BSEP 02-0073, Notification of Emergency Response Data System Modification | 2 April 2002 | Notification of Emergency Response Data System Modification | |
BSEP 02-0078, Occupational Radiation Exposure Report for 2001 from Carolina Power & Light Co | 15 April 2002 | Occupational Radiation Exposure Report for 2001 from Carolina Power & Light Co | High Radiation Area |
BSEP 02-0084, NRC Service/Distribution List Addressee Change | 9 April 2002 | NRC Service/Distribution List Addressee Change | |
BSEP 02-0085, Radioactive Effluent Release Report for 2001 | 29 April 2002 | Radioactive Effluent Release Report for 2001 | Grab sample Process Control Program |
BSEP 02-0086, Annual Radiological Environmental Operating Report for 2001 | 10 May 2002 | Annual Radiological Environmental Operating Report for 2001 | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report |
BSEP 02-0091, Response to Request for Additional Information Re Request for License Amendments Re Extended Power Uprate | 26 April 2002 | Response to Request for Additional Information Re Request for License Amendments Re Extended Power Uprate | Stroke time Power Uprate |
BSEP 02-0092, License Condition Supporting 08/09/2001 Request for License Amendments to Extend Power Uprate | 29 April 2002 | License Condition Supporting 08/09/2001 Request for License Amendments to Extend Power Uprate | Power Uprate |
BSEP 02-0102, Inservice Inspection Program for Third 10-Year Interval - Evaluation of Leakage at Bolted Connections | 20 May 2002 | Inservice Inspection Program for Third 10-Year Interval - Evaluation of Leakage at Bolted Connections | VT-2 |
BSEP 02-0103, Feedwater Sparger and Safe End Examinations | 13 May 2002 | Feedwater Sparger and Safe End Examinations | Non-Destructive Examination Nondestructive Examination EVT-1 Liquid penetrant |
BSEP 02-0104, Implementation Schedule for Alternative Radiological Source Term License Amendment | 10 May 2002 | Implementation Schedule for Alternative Radiological Source Term License Amendment | |
BSEP 02-0108, Cycle 14 Core Operating Limits Report, Supplemental Reload Licensing Report & Loss-Of-Coolant Accident Analysis Report for Operation with Extended Power Uprate | 31 May 2002 | Cycle 14 Core Operating Limits Report, Supplemental Reload Licensing Report & Loss-Of-Coolant Accident Analysis Report for Operation with Extended Power Uprate | Shutdown Margin Anticipated operational occurrence Power Uprate Affidavit |
BSEP 02-0112, May 2002 Monthly Operating Report for Brunswick Steam Electric Plant, Units 1 & 2 | 10 June 2002 | May 2002 Monthly Operating Report for Brunswick Steam Electric Plant, Units 1 & 2 | |
BSEP 02-0113, No. 1 - Notification of Emergency Response Data System Modification | 6 June 2002 | No. 1 - Notification of Emergency Response Data System Modification | Power Uprate |
BSEP 02-0114, Submittal of Technical Specification Bases Changes Revisions 24 & 25 | 5 June 2002 | Submittal of Technical Specification Bases Changes Revisions 24 & 25 | Shutdown Margin Reactor Vessel Water Level Anticipated operational occurrence Hydrostatic Probabilistic Risk Assessment Abnormal operational transient Scram Discharge Volume Feedwater Controller Failure Fuel cladding Power Uprate |
BSEP 02-0116, Request for Approval of Relief Requests for the Third 10-year Inservice Inspection Program for Brunswick Units 1 & 2 | 16 July 2002 | Request for Approval of Relief Requests for the Third 10-year Inservice Inspection Program for Brunswick Units 1 & 2 | Non-Destructive Examination Unidentified leakage |
BSEP 02-0125, June 2002 Monthly Operating Report for Brunswick Units 1 & 2 | 12 July 2002 | June 2002 Monthly Operating Report for Brunswick Units 1 & 2 | Power Uprate |
BSEP 02-0131, Generic Letter 96-06, Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions. | 16 July 2002 | Generic Letter 96-06, Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions. | |
BSEP 02-0133, Operator Licensing Examination Data | 15 July 2002 | Operator Licensing Examination Data | Generic Fundamentals Examination |
BSEP 02-0138, July 2002 Monthly Operating Report for Brunswick Units 1 & 2 | 7 August 2002 | July 2002 Monthly Operating Report for Brunswick Units 1 & 2 | Power Uprate |
BSEP 02-0139, Revision to Plant Emergency Procedures | 7 August 2002 | Revision to Plant Emergency Procedures | Siren |
BSEP 02-0140, Notification of Full Compliance with Order for Interim Safeguards & Security Compensatory Measures | 28 August 2002 | Notification of Full Compliance with Order for Interim Safeguards & Security Compensatory Measures | |
BSEP 02-0142, Emergency Preparedness Exercise Scope and Objectives | 4 September 2002 | Emergency Preparedness Exercise Scope and Objectives | |
BSEP 02-0145, Storage of Classified Information | 19 August 2002 | Storage of Classified Information | |
BSEP 02-0146, Request for License Amendment Revision to License Condition - Alternative Source Term | 16 September 2002 | Request for License Amendment Revision to License Condition - Alternative Source Term | Safe Shutdown Earthquake Design basis earthquake |
BSEP 02-0147, Revisions to Plant Emergency Procedures, Including Revision 48 to OPEP-02.1, Initial Emergency Actions and Rev 59 to Oerp, Radiological Emergency Response Plan. | 26 August 2002 | Revisions to Plant Emergency Procedures, Including Revision 48 to OPEP-02.1, Initial Emergency Actions and Rev 59 to Oerp, Radiological Emergency Response Plan. | Power Uprate |
BSEP 02-0151, Extended Power Uprate Implementation Test Report - Phase 1 | 4 September 2002 | Extended Power Uprate Implementation Test Report - Phase 1 | Shutdown Margin MELLLA Power Uprate |
BSEP 02-0154, Generic Letter 96-06, Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions. | 3 September 2002 | Generic Letter 96-06, Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions. | |
BSEP 02-0158, Submittal of Technical Specification Bases Changes for Revisions 27 | 20 September 2002 | Submittal of Technical Specification Bases Changes for Revisions 27 | |
BSEP 02-0159, Application for Technical Specification Change Regarding Elimination of Post Accident Sampling System Requirements | 13 November 2002 | Application for Technical Specification Change Regarding Elimination of Post Accident Sampling System Requirements | Post Accident Monitoring Incorporated by reference |
BSEP 02-0163, Revision of Request for License Amendment - Frequency of Performance-Based Leakage Rate Testing | 8 October 2002 | Revision of Request for License Amendment - Frequency of Performance-Based Leakage Rate Testing | Non-Destructive Examination Probabilistic Risk Assessment Coatings Large early release frequency Safeguards Contingency Plan Moisture barrier Fire Protection Program |
BSEP 02-0164, Response to Request for Additional Information, Request for License Amendments to Revise Pressure-Temperature Limit Curves | 23 September 2002 | Response to Request for Additional Information, Request for License Amendments to Revise Pressure-Temperature Limit Curves | |
BSEP 02-0174, Request for License Amendment Regarding Technical Specification 2.1.1.2, Reactor Core Safety Limits Minimum Critical Power Ratio Safety Limit | 7 November 2002 | Request for License Amendment Regarding Technical Specification 2.1.1.2, Reactor Core Safety Limits Minimum Critical Power Ratio Safety Limit | Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence Fuel cladding Affidavit |
BSEP 02-0175, Inservice Inspection Program Relief Request - Service Water System Piping Through-Wall Flaw | 25 October 2002 | Inservice Inspection Program Relief Request - Service Water System Piping Through-Wall Flaw | Non-Destructive Examination Through-Wall Leak Through Wall Leak |
BSEP 02-0177, Submittal of Technical Specification Bases Changes for Revisions 28 (Unit 1) & 25 (Unit 2) | 25 October 2002 | Submittal of Technical Specification Bases Changes for Revisions 28 (Unit 1) & 25 (Unit 2) | Missed surveillance |
BSEP 02-0182, Revisions to Plant Emergency Procedures | 7 November 2002 | Revisions to Plant Emergency Procedures | |
BSEP 02-0186, Response to Request for Additional Information, Proposed License Amendment to Revise Pressure - Temperature Curve Limits | 22 November 2002 | Response to Request for Additional Information, Proposed License Amendment to Revise Pressure - Temperature Curve Limits | |
BSEP 02-0188, Letter from Edward T. O'Neil to NRC Subject: Brunswick Steam Electric Plant, Unit Nos. 1 and 2, License Nos. DPR-71 and DPR-62 NRC Service/Distribution List Addressee Change | 18 November 2002 | Letter from Edward T. O'Neil to NRC Subject: Brunswick Steam Electric Plant, Unit Nos. 1 and 2, License Nos. DPR-71 and DPR-62 NRC Service/Distribution List Addressee Change | |
BSEP 02-0189, Correction to Application for Technical Specification Change | 20 November 2002 | Correction to Application for Technical Specification Change | Offsite Dose Calculation Manual |
BSEP 02-0191, Cycle 14 Startup Report | 12 December 2002 | Cycle 14 Startup Report | Shutdown Margin |
BSEP 02-0200, Submittal of TS Bases Changes for Revisions 29 (Unit 1) & 26 (Unit 2) | 12 December 2002 | Submittal of TS Bases Changes for Revisions 29 (Unit 1) & 26 (Unit 2) | |
BSEP 02-0202, Completed Resolution of NRC Generic Letter 92-08, Thermo-LAG 330-1 Fire Barriers | 29 January 2003 | Completed Resolution of NRC Generic Letter 92-08, Thermo-LAG 330-1 Fire Barriers | Fire Barrier |
BSEP 03-0002, Occupational Radiation Exposure Report for 2002 | 8 April 2003 | Occupational Radiation Exposure Report for 2002 | High Radiation Area |
BSEP 03-0013, Withdrawal of Inservice Inspection Program Relief Request for Service Water System Piping Through-Wall Flaw | 17 January 2003 | Withdrawal of Inservice Inspection Program Relief Request for Service Water System Piping Through-Wall Flaw | Through-Wall Leak |
BSEP 03-0019, Response to Request for Information Regarding Third 10-Year Inservice Inspection Program Relief Request for Inspection of Piping Weld Overlays | 11 February 2003 | Response to Request for Information Regarding Third 10-Year Inservice Inspection Program Relief Request for Inspection of Piping Weld Overlays | Weld Overlay |
BSEP 03-0023, LER 2002-02-00 from Brunswick, Unit 2 Regarding Remote Shutdown Panel Power Supply Inventer Design Deficiency | 14 February 2003 | LER 2002-02-00 from Brunswick, Unit 2 Regarding Remote Shutdown Panel Power Supply Inventer Design Deficiency | Safe Shutdown Unanalyzed Condition Fire Protection Program |
BSEP 03-0035, Response to Request for Additional Information Regarding TS 3.1.7, Standby Liquid Control System | 21 February 2003 | Response to Request for Additional Information Regarding TS 3.1.7, Standby Liquid Control System | Shutdown Margin Power Uprate |
BSEP 03-0036, Response to Request for Additional Information Regarding Technical Specification 2.1.1.2, Reactor Core Safety Limits Minimum Critical Power Ration Safety Limit | 17 February 2003 | Response to Request for Additional Information Regarding Technical Specification 2.1.1.2, Reactor Core Safety Limits Minimum Critical Power Ration Safety Limit | Reactor Vessel Water Level Affidavit |
BSEP 03-0042, Response to Request for Information Licensed Operator Positive Controlled Substance Test | 18 March 2003 | Response to Request for Information Licensed Operator Positive Controlled Substance Test | |
BSEP 03-0043, February 2003 Monthly Operating Report for Brunswick Steam Electric Plant | 6 March 2003 | February 2003 Monthly Operating Report for Brunswick Steam Electric Plant | Power Uprate |
BSEP 03-0052, NRC Correspondence Addressee Changes | 20 March 2003 | NRC Correspondence Addressee Changes | |