Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20054M945 | 18 June 1982 | Forwards IE Insp Rept 50-395/82-37 on 820607-09.No Noncompliance Noted | |
ML20055A164 | 18 June 1982 | Forwards IE Insp Rept 50-395/82-31 on 820501-31.No Noncompliance Noted | |
ML20055A758 | 12 July 1982 | Forwards IE Safeguards Insp Rept 50-395/82-30 on 820628-30. No Noncompliance Noted | |
ML20055C734 | 1 June 1990 | Advises of EOP Insp to Be Performed at Plant on 900820-24. Insp Will Verify That Human Factors Considerations Adequately Addressed in EOPs & Review Adequacy of Technical Changes to EOPs in Response to Previous Insps | |
ML20055H375 | 12 July 1990 | Forwards Insp Rept 50-395/90-18 on 900601-30 & Notice of Violation | |
ML20055H602 | 6 July 1990 | Forwards Insp Rept 50-395/90-19 on 900611-15.Violations Noted | |
ML20056A791 | 6 August 1990 | Forwards Safety Evaluation Re Capability of Plant to Meet Requirements of Branch Technical Position Rsb 5-1, Design Requirements of RHR Sys | |
ML20056B455 | 15 August 1990 | Forwards Insp Rept 50-395/90-21 on 900701-31 & Notice of Violation | |
ML20058A596 | 19 October 1990 | Forwards Insp Rept 50-395/90-26 on 900918-19.Violations Noted But Not Cited | |
ML20058B520 | 12 October 1990 | Forwards Insp Rept 50-395/90-24 on 900901-30.No Violations or Deviations Noted | |
ML20058B795 | 2 July 1982 | Forwards IE Insp Rept 50-395/82-40 on 820608-11.No Noncompliance Noted | |
ML20058B954 | 1 July 1982 | Forwards IE Insp Rept 50-395/82-36 on 820601-04.No Noncompliance Noted | |
ML20058D242 | 29 October 1990 | Approves 900928 Request for Extension of Schedule for Implementation of Generic Ltr 89-10 Re motor-operated Valve Testing | |
ML20058F398 | 1 November 1990 | Ack Receipt of & Forwards Staff Understanding of 901025 Mtg Re Status of GSIs Unimplemented at Facility | |
ML20058N951 | 13 August 1990 | Advises That 900720 Amend 28 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable | |
ML20059A346 | 13 August 1990 | Forwards Final SALP Rept 50-395/90-11 & Errata to Initial SALP Rept Covering Jan 1989 to Apr 1990 | Systematic Assessment of Licensee Performance |
ML20059C409 | 30 August 1990 | Accepts Util 890301 & 900103 Responses to NRC Bulletin 88-011 Re Pressurizer Surge Line Thermal Stratification | Finite Element Analysis Earthquake |
ML20059C623 | 21 August 1990 | Requests Util Provide Ref Matls Listed in Encl for Written & Operating Exams Scheduled for Wk of 901126.Training Staff Should Retain Simulator Exam Scenerio Info Until Candidates Passed,Accepted Denial of Licenses or Completed Appeals | Job Performance Measure |
ML20059E334 | 31 August 1990 | Advises That 881220 & 900822 Responses to NRC Bulletin 88-004, Potential Safety-Related Pump Loss Acceptable | |
ML20059J609 | 13 September 1990 | Advises That NRC Will Assess Conformance to Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety- Related Equipment in post-implementation Audit Insps to Verify Adequacy of Util Efforts in Performing Verification | |
ML20059K133 | 28 August 1990 | Congratulates Rc Haag on Promotion to Position of Senior Resident Inspector at Plant | |
ML20059M958 | 13 June 1990 | Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl | |
ML20059N949 | 12 October 1990 | Ack Receipt of 900816 & 0920 Ltrs Which Forwarded Objectives & Scenario Package for 901107 Emergency Exercise | |
ML20062B197 | 13 October 1978 | Forwards IE Circular 78-17, Inadequate Guard Training/ Qualification & Falsified Training Records | |
ML20062B678 | 12 October 1990 | Requests Analyses of Liquid Samples Spiked W/Radionuclides Completed within 60 Days of Sample Receipt | |
ML20062C332 | 27 October 1978 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted During Inspec 50-395/78-15 | |
ML20062C343 | 21 September 1978 | Forwards IE Inspec Rept 50-395/78-15 on 780808-11 & Notice of Violation | |
ML20062C364 | 27 September 1978 | Forwards IE Inspec Rept 50-395/78-19 on 780906-07 During Which No Items of Noncompliance Were Noted | |
ML20062C574 | 4 October 1978 | Forwards IE Inspecc Rept 50-395/78-17 on 780829-31 During Which No Items of Noncompliance Were Noted | |
ML20062C872 | 7 November 1978 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted During Inspec 50-395/78-16 | |
ML20062C882 | 5 October 1978 | Forwards IE Inspec Rept 50-395/78-16 on 780821-24 & Notice of Violation | |
ML20062D293 | 9 November 1978 | Notifies Util of 781205 Seminar in Atlanta to Discuss New Model Rod Effluent Tech Specs & Encl Seminar Info Sheet Registration Form, & Proposed Agenda | Process Control Program |
ML20062D418 | 23 October 1978 | Forwards IE Inspec Repts 50-395/78-20-22 on 781023 During Which No Items of Noncompliance Were Noted | |
ML20062E089 | 18 October 1978 | Forwards IE Inspec Rept 50-395/78-21 on 780927-28 During Which No Items of Noncompliance Were Noted | |
ML20062E139 | 24 November 1978 | Forwards IE Bulletin 78-12A,suppl to IE Bulletin 78-12. W/Encl ANO:7811300055 | |
ML20062E248 | 29 November 1978 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted During Inspec 50-395/78-18 | |
ML20062E256 | 16 October 1978 | Forwards IE Inspec Rept 50-395/78-18 on 780905-08 & Notice of Violation | |
ML20062E734 | 3 November 1978 | Forwards IE Insp Rept 50-395/78-23 on 781010-12.No Noncompliance Noted | |
ML20062F118 | 6 December 1978 | Forwards Listing of 9 Proposed Endangered & 33 Threatened Species Which Occur in South Carolina,Inadvertently Omitted from | |
ML20062F240 | 7 December 1978 | Requests Addl Info Re Bolted Connections in Linear Component Supports,Inasmuch as Design May Have Underestimated Load Capacity Under Seismic Loading | |
ML20062G348 | 16 November 1990 | Forwards Insp Rept 50-395/90-27 on 901001-31.No Violations Noted | |
ML20062G369 | 19 December 1978 | Forwards IE Bulletin 78-14 | |
ML20062H211 | 2 August 1982 | Comments on Responses to to HR Denton Re Monitoring Program for Svc Water Pond Structures.Less Frequent Insp Will Not Be Approved | |
ML20062H220 | 3 August 1982 | Forwards Revised marked-up Pages of App a Tech Specs to Reflect Responses from NRC on Proposed Changes | |
ML20062H914 | 28 July 1982 | Forwards IE Insp Rept 50-395/82-42 on 820713-15.No Noncompliance Noted | |
ML20062K282 | 20 November 1980 | Informs of Planned Corporate & Plant Visit in Dec 1980 to Permit Timely SER Preparation for Inclusion in post-ACRS Suppl.Requests Schedule for Completion of Organizational Changes & Procedures Required Prior to Visit | |
ML20125A652 | 2 July 1979 | Forwards IE Bulletin 79-14, Seismic Analysis for As-Built Safety-Related Piping Sys. Action Required | |
ML20126E810 | 20 February 1985 | Forwards Insp Rept 50-395/85-02 on 850101-31.No Violation or Deviations Noted |