Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML091270246 | 4 May 2009 | NPS Hostile Action Drill - Protective Action Decision Considerations | |
ML091761047 | 5 August 2009 | ECCS Preacs Filtration Presentation | Mission time |
ML101260033 | 5 May 2010 | Meeting Posters | Aging Management |
ML101260034 | 5 May 2010 | Public Mtg. Slides | |
ML101410159 | 21 May 2010 | April 22, 2010 Summary of Meeting with Connecticut Nuclear Energy Advisory Council | |
ML102010021 | 14 July 2010 | Nucler Power Station, Units 1 and 2, Westinghouse RFA-2 Fuel Transition Licensing Meeting Presentation Slides | Fuel cladding |
ML103220444 | 18 November 2010 | Public Meeting Summary - North Anna Power Station | Boric Acid |
ML111030430 | 13 April 2011 | Public Meeting/Open House - Handouts | Earthquake |
ML111030494 | 13 April 2011 | Public Meeting Attendees | |
ML111030498 | 13 April 2011 | Public Meeting Handouts | Earthquake |
ML11228A227 | 2 June 2008 | State-of-the-Art Reactor Consequence Analyses; Briefing for Commission Technical Assistants | B.5.b Mitigating Strategies |
ML11228A228 | 10 September 2008 | State-of-the-Art Reactor Consequence Analyses (Soarca); Semi-Annual Briefing for Commission Technical Assistants | B.5.b Fatality |
ML11228A229 | 17 December 2008 | Soarca Seismic Issue; Briefing for the Commissioners' Technical Assistants | |
ML11228A230 | 14 April 2009 | State-of-the-Art Reactor Consequence Analyses; Semi-Annual Briefing for Commission Technical Assistants | B.5.b Mitigating Strategies |
ML11228A231 | 13 August 2009 | State-of-the-Art Reactor Consequence Analyses (Soarca); Semi-Annual Briefing for Commission Tas | |
ML112420551 | 30 August 2011 | Seismic Event | Safe Shutdown Earthquake Operating Basis Earthquake Design basis earthquake Earthquake |
ML11252A006 | 8 September 2011 | Dominion'S Slides Earthquake Response and North Anna Restart Readiness Demonstration Plan | Safe Shutdown Unanalyzed Condition Reserve Station Service Transformer Operating Basis Earthquake Design basis earthquake Earthquake |
ML11276A024 | 3 October 2011 | Slides-North Anna AIT Public Meeting October 3, 2011 | |
ML112770135 | 3 October 2011 | Ltr to D. Heacock Re Participation in the Commission Meeting on the North Anna Plant on 10/21/11 | Earthquake |
ML11305A045 | 1 November 2011 | Region II - North Anna Public Meeting Slides | |
ML11305A062 | 1 November 2011 | Restart Readiness, Public Meeting PR2 | Safe Shutdown Earthquake |
ML12115A073 | 19 April 2012 | RCS Standpipe White Violation Slides | Boric Acid |
ML12131A505 | 9 May 2012 | Presentation for 2011 North Anna EOC Annual Assessment Meeting | Fukushima Dai-Ichi Earthquake |
ML12257A200 | 11 September 2012 | 2-North Anna Extent of Condition Presentation 9-7-12 Sept 10 | Dissimilar Metal Weld DM weld |
ML12257A234 | 11 September 2012 | 5-Hacker - North Anna Mockup and Search Unit Action Presentation Sept 10 | |
ML13151A102 | 31 May 2013 | Summary of Public Meeting with Virginia Electric and Power Company, to Discuss Annual Assessment of Surry Power Stationfor the Period of January 1, 2012 December 31, 2012 | |
ML13159A009 | 4 June 2013 | Notable Failures in Nondustructive Testing - June 4, 2013 Public Meeting | Weld Overlay Dissimilar Metal Weld |
ML13305A144 | 31 October 2013 | Rlbloca, Revision 3 - Post-Submittal Meeting, Areva, Oct. 31, 2013S, Lides | |
ML14058B176 | 6 March 2014 | Presentation Slides - North Anna ISFSI - High Burnup Dry Storage Confirmatory Data Project, TN-32 Storage Cask, Tom Brookmire, March 6, 2014, Docket No. 72-16, TAC No: L24886 | Fuel cladding |
ML14071A167 | 28 January 2014 | Enclosure 2: Presentation Slides - North Anna ISFSI TN-32 Cask and Pad 1 Assessments Following August 23, 2011, Central Virginia Earthquake | Design basis earthquake Earthquake Fuel cladding |
ML14101A113 | 11 April 2014 | Summary of Meeting with Public to Discuss Annual Assessment of Surry Power Station with the Public for the Period of January 1, 2013 - December 31, 2013 | |
ML14101A120 | 11 April 2014 | Public Meeting Summary - North Anna Power Station, Docket Nos. 50-338, 50-339 | |
ML14176A092 | 25 June 2014 | 6/25/2014, Dominion Public Meeting Presentation for Surry GMRS Profile | |
ML15128A546 | 8 May 2015 | Summary of Public Meeting with North Anna, Units 1 and 2 to Discuss the Annual Assessment with the Public | |
ML15133A082 | 13 May 2015 | ISFSI Presentation Slides - TN-32 High Burnup Dry Storage Research Project, May 13, 2015 (Tom Brookmire) | Aging Management |
ML15153A045 | 13 May 2015 | Revised North Anna ISFSI Presentation Slides - TN-32 High Burnup Dry Storage Research Project, May 13, 2015 (Tom Brookmire) | |
ML15155B369 | 21 May 2015 | Connecticut, Inc. Presentation Slides for Pre-submittal Meeting on May 21, 2015 | |
ML15198A343 | 22 June 2015 | 2015/06/22 Pre-Submittal Teleconference Meeting Slides: LOCA Analyses Supporting MPS2 Upgrade to Areva Standard CE14 Htp Fuel Assembly | Exemption Request |
ML15273A429 | 29 September 2015 | Revised Slides for September 29, 2015 Meeting with Dominion Re North Anna ISFSI License Renewal | Earthquake |
ML15314A102 | 20 October 2015 | 2015/10/20 Pre-Submittal Teleconference Meeting Slides: Proposed License Amendment Request for EAL Changes, RCS Sampling Methodology Revision | |
ML15344A294 | 10 December 2015 | /12/10 Presentation Slides for Pre-Submittal Teleconference - Proposed LAR for Charging System in Response to Confirmatory Order EA-13-188 | |
ML15353A002 | 17 December 2015 | /12/17 Presentation Slides for Pre-Submittal Teleconference - Proposed LAR for Spent Fuel Pool Heat Load Analysis in Response to Confirmatory Order EA-13-188 | |
ML16104A382 | 26 April 2016 | New Fuel Storage Rack & SFP Criticality Analysis for April 26th 2016 Scheduled Category 1, Pre-Submittal Public Teleconference | |
ML16104A387 | 13 April 2016 | Criticality Analysis Checklist for North Anna | Aging Management |
ML16124A758 | 3 May 2016 | April 14, 2016, Summer of Public Meeting - North Anna, Units 1 and 2 | |
ML16124A759 | 3 May 2016 | April 12, 2016 Summary of Public Meeting - Surry, Units 1 and 2 | |
ML16124A763 | 3 May 2016 | April 14, 2016, Summary of Public Meeting - North Anna Power Station, Units 1 and 2 | |
ML16125A009 | 3 May 2016 | 2016/05/03 Presentation Slides for Pre-Submittal Teleconference for Realistic Large Break LOCA License Amendment Request | |
ML16272A346 | 10 August 2016 | 08/10/2016 - NEI Supplemental Material 2 (Estimate of BADGER System Uncertainty Using Millstone Unit 1 2013) | |
ML16272A347 | 10 August 2016 | 08/10/2016 - NEI Supplemental Material 1 (BADGER Measurement of Carborundum B-10 Areal Density) |