 Issue dateTitleTopic
ML15030A29422 September 2014Table 03, Effluent Data Tritium Activity
ML15030A29522 September 2014Table 04, Groundwater Measurements and Elevations - First Quarter 2014
ML15030A29622 September 2014Table 05, Groundwater Analytical Results (1.22.2003 Through 3.31.2014)
ML15030A29822 September 2014Table 06A, Groundwater Tritium Analytical Results for Well AC
ML15030A29922 September 2014Table 06B, Groundwater Analytical Results for Well AC
ML15030A30022 September 2014Table 07, Unit 1 Seismic Gap Drain Tritium Analytical Results
ML15030A30122 September 2014Table 08, Unit 2 Seismic Gap Drain Tritium Analytical Results
ML15238B65510 September 2015Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism ReevaluationFLEX
Fukushima Dai-Ichi
ML15238B70410 September 2015Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54 Information Request - Flood Causing Mechanism ReevaluationFLEX
Fukushima Dai-Ichi
ML15243A44710 September 2015Master Report - Tables 1 and 2
ML15243A50210 September 2015Interim Letter Tables 1 and 2
ML16056A13911 March 2016Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports
ML16102A27711 March 2016Submittal of Annual Incidental Take Report
ML16116A23515 March 2016Meeting Summary for Public Teleconference Between PSEG LLC and the Nuclear Regulatory Commission, Hope Creek Generating Station - Power Range Neutron Monitoring System Digital Upgrade LAR HCGS Numac Upgrade - Open Item DOC-0006-2118 RiCyber Security
ML16231A11016 August 2016Updated Issues List for 08/16/2016 Public Telecon Regarding LAR to Upgrade Power Range Neutron Monitoring System Meeting HandoutCyber Security
Feedwater Heater
MELLLA
Manual Operator Action
ML16320A48415 November 2016Public Telecon Regarding LAR to Upgrade Power Range Neutron Monitoring System (Meeting Handout)Cyber Security
Feedwater Heater
MELLLA
Manual Operator Action
ML17046A29630 January 2017Revision 29 to Updated Final Safety Analysis Report, Table 3.8-1 Through 3.8-11
ML17046A30730 January 2017Revision 29 to Updated Final Safety Analysis Report, Table 3A-1 (Deleted)
ML17046A31130 January 2017Revision 29 to Updated Final Safety Analysis Report, Table 4.1-1 Through 4.1-3Design basis earthquake
Earthquake
Overspeed trip
ML17335A11825 January 2018Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai Ichi AccidentUnanalyzed Condition
Ultimate heat sink
Safe Shutdown Earthquake
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
Severe Accident Management Guideline
Earthquake
Backfit
Seismic Walkdown Report
ML19030A26227 June 1980Submit Plan to Replace Long Term Contractor Personnel with Committed Staff of Public Service Electric & Gas Co
ML19030A70518 January 1978Submit Revised In-Service Inspection & Testing Program, Footnote 1 of Attachment 1, Table 2 to Replace Incomplete Table Submitted on 10/11/1977
ML19031A50323 March 1979Generation Station, Unit 2 - Responses to Requests for Additional Information. Provides 60 Copies of Additional Seismic Qualification Information as Identified During 02/26-28/1979 MeetingEarthquake
ML19031A94730 July 1976Letter Re Request for Deferment Incomplete Items
ML23249A2636 September 2023Attachment 1: PSEG Site Hourly Meteorological Data (2019 - 2021), Salem/Hope Creek Finalized Hourly Meteorological Data 2019
ML23249A2646 September 2023Attachment 1: PSEG Site Hourly Meteorological Data (2019 - 2021), Salem/Hope Creek Finalized Hourly Meteorological Data 2020
ML23249A2656 September 2023Attachment 1: PSEG Site Hourly Meteorological Data (2019 - 2021), Salem/Hope Creek Finalized Hourly Meteorological Data 2021
ML23249A2666 September 2023Attachment 2: Salem Pavan Input File
ML23249A2676 September 2023Attachment 3: Salem Pavan Output File
ML23249A2686 September 2023Attachment 4: Hope Creek Pavan Input File