Issue date | Title | Topic | |
---|---|---|---|
ML031110190 | 15 April 2003 | Unsigned Memo from W. Beckner to J. Holonich Regarding INES Level Point Beach Event | |
ML031110571 | 18 April 2003 | Memo 04/18/03 Prairie Island Re DRS Input to DRP IR 03-04 MWM2 | |
ML031120513 | 25 April 2003 | Draft RAI and Phone Call Summary Regarding Two New Emergency Action Levels | |
ML031270102 | 7 May 2003 | Report on the Status of Open TIAs Assigned to NRR | Backfit |
ML031400649 | 19 May 2003 | NRR Peer Review of Preliminary ASP Analysis of November 2001 Operational Condition at Point Beach, Units 1 & 2 | Safe Shutdown Earthquake Design basis earthquake Earthquake Fire Watch |
ML031470688 | 27 May 2003 | Memorandum, Phone Call Held on May 22, 2003, Regarding Measurement Uncertainty Recapture Power Uprate | |
ML031480072 | 6 June 2003 | Memorandum, Facsimile Transmission Issues Discussed in Phone Conversation | |
ML031480155 | 6 June 2003 | Memorandum, Facsimile Transmission Issues Discussed in Phone Conversation. TAC Nos MB7926 and MB7927 | |
ML031560453 | 17 June 2003 | Safety Evaluation Regarding Unit Staff Qualification Requirements for Prairie Island Nuclear Generating Plant | |
ML031770076 | 26 June 2003 | Report on the Status of Open TIAs Assigned to NRR | Backfit |
ML032040412 | 4 September 2003 | Response to TIA 2001-10, Design Basis Assumptions for Ability of Emergency Diesel Generators to Meet Single Failure Criteria for External Events | Earthquake |
ML032090063 | 21 July 2003 | Schedule and Inspection Plan for 95003 Supplemental Inspection at Point Beach | |
ML032090215 | 16 September 2003 | Advisory Committee on Reactor Safety Review of Stretch Power Uprate Amendment | |
ML032170153 | 1 August 2003 | Transmittal of Final ASP Analyses | Safe Shutdown Fire Barrier Significance Determination Process |
ML032190006 | 15 August 2003 | Transmittal of Draft Request for Additional Information on Proposed Amendment to Change Pressure-Temperature Limit Curves | |
ML032240072 | 15 August 2003 | Facsimile Transmission for Issues Discussed in Telephone Conference | Shutdown Margin |
ML032260728 | 21 August 2003 | Facsimile Transmission for Issues Discussed in Telephone Conference | |
ML032270197 | 26 August 2003 | Transmittal of Electronic Mail on Proprietary Withholding Request Regarding Pressure-Temperature Limit Curves | |
ML032380636 | 28 August 2003 | Safety Evaluation Regarding Unit Staff Qualification Requirements for Kewaunee Nuclear Power Plant; Palisades Nuclear Plant; Point Beach Nuclear Plant, Units 1 and 2 | |
ML032390402 | 27 August 2003 | Results of the Monticello Nuclear Generating Plant Phase 2 Notebook Benchmarking Visit | Internal Flooding Significance Determination Process |
ML032410278 | 28 August 2003 | Results of Kewaunee SDP Phase 2 Notebook Benchmarking Visit | Boric Acid Internal Flooding Probabilistic Risk Assessment Significance Determination Process |
ML033170418 | 13 November 2003 | Public Meeting, Palisades Discuss Current Palisades Plant Performance | |
ML033170419 | 13 November 2003 | (9:00 A.M. CST) Regulatory Conference, Palisades Preliminary Safety Significance of a 3/25/03, Loss of Offsite Power Event Which Occurre When a Signpost Was Driven Into a Conduit and Damaged a Cable in the Plant Parking Lot | |
ML033390246 | 5 December 2003 | Notice of Meeting with Nuclear Management Company, LLC, Re Pressurized Thermal Shock Plans for Extended Plant Life at Palisades Plant | |
ML040050235 | 16 January 2004 | Facsimile Transmission for Issues Discussed in Telephone Conference | |
ML040050368 | 16 January 2004 | Facsimile Transmission for Issues Discussed in Telephone Conference | |
ML040620143 | 9 October 2003 | Advisory Committee on Reactor Safety Review of Stretch Power Uprate Amendment | |
ML040700440 | 18 April 2004 | Technical Specification 3.4b, Auxiliary Feedwater System, Interpretation | |
ML040700457 | 16 March 2004 | Facsimile Transmission for Issues Discussed in Telephone Conference | |
ML040700485 | 16 March 2004 | Facsimile Transmission for Issues Discussed in Telephone Conference | |
ML040910049 | 30 March 2004 | Monthly Region Report - Region III - March 2004 | |
ML041180299 | 26 April 2004 | Notice of Public Meeting, Monticello, to Present Licensee Results of NRC End-of-Cycle Assessment | |
ML041740086 | 21 June 2004 | All Region III Facility Training Managers Revised NRC Form 398 - Personal Qualification Statement Licensee | |
ML041880324 | 29 June 2004 | Audit and Review Plan for Plant Aging Management Reviews and Programs at Point Beach Nuclear Power Plant, Units 1 and 2 | Aging Management |
ML041960462 | 7 July 2004 | Wpdes Permit Reissuance | Grab sample Zebra Mussel Incorporated by reference |
ML042040430 | 22 July 2004 | Notice of Meeting Between the U.S. Nuclear Regulatory Commission (NRC) Staff and Nuclear Management Company, LLC (NMC) on Recent Decisions Involving Unit 2 Reactor Vessel Pressurized Thermal Shock | |
ML042100332 | 30 June 2004 | Close-out of Tacs Relating to the Review of 35-day Letters Submitted in Response to the April 29, 2003, Orders Revising the Design Basis and Security Guard Force Training Enhancements and Physical Fitness Requirements | |
ML042150068 | 5 August 2004 | Notice of Meeting with Nuclear Management Company, LLC (NMC) Regarding Applying Alternative Source Term Methodology at Monticello | |
ML043220582 | 19 November 2004 | Forthcoming Meeting with Nuclear Management Company, LLC (NMC) Regarding the Independent Spend Fuel Storage Installation (ISFSI) at Monticello | |
ML043270587 | 16 November 2004 | Summary of Telephone Conference Held on October 26, 2004, Between the U.S. Nuclear Regulatory Commission and Nuclear Management Company, LLC, Concerning Draft Requests for Additional Information Pertaining to the Point Beach Nuclear Plant, | Aging Management |
ML043270652 | 17 November 2004 | Summary of Telephone Conference Heldon November 17, 2004, Between the U.S. Nuclear Regulatory Commission and Nuclear Management Company, Llc. Concerning Draft Requests for Additional Information Pertaining to the Point Beach Nuclear Plan, U | |
ML043510336 | 16 December 2004 | Use of the University of Maryland'S Letter Report, Thermal-hydraulic Uncertainty Analysis in Pressurized Thermal Shock Risk Assessment, as a Reference in Our NUREG/CR-6859, PRA Procedures and Uncertainty for PTS Analysis | |
ML050270046 | 19 January 2005 | Summary of Telephone Conference Held on January 10, 2005, Between the U.S. Nuclear Regulatory Commission and Nuclear Management Company, LLC, Concerning Draft Requests for Additional Information Pertaining to the Point Beach Nuclear | Non-Destructive Examination Aging Management License Renewal Control of Heavy Loads |
ML050750545 | 18 March 2005 | 3/18/05, Kewaunee, Summary of Telephone Conference Steam Generator Water Chemistry Excursion (TAC No. M40695) | |
ML050830329 | 6 May 2004 | Memo A. Lund, NRR, to L. Raghavan, NRR, Request for Additional Information Re Point Beach Unit 2 Steam Generator Eddy Current Examinations for 2003 Outage | |
ML050830422 | 2 June 2004 | Memo T.Chan, NRR, to L. Raghavan, NRR, Safety Evaluation for Point Beach Unit 1 First Revised Order | Nondestructive Examination Finite Element Analysis |
ML050870148 | 26 May 2004 | NRC Verbal Authorization of Relief Requests Pertaining to the Unit 1 Reactor Vessel Head | |
ML050880164 | 14 April 2004 | Memorandum from K. Lambert, Riii, to K. Riemer, Riii, Subj: Review of Licensee Identified Wrongdoing Issues Allegation No. RIII-04-A-0047 (Point Beach) | |
ML050880166 | 30 April 2004 | Memo from K. Lambert, Riii, to K. Riemer, Riii, Subj: Receipt of New Allegation: RIII-2004-A-0047 (Point Beach). Attachment Allegation Action Plan AMS No. RIII-2004-A-0047 | High Radiation Area |
ML050880167 | 30 April 2004 | Memorandum from K. Riemer, Riii, to J. Heller, Riii, Subj: Review of Licensee Identified Wrongdoing Issues Allegation No. RIII-04-A-0047 (Point Beach) (Aits No. S04-01701) | High Radiation Area |