05000255/LER-1983-023, Forwards LER 83-023/01T-027 April 1983Forwards LER 83-023/01T-0
05000255/LER-1983-025, Forwards LER 83-025/03L-09 May 1983Forwards LER 83-025/03L-0
05000255/LER-1983-026, Forwards LER 83-026/01T-09 May 1983Forwards LER 83-026/01T-0
05000255/LER-1983-027, Forwards LER 83-027/01T-09 May 1983Forwards LER 83-027/01T-0
05000255/LER-1984-001, Responds to NRC Re Noncompliance Noted in IE Insp Rept 50-255/84-05.Corrective Actions Addressed in LER 84-00121 May 1984Responds to NRC Re Noncompliance Noted in IE Insp Rept 50-255/84-05.Corrective Actions Addressed in LER 84-001
05000255/LER-1984-023, Forwards LER 84-023-03 Re Incorrect Setpoint for Reactor Protection Sys Low Primary Coolant Flow Trip.Commitment to Determine Correct three-pump Low Flow Trip Setpoint by 850930 Delayed Until Late 1985.W/o Encl19 September 1985Forwards LER 84-023-03 Re Incorrect Setpoint for Reactor Protection Sys Low Primary Coolant Flow Trip.Commitment to Determine Correct three-pump Low Flow Trip Setpoint by 850930 Delayed Until Late 1985.W/o Encl
05000255/LER-1985-023, Forwards LER 85-023 Possible Low Temp Overpressure Protection Sys Setpoint Error. W/O Encl18 November 1985Forwards LER 85-023 Possible Low Temp Overpressure Protection Sys Setpoint Error. W/O Encl
05000255/LER-1986-004, Forwards LER 86-004-01 Re Failure of Main Steam Safety Relief Valves to Meet as Found Acceptance Criteria30 April 1986Forwards LER 86-004-01 Re Failure of Main Steam Safety Relief Valves to Meet as Found Acceptance Criteria
05000255/LER-1986-016, Forwards LER 86-016-00 & Requests Interpretation of 10CFR50.73(a)(2)(iv) Reportability.Reportability of Event Disputed W/Region III Based on NUREG-1022,Suppl 1.Actuation of Single Component Is Not ESF Actuation6 May 1986Forwards LER 86-016-00 & Requests Interpretation of 10CFR50.73(a)(2)(iv) Reportability.Reportability of Event Disputed W/Region III Based on NUREG-1022,Suppl 1.Actuation of Single Component Is Not ESF Actuation
05000255/LER-1987-017, Forwards Semiannual Radioactive Effluent Release Rept... Jan-June 1987 & Corrected Semiannual Rept for Jul-Dec 1986. LER 87-017 Also Encl Due to Corrective Action Taken Re Failure to Make Flow Rate Estimates During Release28 August 1987Forwards Semiannual Radioactive Effluent Release Rept... Jan-June 1987 & Corrected Semiannual Rept for Jul-Dec 1986. LER 87-017 Also Encl Due to Corrective Action Taken Re Failure to Make Flow Rate Estimates During Release
IR 05000255/197801627 October 1978Follow-up to IE Inspec Rept 50-255/78-16 780905 Response. Util Is Taking Steps Re Mgt control-active Participation by Gen Office Health Physics Group in Procedure Dev & Training, ALARA Review Group
IR 05000255/197802014 November 1978Notifies That Installation of Evacuation Sirens in New Svc Bldg Addition Per IE Inspec#50-255/78-20 Req More Work than Anticipated & Will Be Completed by 790115Siren
IR 05000255/197802129 March 1979Notification of Implementation of New Limited Radiation Access Authorization Program Which Requires Exemption from 10CFR20.203.Revised Program Will Conform w/781208 IE Insp Rept 50-255/78-21,Item 2High Radiation Area
IR 05000255/198000916 March 1981Updates Responses to NRC 800721 Ltr Re Violations Noted in IE Insp Rept 50-255/80-09.Corrective Actions:Facility Training Committee Meetings Scheduled & Inputting Backlog of Records Into Records Mgt Sys Begun
IR 05000255/198302529 May 1985Advises That Four Steam Generator Snubbers (25%) Will Be Functionally Tested During 1985/1986 Refueling Outage & for Each Subsequent Outage,Per Open Item in Insp Rept 50-255/83-25
IR 05000255/198602210 February 1988Submits Addl Info in Reponse to Noncompliance Noted in Insp Rept 50-255/86-22.Util Investigating Availability of 8 H Battery Powered Light to Withstand Conditions at Control Valve CV-2001Safe Shutdown
Emergency Lighting
IR 05000255/198702618 December 1987Forwards Responses to Violations & Concerns Noted in Insp Rept 50-255/87-26.Violations Involved Inadequate Escorting & Displaying of Badges.Concerns Addressed Requirements Re Fitness for Duty Failures.Encl Withheld (Ref 10CFR73.21)Fitness for Duty
Contraband
IR 05000255/198900718 December 1989Forwards Clarification & Addl Info Re Violations Noted in Insp Rept 50-255/89-07,per 891102 Request.Corrective Actions:All Design Change Engineers Have Been Briefed as to Reported Violations by Personal LtrCode Reconciliation
Liquid penetrant
IR 05000255/198901015 August 1989Forwards Update to post-accident Sample Monitor Sys,Per 890616 Insp Rept 50-255/89-10.Line Items Reevaluated W/ Regards to Manpower,Design Criteria & Requirement to Meet NUREG-0373 Commitments
IR 05000255/198901928 September 1990Updates Status of Implementation Schedule,Per NRC Comments Re EOP Insp Rept 50-255/89-19.Longer Implementation Schedule Required for Items Not Completed by 900801 Due to Scope of WorkShutdown Margin
IR 05000255/199000512 October 1990Updates 900206 & 0423 Responses to Violations Noted in Insp Rept 50-255/90-05Operability Determination
IR 05000255/19900104 September 1990Submits Addl Info Re Circuit & Raceway Schedule Enhancement Project,Per Insp Rept 50-255/90-10.Electrical Cable Separation & Channelization Anomalies Identified During Review of Physical Raceway Installations Will Be Evaluated
IR 05000255/199002515 September 1992Verifies That Listed Mods Re SG Replacement Project for Main Steam & Pipe Support Analysis Concerns,Delineated in Insp Repts 50-255/90-25 & 50-255/91-202,completed
IR 05000255/19910197 January 1994Provides Update to Electrical Distribution Sys Functional Insp Rept 50-255/91-19 Concern 8 Re Fast Bus Transfer Scheme Event on 930128.C/As:mod Being Considered to Reduce Dead Bus Time During Fast Transfer
IR 05000255/199301312 November 1993Forwards Rev 1 to 931004 Responses to NRC 930903 Ltr Re Violation Noted in Insp Rept 50-255/93-13.C/A:alignment of Auxiliary Feedwater Pump Completed & Pump Declared Operable Following Successful Post Maint Testing
IR 05000255/199303224 March 1994Respond to Violation Noted in Insp Rept 50-255/93-32. Corrective Actions:All Deviation Repts & Event Repts Reviewed for Reportability by Licensing Engineers
IR 05000255/19940022 September 1994Provides Assessment of Unresolved Items from Svc Water Sys Operational Performance Insp Rept 50-255/94-02 on 940110- 0211
IR 05000255/199401520 April 1995Provides Summary of Requested Changes Associated W/Contents of GL 89-10 Re Insp Rept 50-255/94-15Boric Acid
Weak link
IR 05000255/19940176 January 1995Remits Check in Stated Amount for Payment of Civil Penalty Re Inability of EDGs to Supply Max Design Basis Accident Electrical Loads,Per NRC 941213 Ltr Transmitting Insp Rept 50-255/94-17.Reply to NOV Will Be Submitted by 950112
IR 05000255/19950041 April 1996Forwards Responses to Issues Raised in NRC 951205 Ltr Re CPC Deposition of Unresolved Item Noted in Insp Rept 50-255/95-04 Concerning Adequacy of Fire Area BarriersSafe Shutdown
Fire Barrier
Coatings
Fire Protection Program
IR 05000255/199600424 October 1996Provides Revised Commitment of Insp Rept 50-255/96-04 Re Schedule for MOV Repairs
IR 05000255/19970061 October 1997Ack Comments in NRC Insp Rept 50-255/97-06 on 970709. Improvement in Areas of Procedural Deficiencies & Plant Material Condition Are Underway
IR 05000255/199700813 January 1998Submits Actions to Be Taken to Address ALARA Concerns Noted in Insp Rept 50-255/97-08.Reviews Associated W/Post Maint Testing Continuing & Will Be Discussed W/Nrc at Later Date
IR 05000255/19970189 June 1999Discusses Response of 980226 Violation Re Insp Rept 50-255/97-18 Re Failure to Take Adequate Corrective Action. Ltr Contains New Commitments & No Rev
IR 05000255/19972011 October 1998Provides Update to Design Insp Action Items Re Insp Rept 50-255/97-201 Conducted on 970916-1114.Util Recommends That NRC Consider Scheduling Efforts Early in 1999 to Review Insp Items for Closure Based on Completion Dates for ItemsSafe Shutdown
Loop seal
Fire Barrier
Safe Shutdown Earthquake
Internal Flooding
Temporary Modification
Operability Determination
Battery sizing
Earthquake
Scaffolding
L-86-010, Responds to Notice of Noncompliance in Fire Protection Program Insp Rept 50-255/86-22.Corrective Actions:Fire Patrols Performed & Criteria for Sealing Conduit Penetrations Will Be Modified to Include Seal Cables12 December 1986Responds to Notice of Noncompliance in Fire Protection Program Insp Rept 50-255/86-22.Corrective Actions:Fire Patrols Performed & Criteria for Sealing Conduit Penetrations Will Be Modified to Include Seal CablesSafe Shutdown
Boric Acid
Fire Barrier
Emergency Lighting
Fire Protection Program
ML13308A04431 December 1981Forwards CEN-189, Evaluation of Pressurized Thermal Shock Effects Due to Small Break LOCAs W/Loss of Feedwater for C-E NSSS, & Apps A-J,in Response to TMI Action Plan Requirement II.K.2.13Earthquake
ML17207A1798 March 1979Forwards Oversized Suppl Ref Drawings (Piping Isometric, Controlled Copy 1 & Piping & Instrument Controlled Copy 7), Per Reg Guide 1.70,Revision 2.These Drawings Replace All Previous SubmittalsGrab sample
ML17207A34729 August 1979Forwards Proprietary Version of CEN-115-P,in Response to IE Bulletin 79-06C Items 2 & 3.Response Withheld (Ref 10CFR2.790)
ML17209A88325 March 1981Discusses NRC Concerns Re Lack of Mechanism to Inform Plant Personnel About Industry Problems Such as St Lucie Incident, IE Circular 80-15.Mechanism Explained in 801217 Response to NUREG-0737 & at 810214 Meeting.No Further Changes Needed
ML17275B36321 June 1971Requests Info Re Dates of Planned Shutdown & Period of Time Before Full Licensing.Info Is Necessary to Eliminate Jurisdictional Situations Between Various Unions
ML17309A27728 June 1982Repts Under Purchase Order DR-82-0961 Re Review of Two Draft SEP Integrated Assessments for Facilities.Ltr Comprises Rept on Ginna SEP (Draft NUREG-0821)High winds
Probabilistic Risk Assessment
Backfit
ML17347B6836 April 1987Forwards Endorsement 95 to Nelia Policy NF-179
ML17354B2943 June 1997Resubmits Relief Requests RR-4 & RR-9 Re ISI Program IAW 10CFR50.55a(3).W/two Oversize Drawings
ML18037A34320 May 1981Notifies That Participation of Licensees W/Oswego County Officials Re Fullscale & Medical Exercise Will Be on Rotational Basis Due to Proximity of Facilities
ML18043A2144 October 1978Clarifies Interpretation of Tech Spec 3.1.1a,stating That One Primary Coolant Pump Shall Be in Oper Whenever a Reduction in Primary Coolant Sys Boron Concentration Is Being Made
ML18043A2154 October 1978Forwards Monthly Oper Rept for Sept 1978
ML18043A21810 October 1978Furnishes Long Term Cooling Equip Mod & Bimonthly Status Rept
ML18043A22129 September 1978Forwards LER 77-045/01X-2
ML18043A2264 October 1978Forwards Annual NPDES Compliance Evaluation Insp Rept Dtd 780912Grab sample