Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML11250A17114 September 2011Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs)
ML12090A21230 March 2012Referring Jones River Watershed Association Petition to Intervene and Request to File New Contentions, or in Alternative, Jones River Watershed Association and Pilgrim Water Motion to Reopen the Pilgrim Nuclear Power Station, Docket No. 50-
ML12137A06029 May 2012Nuclear Regulatory Commission'S Analysis of Entergy Nuclear Operations, Inc. Decommissioning Funding Status Report for Indian Point Nuclear Generating Station, Units 1, 2 & 3; and Pilgrim Nuclear Power Station
ML13022A3031 September 1989from Us NRC to All Holders of Operating LicensesHardened vent
Backfit
ML13108A32822 April 2013Notice of Forthcoming Meeting with Petitioners Requesting Action Against Entergy Nuclear Operations, Inc., Regarding Operations at FitzPatrick, Pilgrim, and Vermont Yankee Nuclear Power Stations (TAC Nos. MF1092, MF1093, and MF1094)
ML13196A2206 June 2012Memo from B. Balsam, NRR and D. Logan, NRR to J. Susco, NRR on Summary of Section 7 Consultation Activities Related to the National Marine Fisheries Service'S Final Rule to List the Atlantic SturgeonLicense Renewal
ML13267A23430 August 2013G20130629 - Pilgrim Watch'S 2.206 Petition to Pilgrim'S Emergency Preparedness Plans (MF2656)
ML13309A08011 December 2013Memorandum to File: Transcript for 10 CFR 2.206 Petition from Beyond Nuclear (Et Al) Regarding General Electric Mark I and Mark II Boiling-Water Reactors
ML13351A2739 January 2014G20130846/LTR-13-0911 - James Brett, the New England Council Ltr. Chairman'S Recent Tour and the Council'S Support for the Pilgrim Nuclear Power Station - Response
ML14086A29122 April 2014Summary of Telephone Conference Regarding the Verbal Authorization of Relief Request PRR-25, Revision 1
ML14232A30120 August 2014Memo s Wastler, Technical Assistance Request - Review of Physical Security Plan for the Pilgrim Nuclear Power Stations (TAC No. L24940) Docket Nos. 72-1044, 50-293
ML14294A5714 November 2014Memo - Transmittal of the Final Pilgrim Nuclear Power Station Accident Sequence Analysis
ML14300A09628 October 2014Staff Review of the Pilgrim Physical Security Plan (Revision 12) for the Independent Spent Fuel Storage Installation Security and Verification of ASM Incorporation (TAC L24940)
ML16088A20428 March 2016Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template)Decommissioning Funding Plan
ML16088A20528 March 2016Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage InstallationsDecommissioning Funding Plan
ML16153A27620 June 2016Memo - Transmittal of the Final Pilgrim Nuclear Power Station Accident Sequence Analysis
ML18157A0406 June 2018Inspection Procedure 95003: Evaluation of NRC Assessment and Inspection Processes at Pilgrim Nuclear Power Station
ML18158A1307 June 2018Evaluation - Memorandum Regarding Licensee Event Report Safety Significance Review in Response to Findings Associated with Inspection Procedure 95003; Evaluation of NRC Assessment and Inspection Processes at Pilgrim Nuclear Power StationSafe Shutdown
Reactor Vessel Water Level
Loop seal
High Radiation Area
Ultimate heat sink
Mission time
Weld Overlay
Water level shrink
FLEX
Corrosion bonding
Significance Determination Process
Large early release frequency
Severe Accident Management Guideline
Preliminary White Finding
ML18158A1336 June 2018Extent of Condition Review in Response to Findings Associated with Inspection 95003: Evaluation of NRC Assessment and Inspection Processes at Pilgrim Nuclear Power StationHot Short
Safe Shutdown
Unanalyzed Condition
Enforcement Discretion
Missed surveillance
Tornado Missile Protection
Pressure Boundary Leakage
Offsite Circuit
ML19182A35623 July 2019Quarterly Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations, Section 2.206 - April 1 to June 30, 2019Fukushima Dai-Ichi
ML19274B66613 November 2019Summary of Public Meeting Near the Pilgrim Nuclear Power Station Regarding the Establishment and Operation of Community Advisory Boards
ML21060B11531 March 2021Memo to File: Final Environmental Assessment and Finding of No Significant Impact for Initial and Updated Decommissioning Funding Plans for Pilgrim ISFSIDecommissioning Funding Plan
ML22321A1041 December 2022Lessons Learned Recommendations Effectiveness Review
NRC Generic Letter 1989-1130 June 1989NRC Generic Letter 1989-011: Resolution of Generic Issue 101 Boiling Water Reactor Water Level RedundancySafe Shutdown