Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML15030A294 | 22 September 2014 | Table 03, Effluent Data Tritium Activity | |
ML15030A295 | 22 September 2014 | Table 04, Groundwater Measurements and Elevations - First Quarter 2014 | |
ML15030A296 | 22 September 2014 | Table 05, Groundwater Analytical Results (1.22.2003 Through 3.31.2014) | |
ML15030A298 | 22 September 2014 | Table 06A, Groundwater Tritium Analytical Results for Well AC | |
ML15030A299 | 22 September 2014 | Table 06B, Groundwater Analytical Results for Well AC | |
ML15030A300 | 22 September 2014 | Table 07, Unit 1 Seismic Gap Drain Tritium Analytical Results | |
ML15030A301 | 22 September 2014 | Table 08, Unit 2 Seismic Gap Drain Tritium Analytical Results | |
ML15238B655 | 10 September 2015 | Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation | FLEX Fukushima Dai-Ichi |
ML15238B704 | 10 September 2015 | Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54 Information Request - Flood Causing Mechanism Reevaluation | FLEX Fukushima Dai-Ichi |
ML15243A447 | 10 September 2015 | Master Report - Tables 1 and 2 | |
ML15243A502 | 10 September 2015 | Interim Letter Tables 1 and 2 | |
ML16056A139 | 11 March 2016 | Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports | |
ML16102A277 | 11 March 2016 | Submittal of Annual Incidental Take Report | |
ML16116A235 | 15 March 2016 | Meeting Summary for Public Teleconference Between PSEG LLC and the Nuclear Regulatory Commission, Hope Creek Generating Station - Power Range Neutron Monitoring System Digital Upgrade LAR HCGS Numac Upgrade - Open Item DOC-0006-2118 Ri | Cyber Security |
ML16231A110 | 16 August 2016 | Updated Issues List for 08/16/2016 Public Telecon Regarding LAR to Upgrade Power Range Neutron Monitoring System Meeting Handout | Cyber Security Feedwater Heater MELLLA Manual Operator Action |
ML16320A484 | 15 November 2016 | Public Telecon Regarding LAR to Upgrade Power Range Neutron Monitoring System (Meeting Handout) | Cyber Security Feedwater Heater MELLLA Manual Operator Action |
ML17046A296 | 30 January 2017 | Revision 29 to Updated Final Safety Analysis Report, Table 3.8-1 Through 3.8-11 | |
ML17046A307 | 30 January 2017 | Revision 29 to Updated Final Safety Analysis Report, Table 3A-1 (Deleted) | |
ML17046A311 | 30 January 2017 | Revision 29 to Updated Final Safety Analysis Report, Table 4.1-1 Through 4.1-3 | Design basis earthquake Earthquake Overspeed trip |
ML17335A118 | 25 January 2018 | Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai Ichi Accident | Unanalyzed Condition Ultimate heat sink Safe Shutdown Earthquake Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Spent Fuel Pool Instrumentation Severe Accident Management Guideline Earthquake Backfit Seismic Walkdown Report |
ML19030A262 | 27 June 1980 | Submit Plan to Replace Long Term Contractor Personnel with Committed Staff of Public Service Electric & Gas Co | |
ML19030A705 | 18 January 1978 | Submit Revised In-Service Inspection & Testing Program, Footnote 1 of Attachment 1, Table 2 to Replace Incomplete Table Submitted on 10/11/1977 | |
ML19031A503 | 23 March 1979 | Generation Station, Unit 2 - Responses to Requests for Additional Information. Provides 60 Copies of Additional Seismic Qualification Information as Identified During 02/26-28/1979 Meeting | Earthquake |
ML19031A947 | 30 July 1976 | Letter Re Request for Deferment Incomplete Items | |
ML23249A263 | 6 September 2023 | Attachment 1: PSEG Site Hourly Meteorological Data (2019 - 2021), Salem/Hope Creek Finalized Hourly Meteorological Data 2019 | |
ML23249A264 | 6 September 2023 | Attachment 1: PSEG Site Hourly Meteorological Data (2019 - 2021), Salem/Hope Creek Finalized Hourly Meteorological Data 2020 | |
ML23249A265 | 6 September 2023 | Attachment 1: PSEG Site Hourly Meteorological Data (2019 - 2021), Salem/Hope Creek Finalized Hourly Meteorological Data 2021 | |
ML23249A266 | 6 September 2023 | Attachment 2: Salem Pavan Input File | |
ML23249A267 | 6 September 2023 | Attachment 3: Salem Pavan Output File | |
ML23249A268 | 6 September 2023 | Attachment 4: Hope Creek Pavan Input File |