ML20062E256
| ML20062E256 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 10/16/1978 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mary Johnson SOUTH CAROLINA ELECTRIC & GAS CO. |
| Shared Package | |
| ML20062E252 | List: |
| References | |
| RII:WPA, NUDOCS 7812060029 | |
| Download: ML20062E256 (2) | |
See also: IR 05000395/1978018
Text
^
L.. .
--
-
.
_
1
,
~
~'
-
. . .:
e
.
"
..:;
.
.) ':, y
.
- }
l
.
, ' '
UNITED STATES
2-
,
[t>" K8%q[o
NUCLEAR REGULATORY COMMISSION
g
REGION ll
y
p
g
a
101 MARIETTA STREET.N.W.
"
s
f
ATLANT A. GEORGI A 30303
o
-
s*****/
.
.
OCT 161978
4 '
In Reply Refer To:
RII:WPA
w. -
50-395/78-18
o
- a
,
-
- .
South Carolina Electric and Gas Company
j
+
.
Attn:
Mr. M. C. Johnson, Vice President
and Group Executive-Special
,
Services and Purchasing
P. O. Box 764
Columbia, South Carolina 29218
-
.l
j
Gentlemen:
This refers to the inspection conducted by Mr. W. P. Ang of this office
on September 5-8, 1978, of activities authorized by NRC Construction
Permit No. CPPR-94 for the Virgil C. Summer Nuclear Station Unit 1
'
facility, and to the discussion of our findings held with Mr. D. A.
Nauman at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with NRC requirements. This item
and references to pertinent require.nents are listed in the Notice of
i
Violation enclosed herewith as Appendix A.
This notice is sent to you
p
pursuant to the provisions of Section 2.201 of the NRC's " Rules of
I
V
Practice", Part 2, Title 10, Code of Federal Regulations.
Section 2.201
requires you to submit to this office, within 20 days of your receipt
9
of this notice, a written statement or explantion in reply including:
j
(1) corrective steps which have been taken by you and the results
achieved; (2) corrective steps which will be taken to avoid further
noncompliance; and (3) the date when full compliance will be achieved.
.
In accordance with Section 2.790 of the NRC's " Rules of Practive",
Part 2, Title 10 Code of Federal Regulations, a copy of this letter
and the enclosed inspection report will be placed in the NRC's Public
,
.
Document Room.
If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
j
78120600 v
3
'
I
. - - - . - . - ... - . . - - . -
.. .
- - _ . _ _
, . _ . _
,_
y
_
__
.-
, , , - _ . _
'r
..
_-
~
w
_
- m a, _
,
'
>'
J-
.
,
~.
.
-
'
O
' '
OCT 161978
.
'
.
,
South Carolina Electric and Gas Company
-2-
-c
'9.'
+
make a written application within 20 days to this office to withhold
'
such information from public disclosure. Any such application must
. , ' ,
-
include a full statement of the reasons on the basis of which it is
.
claimed that the information is proprietary, and should be prepared so
,
that proprietary information identified in the application is contained
in a separate part of the document.
If we do not hear from you in this
2
regard within the specified period, the report will be placed in the
a
,
, ,
Public Document Room.
Should you have any questions concerning this letter, we will be glad
'
'
to discuss them with you.
Sincerely,
~
O
.
.
Charles E. Murph , Chief
Reactor Construction & Engineering
'
Support Branch
Enclosures:
1.
Appendix A. Notice of Violation
2.
Inspection Report No. 50-395/78-18
cc w/ enc 1:
Mr. Troy B. Conners, Jr., Esquire
Conners, Moore and Corber
1747 Pennsylvania Avenue, N. W.
Washington, D. C. 20006
g
(]}
Mr. H. I. Donnelly, Jr.
Quality Assurance
P. O. Box 8
Jenkinsville, South Carolina 29065
,
.
.
'
1
--
.---;.--
. . , , . - _ .
, . , . ,.__ , _ ,_.
_ _ . ,
_ _ ,
.
_
,