National Pollutants Discharge Elimination System (NPDES) Permit No. PA0025615 Monthly Report
ML031270375
Person / Time
Site: Beaver Valley
Issue date: 04/28/2003
From: Lash J
FirstEnergy Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation, State of PA, Dept of Environmental Protection, Bureau of Water Quality Management
References
L-03-073
Download: ML031270375 (36)


Text

FENOC z -Z'- --7--

Beaver Valley Power Station P.O. Box4 Shippingport, PA 15077 April 28, 2003 L-03-073 Department of Environmental Protection Bureau of Water Quality Management Attention: DMR Clerk 400 Waterfront Drive Pittsburgh, PA 15222 National Pollutants Discharge Elimination System (NPDES) Permit No. PA0025615 Monthly Report To Whom It May Concern:

The March 2003 NPDES Discharge Monitoring Report for First Energy Nuclear Operating Company, Beaver Valley Power Station is submitted per the requirements of the NPDES permit. The data indicates there were no exceedances during this report period.

Should you have any questions regarding the attached report, please direct them to Edward Hubley, Manager Nuclear Environmental and Chemistry Section at (724) 682-7340.

Sincerely, is H. Lash General Manager EHH/tab Attachment Cc: Document Control Desk US NRC US Environmental Protection Agency S. F. Brown D. K. Sullivan Central File Keyword: DMR

"'e I--

I

CORRESPONDENCE SUBMITTAL CONCURRENCE/SIGN-OFF SHEET NF980 Rev. 4/11/03 Page 1 of 2 (1)LETTER NUMBER. 1(2) LETTER

SUBJECT:

L-0373 March Discharge Monitoring Report (3)PREPARED BY: (4)DATE RESPONSE DUE TO THE NRC-D.J.Salera ext. 7307 ENWA (5)POSTING REQUIRED BY 10 CFR 19.11 (6)COMMITMENTS CONTAINED INLETTER?

El Yes 0 No 5 Yes G No ItYes, see commitmentsummaryincluded with letter (7)NOTARY REOUIRED (or affirmation contained in letter) (8)CR ASSOCIATED WITH LETTER? If Yes, CR Number

[]Yes 3 No []Yes 1 No (9)TECHNICAL REVIEW Comments (Print Name & Section) Date No Included Signature Reviewed Comments Below Preparer D. J. Salera AAA 4-23,s S Peer Review El M. D. Banko Section Manager E.H Hubley El E I1Required. El PORC Meeting No. N/A El CNRB Meeting Date N/A (10) REMARKS / COMMENTS (if adddionaispace needed, atfach2page(s) to form)

1. The Discharge Monitonng Report (DMR) is required to be sent to the Pennsylvania Department of Environmental Protection (DEP) per NPDES Permit No. PA0025615.

A copy of the letter and the reports are forwarded to the US EPA (also required by regulations and the Permit) and the US NRC (current expectation of the NRC).

2. The report due date (postmark) is the 28h of the month.
  • Signatures indicate that the submittal was reviewed for accuracy and completeness, and that no significant information has been excluded from the submittal, such that, due to its absence, the reader would be materially misled.
    • Additional signatures may not be required from the Section/Department if responses are provided in writing and are signed by the Section/Department managers for providing input into the submittal. These documents should accompany the submittal when routing for final approvals.

CORRESPONDENCE SUBMITTAL CONCURRENCE/SIGN-OFF SHEET NF980 Rev. 4/11103 Paae 2 of 2 BLOCK 1 LETTER NO. - Initiator enters serial number obtained from Regulatory Affairs.

BLOCK 2 LETTER SUBJECT - Initiator enters the subject as written on the subject line of the letter.

BLOCK 3 PREPARED BY - Initiator enters the names of individuals responsible for providing technical information for the correspondence along with his/her name.

BLOCK 4 DATE RESPONSE DUE TO THE NRC - Initiator enters the date the correspondence is due to the NRC. If the correspondence does not have a required due date, the block shall be marked not applicable (NA).

BLOCK 5 POSTING REQUIRED BY 10 CFR 19.11 - Initiator checks if the letter is required to be posted per the requirements of 10 CFR 19.11.

BLOCK 6 COMMITMENTS CONTAINED IN LETTER - Initiator enters either Yes or No based upon the content of the letter. Commitments are to be summarized and included in an attachment to the letter or, if no commitments are being made, include statement to that effect in the letter.

BLOCK 7 NOTARY REQUIRED - Initiator checks if the correspondence is required to be notarized or if correspondence provides affirmation, as required.

BLOCK 8 CR ASSOCIATED WITH LETTER - Initiator should identify all Condition Reports associated with the letter.

BLOCK 9 TECHNICAL REVIEW - Initiator identifies the desired reviewer(s) . The technical accuracy of a response to the NRC is the responsibility of the director and management individual(s) assigned the action. Committee review requirements are required to be identified by indicating prior or post approval review of the letter.

BLOCK 10 REMARKS/COMMENTS - Initiator or any reviewer enters appropriate comments regarding the subject correspondence.