IR 05000335/2006005 | 25 January 2007 | IR 0500033506-005, 05000389-06-005; 10/01/2006 - 12/31/2006; St. Lucie Nuclear Plant, Units 1 & 2; Problem Identification and Resolution of Problems; Radiation Monitoring Instrumentation and Protective Equipment; and Radioactive Gaseous and | Boric Acid High Radiation Area Ultimate heat sink Offsite Dose Calculation Manual Internal Flooding Significance Determination Process Operability Determination Annual Radiological Effluent Release Report Substantial potential for overexposure Power change Downpower |
IR 05000335/2006006 | 27 July 2006 | IR 05000335-06-006, IR 05000389-06-006 Completed on 05/19/2006 for St. Lucie, NRC Security Inspection Report | Fitness for Duty Significance Determination Process Affidavit |
IR 05000335/2006007 | 24 November 2006 | IR 05000335-06-007, 05000389-06-007, Safeguards Information Removed | Affidavit |
IR 05000335/2006008 | 3 October 2006 | IR 05000335-06-008 and IR 05000389-06-008; Florida Power & Light Company (Fpl); 08/07-25/2006; St Lucie Nuclear Plant, Unit 1 & 2 | Scaffolding |
IR 05000335/2006401 | 18 January 2007 | NRC Inspection Report 05000335-06-401 and 05000389-06-401 | Affidavit |
IR 05000335/2007002 | 26 April 2007 | IR 05000335-07-002, 05000389-07-002; on 01/01/2007 - 03/31/2007; St. Lucie Nuclear Plant, Units 1 & 2; Post Maintenance Testing: Problem Identification and Resolution of Problems; and Event Followup | Unanalyzed Condition Boric Acid Ultimate heat sink Stroke time Coatings Significance Determination Process Operability Determination Power change Operability Assessment |
IR 05000335/2007003 | 19 July 2007 | IR 05000335-07-003, 05000389-07-003, on 04/01/2007 - 06/30/2007; St. Lucie Nuclear Plant, Units 1 & 2; Problem Identification and Resolution of Problems | High winds High Radiation Area Ultimate heat sink Internal Flooding Coatings Significance Determination Process Operability Determination Control of Heavy Loads Deep Dose Equivalent Fire Protection Program |
IR 05000335/2007004 | 23 October 2007 | IR 05000335-07-004 & IR 05000389-07-004, on 07/01/2007 - 09/30/2007, St. Lucie Nuclear Plant, Units 1 & 2; Event Followup | Boric Acid Time of Discovery High winds Ultimate heat sink Significance Determination Process Job Performance Measure Operability Determination |
IR 05000335/2007005 | 1 February 2008 | IR 05000335-07-005 & 05000389-07-005; Florida Power & Light Company; on 10/01/2007 - 12/31/2007; St. Lucie Nuclear Plant, Units 1 & 2; Occupational Radiation Safety and Public Radiation Safety, NRC Integrated Inspection Report | Boric Acid High Radiation Area Offsite Dose Calculation Manual Weld Overlay Internal Flooding Hydrostatic Nondestructive Examination Temporary Modification VT-2 Locked High Radiation Area Significance Determination Process Foreign Material Exclusion Process Control Program Operability Determination Liquid penetrant |
IR 05000335/2007006 | 5 November 2007 | IR 05000335-07-006, 05000389-07-006, on 08/27/2007 - 08/31/2007, 10/10/2007 - 10/14/2007, 10/24/2007 - 10/28/2007; St. Lucie Nuclear Plant, Units 1 and 2; Component Design Bases Inspection | Ultimate heat sink Stroke time Safe Shutdown Earthquake Probabilistic Risk Assessment Significance Determination Process Job Performance Measure Time Critical Operator Action Battery sizing Operability Assessment |
IR 05000335/2007401 | 4 June 2007 | IR 05000335-07-401, 05000389-07-401, on 03/02/2007; St. Lucie, Units 1 and 2; and Notice of Violation, EA-06-092 | Safeguards Contingency Plan |
IR 05000335/2007402 | 26 July 2007 | Transmittal Letter for St. Lucie Nuclear Plant - NRC Security Inspection Report 05000335/2007402 and 05000389/2007402 - SGI Removed | Affidavit |
IR 05000335/2007501 | 14 March 2007 | Inspection Report No. 05000335-07-501 and 05000389-07-501, on 02/12/07 - 02/16/07, St. Lucie Nuclear Plant | Siren |
IR 05000335/2008001 | 3 March 2008 | Annual Assessment Letter - St. Lucie Nuclear Plant (NRC Inspection Report 05000335-08-001 and 05000389-08-001) | B.5.b |
IR 05000335/2008002 | 30 April 2008 | IR 05000335-08-002 and 05000389-08-002; Florida Power & Light Company; 01/01/2008 - 03/31/2008; St. Lucie Nuclear Plant, Units 1 & 2, NRC Integrated Inspection Report | Safe Shutdown Fire Barrier Fire impairment Temporary Modification Significance Determination Process Pressure Boundary Leakage Pressure boundary leak Unidentified leakage |
IR 05000335/2008003 | 17 July 2008 | IR 05000335-08-003, 05000389-08-003 on 06/30/08 for St. Lucie Nuclear Plant | Fire Barrier Fire impairment Temporary Modification Significance Determination Process Operability Determination License Renewal Control of Heavy Loads Liquid penetrant Pressure boundary leak Downpower Unidentified leak |
IR 05000335/2008004 | 30 October 2008 | IR 05000335-08-004 & 05000389-08-004; on 07/01/2008 - 09/30/2008; St. Lucie Nuclear Plant, Units 1 & 2; Fire Protection and Other Activities | High winds Fire Barrier Internal Flooding Fire impairment Condition Adverse to Quality Significance Determination Process Operability Determination License Renewal Maintenance Rule Program Downpower Unidentified leakage |
IR 05000335/2008005 | 30 January 2009 | IR 05000335-08-005, 05000389-08-005, October 1 to December 31, 2008, St. Lucie Nuclear Plant, Units 1 & 2, NRC Integrated Inspection Report | High Radiation Area Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Weld Overlay Internal Flooding Fire impairment Temporary Modification Finite Element Analysis Significance Determination Process Foreign Material Exclusion Operability Determination License Renewal Dissimilar Metal Weld DM weld Unidentified leakage Power Uprate |
IR 05000335/2008008 | 25 August 2008 | IR 05000335-08-008, 05000389-08-008; on 07/097/2008 - 07/25/2008; St. Lucie Nuclear Plant, Units 1 & 2; Identification and Resolution of Problems | Stroke time Coatings Condition Adverse to Quality |
IR 05000335/2008301 | 3 October 2008 | Er 05000335-08-301, 05000389-08-301, 07/23-25 and 07/28-30/2008 and 08/01/2008; St. Lucie Nuclear Plant, Licensed Operator Examinations | Downpower |
IR 05000335/2008401 | 2 April 2008 | NRC Office of Investigations Report No. 2-2006-034 - St. Lucie Nuclear Plant and NRC Security Inspection Report 05000335/2008401 and 05000389/2008401 (OUO Removed) | |
IR 05000335/2008403 | 15 October 2008 | IR 05000335-08-403, IR 05000389-08-403, Saint Lucie Nuclear Plant-NRC Physical Security Inspection Report | Affidavit |
IR 05000335/2008404 | 29 January 2009 | IR 05000335-08-404, IR 05000389-08-404, on 09/12/2008, for St. Lucie, Notice of Violation (Cover Letter) | |
IR 05000335/2008501 | 28 March 2008 | IR 05000335-08-501, 05000389-08-501, on February 18-22, 2008, St. Lucie Nuclear Plant, Units 1 & 2; Baseline Inspection | |
IR 05000335/2009002 | 30 April 2009 | Errata - IR 05000335-09-002, 05000389-09-002, 05000335-09-501, 05000389-09-501, on January 1 to March 31, 2009, St. Lucie Units 1 & 2 - NRC Integrated Inspection Report | Significance Determination Process |
IR 05000335/2009003 | 29 July 2009 | IR 05000335-09-003, 05000389-09-003, on 04/01/2009 - 06/30/2009, St. Lucie, Units 1 & 2, Maintenance Risk Assessment and Emergent Work Control, Identification and Resolution of Problems, Other Activities | Boric Acid High Radiation Area Non-Destructive Examination Offsite Dose Calculation Manual Fire Barrier Weld Overlay Internal Flooding Fire impairment Locked High Radiation Area Significance Determination Process Annual Radioactive Effluent Release Report Foreign Material Exclusion Process Control Program Operability Determination License Renewal Maintenance Rule Program Pressure Boundary Leakage Through Wall Leak Incremental Core Damage Probability Deficit Power change Downpower Unidentified leakage |
IR 05000335/2009004 | 30 October 2009 | IR 05000335-09-004, 05000389-09-004 on 07/01/09 - 09/30/2009 for St. Lucie Nuclear Plant, Units 1 & 2 | Boric Acid Fire Barrier Fire impairment Significance Determination Process Operability Determination License Renewal Pressure Boundary Leakage Downpower Unidentified leakage Unidentified leak |
IR 05000335/2009005 | 21 January 2010 | IR 05000335-09-005 and 05000389-09-005, on 10/01/2009 - 12/31/2009; St. Lucie Nuclear Plant, Units 1 & 2; Identification and Resolution of Problems | Fire Barrier Fire impairment Temporary Modification Significance Determination Process Job Performance Measure Operability Determination License Renewal Downpower Unidentified leakage |
IR 05000335/2009006 | 4 February 2010 | Notice of Category 1 Public Meeting with Florida Power and Light Company to Discuss Risk Significance of the Two Preliminary Greater than Green Inspection Report 05000335-09-006 and 05000389-09-006 | |
IR 05000335/2009007 | 17 July 2009 | IR 05000335-09-007 & 05000389-09-007 on 01/26/09 - 01/30/09 and 02/09/09 - 02/13/09 for St. Lucie, Units 1 & 2, Triennial Fir Protection | Safe Shutdown Fitness for Duty Fire Barrier Enforcement Discretion Operator Manual Action Emergency Lighting Condition Adverse to Quality Significance Determination Process Job Performance Measure Hemyc Maintenance Rule Program Fire Protection Program Hourly Fire Watch |
IR 05000335/2009301 | 12 February 2010 | NRC Operator License Examination Report 05000335-09-301 and 05000389-09-301 | |
IR 05000335/2009302 | 3 March 2010 | Er 05000335-09-302, 05000389-09-302, 01/11-14/2010 and 12/15/2009; St. Lucie Nuclear Plant, Licensed Operator Examinations | |
IR 05000335/2009402 | 19 June 2009 | IR 05000335-09-402, IR 05000389-09-402, on 04/17/2009, Saint Lucie Nuclear Plant - NRC Physical Security Inspection | Affidavit |
IR 05000335/2009403 | 1 December 2009 | IR 05000335-09-403, IR 05000389-09-403, on 11/06/2009, St. Lucie Nuclear Plant - NRC Physical Security Inspection Report. Cover Letter | Significance Determination Process Affidavit |
IR 05000335/2009404 | 31 July 2009 | IR 05000335-09-404 and 05000389-09-404, on 07/20/2009 - 07/24/02009; St. Lucie Nuclear Plant, Units 1 and 2; Security | Affidavit |
IR 05000335/2010002 | 28 April 2010 | IR 05000335-10-002, 05000389-10-002; on 1/01/2010 - 3/31/2010; St. Lucie Nuclear Plant, Units 1 & 2; Identification and Resolution of Problems, Operability Evaluations | Boric Acid Fire Barrier Stroke time Fire impairment Temporary Modification Condition Adverse to Quality Significance Determination Process Foreign Material Exclusion Operability Determination License Renewal Maintenance Rule Program Through-Wall Leakage Power change Downpower Unidentified leakage Power Uprate |
IR 05000335/2010003 | 28 July 2010 | IR 05000335-10-003, 05000389-10-003; IR 07200061-10-001; on 4/01/2010 - 6/30/2010; St. Lucie Nuclear Plant, Units 1 & 2; Identification and Resolution of Problems; Other Activities | Safe Shutdown Boric Acid Packing leak High Radiation Area Offsite Dose Calculation Manual Fire Barrier Stroke time Time to boil Internal Flooding Fire impairment Temporary Modification Locked High Radiation Area Condition Adverse to Quality Significance Determination Process Foreign Material Exclusion Large early release frequency Operability Determination License Renewal Maintenance Rule Program Pressure Boundary Leakage Pressure boundary leak Unidentified leakage Unidentified leak Power Uprate |
IR 05000335/2010004 | 29 October 2010 | IR 05000335-10-004, 05000389-10-004; 07/01/2010-09/30/2010; St. Lucie Nuclear Plant, Units 1 & 2; Equipment Alignment, Identification and Resolution of Problems Other Activities | Time of Discovery High Radiation Area Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Stroke time Fire impairment Met Tower Temporary Modification Condition Adverse to Quality Significance Determination Process Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Operability Determination Annual Radiological Effluent Release Report Through Wall Leak Scaffolding Downpower Flow Induced Vibration Unidentified leakage |
IR 05000335/2010005 | 27 January 2011 | IR 05000335-10-005, 05000389-10-005; 10/01/2010 - 12/31/2010; St. Lucie Nuclear Plant, Units 1 & 2; Identification and Resolution of Problems and Other Activities | Boric Acid Non-Destructive Examination Mission time Fire Barrier Weld Overlay Internal Flooding Fire impairment Temporary Modification Condition Adverse to Quality Significance Determination Process Job Performance Measure Operability Determination Moisture barrier License Renewal Liquid penetrant GOTHIC Unidentified leakage |
IR 05000335/2010006 | 19 April 2010 | IR 05000335-10-006 and 05000389-10-006; on 03/01/2010 - 03/19/2010; St. Lucie Nuclear Plant, Units 1 and 2; Biennial Inspection of the Identification and Resolution of Problems | Condition Adverse to Quality Significance Determination Process |
IR 05000335/2010007 | 17 November 2010 | Summary of Public Regulatory Performance Meeting with Florida Power and Light Company to Discuss Corrective Actions Associated with the Yellow Finding That Was Documented in the NRC Inspection Report IR 05000335-10-007 | Significance Determination Process Operability Determination |
IR 05000335/2010009 | 3 November 2010 | IR 05000335-10-009; 9/27/2010-9/30/2010; St. Lucie Nuclear Plant, Unit 1; Supplemental Inspection - Inspection Procedure (IP) 95002 | Non-Destructive Examination Condition Adverse to Quality Significance Determination Process Design basis earthquake Operability Determination Maintenance Rule Program Through Wall Leak |
IR 05000335/2010201 | 23 December 2010 | IR 05000335-10-201 and 05000389-10-201; on November 15 - November 18, 2010; St. Lucie Plant Units 1 and 2; Target Set Inspection | Affidavit |
IR 05000335/2010404 | 19 August 2010 | IR 05000335-10-404 and 05000389-10-404 on 07/22/2010 for St. Lucie, Units 1 and 2 - NRC Physical Security Inspection Report | Affidavit |
IR 05000335/2010405 | 14 January 2011 | IR 05000335-10-405 and 05000389-10-405, on December 16, 2010, St. Lucie Nuclear Plant, NRC Physical Security Inspection (Cover Letter) | Significance Determination Process Affidavit |
IR 05000335/2010501 | 30 March 2010 | IR 05000335-10-501 and 05000389-10-501; Florida Power and Light Company; 02/22/210 - 02/26/2010; St. Lucie Plant, Units 1 and 2; Baseline Inspection | |
IR 05000335/2010503 | 9 March 2011 | NRC Emergency Preparedness Annual Inspection Report 05000335/2010503 and 05000389/2010503 | |
IR 05000335/2011002 | 29 April 2011 | IR 05000335-11-002, 05000389-11-002, 05000335-11-501, 05000389-11-501; 01/01/2011 - 03/31/2011; St. Lucie Nuclear Plant, Units 1 & 2; Radiological Hazard Assessment and Exposure Controls; Other Activities | Safe Shutdown Unanalyzed Condition Boric Acid High Radiation Area Non-Destructive Examination Offsite Dose Calculation Manual Fire Barrier Fire impairment Locked High Radiation Area Significance Determination Process Foreign Material Exclusion Operability Determination License Renewal Liquid penetrant Through-Wall Leak Fire Watch Substantial potential for overexposure Power change Unidentified leakage Siren Overexposure |
IR 05000335/2011003 | 28 July 2011 | IR 05000335-11-003 & 05000389-11-003, on 04/01/2011 - 06/30/2011, St. Lucie Nuclear Plant, Units 1 & 2, NRC Integrated Inspection Report | Fire Barrier Internal Flooding Fire impairment Temporary Modification B.5.b Missed surveillance Significance Determination Process Foreign Material Exclusion Operability Determination Severe Accident Management Guideline Downpower Unidentified leakage |
IR 05000335/2011004 | 27 October 2011 | IR 05000335-11-004 & 05000389-11-004; Florida Power & Light Company; 07/01/2011 - 09/30/2011; St. Lucie Nuclear Plant, Units 1 & 2, NRC Integrated Inspection Report | High winds Fire Barrier Internal Flooding Fire impairment Significance Determination Process Job Performance Measure Foreign Material Exclusion Operability Determination Maintenance Rule Program Unidentified leakage |