Supply valve, opens.
(Cue: MO-131 red light is on, green light is off.)
6 Verify MO-2-13-021, RCIC to Feed Line valve, opens.
(Cue: MO-021 red light is on, green light is off.)
- 7 Verify MO-2-13-132, RCIC Cooling Water valve, is open.
(Cue: MO-132 green light is on, red light is off.)
P P
' P P
P P
P A copy of procedure RRC 13.1-2 is obtained.
RCIC Manual Initiation pushbutton collar i 1 rotated clockwise to the ARMED position at panel 20C004C.
RClC Manual Initiation pushbutton is momentarily DEPRESSED at panel 20c004c.
The annunciator "ACKNOWLEDGE" pushbutton is depressed.
MO-2-13-131 red light is verified ON at panel 20C004C.
MO-2-13-021 red light is verified ON at panel 20C004C.
MO-2-13-132 red light discovered to be OFF at panel 20C004C.
RClC JPM Rev000.doc Page 5 of 7
- 8 ACT 9
10 STANDARD The control switch for MO-2-13-132 is placed in the OPEN position until the valvc begins stroking open.
11 P
P I l2 i
MO-2-13-132 red light is verified to be to be ON at panel 20C004C.
AO-2-13-034 and AO-2-13-035 green lights verified ON at panel 20C004C.
STEP P
Place the switch for MO-2-13-132, RClC Cooling Water valve, to the OPEN position.
20P046 red light verified ON at panel 20c004c.
(Cue: Acknowledae switch maniDulation.
P Verify MO-2-13-132, RClC Cooling Water valve, is open.
RClC Flow is verified to be 600 gpm on panel 20C004C.
(Cue: MO-132 red light is on, green light is off.)
P Verify AO-2-13-034 and AO-2-13-035, RClC Drain Is01 to Mn Cndr valves, dose.
MO-2-13-027 red light verified ON at panel 20C004C when RClC pump flowrate reaches 600 gpm.
(Cue: AO-034 and AO-035 green lights are on, red lights are off.)
14 15 I L Verify 20P046, Vacuum Pump, starts.
Inform Control Room Supervisor of task completion.
(Cue: Control Room Supervisor acknowledges report.)
As an evaluator ensure that you have positive control of all exam material provided to the examinee (Task Conditions/Prerequisites) AND procedures.
[Cue: 20P046 red light is on, green lght is Dut. Alarm 222 C-5 lit.)
P P
derify RClC system flowrate is 600 gpm.
Task completion reported.
Positive control established.
- Cue: FI-2-13-091 indicates 600 gpm.
3CIC Flow Controller output meter ndicates 80%.)
Jerify MO-2-13-027, RClC Min Flow valve, (Cue: MO-27 green light is on, red light is off at normal RClC pump flow.)
RClC JPM Rev000.doc Page 6 of 7
Under ACT P - must perform S - must simulate TERMINATING CUE When RCIC is injecting into the Reactor vessel with cooling water aligned, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.
RClC JPM Rev000.doc Page 7 of 7
TASK CONDITIONS/PREREQUISlTES I. Reactor Scram has occurred on low level due to a loss of all Feedwater.
- 2.
Reactor level is -25 and dropping slowly.
INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator to initiate the RCIC System using the RCIC Manual Initiation pushbutton and inject to the Reactor vessel at approximately 600 gpm using RRC 13.1 -2 RCIC System Operation During a Plant Event.
EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL; COVERSHEET Signature / T i Date I
SigMture I Title Date PROVED FOR USE:
Signature I T i i Date I
EFFECTIVE DATE:
f f
NAME:
ISSUE DATE:
Last First M.I.
SOC. SEC. NO.
COMPLETION DATE:
COMMENTS:
Training Review for Completeness:
I PIMS CODE:
t I
I ENTRY:
Signature/Date I
I SBLC JPM.doc Page 1 of 6
TEMPORARY CHANGE FORM LOG CODE NO.: PLOR-NEW REV. NO.:
TITLE:
lniect SBLC (Alternate Path - Low SBLC Discharge Pressure)
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
- 7.
- 8.
- 9.
I O.
- 11.
- 12.
- 13.
114.
I I
115.
EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE:
Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 21 30220401 / PLOR-NEW WA:
295024EA1.07 URO: 3.8 SRO: 3.9 TASK DESCRIPTION:
lniect SBLC (Alternate Path - Low SBLC Discharqe Pressure)
A.
NOTES TO EVALUATOR:
- 1.
An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
- 2.
System cues included in the performance checklist are to be provided to the examinee when no system response is available.
- 3.
JPM Performance
- a.
"Control Roomm JPMs are designed to be performed in the simulator. If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
- b.
When performing "In-Plant" JPMs, no equipment will be operated without Shift Management approval.
- 4.
Satisfactory performance of this JPM is accomplished if:
- a.
The task standard is met.
- b.
JPM completion time requirement is met.
- 1)
For non-time critical JPMs, completion within double the estimated time (listed in paragraph 0.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
- 2)
For time critical JPMs, completion within the estimated time (listed in paragraph 0.2) is required.
- 5.
The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.
SBLC JPM.doc Page 3 of 6
B.
TOOLS AND EQUIPMENT None C.
REFERENCES RRC 11 2, Rev. 0, Standby Liquid System Initiation During a Plant Event D.
TASK STANDARD
- 1.
Satisfactory task completion is indicated when Standby Liquid Control is injecting into the RPV at adequate discharge pressure using the 6 SBLC Pump.
- 2.
Estimated time to complete: 12 minutes Non-Time Critical E.
DIRECTIONS TO EXAMINEE When given the initiating cue, inject SBLC into the RPV using the A SBLC Pump using RRC 11.l-2, Standby Liquid System Initiation during a Plant Event. I will describe initial plant conditions and provide you access to the materials required to complete this task.
F.
TASK CONDITIONS/PREREQUlSlTES
- 1.
An attempt has been made to scram the reactor.
- 2.
An Electric ATWS has resulted and SBLC injection is required.
- 3.
Reactor Pressure is 1000 psig with the Turbine EHC system in control.
- 4.
Reactor Level is in the normal band with feedwater in automatic control.
G.
INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to inject Standby Liquid Control using the A SBLC Pump in accordance with RRC 11.1-2, Standby Liquid System Injection During a Plant Event.
1 SBLC JPM.doc Page 4 of 6
H.
PERFORMANCE CHECKLIST STEP NO 1
2
- 3 4
- 5 STEP STANDARD A copy of procedure RRC 11.l-2 is obtained.
Obtain a copy of procedure RRC 1 1.l-2.
Verify CLOSED the AO-39 AND AO-40, Recirc Sample Inboard and Outboard Isolation valves.
(Cue: AO-39 AND A 0 4 0 green lights are ON and red lights are OFF.)
P AO-39 AND AO-40 green lights are ON and red lights are OFF on Panel 20C005A.
Start the A SBLC Pump.
{Cue: Acknowledge switch movement.)
Verify that the RWCU system isolates.
(Cue: Valves checked have the green lights ON and the red lights off.)
P The SBLC switch is placed in the START SYS A position on Panel 20C005A.
P Veriw green lights ON and red lights OFF for the following valves on Panel 20C004A:
MO-2-12-15, RWCU Inboard Isolation MO-2-12-18, RWCU Outboard Isolation MO-2-12-68, RWCU Outlet valve Verify that SBLC is injecting.
(Cue: Pump Red Light is on, Discharge pressure 400 psig, tank level steady.)
P Recognize that SBLC Pump discharge pressure on PI-2-1 1-065 is lower than reactor pressure and therefore SBLC is NOT injecting.
NOTE:
Candidate may immediately move to inject with the B SBLC Pump OR may notify the CRS of the failure to inject. If the candidate noties the CRS, then direct him to inject with the B SBLC Pump.
6 Start the B SBLC Pump.
(Cue: Acknowledge switch operation.)
P I p Verify that SBLC is injecting.
(Cue when checked: Pump Red Light is on, Discharge pressure 1050 psig, tank level is lowering.)
The SBLC switch is placed in the START SYS B position on Panel 20C005A.
Venfy that SBLC Discharge pressure is now greater than reactor pressure.
SBLC JPM.doc Page 5 of 6
STEP NO STEP 8
Inform Control Room Supervisor of task completion.
(Cue: Control Room Supervisor acknow-ledges report.)
Under "ACT" P - must perform S - must simulate ACT P
P STANDARD
~
Task completion reported.
Positive control established.
- 1.
TERMINATING CUE When SBLC is injecting at greater than reactor pressure, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.
SBLC JPM.doc Page 6 of 6
TASK CONDITIONS/PREREQUlSlTES I. An attempt has been made to scram the reactor.
- 2. An Electric AlWS has resulted and SBLC injection is required.
- 3. Reactor Pressure is I000 psig with the Turbine EHC system in control.
- 4.
Reactor Level is in the normal band with feedwater in automatic control.
INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to inject Standby Liquid Control using the A SBLC Pump in accordance with RRC I 1.I
=2, Standby Liquid System Injection During a Plant Event.
PECO NUCLEAR Nuclear Generation Group OJTlTPE MATERIAL COVERSHEET APPROVALS:
,PPROVED FOR USE:
1 EFFECTIVE DATE:
f t
NAME:
SOC. SEC. NO.
Last First M.I.
ISSUE DATE:
COMPLETION DATE:
PlMS CODE:
PlMS ENTRY:
4 PLOR023C RevOO6.doc Page 1 of 7
- CODE NO.: PLOR-023C
- 15.
1 TEMPORARY CHANGE FORM LOG REV. NO.: -
006 TITLE:
ADS RESET FOLLOWING BLOWDOWN
- 1.
- 2.
- 3.
- 4.
I 5.
1 1
- 8.
- 9.
I O.
- 11.
- 12.
- 13.
- 14.
- 15.
I 8.
- 9.
I O.
- 11.
- 12.
I
- 13.
- 14.
PLOR023C RevOO6.d~
Page 2 of 7
PECO NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE:
TASK-JPM DESIGNATOR: 21800401 01 / PLOR-023C WA:
21 8000A4.03 Unit Reactor Operator/Senior Reactor Operator RO: 4.2 SRO: 4.2 TASK DES CR I PTI 0 N :
ADS RESET FOLLOWING BLOWDOWN A.
NOTES TO EVALUATOR:
- 1.
- 2.
- 3.
- 4.
- 5.
An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
System cues included in the performance checklist are to be provided to the examinee when no system response is available.
JPM Performance
- a.
Control Room JPMs are designed to be performed in the simulator. If a Control Room JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
When performing ln-Plant JPMs, no equipment will be operated without Shift Management approval.
- b.
Satisfactory performance of this JPM is accomplished if:
- a.
- b.
The task standard is met.
JPM completion time requirement is met.
- 1)
For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
- 2)
The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.
P~OR023~RevOO6.doc Page 3 of 7
B.
C.
D.
E.
F.
G.
TOOLS AND EQUIPMENT None REFERENCES Procedure SO 1 G.7.C-2, Rev. 8, Automatic Depressurization System Reset Following Blowdown (R)
TASK STANDARD
- 1.
Satisfactory task completion is indicated when ADS logic reset, Vacuum breaker position indication reset, and ADS relief valve position indication reset.
- 2.
Estimated time to complete: 7 minutes (A.5) Non-Time Critical DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to reset the ADS system using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.
TASK CONDITIONS/PREREQUISlTES
- 1.
RPV water level is greater than -1 60 and the capability exists to maintain level above
-1 60.
- 2.
The following annunciators have been reset:
- a.
- b.
Blowdown of the RPV is complete by evidence of valves closed due to lack of pressure to keep them open.
Relief Valve Tailpipe Temperatures indicated on TR-2-02-103 on Panel 2OCOO3-01 are all 200°F and lowering.
Reactor pressure is 20 psig.
Drywell pressure is 0.25 psig.
System I ECCS REAC VESSEL LO-LO-LO LEVEL, panel 227 0-2.
System II ECCS REAC VESSEL LO-LO-LO LEVEL, panel 228 C-2.
- 3.
- 4.
- 5.
- 6.
INITIATING CUE The Control Room Supervisor directs you to reset the ADS system following an automatic initiation by completing SO 1 G.7.C-2, Automatic Depressurization System Reset Following Blowdown.
PLORO23C RevOO6.doc Page 4 of 7
H.
PERFORMANCE CHECKLIST TEP NO
- I
- 2 3
4 STEP Depress the A ADS LOGIC RESET-TIMER pushbutton, 2E-S2A.
(Cue: Acknowledge pushbutton operation.)
Depress the B ADS LOGIC RESET-TIMER pushbutton, 2E-S26.
(Cue: Acknowledge pushbutton meration.)
Reset the following annunciators:
- a.
BLOWDOWN AUX RELAYS ENERGIZED RHR OR CS (227 E-4)
- b.
BLOWDOWN RELIEF VALVES HIGH TEMP (227 8-4)
(Cue: Acknowledge pushbutton operation. )
Verify BLOWDOWN AUX RELAYS ENERGIZED RHR OR CS and BLOWDOWN RELIEF VALVES HIGH TEMP annunciators are clear.
(Cue: Annunciators 227 E-4 and 227 8-4 are not lit.)
Verify BLOWDOWN TIMERS INITIATED annunciator reset.
(Cue: Annunciator 227 D-4 is not lit.)
Verify SAFETY RELIEF VALVE OPEN annunciator reset.
(Cue: Annunciator 210 D-2 is not lit.)
Verify the ADS valves indicate closed.
(Cue: RV-2-02-71A, B, C, G, & K green lights are on, red lights are off.)
- NO ACT STANDARD P
The A ADS LOGIC TIMER RESET pushbutton, 2E-S2A, is momentarily depressed at panel 2OCOO3-01.
P The B ADS LOGIC TIMER RESET pushbutton, 2E-S2B, is momentarily depressed at panel 2OCOO3-01.
P The alarm RESET Pushbutton is momentarily depressed on panel 20C003.
P BLOWDOWN AUX RELAYS ENERGIZED RHR OR CS and BLOWDOWN RELIEF VALVES HIGH TEMP annunciators are verified clear on alarm panels 227 E-4 and 227 6-4.
P BLOWDOWN TIMERS INITIATED annunciator is verified clear on alarm panel 227 D-4.
P SAFETY RELIEF VALVE OPEN annunciator is verified clear on alarm panel 210 D-2.
P RV-2-02-71A, B, C, G, & K green lights verified ON at panel 2OCOO3-01.
I E***
If candidate begins to look at TR-2-02-103 to check SRV Tailpipe Temperatures, then refer them to the initial task conditions information provided.
1-PLOR023C RevOO6.doc Page 5 of 7
- 9
- 10 11 STEP Monitor temperature recorder TR-2-02-103 to ensure each valve has reseated.
(Cue: TR-2-02-103 points TE-2-2-113A, B, C, G, & K read 200°F and decreasing Depress the "A" ADS LOGIC RESET -
DRYWELL HIGH PRESS pushbutton, 2E-S3A.
slowly.)
(Cue: Acknowledge pushbutton operation.)
Depress the "B" ADS LOGIC RESET DRYWELL HIGH PRESS pushbutton 2E-S3B.
(Cue: Acknowledae Dushbutton oDeration.
~~
~
Reset the following annunciators:
- a.
"DRYWELL HI PRESS SIGNAL SEALED IN" (227 A-4).
- b.
"HIGH DRYWELL PRESSURE BYPASS TIMERS INITIATED" (227 A-3).
(Cue: Acknowledge pushbutton operation.)
Verify "DRYWELL HI PRESS SIGNAL SEALED IN" and "HIGH DRYWELL PRESSURE BYPASS TIMERS INITIATED" annunciators are clear.
(Cue: Annunciators 227 A 4 and 227 A-3 are not lit.)
Verify "MSRV DISCH LIN VAC RELIEF VALVE OPEN" annunciator is clear.
Cue: Annunciator 219 C-5 is not lit.)
Verify vacuum breaker amber lights out.
(Cue: All ADS valve vacuum breaker amber lights are not lit.)
ACT P
P P
P P
P P
STANDARD TR-2-02-103 monitored to ensure each ADS valve has reseated at panel 20C003-
- 01.
The " A ADS DRYWELL HIGH PRESSURE LOGIC RESET pushbutton, 2A-S3A, is momentarily depressed at panel 2OCOO3-01.
~~
The "B" ADS DRYWELL HIGH PRESS LOGIC RESET pushbutton, 2E-S3B, is momentarily depressed at panel 20C003-
- 01.
The alarm "RESET" pushbutton is momentarily depressed on panel 20C003.
"DRYWELL HI PRESS SIGNAL SEALED IN" and "HIGH DRYWELL PRESSURE BYPASS TIMERS INITIATED" annunciators are verified clear on alarrn panels 227 A-4 and 227 A-3.
"MSRV DISCH LINE VAC RELIEF VALVE OPEN" annunciator is verified clear on alarm panel 219 C-5.
All of the ADS valve vacuum breaker amber lights verified OUT at panel 2OCOO3-0 1.
PLOR023C RevOO6.doc Page 6 of 7
-E 15 16 17 18 STEP Erect an Equipment Operator to perform Steps 4.3.1,4.3.2, and 4.3.3 of SO 1G.7.C-2 in the Cable Spread Room.
(Cue: Equipment Operator acknowledges direction.)
Depress the SRV MEMORY RESET pushbutton, 2E-S9.
(Cue: Acknowledge pushbutton operation.)
Verify the ADS Valve "MEMORY" lights go out.
(Cue: RV-2-02-71A, 6, C, G, & K white memory lights are not lit.)
Inform the Control Room Supervisor of task completion.
(Cue: Control Room Supervisor acknowledges report.)
ACT P
P P
P STANDARD Equipment Operator directed to perform Steps 4.3.1,4.3.2, and 4.3.3 of SO 1 G.7.C-2.
The SRV MEMORY RESET pushbutton, 2E-S9 is momentarily depressed at panel 2OCOO3-01.
RV-2-02-71A, C, C, G, & K white memory lights verified OUT at panel 2OCOO3-01.
Task completion reported.
Under "ACT" P - must perform S - must simulate
- 1.
TERMINATING CUE When the ADS logic has been reset, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.
1 PLOR023C RevOO6.doc Page 7 of 7
TASK CONDlTlONSlPREREQUlSlTES 1. RPV water level is greater than -160 and the capability exists to maintain level above -1 60.
- 2.
The following annunciators have been reset:
- a.
System I ECCS REAC VESSEL LO-LO-LO LEVEL, panel 227 D-2.
- b.
System II ECCS REAC VESSEL LO-LO-LO LEVEL, panel 228 C=2.
- 3.
Blowdown of the RPV is complete by evidence of valves closed due to lack of pressure to keep them open.
- 4.
Relief Valve Tailpipe Temperatures indicated on TR-2-02-103 on Panel 2OCOO3-01 are all 2OOOF and lowering
- 4.
Reactor pressure is 20 psig.
- 5.
Drywell pressure is 0.25 psig.
INITIATING CUE The Control Room Supervisor directs you to reset the ADS system following an automatic initiation by completing SO 1 G.7.C-2, Automatic Depress u rizat i o n System Reset Following Blowdown.
EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET APPROVALS:
I Signature I Title Date I
n Signature / Title Date Signature I Title Date APPROVED FOR USE:
Signature I Title Date I
EFFECTIVE DATE:
I I
NAME:
ISSUE DATE:
Last First M.I.
SOC. SEC. NO.
COMPLETION DATE:
COMMENTS:
Training Review for Completeness:
PIMS CODE:
PIMS ENTRY:
Signature/Date I
NEW HPCl ALT PATH Rev000.doc Page 1 of 7
TEMPORARY CHANGE FORM LOG CODE NO.: NEW HPCl AP REV. NO.:
TITLE:
Raise HPCl Flow (Alternate Path - Suctions Fail to Auto Swap on Low CST Level)
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
- 7.
- 8.
- 9.
- 10.
- 11.
- 12.
- 13.
- 14.
- 15.
NEW HPCl ALT PATH Rev000.doc Page 2 of 7
EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE:
Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 20602501 01 / PLOR-323CA WA:
206000A2.09 URO: 3.5 SRO: 3.7 TASK DESCRIPTION:
Raise HPCI Flow (Alternate Path - Suction Valves Fail to Auto Swap on Low CST Level)
A.
NOTES TO EVALUATOR:
- 1.
An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
- 2.
System cues included in the performance checklist are to be provided to the examinee when no system response is available.
- 3.
JPM Performance
~
- a.
"Control Room" JPMs are designed to be performed in the simulator. If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
- b.
When performing "In-Plant" JPMs, no equipment will be operated without Shift Management approval.
- 4.
Satisfactory performance of this JPM is accomplished if:
- a.
The task standard is met.
- b.
JPM completion time requirement is met.
- 1)
For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
- 2)
For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
- 5.
The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.
L-Page 3 of 7 NEW HPCl ALT PATH Rev000.doc
B.
TOOLS AND EQUIPMENT None C.
REFERENCES
- 1. Alarm Response Card 221 C-3, Condensate Stor Tank Level Low-Low
D.
TASK STANDARD
- 1.
Satisfactory task completion is indicated when HPCl flow has been raised to 5000 gpm and pump suction is manually transferred from the CST to the Torus (Torus suction valves open and CST suction valve closed) without adverse effects on RPV injection.
- 2.
Estimated time to complete: 10 minutes Non-Time Critical E.
DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps raise HPCl flowrate to 5000 gpm and maintain injection to the RPV. I will describe initial plant conditions and provide you access to the materials required to complete this task.
c.
TASK CONDITIONS/PREREQUISlTES
- 2. RClC is isolated.
- 3. Torus Cooling is in service per SO 10.1.D-2, Residual Heat Removal System Torus Cooling.
- 4. SBGT is in service per SO 9A.1.B, Standby Gas Treatment System Manual Startup.
- 5. ST-0-007-540-2, Torus Water Temperatures is in progress.
G.
INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to raise the HPCl flowrate to 5000 gpm and maintain HPCl injection.
NEW HPCl ALT PATH Rev000.doc Page 4 of 7
H.
PERFORMANCE CHECKLIST I
3TEP NO
- 1 2
STEP ACT STANDARD Raise HPCl Flow Rate to 5000 gpm.
(Cue: The HPCl Flow Controller is now indicating 5000.)
HPCl Flow is verified to rise to 5000 gpm.
(Cue: The Flow Indicator is reading 5000 gpm.)
P The HPCl Flow Controller knob is adjustec in the clockwise direction to raise the flow rate setting to 5000.
Fl-2-23-108 is monitored to verify that the actual flow rate rises to 5000 gpm.
P
- 3 I'
Verify the Low CST Level Condition.
(Cue: When the candidate checks any of the CST Level indications, report to the candidate that level is indicating 5 feet.)
Recognize that HPCl failed to automatically swap suction paths on low CST level.
I will be received initiatina the next P
Candidate verifies that CST Level is low by referencing LR-2217 on 20C007A or LI-2217 OR Ll-8453 on 20C004. (The candidate may also send an EO to verify level on LI-2210.)
Candidate will recognize by reporting that the HPCl suction path failed to automatically swap. (A RClC suction swap is not required due to RClC being P
Recognize the Condensate Storage Tank Low Level Condition alarm.
(Cue: Report Annunciator 221 C-3 is alarming.)
Obtain a copy of Alarm Response Card 221 c-3.
(Cue: Acknowledge report.)
part of the JPM.
Recognize by reporting annunciator 221 C-3 is alarming indicating a Low CST Level condition.
isolated. )
I Candidate references ARC 221 C-3, CONDENSATE STOR TANK LEVEL LOW - LOW.
Check Level Switches responsible for the automatic swap.
(Cue: Acknowledge direction 5
- 6 7
P Direct that LS-2-23-74 and LS-2-23-75 be checked for proper operation due to the failed auto transfer.
1 NEW HPCl ALT PATH Rev000.doc Page 5 of 7
8
~
- 9
- 10 11 12
- 13 14 15 STEP Obtain a copy of procedure SO 23.7.B-2.
Open MO-2-23-057 HPCl Torus Suction valve.
(Cue: Acknowledge control switch operation.)
Open MO-2-23-058, HPCl Torus Suction valve.
(Cue: Acknowledge control switch operation.)
Verify MO-2-23-057 and MO-2-23-058, HPCl Torus Suction valves are open.
(Cue: MO-57 and MO-58 red lights are on, green lights are off.)
Verify MO-2-23-017 Cond Tank Suction valve automatically closes when M0-2-23-057 and MO-2-23-058 are full open.
(Cue: MO-17 green light is off, red light is on.)
Close MO-2-23-017, Cond Tank Suction valve.
(Cue: Acknowledge control switch 9 pera t io n. )
Verify M0-2-23-017, Cond Tank Suction valve is closed.
[Cue: MO-17 green light is on, red light is derify HPCl has been declared noperable.
- Cue: Acknowledge report.)
D f f.)
ACT P
P P
P P
P S
STANDARD A copy of procedure SO 23.7.8-2 is obtained.
M0-2-23-057 control switch is momentarily placed in the OPEN position then released at panel 20C004B.
~
~~~
~
MO-2-23-058 control switch is momentarily placed in the OPEN position then released at panel 20C004B.
M0-2-23-057 and M0-2-23-058 red lights are verified ON, and green lights OFF at panel 20C004B.
Recognize that MO-2-23-017 failed to close as indicated by the green light verified OFF and red light verified ON at panel 20C004B.
MO-2-23-017 control switch is momentarily placed in the CLOSE position then released at panel 20C004B.
\\no-2-23-017 green light is verified ON, 3nd red light OFF at panel 20C004B.
2ontrol Room Supervisor is informed that iPCI is inoperable.
NEW HPCl ALT PATH Rev000.doc Page 6 of 7
I STEP NO ACT STEP STANDARD Inform Control Room Supervisor of task completion.
P P
(Cue: Acknowledge report.)
Task completion reported.
Positive control established.
As an evaluator, ensure that you have positive control of all exam material provided to the examinee (Task Conditions/Prerequisites) AND procedures. I Under ACT P - must perform S - must simulate I.
TERMINATING CUE When the HPCI suction has been transferred to the Torus, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.
NEW HPCl ALT PATH Rev000.doc Page 7 of 7
I.
- 2.
- 3.
- 4.
- 5.
TASK CONDITIONS/PREREQUISlTES HPCl is injecting into the RPV at 4000 gpm in response to a plant transient.
RClC is isolated.
Torus Cooling is in service per SO 10.1.D-2, Residual Heat Removal System Torus Cooling.
SBGT is in service per SO 9A.l.B, Standby Gas Treatment System Manual Startup.
ST-0-007-540=2, Torus Water Temperatures is in progress.
INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to raise the HPCl flowrate to 5000 gpm and maintain HPCl injection.
EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET Signature I Title Date Signature I Title Date Signature I Title Date Date I APPROVED FOR USE:
Signature I Title EFFECTIVE DATE:
/
/
NAME:
ISSUE DATE:
Last First M.I.
SOC. SEC. NO.
I COMPLETION DATE:
COMMENTS:
I Training Review for Completeness:
I PlMS CODE:
I ENTRY:
Signature/Date EDG Synch & Loading Rev. 000.doc Page 1 of 7
TEMPORARY CHANGE FORM LOG CODE NO.: PLOR REV. NO.: @
TITLE:
Diesel Generator Svnchronization and Loadinq I -2.
- 3.
- 4.
- 5.
- 6.
- 7.
- 8.
- 10.
- 11.
- 12.
- 13.
- 14.
- 15.
EDG Synch & Loading Rev. 000.doc Page 2 of 7
EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE:
Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 26400201 01 / PLOR-322CA WA:
264000A4.04 URO: 3.7 SRO: 3.7 TASK DESCRIPTION:
Diesel Generator Svnchronization and Loading A.
NOTES TO EVALUATOR:
- 1.
An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
- 2.
System cues included in the performance checklist are to be provided to the examinee when no system response is available.
- 3.
JPM Performance
- a.
Control Room JPMs are designed to be performed in the simulator. If a Control Room JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
- b.
When performing In-Plant JPMs, no equipment will be operated without Shift Management approval.
- 4.
Satisfactory performance of this JPM is accomplished if:
- a.
The task standard is met.
- b.
JPM completion time requirement is met.
- 1)
For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
- 2)
For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
- 5.
The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.
EDG Sy&h 8 Loading Rev. 000.doc Page 3 of 7
with Section 4.2 of SO 52A.1.B, "Diesel Generator Operations."
B.
C.
D.
E.
F.
G.
TOOLS AND EQUIPMENT Synchronizing Switch Removable Handle REFERENCES Procedure SO 52A.l.B, Rev. 32, "Diesel Generator Operations" (R)
TASK STANDARD
- 1.
Satisfactory task completion is indicated when the EDG has been synchronized and appropriate load has been picked up.
Estimated time to complete: 15 minutes Non-Time Critical
- 2.
DIRECTIONS TO EXAMINEE When given the initiating cue, synchronize the E 4 Diesel to the E43 bus and pick up 200 -
300 KW and 100 KVAR for testing purposes using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.
TASK CONDITIONS/PREREQUISlTES I. The E 4 Diesel Generator has been "SLOW" started and is running in accordance with Section 4.1 of SO 52A. 1.B, "Diesel Generator Operations."
The E 4 Diesel Generator is running at rated frequency and voltage.
The E 4 3 Bus is being supplied by 2SUE.
The ESW system is supplying Diesel Generator cooling water.
- 2.
- 3.
- 4.
INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to synchronize the E 4 Diesel Generator to the E43 Bus and pick up 200 - 300 Kw and 100 KVAR in accordance EDG Synch & Loading Rev. 000.doc Page 4 of 7
H.
PERFORMANCE CHECKLIST 7
3TEP NO 1
2
- 3 6
STEP Obtain a copy of procedure SO 52A.1.B.
Verify E 4 D/G is running at rated frequency and voltage.
(Cue: E 4 DIG frequency is 60 HZ and voltage is 4280 volts.)
Insert Sync scope key in E43 Breaker Sync Switch and turn ON.
(Cue: Both Sync Scopes rotating, incoming and running lights "ON" at Bottom Dead Center and "OFF" at Top Dead Center.)
Verify E 4 D/G speed control.
(Cue: "GOVERNOR control switch raises, lowers frequency 0.5 Hz above/below the initial value, then returns to initial value.)
Verify E 4 D/G voltage control.
(Cue: "AUTO VOLT REG" raises then lowers voltage 50 volts above/below initial value, then returns to initial value.)
Check both synchronizing lights for proper
- ,pera tion.
[Cue: Both lights "ON" when sync scope at "Bottom Dead Center" and both lights
'OFF" when sync scope at "Top Dead Center".)
ACT P
P P
P P
P STANDARD A copy of procedure SO 52A.1.B is obtained.
E 4 D/G frequency is verified at 58.8 to 61.2 Hz on E 4 D/G Freq. meter. E 4 D/G voltage is verified at 4.16 to 4.4 KV on E 4 D/G Volt meter.
E43 Breaker Sync Switch (3-1 25-1 807) is placed in the "ON" position at panel 00C026A.
E 4 D/G frequency is raised to 60.5 Hz then lowered to 55.5 Hz on E 4 D/G FREC meter using the "GOVERNOR control switch (165-OG12) then returned to the initial value at panel 00C026D.
E 4 D/G voltage is raised and lowered 50 volts above/below initial value on E 4 D/G volts meter using the "AUTO VOLT REG" control switch (90-DG14) then returned to the initial value at panel 00C026D.
Both sync lights are verified "ON" at Bottom Dead Center and "OFF" at Top Dead Center at panels 00C026A or OOC026C.
EDG Synch 8 Loading Rev. 000.doc Page 5 of 7
- 7 a
9
- 10 11 "12 13 STEP Adjust E 4 D/G engine speed using "GOVERNOR" control switch until sync scope is rotating slowly in "FAST" direction.
(Cue: Acknowledge control switch operation. Synchroscope is rotating slowly in the fast direction.)
Adjust E 4 diesel generator voltage until "INCOMING" voltmeter is slightly higher than "RUNNING" voltmeter.
(Cue: Acknowledge control switch operation. Incoming is slightly higher than running.)
Verify sync scope rotating slowly in "FAST" direction.
(Cue: Sync scope rotating slowly in "FAST".)
Close the E43 breaker when the sync scope is within 13 degrees of "Top Dead Center.
(Cue: Acknowledge [CLOCKWISE]
breaker control switch operation.)
~
~~
Verify the E43 breaker is closed.
(Cue: E43 breaker red light on, both sync scopes stopped at 12 o'clock and sync lights "OFF".)
Immediately load the E 4 diesel to 200-300 KW.
- Cue: [CLOCKWISE, "GOVERNOR" zontrol switch is taken to "RAISE'1.
~~
derify E 4 D/G load is 200-300 KW.
- Cue: E 4 DIG load is 250 KW.)
ACT P
P P
P P
P P -
STANDARD Sync scope is verified rotating slowly in "FAST" direction at panels 00C026A OR OOC026C.
Incoming voltmeter about 50 volts but less than 100 volts above bus voltage at panel OOC026C.
Sync scope is verified rotating slowly in "FAST" direction at Panels 00C026A OR OOC026C.
When the sync scope is within 13 degrees Df "Top Dead Center, the E43 breaker mntrol switch is taken to the "CLOSED" position and released at panel 00C026D.
E43 breaker red light lit, sync scope stopped at 12 o'clock, and sync lights
'OFF" verified at panel OOC026C and 30C026D.
5 4 D/G KW load is promptly raised by momentarily placing the "GOVERNOR" mntrol switch (165-DG12) to "RAISE" at lane1 00C026D. No reverse power trip of
- he E43 breaker occurs.
3 D/G load is verified to be 150 - 350 (W on the E 4 DIG KW meter at panel lOC026D.
EDG Synch & Loading Rev. 000.doc Page 6 of 7
NO STEP (Cue: Acknowledge positive control of all exam material ACT P
P P
P P
STANDARD E 4 D/G KVAR load is promptly raised by momentarily placing the AUTO VOLT REG control switch (90-DG14) in RAISE at panel 00C026D.
E 4 D/G load is verified to be 50-150 KVAR on the E 4 D/G KVAR meter at panel OOC026D.
E43 BKR SYNC switch taken to OFF at Panel 00C026D.
BKR SYNC verified in OFF via INCOMING and RUNNING voltmeters dropping to zero.
Positive control established.
Under ACT P - must perform S - must simulate I.
TERMINATING CUE When the Diesel is Loaded and the Synch Switch is in OFF, the evaluator will terminate the exercise.
EDG Synch & Loading Rev. 000.doc Page 7 of 7
TASK CONDITIONS/PREREQUISlTES I.
- 2.
- 3.
- 4.
The E 4 Diesel Generator has been SLOW started and is running in accordance with Section 4.1 of SO 52A.I.B, Diesel Generator Operations.
The E 4 Diesel Generator is running at rated frequency and voltage.
The E43 Bus is being supplied by 2SUE.
The ESW system is supplying Diesel Generator cooling water.
INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to synchronize the E 4 Diesel Generator to the E43 Bus and pick up 200 = 300 KW and I00 KVAR in accordance with Section 4.2 of SO 52A.l.B, Diesel Generator Operations.
PECO NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET AND PLACING THE IN-SERVICE SJAE IN I APPROVALS:
1 APPROVED FOR USE:
EFFECTIVE DATE:
I I
NAME:
SOC. SEC. NO.
Last First M.I.
I ISSUE DATE:
1 COMPLETION DATE:
COMMENTS:
PlMS CODE:
PlMS ENTRY:
1 1
Page 1 of 9
CODE NO.: PLOR-067C TEMPORARY CHANGE FORM LOG REV. NO.: -
008 TITLE:
Placing the Standby SJAE In-Service and Placing the ln-Service SJAE in Standby
- 2.
- 3.
- 4.
- 5.
- 6.
- 7.
- 8.
- 9.
- 10.
- 11.
- 12.
- 13.
- 14.
- 15.
1 1
Page 2 of 9
PECO NUCLEAR PEACH BOlTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE:
Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 25500301 01 / PLOR-067C WA:
271000A4.09 URO: 3.3 SRO: 3.2 TASK DESCRIPTION:
Placing the Standby SJAE In-Service and Placing the In-Service SJAE in Standbv A.
NOTES TO EVALUATOR:
- 1.
- 2.
- 3.
- 4.
- 5.
\\
An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
System cues included in the performance checklist are to be provided to the examinee when no system response is available.
JPM Performance
- a.
Control Room JPMs are designed to be performed in the simulator. If a Control Room JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
When performing In-Plant JPMs, no equipment will be operated without Shift Management approval.
- b.
Satisfactory performance of this JPM is accomplished if:
- a.
- b.
The task standard is met.
JPM completion time requirement is met.
- 1)
For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
- 2)
The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.
1 1
Page 3 of 9
B.
-~
C.
D.
E.
--- F.
G.
I TOOLS AND EQUIPMENT None REFERENCES
- 1.
Procedure SO 8A.6.A-2 Rev. 13, "Placing the Standby SJAE In-Service and Placing the In-Service SJAE in Standby" (R)
- 2.
P&ID M-310, "Air Ejector and Off-Gas" (A)
- 3.
P&ID M-307, "Condensate System" (A)
TASK STANDARD
- 1.
Satisfactory task completion is indicated when "B" SJAE placed in service and "A" SJAE placed in standby.
- 2.
DIRECTIONS TO EXAMINEE Estimated time to complete: 25 minutes Non-Time Critical When given the initiating cue, perform necessary steps to place "6" SJAE in service and place "A" SJAE in standby using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.
TASK CONDITIONS/PREREQUISlTES
- 1.
Plant is at steady state conditions.
- 2.
"A" SJAE in service.
- 3.
Air ejector intedafter condenser loop seals have been established IAW GP-2.
INITIATING CUE The Control Room Supervisor directs you to place the "6" SJAE in service and place "A" SJAE in standby in accordance with SO 8A.6.A-2 "Placing the Standby SJAE In-Service and Placing the In-Service SJAE in Standby".
I PLOR067C Rev008.doc Page 4 of 9
H.
PERFORMANCE CHECKLIST
'TEP 1 ii NO I STEP 1
Obtain a copy of procedure SO 8A.6.A-2.
I
~~
~
2 Verify MO-2104B, SPE B Isolation valve and MO-21058, SJAE B Isolation valve are open.
(Cue: MO-2104B and MO-2105B red lights are on, green lights are off.)
3 Verify PIC-2239B, B SJAE Main Steam Supply Hdr Controller is in "MANUAL" and the control valve is closed by adjusting the setpoint to minimum.
(Cue: PIC-22398 (SP) is in "MANUAL".)
I 4 Adjust PIC-2239B setpoint to the minimum position and depress the "CLOSE" button.
A (Cue: PIC-2239B controller indicates 0 psig with a controller output of loo%.)
- 5 Open AO-2244/45/47B, Air Ejector Inlet B 2nd Stage valves.
(Cue: Acknowledge control switch operation.)
I 6
Verify A0-2244/45/478, Air Ejector Inlet B 2nd Stage valves are open.
(Cue: AO-2244/45/478 red light is on, green light is off.)
ACT STANDARD P
A copy of procedure SO 8A.6.A-2 is obtained.
MO-2104B and MO-21058, red lights are verified ON at panel 20C007A.
P PIC-2239B is verified to be in "MANUAL",
point at panel 20C007A by ensuring lower portion of auto/manual selector switch is lit.
P PIC-22398 auto setpoint knob is verified at 0 psig. Controller manual close pushbutton is depressed as required to ensure setpoint at minimum, controller output of 100%.
P A0-2244/45/478 control switch is placed in the "OPEN" position at panel 20C007A.
P AO-2244/45/47B red light is verified ON and green light is verified OFF at panel 20C007A.
- NOTE***
The following direction to the Equipment Operator requires simulator instructor action:
MRF MSS05B OPEN Page 5 of 9
- 7
- 8
- 9
- I O 11
- 12 STEP Direct Equipment Operator to adjust HCS-2-8A-24666, Main Steam Isolation Valve to SJAE 2B, for 35 to 40 psi.
(Cue: Equipment Operator acknowledges direction and reports HCS-2-8A-24666 adjusted to 35 psi.)
Place PIC-2239B in AUTO.
(Cue: PIC-2239B is in AUTO.)
Raise setpoint on PIC-2239B in 20 psig increments to between 1 15 and 125 psig.
(Cue: Pl-24728 is slowly increasing, controller setpoint (SP) and Process Valve (PV) slowly increase. Controller output is slowly decreasing until PI-2472B reaches 120 psig.
Open AO-2238D, E, F Air Ejector Inlet B 1 st Stage/AO-25406 Air Ejector Inner Cdsr Drain valves when SJAE B 2nd stage pressure is greater than 13 inches (Cue: Acknowledge control switch operation.)
Verify AO-2238D,EIF, Air Eject Inlet B 1 st Stage valves are open.
(Cue: AO-2238D,E,F red light is on, green light is off.)
When steam pressure reaches 11 5 to 125 psig, place the control switch for AO-2236D/E/F Air Ejector M-Gas Inlet B in AUTO.
(Cue: Steam pressure is 120 psig, AO-2236D/E/F is in AUTO.
ACT P
P P
P P
P STANDARD Equipment Operator directed to adjust HCS-2-8A-2466B for 35 to 40 psi.
PIC-2239B auto portion of Auto/Manual selector switch is depressed and verified lit.
PIC-2239B control knob is rotated in the CLOCKWISE direction in increments (20 psig increments over several minutes) at panel 20C007A to increase SJAE B steam pressure to 115 to 125 psig on PI-24726 at panel 20C006B.
AO-2238D, E & F/AO-2540B control switch is placed in the OPEN position at panel 20C007A when SJAE B 2nd stage pressure is greater than 13 inches of mercury on Pl-22468 at panel 20C006B.
AO-2238D,E,F/AO-2540B red light is verified ON and green light is verified OFF at panel 20C007A.
Steam pressure on Pl-24728 is verified to be 115 to 125 psig and the control switch for AO-2236D/E/F is placed in AUTO.
1 1
Page 6 of 9
STEP I
13 Verify AO-2236D,E and F Off Gas Inlet B in AUTO.
(Cue: AO-2236D,E and F red light on, green light off.)
- 14 Place control switch for AO-2236A,B,C, Air Ejector Off Gas Inlet A valves in CLOSE.
(Cue: Acknowledge control switch operation.)
15 Verify AO-2236AlBlC Air Ejector Off Gas Inlet A valves closed.
(Cue: AO-2236A,B,C green light is on, red light is off.)
Adjust setpoint on PIC-2239A to 0 psi.
(Cue: PI-2472A is quickly decreasing, controller setpoint (SP) and Process Valve (PV) are slowly decreasing. Controller output stabilizes at 100.)
- I6 ACT P
P P
P STANDARD AO-2236D,E and F red light is verified ON and green light is verified OFF at panel 20C007A.
AO-2236A,BlC control switch is placed in the "CLOSE" position at panel 20C007A.
AO-2236A,B,C green light is verified ON and red light verified OFF at panel 20C007A.
Control knob on PIC-2239A is rotated in the COUNTERCLOCKWISE direction unti the setpoint is at minimum at panel 20C007A.
- NOTE***
The following direction to the Equipment Operator requires simulator instructor action:
MRF MSS05A CLOSE 17 Direct Equipment Operator to adjust HCS-2-8A-2466A, Main Steam Isolation valve to SJAE 2A, to 0 psi.
(Cue: Equipment Operator acknowledges direction and reports HCS-2-8A-2466A adjusted to 0 psi.)
P Equipment Operator directed to adjust HCS-2-8A-2466A to 0 psi, at panel 20C156.
18 Verify pressure on PI-2472A decreases to 0 psig.
P I
I I (Cue: PI-2472A indicates 0 psig.)
Pressure on PI-2472A is verified to be at 0 psig at panel 20C006B.
I PLOR067C Rev008.doc Page 7 of 9
- 19 20
- 2 1 22 23 24 STEP Close AO-2238A,B,C, "Air Ejector Inlet A 1 st Stagen/AO-2540A "Air Ejector Inter Cdsr Drain" valves when steam pressure decreases to 30 psig.
(Cue: Acknowledge control switch operation.)
Verify AO-2238A,B,C, "Air Ejector Inlet A 1 st Stage" AO-2540A "Air Ejector Inter Cdsr Drain", valves are closed.
(Cue: AO-2238A,B,C green light is on, red light is off.)
Close AO-2244/45/47A, Air Ejector Inlet A 2nd Stage valves.
(Cue: Acknowledge control switch operation.)
Verify AO-2244/45/47A, Air Ejector Inlet A 2nd Stage valves are closed.
[Cue: AO-2244/45/47A green light is on, red light is off.)
Verify " B SJAE parameters are within desired limits.
[Cue: PR-2154 is 28" Hg; PI-24728 ndicates 120 psig, PI-22466 indicates 15"
-b) nform Control Room Supervisor of task zompletion.
- Cue: Control Room Supervisor acknowledges report.)
ACT P
P P
P P
P STANDARD AO-2238A,B,C/AO-254OA, control switch is placed in the "CLOSE" position at panel 20C007A when steam pressure decreases to 30 psig.
AO-2238A,B,C, AO-2540A, green light is verified ON and red light is verified OFF at panel 20C007A.
AO-2244/45/47A control switch is placed in the "CLOSE" position at panel 20C007A.
40-2244/45/47A green light is verified ON and red light is verified OFF at panel 20C007A.
'B" SJAE 1st stage pressure on PI-24728 s verified to be within 1 15-125 psig and
'B" SJAE 2nd stage pressure is verified to 3 8 greater than 13 inches Hg at panel ZOC006B.
~~
rask completion reported.
1 1
Page 8 of 9
Under ACT P - must perform S - must simulate I.
TERMINATING CUE When SJAE B is in service and SJAE A is in standby, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.
Page 9 of 9 I PLOR067C Rev008.doc
TASK CONDITIONS/PREREQUISlTES I. Plant is at steady state conditions.
- 2.
A SJAE in service.
- 3.
Air ejector intedafter condenser loop seals have been established IAW GP-2 Attachment
- 4.
INITIATING CUE The Control Room Supervisor directs you to place the By SJAE in service and place A SJAE in standby in accordance with SO 8Am6mA12 Placing the Standby SJAE In-Service and Placing the In-Service SJAE in Standby.
EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET I
2 1 pAG5 Signature I Title Date Signature I Title Date Signature I Title Date Signature I Title Date
'1 I APPROVED FOR USE:
Signature I Title Date I
EFFECTIVE DATE:
I NAME:
ISSUE DATE:
SOC. SEC. NO.
COMPLETION DATE:
COMMENTS:
Last First M.I.
Training Review for Completeness:
PlMS CODE:
I PlMS ENTRY:
Signature/Date 1
1 Page 1 of 9
TEMPORARY CHANGE FORM LOG
- 9.
- 10.
- 11.
- 12.
- 13.
- 14.
- 15.
CODE NO.: PLOR-062P REV. NO.: 015 TITLE:
Restore Control Room Ventilation Followina a Hiah Radiation Trip 1
I zOR062P NRC RevO15.doc Page 2 of 9
EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE:
TASK-JPM DESIGNATOR: 2880010101/ PLOR-062P KIA:
29003A4.01 Unit Reactor Operator/Senior Reactor Operator URO: 3.2 SRO: 3.2 TASK DESCRIPTION:
Restore Control Room Ventilation Followina a Hiqh Radiation Trip A.
NOTES TO EVALUATOR:
- 1.
An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
- 2.
System cues included in the performance checklist are to be provided to the examinee when no system response is available.
- 3.
JPM Performance
- a.
"Control Room" JPMs are designed to be performed in the simulator. If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
- b.
When performing "In-Plant" JPMs, no equipment will be operated without Shift Management approval.
- 4.
Satisfactory performance of this JPM is accomplished if:
- a.
The task standard is met.
- b.
JPM completion time requirement is met.
- 1)
For non-time critical JPMs, completion within double the estimated time (listed in paragraph 0.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
- 2)
For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
- 5.
The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.
I G 6 6 2 P NRC Rev01 5.doc Page 3 of 9
. B.
C.
D.
E.
F.
TOOLS AND EQUIPMENT None REFERENCES Procedure SO 400.1.A Rev. 11, "Control Room Ventilation Startup and Control Room Emergency Ventilation High Radiation Trip Restoration and Automatic Operation Alignment" TASK STANDARD
- 1.
Restoration and startup of Control Room Ventilation completed following a trip due to high radiation. This will include:
- a.
Placing all Control Room ventilation fans to "OFF".
- b.
Startup of Control Room N C Supply, N C Return, and Fresh Air Supply Fans.
- c.
Startup of Toilet Room Fan and Control Room Office cooling unit.
- 2.
Estimated time to complete: 24 minutes Non-Time Critical DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to restore and startup Control Room Ventilation following a high radiation trip using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.
TASK CON D IT1 ON S/PREREQU I S ITES
- 1.
Initially, the "A" Control Room Ventilation fans were running.
- 2.
Control Room Ventilation spuriously tripped on high radiation and CREV initiated on its "A" Fan.
- 3.
Control Room Chilled Water is available to the Control Room Ventilation System in accordance with SO 44B.
- 4.
480V MCC System is available to the Control Room Ventilation System in accordance with SO 56.
- 5.
Heating Steam System is available to Control Room Ventilation System in accordance with SO 24.1.A, 'Startup of Auxiliary Steam System".
- 6.
Instrument Air is available to Control Room Ventilation System in accordance with SO 368.
- 7.
120 VAC is available to the Control Room Ventilation System in accordance with SO 58A.
-cII I x R 0 6 2 P NRC Rev015.doc Page 4 of 9
- 8.
The Control Room Emergency Ventilation Filter Plenum A(B) is available for operation with all filters installed and operable.
- 9.
Airborne activity levels in the ventilation intake have been verified acceptable by Health Physics.
I O.
Communication is established between OOCl33 and Control Room (simulated).
- 11.
Shift management has determined that COL 40D.l.A is not required to be performed.
G.
INITIATING CUE The Control Room Supervisor directs you, the Equipment Operator, to reset Control Room Ventilation following a high radiation trip and restore the Control Room Ventilation System using SO 40D.1.A, "Control Room Ventilation Startup and Control Room Emergency Ventilation High Radiation Trip Restoration and Automatic Operating Alignment", to the following line-up:
e "A" Control Room Ventilation fans running.
e Both Control Room Emergency Ventilation Supply Fans aligned for automatic start.
e "B" Control Room Ventilation fans aligned for automatic start.
r-Steps 4.1 - 4.12 of SO 400.1.A have been completed, begin with Step 4.13. Notify the control room when the system is running and another operator will perform the routine inspection.
4 I F F
Page 5 of 9
H.
PERFORMANCE CHECKLIST I
I I
3TEP STEP NO 1
Obtain a copy of procedure SO 40D.1.A.
Supply Fan A".
(Cue: Acknowledge control switch operation.)
I
- 2 Start OAV-079, "Control Rm Fresh Air I
3 Verify Fan OAV-079, Control Room Fresh Air Supply is running.
7 Verify OAV-028, Control Room N C Supply is running.
(Cue: Fan OAV-028 red light is on.)
Verify that "CONTROL ROOM SUPPLY annunciator is clear.
(Cue: Annunciator OOC133 R-1 is not lit.)
Place the standby fan, OW-028, control switch in "AUTO".
(Cue: Acknowledge control switch 8
FAN OA-BV28 STANDBY FAN" 9
(Cue: Fan OAV-079 red light is on.)
I 4
Verify that "CONTROL ROOM SUPPLY FAN OA-BV79 STANDBY FAN" annunciator is clear.
(Cue: Annunciator OOC133 P-4 is not lit.)
I
- 5 Place standby fan, OBV-079, control
.I I switch in "AUTO".
(Cue: Acknowledge control switch o eration.
I
- 6 Start OAV-028, "Control Room N C Supply.
Fan A."
(Cue: Acknowledge control switch operation.)
ACT P
S S
S S
S S
S S
STANDARD A copy of procedure SO 40D.1.A is obtained.
OAV-079 fan control switch is placed in "RUN" at panel OOCl33.
OAV-079 Control Room Fresh Air Supply Fan red light is verified ON at panel OOC133.
"CONTROL ROOM SUPPLY FAN OA-BV79 STANDBY FAN" annunciator is verified clear at panel OOCl33.
OBV-079 fan control switch is placed in "AUTO" at panel OOCl33.
OAV-028 control switch is placed in "RUN' at panel OOCl33.
OAV-028 Control Room A/C Supply Fan red light is verified ON at panel OOC133."
"CONTROL ROOM SUPPLY FAN OA-BV28 STANDBY FAN" annunciator is verified clear at panel OOCl33.
OBV-028 fan control switch is placed in
'AUTO" at panel OOCl33.
I bLOR062P NRC Rev01 5.dm-Page 6 of 9
\\-
STEP NO
- 10 11 12 13 14 15
- 16 17 STEP Start OAV-029, "Control Room A/C Returr Fan A".
(Cue: Acknowledge control switch oDeration.)
Verify OAV-029, "Control Room A/C Return Fan A" is running.
(Cue: Fan OAV-029 red light is on.)
Verify that "CONTROL ROOM RETURN annunciator is clear.
FAN OA-BV29 STANDBY FAN" (Cue: Annunciator OOCl33-0-1 is not lit Place the standby fan, OBV-029, control switch to "AUTO".
(Cue: Acknowledge control switch operation.)
Place HS-2-63L-J180 and J181 to the "RESET" position at panel OOCl33 and release.
(Cue: Acknowledge control switch operation.)
Request the Control Room personnel place the Control Room Vent Purge Control switch to "OFF" on panel C012 and verify FR-0765 on panel COlO indicates 2500-3000 cfm (or that they perform steps 4.17 and 4.18).
(Cue: The Control Room reports that the Control Room Vent Purge control switch is in "OFF" and FR-0765 indicates 2800 cfm or that steps 4.17 and 4.1 8 are complete.)
Start OOV-33, the "Toilet Room Exhaust Fan".
(Cue: Acknowledge control switch operation.)
Verify OOV-33, Toilet Room Exhaust is running.
(Cue: Fan OOV-33 red light is on.)
ACT S
S S
S S
S S
S STANDARD OAV-029 fancontrol switch is placed%
"RUN" at panel OOCl33.
OAV-029 Control Room A/C Return Fan red light is verified ON at panel OOCl33.
"CONTROL ROOM RETURN FAN OA-BV29 STANDBY FAN" annunciator is verified clear at panel OOCl33.
OBV-029 fan control switch is placed in "AUTO" at panel OOCl33 HS-2-63L-J180 and J181 momentarily placed in "RESET" and released.
The Control Room is requested to place the Control Room Vent Purge Control switch to "OFF" on panel 20C012 and verii FR-0765 on panel 20C010 indicates 2500 -3000 cfm (or to complete steps 4.17 and 4.18).
OOV-33 control switch is placed in "ON" at panel OOC133..
OOV-33 Toilet Room Exhaust Fan red light is verified ON at panel OOCl33.
1 1
Page 7 of 9
STEP Start OOV-326, the "Control Room Ofice Area Cooling Unit".
(Cue: Acknowledge control switch operation on.)
Verify Fan OOV-326 Control Room Office Area-Cooling Unit is running.
(Cue: Unit OOV-326 red light is on.)
switch is in the Filter 'A' position.)
Request that Control Room personnel place the "Outside Air Filter Select SV-001 54" control switch to FILTER 'A'('B')
(or complete step 4.21.1).
(Cue: The Control Room reports that the "Outside Air Filter Select SV-00154" control switch is in the Filter 'A' position or that step 4.21.1 is complete.)
Request that Control Room personnel place the "Outside Air Filter Bypass SV-001 53" to "BYPASS" (or perform step 4.21 2).
(Cue: The Control Room reports that the "Outside Air Filter Bypass SV-00153" is in the "BYPASS" position or that step 4.21.2 is complete Verify OBV030, "Control Room Emergency Ventilation Supply Fan B" to the "AUTO-STBY" position on Panel OOC133.
(Cue: OBV030, "Control Room Emergency Ventilation Supply Fan B is in the "AUTO-STBY" position on Panel OOCl33.)
Place OAV030, "Control Room Emergency Ventilation Supply Fan A" to the "AUTO" position on Panel OOCl33.
(Cue: OAV030, "Control Room Emergency Ventilation Supply Fan A is in the "AUTO" position on Panel OOCl33.)
ACT S
S S
STANDARD OOV-326 control switch is placed in "ON" at panel OOCl33.OOV-326 Control Room Office Area Cooling Unit red light is verified ON at panel OOCl33.
OOV-326 Control Room Office Area Cooling Unit red light is verified ON at panel OOC133.
The Control Room is requested to place the "Outside Air Filter Select SV-00154" control switch to FILTER 'A'('B*) or to complete step 4.21.l.
~~
~
The Control Room is requested to place the "Outside Air Filter Bypass SV-00153" to "BYPASS" or complete step 4.21.2.
OBV030, "Control Room Emergency Ventilation Supply Fan 6" is verified in the "AUTO-STBY" position on Panel OOCl33.
OAV030, "Control Room Emergency Ventilation Supply Fan A" is placed to the "AUTO" position on Panel OOC133.
I FLOR062P NRC Rev01 5.doc Page 8 of 9
I STEP I STEP I ACT I STANDARD I
NO 24 Inform the Control Room Supervisor that P
Task completion reported using a hand I
25 Control Room Ventilation has been restored IAW SO 40D.1.A.
(Cue: Control Room Supervisor acknowledges report.)
As an evaluator ensure that you have positive control of all exam material provided to the examinee (Task Conditions/Prerequisites) AND P
held radio or GAI-TRONICS page system.
Positive control established.
Under ACT P - must perform S - must simulate
- 1.
TERMINATING CUE When the Control Room Ventilation system is in operation, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.
I EOR062P NRC Rev01 5.doc Page 9 of 9
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
- 7.
- 8.
- 9.
L-1 o.
- 11.
TASK CONDITIONS/PREREQUlSlTES Initially, the "A" Control Room Ventilation fans were running.
Control Room Ventilation spuriously tripped on high radiation and CREV initiated on its "A" Fan.
Control Room Chilled Water is available to the Control Room Ventilation System in accordance with SO 448.
480V MCC System is available to the Control Room Ventilation System in accordance with SO 56.
Heating Steam System is available to Control Room Ventilation System in accordance with SO 24.1.4 "Startup of Auxiliary Steam System".
Instrument Air is available to Control Room Ventilation System in accordance with SO 36B.
120 VAC is available to the Control Room Ventilation System in accordance with SO 58A.
The Control Room Emergency Ventilation Filter Plenum A(B) is available for operation with all filters installed and operable.
Airborne activity levels in the ventilation intake have been verified acceptable by Health Physics.
Communication is established between OOCl33 and Control Room (simulated).
Shift management has determined that COL 40D.1.A is not required to be performed.
INITIATING CUE The Control Room Supervisor directs you, the Equipment Operator, to reset Control Room Ventilation following a high radiation trip and restore the Control Room Ventilation System using SO 400.1.A, "Control Room Ventilation Startup and Control Room Emergency Ventilation High Radiation Trip Restoration and Automatic Operating Alignment", to the following line-up:
0 "A" Control Room Ventilation fans running.
0 Both Control Room Emergency Ventilation Supply Fans aligned for automatic start.
0 "Bee Control Room Ventilation fans aligned for automatic start.
Steps 4.1 - 4.12 of SO 40D.1.A have been completed, begin with Step 4.13. Notify the control room when the system is running and another operator will perform the routine inspection.
EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET APPROVALS:
Signature I Title Date I
Signature I Title Date APPROVED FOR USE:
Signature I Title Date EFFECTIVE DATE:
I I
M.I.
ISSUE DATE:
COMMENTS:
1 SOC. SEC. NO.
COMPLETION DATE:
PlMS CODE:
PIMS ENTRY:
PLOR075P RevO12.doc Page 1 of 6
TEMPORARY CHANGE FORM LOG
~
~
~
- 6.
- 7.
CODE NO.:
TITLE:
PLOR-075P REV. NO.: 012 SCRAM SOLENOID DE-ENERGIZATION - UNIT 2 (T-213-2)
- 2.
- 3.
- 4.
- 5.
112.
- 13.
- 14.
- 15.
PLOR075P RevO12.doc Page 2 of 6
EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE:
Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2003730599 / PLOR-075P WA:
295037EA1.01 URO: 4.6 SRO: 4.6 TASK D E SC RI PT I 0 N :
Scram Solenoid De-energization - Unit 2 (T-213-2)
A.
NOTES TO EVALUATOR:
- 1.
An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
- 2.
System cues included in the performance checklist are to be provided to the examinee when no system response is available.
- 3.
JPM Performance
- a.
Control Room JPMs are designed to be performed in the simulator. If a Control Room JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
- b.
When performing In-Plant JPMs, no equipment will be operated without Shift Management approval.
- 4.
Satisfactory performance of this JPM is accomplished if:
- a.
The task standard is met.
- b.
JPM completion time requirement is met.
- 1)
For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
- 2)
For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
- 5.
The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.
PLORO75P RevO12.d~
Page 3 of 6
B.
C.
D.
E.
c G.
TOOLS AND EQUIPMENT
- 1.
T-213-2 Tool Package from the Main Control Room Emergency Operating Procedure Tool Box
- 2.
EOP Tool Box Key REFERENCES Procedure T-213-2, Rev. 9, "Scram Solenoid De-energization" (R)
TASK STANDARD
- 1.
Satisfactory task completion is indicated when Unit 2 Control Rod 26-1 5 scram solenoid fuses are removed.
Estimated time to complete: 5 minutes Non-Time Critical
- 2.
DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to de-energize Unit 2 ConLiol Rod 26-15 scram solenoids using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.
TASK CONDITIONS/PREREQUISlTES
- 1.
Unit 2 was initially at 100% power.
- 2.
RPV level then drops to the scram setpoint due to partial loss of feedwater flow.
- 3.
Several Control Rods are stuck at position 48 with their blue scram lights NOT lit on the Full Core Display.
- 4.
Use of procedure T-213-2, "Scram Solenoid De-energization" has been directed by the T-100 procedures.
- 5.
Prerequisites and procedure steps up to and including step 4.3 of procedure T-213-2 have been completed.
INITIATING CUE The Control Room Supervisor directs you, the Equipment Operator, to de-energize Unit 2 Control Rod 26-1 5 scram solenoids in accordance with Steps 4.4.1 - 4.4.3 of procedure T-213-2, "Scram Solenoid De-energization".
PLOR075P Rev01 2.doc Page 4 of 6
H.
PERFORMANCE CHECKLIST STEP NO
- 1
- 2 STEP Obtain the key for the Emergency Operating Procedure Tool Locker.
(Cue: When examinee requests EOP Tool Locker key from WECS examinee identifies the location of the WECS key box and its associated key then evaluator should provide the EOP Tool Locker key.)
Open Emergency Operation Procedure Tool Locker and obtain T-213 Tool Kit equipment.
(Cue: Equipment obtained.)
""NOTE ACT S
P t"*
~
STANDARD Emergency Operating Procedure Tool Locker Key requested from WECS OR examinee identifies the location of the WECS key box and its associated key.
Tool Locker located on Radwaste Building E. 165' is unlocked, opened and T-213 Tool Kit is located.
When examinee locates tool kit, inform him that he now has the tools to perform the procedure. Provide the examinee with a copy of the T-200 procedure which corresponds to the tool kit that has been chosen. DO NOT allow equipment to be removed from the locker. Relock the locker before leaving the area.
1 Open panel 2CC068 door.
(Cue: Panel 2CC068 door is open.)
P Panel fasteners unfastened, door pulled outward to gain access to Control Rod 26-15 fuses.
Pull the Channel A fuse for Control Rod 26-1 5.
(Cue: Fuse is removed.)
S Control Rod 26-15 Channel A fuse is removed at panel 2CC068 using fusepuller from T-213-2 Tool Kit.
Pull the Channel B fuse for Control Rod 26-1 5.
(Cue: Fuse is removed. Control Room reports Control Rod 26-15 is inserting.)
S Control Rod 26-15 Channel B fuse is removed at panel 2CC068 using fusepuller from T-213-2 Tool Kit.
Initial on Table 1 by Control Rod 26-1 5.
(Cue: Acknowledge initialing Table 1.)
P T-213-2, Table 1 is initialed under "FUSES REMOVED" column by Control Rod 26-
- 15.
PLOR075P RevOl2.doc Page 5 of 6
STEP 7
1 Inform Control Room of task comdetion.
(Cue: Control Room acknowledges report. Control Rod 26-15 blue scram lights are lit.)
8 As an evaluator ensure that you have positive control of all exam material provided to the examinee (Task Conditions/Prerequisites) AND Drocedures.
ACT S
P STANDARD Task completion reported using telephone, hand held radio or GAI-TRONICS page system.
Positive control established.
Under ACT P - must perform S - must simulate
- 1.
TERMINATING CUE When Control Rod 26-15 scram solenoid fuses have been pulled, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.
PLOR075P RevO12.doc Page 6 of 6
TASK CON DITIONS/PREREQUISITES
- 1.
Unit 2 was initially at 100% power.
- 2.
RPV level then drops to the scram setpoint due to partial loss of feedwater flow.
- 3.
Several Control Rods are stuck at position 48 with their blue scram lights NOT lit on the Full Core Display.
- 4.
Use of procedure T-213~2, Scram Solenoid De-energization has been directed by the T=lOO procedures.
- 5.
Prerequisites and procedure steps up to and including step 4.3 of procedure T=213=2 have been completed.
INITIATING CUE The Control Room Supervisor directs you, the Equipment Operator, to de-energize Unit 2 Control Rod 2645 scram solenoids in accordance with Steps 4.4.1 - 4.4.3 of procedure T=213-2, Scram Solenoid L
De-energ ization.
EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET I
CLOSING A STUCK OPEN MSlV - UNIT 3 (ALTERNATE PATH - AC FUSES DO APPROVALS:
Signature I Title Date Signature I Title Date Signature I Title Date Signature I Title Date Date APPROVED FOR USE:
I Signature I T i e EFFECTIVE DATE:
I I
NAME:
ISSUE DATE:
SOC. SEC. NO.
COMPLETION DATE:
COMMENTS:
Last First M.I.
Training Review for Completeness:
PIMS CODE:
1 PlMS ENTRY:
Signature/Date 1
1 Page 1 of 6
- CODE NO.
- PLOR
~~~~
~~
~
~
- 2.
- 3.
- 4.
- 5.
- 6.
- 7.
- 8.
TEMPORARY CHANGE FORM LOG REV. NO.:
I TITLE:
Closing a Stuck Open MSlV - Unit 3 (Alternate Path - AC Fuses do not isolate MSlVs)
I
- 1.
i i
1 1
-. I 9.
1 1
- 10.
- 11.
(12.
113.
I NEW MSlV AP Rev000.doc Page 2 of 6
EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE:
Unit Reactor OperatodSenior Reactor Operator TASK-JPM DESIGNATOR: 23901 10401 / PLOR-118P WA:
2390016.2.4.35 URO: 3.3 SRO: 3.5 1 TASK DESCRIPTION:
Closing a Stuck Open MSlV - Unit 3 A.
NOTES TO EVALUATOR:
- 1.
An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
- 2.
System cues included in the performance checklist are to be provided to the examinee when no system response is available.
- 3.
JPM Performance
- a.
Control Room JPMs are designed to be performed in the simulator. If a Control Room JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
- b.
When performing In-Plant JPMs, no equipment will be operated without Shift Management approval.
- 4.
Satisfactory performance of this JPM is accomplished if:
- a.
The task standard is met.
- b.
JPM completion time requirement is met.
- 1)
For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
- 2)
For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
- 5.
The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.
Page 3 of 6 I NEW MSlV AP Rev000.doc
B.
-L C.
D.
E.
F.
I G.
TOOLS AND EQUIPMENT Insulated Fuse Pullers REFERENCES A 0 1A.2-3, Rev. 9, Closing a Stuck Open Inboard or Outboard Main Steam Isolation Valve TASK STANDARD
- 1.
Satisfactory task completion is indicated when the Unit 3 Outboard MSlV AC AND DC solenoid valve control power fuses are removed.
- 2.
Estimated time to complete: 15 minutes Non-Time Critical DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to close the stuck open outboard MSlVs using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.
TASK CONDITIONS/PREREQUISlTES
- 1.
Unit 3 has just been manually scrammed (Unit 3 Mode Switch in Shutdown).
- 2.
RPV level is -175 inches (Group I isolation signal is present).
- 3.
All Outboard MSlVs failed to isolate.
- 4.
The MSlVs did not close using the Test Pushbuttons in accordance with Steps 4.1.I and 4.1.2 of A 0 1A.2-3, Closing a Stuck Open Inboard or Outboard MSIV.
- 5.
Radiological conditions do NOT allow entry into the Outboard MSlV Room.
INITIATING CUE The Control Room Supervisor directs you, the Equipment Operator, to close the Unit 3 Outboard MSIVs using A 0 1A.2-3, Closing a Stuck Open Inboard or Outboard MSIV beginning with step 4.1.3.
1 1
Page 4 of 6
H.
PERFORMANCE CHECKLIST NO 1
YTEP 1 STEP I ACT I STANDARD Obtain a copy of procedure A 0 1A.2-3.
P A copy of procedure A 0 1A.2-3 is obtained.
S
- 2
- 3 Room.
Fuse 16A-F12B is identified as the fourth 4
S
- 5 Unit Reactor Operator is contacted to monitor outboard MSlV position indication.
Examinee should utilize Seci Open panel 306042 front panel doors.
P (Cue: Panel 30C042 doors are open.)
Door closed and relatched using handle.
Pull the outboard MSlV AC solenoid valve fuse 16A-F12B.
S (Cue: Fuse is removed.)
Task completion reported using telephone or GAI-TRONICS page system.
Direct the Unit Reactor Operator to monitor outboard MSlV position indication.
(Cue: Outboard MSIVs are open.)
Pull the outboard MSlV DC solenoid valve fuse for 16A-F11 B.
(Cue: Fuse is removed.)
Direct the Unit Reactor Operator to monitor Main Steam line flow using FI 06-088A,B,C,D on panel 30C008A.
(Cue: Main steam line FI-2 088A,B,C,D read 0 Mlbm/hr.
Close panel 30C042 front panel doors.
(Cue: Panel 306042 doors are closed.)
Inform Control Room of task completion.
[Cue: Control Room acknowledges report.
Outboard MSlV are closed.)
In 4.1 of A 0 1A.2-3.
P 1 Door handle turned, doors pulled outward
'to gain access to the outboard MSlV AC
'and DC solenoid valve fuses at the front oi panel 306042 in the Cable Spreading S
S Fuse 16A-F11 B is identified as the eighth fuse from the top of terminal strip BB located inside the lefthear of Panel 20C042. Fuse puller is attached to outboard MSlV DC solenoid valve fuse 16A-F11 B. Fuse is pulled outward until fuse is free of fuse holder.
Unit Reactor Operator is contacted to monitor Main Steam line flow on FI-3 088A,B,C,D at panel 30C008A.
I NEW MSlV AP Rev000.doc Page 5 of 6
STEP STEP ACT 9
As an evaluator ensure you have positive P
control of all exam material provided to the examinee (Task Co nd it ionslprerequ i s ites)
AND procedures.
NO Under ACT P - must perform S - must simulate STANDARD Positive control established I.
TERMINATING CUE When the Unit 3 Outboard MSlVs are closed, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.
I I NEW MSlV AP Rev000.doc Page 6 of 6