Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20054M94518 June 1982Forwards IE Insp Rept 50-395/82-37 on 820607-09.No Noncompliance Noted
ML20055A16418 June 1982Forwards IE Insp Rept 50-395/82-31 on 820501-31.No Noncompliance Noted
ML20055A75812 July 1982Forwards IE Safeguards Insp Rept 50-395/82-30 on 820628-30. No Noncompliance Noted
ML20055C7341 June 1990Advises of EOP Insp to Be Performed at Plant on 900820-24. Insp Will Verify That Human Factors Considerations Adequately Addressed in EOPs & Review Adequacy of Technical Changes to EOPs in Response to Previous Insps
ML20055H37512 July 1990Forwards Insp Rept 50-395/90-18 on 900601-30 & Notice of Violation
ML20055H6026 July 1990Forwards Insp Rept 50-395/90-19 on 900611-15.Violations Noted
ML20056A7916 August 1990Forwards Safety Evaluation Re Capability of Plant to Meet Requirements of Branch Technical Position Rsb 5-1, Design Requirements of RHR Sys
ML20056B45515 August 1990Forwards Insp Rept 50-395/90-21 on 900701-31 & Notice of Violation
ML20058A59619 October 1990Forwards Insp Rept 50-395/90-26 on 900918-19.Violations Noted But Not Cited
ML20058B52012 October 1990Forwards Insp Rept 50-395/90-24 on 900901-30.No Violations or Deviations Noted
ML20058B7952 July 1982Forwards IE Insp Rept 50-395/82-40 on 820608-11.No Noncompliance Noted
ML20058B9541 July 1982Forwards IE Insp Rept 50-395/82-36 on 820601-04.No Noncompliance Noted
ML20058D24229 October 1990Approves 900928 Request for Extension of Schedule for Implementation of Generic Ltr 89-10 Re motor-operated Valve Testing
ML20058F3981 November 1990Ack Receipt of & Forwards Staff Understanding of 901025 Mtg Re Status of GSIs Unimplemented at Facility
ML20058N95113 August 1990Advises That 900720 Amend 28 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable
ML20059A34613 August 1990Forwards Final SALP Rept 50-395/90-11 & Errata to Initial SALP Rept Covering Jan 1989 to Apr 1990Systematic Assessment of Licensee Performance
ML20059C40930 August 1990Accepts Util 890301 & 900103 Responses to NRC Bulletin 88-011 Re Pressurizer Surge Line Thermal StratificationFinite Element Analysis
Earthquake
ML20059C62321 August 1990Requests Util Provide Ref Matls Listed in Encl for Written & Operating Exams Scheduled for Wk of 901126.Training Staff Should Retain Simulator Exam Scenerio Info Until Candidates Passed,Accepted Denial of Licenses or Completed AppealsJob Performance Measure
ML20059E33431 August 1990Advises That 881220 & 900822 Responses to NRC Bulletin 88-004, Potential Safety-Related Pump Loss Acceptable
ML20059J60913 September 1990Advises That NRC Will Assess Conformance to Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety- Related Equipment in post-implementation Audit Insps to Verify Adequacy of Util Efforts in Performing Verification
ML20059K13328 August 1990Congratulates Rc Haag on Promotion to Position of Senior Resident Inspector at Plant
ML20059M95813 June 1990Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl
ML20059N94912 October 1990Ack Receipt of 900816 & 0920 Ltrs Which Forwarded Objectives & Scenario Package for 901107 Emergency Exercise
ML20062B19713 October 1978Forwards IE Circular 78-17, Inadequate Guard Training/ Qualification & Falsified Training Records
ML20062B67812 October 1990Requests Analyses of Liquid Samples Spiked W/Radionuclides Completed within 60 Days of Sample Receipt
ML20062C33227 October 1978Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted During Inspec 50-395/78-15
ML20062C34321 September 1978Forwards IE Inspec Rept 50-395/78-15 on 780808-11 & Notice of Violation
ML20062C36427 September 1978Forwards IE Inspec Rept 50-395/78-19 on 780906-07 During Which No Items of Noncompliance Were Noted
ML20062C5744 October 1978Forwards IE Inspecc Rept 50-395/78-17 on 780829-31 During Which No Items of Noncompliance Were Noted
ML20062C8727 November 1978Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted During Inspec 50-395/78-16
ML20062C8825 October 1978Forwards IE Inspec Rept 50-395/78-16 on 780821-24 & Notice of Violation
ML20062D2939 November 1978Notifies Util of 781205 Seminar in Atlanta to Discuss New Model Rod Effluent Tech Specs & Encl Seminar Info Sheet Registration Form, & Proposed AgendaProcess Control Program
ML20062D41823 October 1978Forwards IE Inspec Repts 50-395/78-20-22 on 781023 During Which No Items of Noncompliance Were Noted
ML20062E08918 October 1978Forwards IE Inspec Rept 50-395/78-21 on 780927-28 During Which No Items of Noncompliance Were Noted
ML20062E13924 November 1978Forwards IE Bulletin 78-12A,suppl to IE Bulletin 78-12. W/Encl ANO:7811300055
ML20062E24829 November 1978Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted During Inspec 50-395/78-18
ML20062E25616 October 1978Forwards IE Inspec Rept 50-395/78-18 on 780905-08 & Notice of Violation
ML20062E7343 November 1978Forwards IE Insp Rept 50-395/78-23 on 781010-12.No Noncompliance Noted
ML20062F1186 December 1978Forwards Listing of 9 Proposed Endangered & 33 Threatened Species Which Occur in South Carolina,Inadvertently Omitted from
ML20062F2407 December 1978Requests Addl Info Re Bolted Connections in Linear Component Supports,Inasmuch as Design May Have Underestimated Load Capacity Under Seismic Loading
ML20062G34816 November 1990Forwards Insp Rept 50-395/90-27 on 901001-31.No Violations Noted
ML20062G36919 December 1978Forwards IE Bulletin 78-14
ML20062H2112 August 1982Comments on Responses to to HR Denton Re Monitoring Program for Svc Water Pond Structures.Less Frequent Insp Will Not Be Approved
ML20062H2203 August 1982Forwards Revised marked-up Pages of App a Tech Specs to Reflect Responses from NRC on Proposed Changes
ML20062H91428 July 1982Forwards IE Insp Rept 50-395/82-42 on 820713-15.No Noncompliance Noted
ML20062K28220 November 1980Informs of Planned Corporate & Plant Visit in Dec 1980 to Permit Timely SER Preparation for Inclusion in post-ACRS Suppl.Requests Schedule for Completion of Organizational Changes & Procedures Required Prior to Visit
ML20125A6522 July 1979Forwards IE Bulletin 79-14, Seismic Analysis for As-Built Safety-Related Piping Sys. Action Required
ML20126E81020 February 1985Forwards Insp Rept 50-395/85-02 on 850101-31.No Violation or Deviations Noted