NRC 2002-0086, Clarification of Reply to Notice of Violation (EA-02-031) NRC Special Inspection Reports 05000266-01-017(DRS) & 05000301-01-017(DRS) | 26 September 2002 | Clarification of Reply to Notice of Violation (EA-02-031) NRC Special Inspection Reports 05000266-01-017(DRS) & 05000301-01-017(DRS) | |
NRC 2002-0090, Response to Request for Additional Information License Amendment Request 226 Measurement Uncertainly Recapture Power Uprate | 3 October 2002 | Response to Request for Additional Information License Amendment Request 226 Measurement Uncertainly Recapture Power Uprate | |
NRC 2002-0091, NRC Bulletin 2002-02: Reactor Pressure Vessel Head and Vessel Head Penetration Nozzle Inspection Programs - Response to Request for Additional Information | 4 October 2002 | NRC Bulletin 2002-02: Reactor Pressure Vessel Head and Vessel Head Penetration Nozzle Inspection Programs - Response to Request for Additional Information | Through Wall Leak |
NRC 2002-0093, License Amendment Request 230, Control Room Emergency Filtration System (CREFS) Deletion of One-Time Allowed Outage Time Extension | 17 October 2002 | License Amendment Request 230, Control Room Emergency Filtration System (CREFS) Deletion of One-Time Allowed Outage Time Extension | |
NRC 2002-0099, Response to Request for Additional Information License Amendment Request 226 Measurement Uncertainty Recapture Power Uprate | 11 November 2002 | Response to Request for Additional Information License Amendment Request 226 Measurement Uncertainty Recapture Power Uprate | |
NRC 2002-0101, Transmittal of Fire Protection Evaluation Report, Revision 1 | 18 November 2002 | Transmittal of Fire Protection Evaluation Report, Revision 1 | Safe Shutdown Fire Protection Program |
NRC 2002-0103, Combustible Loading Calculation Rebaselining | 22 November 2002 | Combustible Loading Calculation Rebaselining | Safe Shutdown Boric Acid Exemption Request |
NRC 2002-0108, Technical Specification Bases Revisions | 10 November 2002 | Technical Specification Bases Revisions | Shutdown Margin High Radiation Area Post Accident Monitoring Missed surveillance |
NRC 2002-0109, Letter from A. J. Cayia Which Serves to Document the December 17, 2002 Conference Call Re Clarification of Safety Evaluation, License Amendments 207 and 212 | 20 December 2002 | Letter from A. J. Cayia Which Serves to Document the December 17, 2002 Conference Call Re Clarification of Safety Evaluation, License Amendments 207 and 212 | |
NRC 2002-0110, Security Plan Revisions | 20 December 2002 | Security Plan Revisions | |
NRC 2003-0001, Registration of Spent Fuel Storage Cask | 6 January 2003 | Registration of Spent Fuel Storage Cask | |
NRC 2003-0006, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity, 60-Day Response for Point Beach Nuclear Plant, Request for Additional Information (TAC No.MB4566 & MB4567) | 20 January 2003 | Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity, 60-Day Response for Point Beach Nuclear Plant, Request for Additional Information (TAC No.MB4566 & MB4567) | Boric Acid Hydrostatic VT-2 Liquid penetrant Pressure Boundary Leakage Through-Wall Leak Dissimilar Metal Weld |
NRC 2003-0008, Filing of Owners'S Inservice Inspection Summary Report | 17 January 2003 | Filing of Owners'S Inservice Inspection Summary Report | Boric Acid Hydrostatic Coatings VT-2 Liquid penetrant |
NRC 2003-0009, Request for Withdrawal of License Amendment Request 224, Control Room Habitability | 24 January 2003 | Request for Withdrawal of License Amendment Request 224, Control Room Habitability | |
NRC 2003-0010, Registration of Spent Fuel Storage Cask | 27 January 2003 | Registration of Spent Fuel Storage Cask | |
NRC 2003-0011, Emergency Plan Implementing Procedure Revisions | 27 January 2003 | Emergency Plan Implementing Procedure Revisions | Nuclear Accident Reporting System Fuel cladding |
NRC 2003-0012, Emergency Plan Implementing Procedure Revisions, Point Beach Nuclear Plant, Units 1 & 2 | 7 February 2003 | Emergency Plan Implementing Procedure Revisions, Point Beach Nuclear Plant, Units 1 & 2 | Reactor Vessel Water Level |
NRC 2003-0015, Transmittal of Fire Protection Evaluation Report, Revision 2 | 10 February 2003 | Transmittal of Fire Protection Evaluation Report, Revision 2 | Safe Shutdown Fire Barrier |
NRC 2003-0016, Request for Withholding of Proprietary Information | 14 February 2003 | Request for Withholding of Proprietary Information | |
NRC 2003-0017, Emergency Plan Implementing Procedure Revisions Point Beach Nuclear Plant, Units 1 & 2 | 5 March 2003 | Emergency Plan Implementing Procedure Revisions Point Beach Nuclear Plant, Units 1 & 2 | Nuclear Accident Reporting System Minimum staff Accidental discharge |
NRC 2003-0018, Request for Exemptions to 10 CFR 50.61, Appendices G and H to 10 CFR 50, and Approval of PTS Application for Pbnp Unit 2 and Proposed Heatup and Cooldown Limit Curves for Pbnp Units 1 & 2 | 3 March 2003 | Request for Exemptions to 10 CFR 50.61, Appendices G and H to 10 CFR 50, and Approval of PTS Application for Pbnp Unit 2 and Proposed Heatup and Cooldown Limit Curves for Pbnp Units 1 & 2 | Anticipated operational occurrence Hydrostatic Pressure and Temperature Limits Report Exemption Request |
NRC 2003-0019, Security Plan Revisions | 5 March 2003 | Security Plan Revisions | |
NRC 2003-0020, Day Response to Order EA-03-009, Issuance of Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors. | 3 March 2003 | Day Response to Order EA-03-009, Issuance of Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors. | |
NRC 2003-0021, Point Peach Nuclear Plant, Units 1 & 2 - Fitness-for-Duty (FFD) Program | 28 February 2003 | Point Peach Nuclear Plant, Units 1 & 2 - Fitness-for-Duty (FFD) Program | Fitness for Duty |
NRC 2003-0023, Additional Information Regarding Fourth Interval Inservice Inspection Program Relief Request 11 | 10 March 2003 | Additional Information Regarding Fourth Interval Inservice Inspection Program Relief Request 11 | VT-2 |
NRC 2003-0025, Supplement to Generic Letter 96-06 Resolution | 27 March 2003 | Supplement to Generic Letter 96-06 Resolution | Ultimate heat sink |
NRC 2003-0026, Response to Request for Additional Information Regarding Relief Request 3, Risk Informed Inservice Inspection Program | 27 March 2003 | Response to Request for Additional Information Regarding Relief Request 3, Risk Informed Inservice Inspection Program | |
NRC 2003-0027, License Amendment Request 231 Technical Specifications SR 3.1.4.1, Rod Group Alignment Limits | 27 March 2003 | License Amendment Request 231 Technical Specifications SR 3.1.4.1, Rod Group Alignment Limits | Boric Acid Shutdown Margin |
NRC 2003-0028, License Amendment Request 234, Selective Scope Implementation of Alternative Source Term for Fuel Handling Accident | 27 March 2003 | License Amendment Request 234, Selective Scope Implementation of Alternative Source Term for Fuel Handling Accident | Deep Dose Equivalent Fuel cladding Recently irradiated fuel Power Uprate |
NRC 2003-0029, Supplement 1 to License Amendment Request 229 Technical Specification LCO 3.5.2, ECCS - Operating, and LCO 3.5.3, ECCS - Shutdown | 27 March 2003 | Supplement 1 to License Amendment Request 229 Technical Specification LCO 3.5.2, ECCS - Operating, and LCO 3.5.3, ECCS - Shutdown | Stroke time |
NRC 2003-0030, 2003 Insurance Certification | 3 April 2003 | 2003 Insurance Certification | |
NRC 2003-0031, Emergency Plan Implementing Procedure Revisons. | 8 April 2003 | Emergency Plan Implementing Procedure Revisons. | High Radiation Area Grab sample |
NRC 2003-0032, March 2003 Monthly Operating Report for Point Beach, Units 1 & 2 | 7 April 2003 | March 2003 Monthly Operating Report for Point Beach, Units 1 & 2 | |
NRC 2003-0033, Technical Specification Bases Revisions | 9 April 2003 | Technical Specification Bases Revisions | Stroke time |
NRC 2003-0034, Reactor Vessel Closure Head Penetration Repair Relief Requests MR 03-018-1 & MR 02-018-2 Supplement 1 & Response to Request for Additional Information | 10 April 2003 | Reactor Vessel Closure Head Penetration Repair Relief Requests MR 03-018-1 & MR 02-018-2 Supplement 1 & Response to Request for Additional Information | |
NRC 2003-0035, Emergency Plan Implementing Procedure Revisions Point Beach Nuclear Plant, Units 1 & 2 | 14 April 2003 | Emergency Plan Implementing Procedure Revisions Point Beach Nuclear Plant, Units 1 & 2 | Safe Shutdown Time of Discovery High winds Ultimate heat sink Safe Shutdown Earthquake Internal Flooding Enforcement Discretion Operating Basis Earthquake Severe Accident Management Guideline Earthquake Turbine Missile Fuel cladding Power change |
NRC 2003-0036, ECCS Evaluation Model Changes, 10 CFR 50.46 | 11 April 2003 | ECCS Evaluation Model Changes, 10 CFR 50.46 | |
NRC 2003-0039, Annual Monitoring Report for Point Beach for 2002 | 29 April 2003 | Annual Monitoring Report for Point Beach for 2002 | Grab sample Offsite Dose Calculation Manual Chernobyl |
NRC 2003-0040, Reply to a Notice of Violation NRC Special Inspection Report No. 50-266/02-015 (Drs); 50-301/02-015 (DRS) | 2 May 2003 | Reply to a Notice of Violation NRC Special Inspection Report No. 50-266/02-015 (Drs); 50-301/02-015 (DRS) | Condition Adverse to Quality |
NRC 2003-0042, Reporting of Fire Barriers Degraded for More than Seven Days | 9 May 2003 | Reporting of Fire Barriers Degraded for More than Seven Days | Fire Barrier |
NRC 2003-0044, Security Plan Revisions | 19 May 2003 | Security Plan Revisions | |
NRC 2003-0045, Review of Preliminary Accident Sequence Precursor Analysis of November 2001 Operational Condition | 19 May 2003 | Review of Preliminary Accident Sequence Precursor Analysis of November 2001 Operational Condition | |
NRC 2003-0046, Annual 10 CFR 50.59 Summary Report for 2002 | 30 June 2003 | Annual 10 CFR 50.59 Summary Report for 2002 | Loop seal Zebra Mussel Earthquake Flow Induced Vibration |
NRC 2003-0051, Response to Request for Additional Information (RAI) Regarding Request for Exemptions to 10 CFR 50.61, Appendices G & H to 10 CFR 50, and Approval of PTS Application for Pbnp Unit 2 and Proposed Heatup and Cooldown Limit Curves | 27 June 2003 | Response to Request for Additional Information (RAI) Regarding Request for Exemptions to 10 CFR 50.61, Appendices G & H to 10 CFR 50, and Approval of PTS Application for Pbnp Unit 2 and Proposed Heatup and Cooldown Limit Curves | Exemption Request |
NRC 2003-0055, Emergency Plan Implementing Procedure Revisions, Point Beach, Units 1 & 2 | 10 June 2003 | Emergency Plan Implementing Procedure Revisions, Point Beach, Units 1 & 2 | Health Physics Network Emergency Lighting Minimum staff Accidental discharge |
NRC 2003-0056, Submittal of the Auxiliary Feedwater Orifice Issue Regulatory Conference Slide Presentation | 10 June 2003 | Submittal of the Auxiliary Feedwater Orifice Issue Regulatory Conference Slide Presentation | Safe Shutdown Earthquake Probabilistic Risk Assessment Significance Determination Process |
NRC 2003-0058, License Amendment Request 235, TS LCO 5.6.5 Reactor Coolant System Pressure & Temperature Limits Report | 27 June 2003 | License Amendment Request 235, TS LCO 5.6.5 Reactor Coolant System Pressure & Temperature Limits Report | Post Accident Monitoring Hydrostatic Incorporated by reference Pressure and Temperature Limits Report Exemption Request |
NRC 2003-0060, Request for Relief from the Provisions of ASME Section XI Impractical Requirements | 3 July 2003 | Request for Relief from the Provisions of ASME Section XI Impractical Requirements | Temporary Modification |
NRC 2003-0061, June 2003 Monthly Operating Report for Point Beach Units 1 & 2 | 11 July 2003 | June 2003 Monthly Operating Report for Point Beach Units 1 & 2 | |
NRC 2003-0062, Emergency Plan Implementing Procedure Revisions, Point Beach, Units 1 & 2 | 14 July 2003 | Emergency Plan Implementing Procedure Revisions, Point Beach, Units 1 & 2 | Minimum staff |