L-03-006, Amendment to NPDES Permit No. PA0025615 | 8 January 2003 | Amendment to NPDES Permit No. PA0025615 | Grab sample |
L-03-009, Alternative Repair Request on Material Removal Requirements Following Thermal Removal Processes | 17 March 2003 | Alternative Repair Request on Material Removal Requirements Following Thermal Removal Processes | |
L-03-010, Proposed Alternatives to Gas-Tungsten Arc Welding (Relief Request BV3-RV-03) | 17 March 2003 | Proposed Alternatives to Gas-Tungsten Arc Welding (Relief Request BV3-RV-03) | Nondestructive Examination Incorporated by reference Liquid penetrant Dissimilar Metal Weld Scaffolding |
L-03-011, Beaver, Unit 2, Supplemental Information in Support of LAR No. 165 New Fuel Storage Racks Enrichment Limit | 30 January 2003 | Beaver, Unit 2, Supplemental Information in Support of LAR No. 165 New Fuel Storage Racks Enrichment Limit | |
L-03-012, Response to Request for Additional Information Concerning the License Amendment Request for a One-time Integrated Leak Rate Test Interval Extension | 24 January 2003 | Response to Request for Additional Information Concerning the License Amendment Request for a One-time Integrated Leak Rate Test Interval Extension | Probabilistic Risk Assessment |
L-03-013, Order for Compensatory Measures Related to Access Authorization | 24 January 2003 | Order for Compensatory Measures Related to Access Authorization | |
L-03-016, Reply to Request for Additional Information Regarding Risk-Informed Inservice Inspection Program Relief Request | 18 February 2003 | Reply to Request for Additional Information Regarding Risk-Informed Inservice Inspection Program Relief Request | VT-2 Large early release frequency Maintenance Rule Program |
L-03-017, Supplemental Information in Support of LAR No.179 Main Steam Isolation Valve Surveillance Modifications | 4 February 2003 | Supplemental Information in Support of LAR No.179 Main Steam Isolation Valve Surveillance Modifications | |
L-03-020, License Amendment Request Nos. 303 and 174 | 11 March 2003 | License Amendment Request Nos. 303 and 174 | Shutdown Margin Power change |
L-03-021, Additional Information in Support of License Amendment Requests No.300 & 172 | 4 February 2003 | Additional Information in Support of License Amendment Requests No.300 & 172 | |
L-03-023, Fitness-For-Duty Program Six Month Report | 21 February 2003 | Fitness-For-Duty Program Six Month Report | Fitness for Duty |
L-03-027, January 2003 Monthly Operating Report for Beaver Valley Power Station | 7 February 2003 | January 2003 Monthly Operating Report for Beaver Valley Power Station | |
L-03-031, Emergency Preparedness Plan/Implementing Procedures (Volume 2 & 3) | 14 February 2003 | Emergency Preparedness Plan/Implementing Procedures (Volume 2 & 3) | High Radiation Area |
L-03-032, BVPS Physical Security Plan (PSP) Revision 44 | 24 February 2003 | BVPS Physical Security Plan (PSP) Revision 44 | |
L-03-033, Additional Information in Support of LAR No. 165 New Fuel Storage Racks Enrichment Limit | 21 February 2003 | Additional Information in Support of LAR No. 165 New Fuel Storage Racks Enrichment Limit | |
L-03-034, Decommissioning Reports for Beaver Valley Power Station, Units 1 & 2 | 21 March 2003 | Decommissioning Reports for Beaver Valley Power Station, Units 1 & 2 | |
L-03-035, Order Establishing Interim Inspection Requirements for RPV Heads | 3 March 2003 | Order Establishing Interim Inspection Requirements for RPV Heads | Boric Acid |
L-03-037, Reply to Request for Additional Information Regarding Risk-Informed Inservice Inspection Program Relief Request | 14 May 2003 | Reply to Request for Additional Information Regarding Risk-Informed Inservice Inspection Program Relief Request | Probabilistic Risk Assessment |
L-03-039, Firstenergy - Retrospective Premium Guarantee | 6 March 2003 | Firstenergy - Retrospective Premium Guarantee | |
L-03-045, Firstenergy Corporation Retrospective Premium Guarantee | 4 April 2003 | Firstenergy Corporation Retrospective Premium Guarantee | Boric Acid |
L-03-047, Clarifications of License Amendment No. 254 & 134 | 19 March 2003 | Clarifications of License Amendment No. 254 & 134 | |
L-03-048, Steam Generating Tubesheet Inspection Information | 20 March 2003 | Steam Generating Tubesheet Inspection Information | |
L-03-049, License Amendment Request Nos. 313 & 186 | 26 March 2003 | License Amendment Request Nos. 313 & 186 | Time of Discovery Incorporated by reference Missed surveillance |
L-03-051, Cycle 16 Reload and Core Operating Limits Report | 17 April 2003 | Cycle 16 Reload and Core Operating Limits Report | |
L-03-053, Order (EA-03-009) Relaxation Request | 27 March 2003 | Order (EA-03-009) Relaxation Request | Nondestructive Examination |
L-03-056, Proposed Alternative Repair Methods for Reactor Vessel Head Penetrations (Relief Request No. BV3-RV-04) | 28 March 2003 | Proposed Alternative Repair Methods for Reactor Vessel Head Penetrations (Relief Request No. BV3-RV-04) | Weld Overlay |
L-03-057, Reply to Request for Additional Information Regarding Order EA-03-009 Relaxation Request | 2 April 2003 | Reply to Request for Additional Information Regarding Order EA-03-009 Relaxation Request | Nondestructive Examination |
L-03-058, March 2003 Monthly Operating Report for Beaver Valley Power Station | 7 April 2003 | March 2003 Monthly Operating Report for Beaver Valley Power Station | |
L-03-059, R15 Steam Generator C-3 Report | 4 April 2003 | R15 Steam Generator C-3 Report | Boric Acid |
L-03-064, Supplemental Information Supporting Proposed Alternative Repair Methods for Reactor Vessel Head Penetrations | 4 April 2003 | Supplemental Information Supporting Proposed Alternative Repair Methods for Reactor Vessel Head Penetrations | Boric Acid Weld Overlay Aging Management Liquid penetrant |
L-03-065, Revision 1 to Reply to Request for Additional Information Regarding Proposed Alternative Repair Methods for Reactor Vessel Head Penetrations | 7 April 2003 | Revision 1 to Reply to Request for Additional Information Regarding Proposed Alternative Repair Methods for Reactor Vessel Head Penetrations | Weld Overlay Nondestructive Examination Aging Management |
L-03-066, Annual Environmental Report, Non-Radiological | 25 April 2003 | Annual Environmental Report, Non-Radiological | Grab sample Zebra Mussel Veliger Biofouling |
L-03-067, R15 Steam Generator Tube Plug Special Report | 15 April 2003 | R15 Steam Generator Tube Plug Special Report | |
L-03-070, Annual Man-Rem Report for 2002 | 22 April 2003 | Annual Man-Rem Report for 2002 | |
L-03-073, National Pollutants Discharge Elimination System (NPDES) Permit No. PA0025615 Monthly Report | 28 April 2003 | National Pollutants Discharge Elimination System (NPDES) Permit No. PA0025615 Monthly Report | |
L-03-076, Annual Environmental Report, Radiological | 7 May 2003 | Annual Environmental Report, Radiological | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report |
L-03-078, New Site Vice President for Beaver Valley Power Station | 7 May 2003 | New Site Vice President for Beaver Valley Power Station | |
L-03-079, Response to a Request for Additional Information in Support of License Amendment Requests Nos. 300 and 172 | 6 June 2003 | Response to a Request for Additional Information in Support of License Amendment Requests Nos. 300 and 172 | |
L-03-080, Request for Regulatory Conference | 7 May 2003 | Request for Regulatory Conference | Preliminary White Finding |
L-03-081, Revisions to Implementing Procedures (Volume 2) | 27 May 2003 | Revisions to Implementing Procedures (Volume 2) | Severe Accident Management Guideline Fuel cladding |
L-03-088, Order (EA-03-009) Relaxation Request | 29 July 2003 | Order (EA-03-009) Relaxation Request | Non-Destructive Examination Nondestructive Examination |
L-03-092, National Pollutants Discharge Elimination System (NPDES) Monthly Report for April 2003 | 27 May 2003 | National Pollutants Discharge Elimination System (NPDES) Monthly Report for April 2003 | |
L-03-093, Withdrawal of Request for Regulatory Conference | 30 May 2003 | Withdrawal of Request for Regulatory Conference | Preliminary White Finding |
L-03-097, Withdrawal of Relief Requests | 2 July 2003 | Withdrawal of Relief Requests | |
L-03-099, Response to a Request for Additional Information in Support of License Amendment Request No. 300 & 172 | 24 June 2003 | Response to a Request for Additional Information in Support of License Amendment Request No. 300 & 172 | |
L-03-100, License Amendment Request No. 311, Steam Generator Tube Inspection Clarifications | 24 June 2003 | License Amendment Request No. 311, Steam Generator Tube Inspection Clarifications | Non-Destructive Examination Operating Basis Earthquake Nondestructive Examination |
L-03-103, Reactor Head Inspection 60-Day Report | 24 June 2003 | Reactor Head Inspection 60-Day Report | Non-Destructive Examination Weld Overlay Nondestructive Examination VT-2 Through-Wall Leak |
L-03-104, National Pollutants Discharge Elimination System (NPDES) Monthly Report, Permit No. PA0025615 | 26 June 2003 | National Pollutants Discharge Elimination System (NPDES) Monthly Report, Permit No. PA0025615 | |
L-03-107, June 2003 Monthly Operating Report for Beaver Valley, Units 1 & 2 | 8 July 2003 | June 2003 Monthly Operating Report for Beaver Valley, Units 1 & 2 | |
L-03-108, Supplemental Response to Order for Compensatory Measures Related to Access Authorization for Beaver Valley, Units 1, Davis-Besse, Beaver Valley, Unit 2 and Perry | 7 July 2003 | Supplemental Response to Order for Compensatory Measures Related to Access Authorization for Beaver Valley, Units 1, Davis-Besse, Beaver Valley, Unit 2 and Perry | |