ML20058B795

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-395/82-40 on 820608-11.No Noncompliance Noted
ML20058B795
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 07/02/1982
From: Dance H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dixon O
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML20058B800 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8207260149
Download: ML20058B795 (2)


See also: IR 05000395/1982040

Text

_ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_

_ _ - . -

-

_

i

.

July 2, 1982

South Carolina Electric and Gas Company

ATTN:

Mr. O. W. Di xon , Jr.

Vice President, Nuclear Operations

P. O. Box 764 (Mail Code F-04)

Columbia, SC 29218

Gentlemen:

Subject:

Report No. 50-395/82-40

This refers to the routine safety inspection conducted by Mr. W. W. Peery of this

office on June 8-11, 1982, of activities authorized by NRC Construction Permit

No. CPPR-94 tor the V. C. Su,mer facility and to the discussion of our findings

held with Mr. O. S. Bradham, Station Manager, at the conclusion of the inspec-

tion.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no vanlations or deviations were disclosed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this of fice, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter.

Such application must be consistent with the requirements of

10 CFR 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

(Orginal signed by H. C. Dance)

H. C. Dance, Chief

Reactor Projects Branch 2

Division of Project and

Resident Programs

Enclosure:

See Page 2

i

khRADOCK07260149 820702

05000395

G

i

PDR

'

ZEol

- - - - - - - - - - - - -

r

.

.

July 2, 1982

South Carolina Electric and

2

Gas Company

Enclosure:

Inspection Raport No. 50-395/82-40

cc w/ enc!:

J. B. Knotts, Jr.

O. S. Bradham, Station Manager

J. P. Harrison, Manager Nuclear

Security

C. A. Price, Manager, Nuclear

Engineering

A. A. Smith, Site OA Coordinator

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of South Carolina

l

I

i

RII

RII

RII

RII

RII

g

O

t

WWPeery:ht

KP rr

AFGibson

JR g e

HC ance

64 #82

6/p/82

'k\\/82

/82

6/ /82