Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML11250A171 | 14 September 2011 | Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) | |
ML12090A212 | 30 March 2012 | Referring Jones River Watershed Association Petition to Intervene and Request to File New Contentions, or in Alternative, Jones River Watershed Association and Pilgrim Water Motion to Reopen the Pilgrim Nuclear Power Station, Docket No. 50- | |
ML12137A060 | 29 May 2012 | Nuclear Regulatory Commission'S Analysis of Entergy Nuclear Operations, Inc. Decommissioning Funding Status Report for Indian Point Nuclear Generating Station, Units 1, 2 & 3; and Pilgrim Nuclear Power Station | |
ML13022A303 | 1 September 1989 | from Us NRC to All Holders of Operating Licenses | Hardened vent Backfit |
ML13108A328 | 22 April 2013 | Notice of Forthcoming Meeting with Petitioners Requesting Action Against Entergy Nuclear Operations, Inc., Regarding Operations at FitzPatrick, Pilgrim, and Vermont Yankee Nuclear Power Stations (TAC Nos. MF1092, MF1093, and MF1094) | |
ML13196A220 | 6 June 2012 | Memo from B. Balsam, NRR and D. Logan, NRR to J. Susco, NRR on Summary of Section 7 Consultation Activities Related to the National Marine Fisheries Service'S Final Rule to List the Atlantic Sturgeon | License Renewal |
ML13267A234 | 30 August 2013 | G20130629 - Pilgrim Watch'S 2.206 Petition to Pilgrim'S Emergency Preparedness Plans (MF2656) | |
ML13309A080 | 11 December 2013 | Memorandum to File: Transcript for 10 CFR 2.206 Petition from Beyond Nuclear (Et Al) Regarding General Electric Mark I and Mark II Boiling-Water Reactors | |
ML13351A273 | 9 January 2014 | G20130846/LTR-13-0911 - James Brett, the New England Council Ltr. Chairman'S Recent Tour and the Council'S Support for the Pilgrim Nuclear Power Station - Response | |
ML14086A291 | 22 April 2014 | Summary of Telephone Conference Regarding the Verbal Authorization of Relief Request PRR-25, Revision 1 | |
ML14232A301 | 20 August 2014 | Memo s Wastler, Technical Assistance Request - Review of Physical Security Plan for the Pilgrim Nuclear Power Stations (TAC No. L24940) Docket Nos. 72-1044, 50-293 | |
ML14294A571 | 4 November 2014 | Memo - Transmittal of the Final Pilgrim Nuclear Power Station Accident Sequence Analysis | |
ML14300A096 | 28 October 2014 | Staff Review of the Pilgrim Physical Security Plan (Revision 12) for the Independent Spent Fuel Storage Installation Security and Verification of ASM Incorporation (TAC L24940) | |
ML16088A204 | 28 March 2016 | Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) | Decommissioning Funding Plan |
ML16088A205 | 28 March 2016 | Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations | Decommissioning Funding Plan |
ML16153A276 | 20 June 2016 | Memo - Transmittal of the Final Pilgrim Nuclear Power Station Accident Sequence Analysis | |
ML18157A040 | 6 June 2018 | Inspection Procedure 95003: Evaluation of NRC Assessment and Inspection Processes at Pilgrim Nuclear Power Station | |
ML18158A130 | 7 June 2018 | Evaluation - Memorandum Regarding Licensee Event Report Safety Significance Review in Response to Findings Associated with Inspection Procedure 95003; Evaluation of NRC Assessment and Inspection Processes at Pilgrim Nuclear Power Station | Safe Shutdown Reactor Vessel Water Level Loop seal High Radiation Area Ultimate heat sink Mission time Weld Overlay Water level shrink FLEX Corrosion bonding Significance Determination Process Large early release frequency Severe Accident Management Guideline Preliminary White Finding |
ML18158A133 | 6 June 2018 | Extent of Condition Review in Response to Findings Associated with Inspection 95003: Evaluation of NRC Assessment and Inspection Processes at Pilgrim Nuclear Power Station | Hot Short Safe Shutdown Unanalyzed Condition Enforcement Discretion Missed surveillance Tornado Missile Protection Pressure Boundary Leakage Offsite Circuit |
ML19182A356 | 23 July 2019 | Quarterly Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations, Section 2.206 - April 1 to June 30, 2019 | Fukushima Dai-Ichi |
ML19274B666 | 13 November 2019 | Summary of Public Meeting Near the Pilgrim Nuclear Power Station Regarding the Establishment and Operation of Community Advisory Boards | |
ML21060B115 | 31 March 2021 | Memo to File: Final Environmental Assessment and Finding of No Significant Impact for Initial and Updated Decommissioning Funding Plans for Pilgrim ISFSI | Decommissioning Funding Plan |
ML22321A104 | 1 December 2022 | Lessons Learned Recommendations Effectiveness Review | |
NRC Generic Letter 1989-11 | 30 June 1989 | NRC Generic Letter 1989-011: Resolution of Generic Issue 101 Boiling Water Reactor Water Level Redundancy | Safe Shutdown |