Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML0912702464 May 2009NPS Hostile Action Drill - Protective Action Decision Considerations
ML0917610475 August 2009ECCS Preacs Filtration PresentationMission time
ML1012600335 May 2010Meeting PostersAging Management
ML1012600345 May 2010Public Mtg. Slides
ML10141015921 May 2010April 22, 2010 Summary of Meeting with Connecticut Nuclear Energy Advisory Council
ML10201002114 July 2010Nucler Power Station, Units 1 and 2, Westinghouse RFA-2 Fuel Transition Licensing Meeting Presentation SlidesFuel cladding
ML10322044418 November 2010Public Meeting Summary - North Anna Power StationBoric Acid
ML11103043013 April 2011Public Meeting/Open House - HandoutsEarthquake
ML11103049413 April 2011Public Meeting Attendees
ML11103049813 April 2011Public Meeting HandoutsEarthquake
ML11228A2272 June 2008State-of-the-Art Reactor Consequence Analyses; Briefing for Commission Technical AssistantsB.5.b Mitigating Strategies
ML11228A22810 September 2008State-of-the-Art Reactor Consequence Analyses (Soarca); Semi-Annual Briefing for Commission Technical AssistantsB.5.b
Fatality
ML11228A22917 December 2008Soarca Seismic Issue; Briefing for the Commissioners' Technical Assistants
ML11228A23014 April 2009State-of-the-Art Reactor Consequence Analyses; Semi-Annual Briefing for Commission Technical AssistantsB.5.b Mitigating Strategies
ML11228A23113 August 2009State-of-the-Art Reactor Consequence Analyses (Soarca); Semi-Annual Briefing for Commission Tas
ML11242055130 August 2011Seismic EventSafe Shutdown Earthquake
Operating Basis Earthquake
Design basis earthquake
Earthquake
ML11252A0068 September 2011Dominion'S Slides Earthquake Response and North Anna Restart Readiness Demonstration PlanSafe Shutdown
Unanalyzed Condition
Reserve Station Service Transformer
Operating Basis Earthquake
Design basis earthquake
Earthquake
ML11276A0243 October 2011Slides-North Anna AIT Public Meeting October 3, 2011
ML1127701353 October 2011Ltr to D. Heacock Re Participation in the Commission Meeting on the North Anna Plant on 10/21/11Earthquake
ML11305A0451 November 2011Region II - North Anna Public Meeting Slides
ML11305A0621 November 2011Restart Readiness, Public Meeting PR2Safe Shutdown
Earthquake
ML12115A07319 April 2012RCS Standpipe White Violation SlidesBoric Acid
ML12131A5059 May 2012Presentation for 2011 North Anna EOC Annual Assessment MeetingFukushima Dai-Ichi
Earthquake
ML12257A20011 September 20122-North Anna Extent of Condition Presentation 9-7-12 Sept 10Dissimilar Metal Weld
DM weld
ML12257A23411 September 20125-Hacker - North Anna Mockup and Search Unit Action Presentation Sept 10
ML13151A10231 May 2013Summary of Public Meeting with Virginia Electric and Power Company, to Discuss Annual Assessment of Surry Power Stationfor the Period of January 1, 2012 December 31, 2012
ML13159A0094 June 2013Notable Failures in Nondustructive Testing - June 4, 2013 Public MeetingWeld Overlay
Dissimilar Metal Weld
ML13305A14431 October 2013Rlbloca, Revision 3 - Post-Submittal Meeting, Areva, Oct. 31, 2013S, Lides
ML14058B1766 March 2014Presentation Slides - North Anna ISFSI - High Burnup Dry Storage Confirmatory Data Project, TN-32 Storage Cask, Tom Brookmire, March 6, 2014, Docket No. 72-16, TAC No: L24886Fuel cladding
ML14071A16728 January 2014Enclosure 2: Presentation Slides - North Anna ISFSI TN-32 Cask and Pad 1 Assessments Following August 23, 2011, Central Virginia EarthquakeDesign basis earthquake
Earthquake
Fuel cladding
ML14101A11311 April 2014Summary of Meeting with Public to Discuss Annual Assessment of Surry Power Station with the Public for the Period of January 1, 2013 - December 31, 2013
ML14101A12011 April 2014Public Meeting Summary - North Anna Power Station, Docket Nos. 50-338, 50-339
ML14176A09225 June 20146/25/2014, Dominion Public Meeting Presentation for Surry GMRS Profile
ML15128A5468 May 2015Summary of Public Meeting with North Anna, Units 1 and 2 to Discuss the Annual Assessment with the Public
ML15133A08213 May 2015ISFSI Presentation Slides - TN-32 High Burnup Dry Storage Research Project, May 13, 2015 (Tom Brookmire)Aging Management
ML15153A04513 May 2015Revised North Anna ISFSI Presentation Slides - TN-32 High Burnup Dry Storage Research Project, May 13, 2015 (Tom Brookmire)
ML15155B36921 May 2015Connecticut, Inc. Presentation Slides for Pre-submittal Meeting on May 21, 2015
ML15198A34322 June 20152015/06/22 Pre-Submittal Teleconference Meeting Slides: LOCA Analyses Supporting MPS2 Upgrade to Areva Standard CE14 Htp Fuel AssemblyExemption Request
ML15273A42929 September 2015Revised Slides for September 29, 2015 Meeting with Dominion Re North Anna ISFSI License RenewalEarthquake
ML15314A10220 October 20152015/10/20 Pre-Submittal Teleconference Meeting Slides: Proposed License Amendment Request for EAL Changes, RCS Sampling Methodology Revision
ML15344A29410 December 2015/12/10 Presentation Slides for Pre-Submittal Teleconference - Proposed LAR for Charging System in Response to Confirmatory Order EA-13-188
ML15353A00217 December 2015/12/17 Presentation Slides for Pre-Submittal Teleconference - Proposed LAR for Spent Fuel Pool Heat Load Analysis in Response to Confirmatory Order EA-13-188
ML16104A38226 April 2016New Fuel Storage Rack & SFP Criticality Analysis for April 26th 2016 Scheduled Category 1, Pre-Submittal Public Teleconference
ML16104A38713 April 2016Criticality Analysis Checklist for North AnnaAging Management
ML16124A7583 May 2016April 14, 2016, Summer of Public Meeting - North Anna, Units 1 and 2
ML16124A7593 May 2016April 12, 2016 Summary of Public Meeting - Surry, Units 1 and 2
ML16124A7633 May 2016April 14, 2016, Summary of Public Meeting - North Anna Power Station, Units 1 and 2
ML16125A0093 May 20162016/05/03 Presentation Slides for Pre-Submittal Teleconference for Realistic Large Break LOCA License Amendment Request
ML16272A34610 August 201608/10/2016 - NEI Supplemental Material 2 (Estimate of BADGER System Uncertainty Using Millstone Unit 1 2013)
ML16272A34710 August 201608/10/2016 - NEI Supplemental Material 1 (BADGER Measurement of Carborundum B-10 Areal Density)