AECM-83-020, Final Deficiency Rept PRD-82/37 Re Failure of Qualified Cables to Pass IEEE Flame Test.Initially Reported on 821214. Design Change DCP-82/3196 Initiated.Also Reported Per Part 21 | 13 January 1983 | Final Deficiency Rept PRD-82/37 Re Failure of Qualified Cables to Pass IEEE Flame Test.Initially Reported on 821214. Design Change DCP-82/3196 Initiated.Also Reported Per Part 21 | |
AECM-83-0215, Seventh Interim Deficiency Rept PRD-81/44 Re Valves & Actuators Not Mfg Under QA Program.Initially Reported on 811029.Actuators & Appurtenances Not Mfg Under QA Program Qualified by Tests.Final Rept Expected by 830708 | 31 March 1983 | Seventh Interim Deficiency Rept PRD-81/44 Re Valves & Actuators Not Mfg Under QA Program.Initially Reported on 811029.Actuators & Appurtenances Not Mfg Under QA Program Qualified by Tests.Final Rept Expected by 830708 | |
AECM-83-0220, Interim Deficiency Rept Re Stress Relieving of Sockets by Vendor Absent from Ae Supplier List.Initially Reported on 830308.Investigation Continuing.Final Rept Will Be Submitted by 830606 | 7 April 1983 | Interim Deficiency Rept Re Stress Relieving of Sockets by Vendor Absent from Ae Supplier List.Initially Reported on 830308.Investigation Continuing.Final Rept Will Be Submitted by 830606 | |
AECM-83-0236, Interim Deficiency Rept PRD-83/07 Re Improperly Routed Div II Cables.Initially Reported on 830412.Also Reported Per Part 21 for Unit 1.Investigation in Progress to Determine Applicability to Unit 2.Final Rept Expected Prior to Heatup | 13 April 1983 | Interim Deficiency Rept PRD-83/07 Re Improperly Routed Div II Cables.Initially Reported on 830412.Also Reported Per Part 21 for Unit 1.Investigation in Progress to Determine Applicability to Unit 2.Final Rept Expected Prior to Heatup | Safe Shutdown |
AECM-83-0243, Interim Deficiency Rept Re Inability to Maintain Pressurized Water Supply to RHR Jockey Pumps & Discharge Piping.Design Change Package DCP-83/5006 Will Be Implemented.Final Rept Expected by 830613.Also Reportable Per Part 21 for Unit 1 | 15 April 1983 | Interim Deficiency Rept Re Inability to Maintain Pressurized Water Supply to RHR Jockey Pumps & Discharge Piping.Design Change Package DCP-83/5006 Will Be Implemented.Final Rept Expected by 830613.Also Reportable Per Part 21 for Unit 1 | |
AECM-83-0244, Final Deficiency Rept PRD-83/01 Re Potential Failure of GE Hea Relays to Operate When Trip Solenoid Energized.Initially Reported on 830217.Suspect Relays in Unit 2 Will Perform Satisfactorily.Not Reportable Under 10CFR50.55(e) | 18 April 1983 | Final Deficiency Rept PRD-83/01 Re Potential Failure of GE Hea Relays to Operate When Trip Solenoid Energized.Initially Reported on 830217.Suspect Relays in Unit 2 Will Perform Satisfactorily.Not Reportable Under 10CFR50.55(e) | |
AECM-83-0245, Final Deficiency Rept PRD-83/02 Re Possible Defect W/Liberty Control Co Telephone Relays Used in GE Protective Relays. Initially Reported on 830217.Relays Will Be Replaced. Item Not Reportable Per 10CFR50.55(e) | 18 April 1983 | Final Deficiency Rept PRD-83/02 Re Possible Defect W/Liberty Control Co Telephone Relays Used in GE Protective Relays. Initially Reported on 830217.Relays Will Be Replaced. Item Not Reportable Per 10CFR50.55(e) | |
AECM-83-0246, Final Deficiency Rept PRD-83/03 Re Omitted Specified Insulation Wraps from GE Iac Overcurrent Relays.Initially Reported on 830217.Deficiency Not Reportable for Unit 1. Nonconforming Relay Replacement to Be Completed by 831015 | 18 April 1983 | Final Deficiency Rept PRD-83/03 Re Omitted Specified Insulation Wraps from GE Iac Overcurrent Relays.Initially Reported on 830217.Deficiency Not Reportable for Unit 1. Nonconforming Relay Replacement to Be Completed by 831015 | |
AECM-83-0321, Sixth Interim Deficiency Rept PRD-82/14 Re Sheared Bolts on Diesel Generator Rear Crankcase Cover.Initially Reported on 820322.Deficiency Reportable Under 10CFR50.55(e) & Part 21 for Unit 1,Div II Diesel Generator Only | 1 June 1983 | Sixth Interim Deficiency Rept PRD-82/14 Re Sheared Bolts on Diesel Generator Rear Crankcase Cover.Initially Reported on 820322.Deficiency Reportable Under 10CFR50.55(e) & Part 21 for Unit 1,Div II Diesel Generator Only | |
AECM-83-0322, Final Deficiency Rept PRD-82/27 Re Potential for Plant Flooding Based on PMP Flood Level.Watertight Door Seals,Toe Plate & Curb to Be Installed & Two Penetrations Raised.Also Reportable Under Part 21 | 31 May 1983 | Final Deficiency Rept PRD-82/27 Re Potential for Plant Flooding Based on PMP Flood Level.Watertight Door Seals,Toe Plate & Curb to Be Installed & Two Penetrations Raised.Also Reportable Under Part 21 | Safe Shutdown Internal Flooding |
AECM-83-0324, Final Deficiency Rept PRD-83/06 Re Failure to Provide corrosion-resistant Matl in Carbon Steel Instrument Air Penetration.Initially Reported on 830315.Util Preparing Design Change Package.Also Reportable Per Part 21 | 6 June 1983 | Final Deficiency Rept PRD-83/06 Re Failure to Provide corrosion-resistant Matl in Carbon Steel Instrument Air Penetration.Initially Reported on 830315.Util Preparing Design Change Package.Also Reportable Per Part 21 | Coatings |
AECM-83-0325, Final Deficiency Rept PRD-83/05 Re Stress Relieving of Rsos Sockets by Vendor Not Appearing on Ae Evaluated Supplier List.Initially Reported on 830308.Condition Not Reportable Per 10CFR50.55(e) | 6 June 1983 | Final Deficiency Rept PRD-83/05 Re Stress Relieving of Rsos Sockets by Vendor Not Appearing on Ae Evaluated Supplier List.Initially Reported on 830308.Condition Not Reportable Per 10CFR50.55(e) | |
AECM-83-0326, Second Interim Part 21 Rept PRD-83/08 Re Inability to Maintain Pressurized Water Supply to RHR Pumps & Discharge Piping.Initially Reported on 830415.Final Rept Expected by 840201 | 13 June 1983 | Second Interim Part 21 Rept PRD-83/08 Re Inability to Maintain Pressurized Water Supply to RHR Pumps & Discharge Piping.Initially Reported on 830415.Final Rept Expected by 840201 | |
AECM-83-0329, Interim Deficiency Rept 3 Re Nelson Stud Failures on Type 86 Embed Plates.Initially Reported on 821221.Unit 1 Embed Plates Replaced W/Surface Mounted Plates.Final Rept to Be Submitted by 830705.Also Reported Per Part 21 | 7 June 1983 | Interim Deficiency Rept 3 Re Nelson Stud Failures on Type 86 Embed Plates.Initially Reported on 821221.Unit 1 Embed Plates Replaced W/Surface Mounted Plates.Final Rept to Be Submitted by 830705.Also Reported Per Part 21 | Safe Shutdown Weak link |
AECM-83-033, Interim Deficiency Rept Re Nelson Stud Failures on Embedded Plates.Initially Reported on 821221.Lab Testing of Plates in Progress.Deficiency Reported Per 10CFR21 for Unit 1 & 10CFR50.55(e) for Unit 2.Final Rept Expected by 830315 | 20 January 1983 | Interim Deficiency Rept Re Nelson Stud Failures on Embedded Plates.Initially Reported on 821221.Lab Testing of Plates in Progress.Deficiency Reported Per 10CFR21 for Unit 1 & 10CFR50.55(e) for Unit 2.Final Rept Expected by 830315 | Safe Shutdown |
AECM-83-0352, Final Deficiency Rept PRD-83/07 Re Two Div II Cables Improperly Routed Outside Scheduled Conduit.Initially Reported on 830412.Design Change Package Issued to Rework Cables.Also Reportable Per Part 21 for Unit 1 | 14 June 1983 | Final Deficiency Rept PRD-83/07 Re Two Div II Cables Improperly Routed Outside Scheduled Conduit.Initially Reported on 830412.Design Change Package Issued to Rework Cables.Also Reportable Per Part 21 for Unit 1 | Safe Shutdown |
AECM-83-0386, Final/Interim Deficiency Rept PRD-82/14 for Units 1/2, Respectively Re Sheared Bolts on Rear Crankcase Cover of Delaval Diesel Generators.Unit 1 Bolts Not Defective.Unit 2 Rept Due on 850130.Also Reportable Per Part 21 | 5 July 1983 | Final/Interim Deficiency Rept PRD-82/14 for Units 1/2, Respectively Re Sheared Bolts on Rear Crankcase Cover of Delaval Diesel Generators.Unit 1 Bolts Not Defective.Unit 2 Rept Due on 850130.Also Reportable Per Part 21 | |
AECM-83-0405, Final Deficiency Rept PRD-81/44 Re Valves & Actuators Not Mfg Under QA Program.Initially Reported on 811029.Seals, Lubricants & Coating on Pins & Rollers Upgraded.Corrective Action Completed.Item Not Reportable Per 10CFR50.55(e) | 8 July 1983 | Final Deficiency Rept PRD-81/44 Re Valves & Actuators Not Mfg Under QA Program.Initially Reported on 811029.Seals, Lubricants & Coating on Pins & Rollers Upgraded.Corrective Action Completed.Item Not Reportable Per 10CFR50.55(e) | |
AECM-83-0445, Interim Deficiency Rept Re Asco Spare Part Kits for Scram Pilot Valve Solenoids.Initially Reported on 830804.Kits to Be Inspected & Air Supply to Be Flushed.Also Reportable Per Part 21.Next Rept by 830909 | 5 August 1983 | Interim Deficiency Rept Re Asco Spare Part Kits for Scram Pilot Valve Solenoids.Initially Reported on 830804.Kits to Be Inspected & Air Supply to Be Flushed.Also Reportable Per Part 21.Next Rept by 830909 | |
AECM-83-0484, Final Deficiency Rept for Unit 1 & Interim Deficiency Rept for Unit 2 Re Failure of Agastat CR0095 Relay Bases.Bases Which Failed Push Test in Unit 1 Replaced.Investigation of Unit 2 Underway.Also Reportable Per Part 21 for Unit 1 | 20 August 1983 | Final Deficiency Rept for Unit 1 & Interim Deficiency Rept for Unit 2 Re Failure of Agastat CR0095 Relay Bases.Bases Which Failed Push Test in Unit 1 Replaced.Investigation of Unit 2 Underway.Also Reportable Per Part 21 for Unit 1 | |
AECM-83-0516, Final Deficiency Rept PRD-83/09 Re Comsip,Inc Containment Gas Analyzer Panels.Initially Reported on 830727.Catalyst Bed Replacement Kits Ordered.Also Reportable Per Part 21 for Unit 1 | 26 August 1983 | Final Deficiency Rept PRD-83/09 Re Comsip,Inc Containment Gas Analyzer Panels.Initially Reported on 830727.Catalyst Bed Replacement Kits Ordered.Also Reportable Per Part 21 for Unit 1 | |
AECM-83-0551, First Interim Part 21 Rept PRD-83/12 Re Failure of Agastat GP Series Relays to Switch.Initially Reported on 830902. Malfunctioning Relays Sent to GE for Evaluation. Applicability to Unit 2 Under Review.Final Rept by 831107 | 6 September 1983 | First Interim Part 21 Rept PRD-83/12 Re Failure of Agastat GP Series Relays to Switch.Initially Reported on 830902. Malfunctioning Relays Sent to GE for Evaluation. Applicability to Unit 2 Under Review.Final Rept by 831107 | |
AECM-83-0561, Part 21 Rept 2 Re Improperly Assembled Automatic Switch Co Spare Part Kits for Scram Pilot Valve Solenoids.Initially Reported on 830804.Investigation Continuing.Final Rept Will Be Provided by 840224 | 9 September 1983 | Part 21 Rept 2 Re Improperly Assembled Automatic Switch Co Spare Part Kits for Scram Pilot Valve Solenoids.Initially Reported on 830804.Investigation Continuing.Final Rept Will Be Provided by 840224 | |
AECM-83-0596, Final Deficiency Rept for Unit 1 & Interim Deficiency Rept for Unit 2 Re Asco Spare Parts Kits for Scram Pilot Valve Solenoids.Initially Reported on 830804.Valves Reworked.Next Rept by 840224.Also Reportable Per Part 21 for Unit 1 | 16 September 1983 | Final Deficiency Rept for Unit 1 & Interim Deficiency Rept for Unit 2 Re Asco Spare Parts Kits for Scram Pilot Valve Solenoids.Initially Reported on 830804.Valves Reworked.Next Rept by 840224.Also Reportable Per Part 21 for Unit 1 | |
AECM-83-0609, Final & Interim Deficiency Rept for Units 1 & 2,respectively Re Incorrect Operation of Div I & II Diesel Generator Load Shedding & Sequencing Sys Panels W/Automatic Test Feature on Line.Initially Reported 830921.Also Reportable Per Part | 21 September 1983 | Final & Interim Deficiency Rept for Units 1 & 2,respectively Re Incorrect Operation of Div I & II Diesel Generator Load Shedding & Sequencing Sys Panels W/Automatic Test Feature on Line.Initially Reported 830921.Also Reportable Per Part 21 | |
AECM-83-0610, Second Interim Part 21 Rept Re Failure of Agastat GP Series Relays to Change State When Called to Operate.Caused by Svc Aging in Mild Environ in Combination W/Mechanical Configurations & Tolerances of Internal Parts | 22 September 1983 | Second Interim Part 21 Rept Re Failure of Agastat GP Series Relays to Change State When Called to Operate.Caused by Svc Aging in Mild Environ in Combination W/Mechanical Configurations & Tolerances of Internal Parts | |
AECM-83-0664, Final Deficiency Rept for Unit 1 & Interim Deficiency Rept for Unit 2 Re Potential Rupture of High Pressure Fuel Injection Lines on Div I & II Diesel Generators During Engine Operation.Also Reportable Under Part 21 for Unit 1 | 5 October 1983 | Final Deficiency Rept for Unit 1 & Interim Deficiency Rept for Unit 2 Re Potential Rupture of High Pressure Fuel Injection Lines on Div I & II Diesel Generators During Engine Operation.Also Reportable Under Part 21 for Unit 1 | |
AECM-83-0666, Final Deficiency Rept PRD-83/15 Re Defective Sprague Type 40D Capacitor on Brown Boveri Electric Low Voltage Circuit Breakers Equipped W/Solid State Trip Devices.Initially Reported on 831002.Also Reportable Per Part 21 | 10 October 1983 | Final Deficiency Rept PRD-83/15 Re Defective Sprague Type 40D Capacitor on Brown Boveri Electric Low Voltage Circuit Breakers Equipped W/Solid State Trip Devices.Initially Reported on 831002.Also Reportable Per Part 21 | |
AECM-83-0668, Final Deficiency Rept PRD-83/12 for Unit 1 & Interim Rept for Unit 2 Re Failure of Agastat GP Series Relays to Switch. Initially Reported on 830902.Deficiency Reportable Per Part 21 for Unit 1.Investigation Ongoing for Unit 2 | 17 October 1983 | Final Deficiency Rept PRD-83/12 for Unit 1 & Interim Rept for Unit 2 Re Failure of Agastat GP Series Relays to Switch. Initially Reported on 830902.Deficiency Reportable Per Part 21 for Unit 1.Investigation Ongoing for Unit 2 | |
AECM-83-0674, Part 21 Rept Re Potentially Defective Presray Airlock Seal in Drywell Personnel Airlock Supplied by Wj Woolley. Initially Reported by Vendor on 830919.New Seal Being Designed by Presray Corp Will Be Installed When Available | 24 October 1983 | Part 21 Rept Re Potentially Defective Presray Airlock Seal in Drywell Personnel Airlock Supplied by Wj Woolley. Initially Reported by Vendor on 830919.New Seal Being Designed by Presray Corp Will Be Installed When Available | |
AECM-83-0706, Interim Deficiency Rept Re Possible Defect on Wj Woolley Co Drywell Personnel Airlock Seals.Evaluation of Reportability Per Part 21 Continuing | 16 November 1983 | Interim Deficiency Rept Re Possible Defect on Wj Woolley Co Drywell Personnel Airlock Seals.Evaluation of Reportability Per Part 21 Continuing | |
AECM-83-0759, Final Part 21 Rept PRD-83/16 for Unit 1 & Interim Part 21 Rept for Unit 2 Re Failure of Internal Coating of Automatic Depressurization Sys,Main Steam Safety Relief Valve & MSIV Accumulators.Final Rept Expected by 840531 | 18 November 1983 | Final Part 21 Rept PRD-83/16 for Unit 1 & Interim Part 21 Rept for Unit 2 Re Failure of Internal Coating of Automatic Depressurization Sys,Main Steam Safety Relief Valve & MSIV Accumulators.Final Rept Expected by 840531 | |
AECM-83-0822, Interim Part 21 Rept Re Failure of Fuel Oil Mfg by Transamerica Delaval Adjacent to Male Branch Tee on Div I Diesel Generator.Initially Reported on 831230.Fuel Oil Line Support Installed.Next Rept by 840413 | 3 January 1984 | Interim Part 21 Rept Re Failure of Fuel Oil Mfg by Transamerica Delaval Adjacent to Male Branch Tee on Div I Diesel Generator.Initially Reported on 831230.Fuel Oil Line Support Installed.Next Rept by 840413 | |
AECM-84-0022, Interim Deficiency Rept PRD-84/01 Re Incorrect Installation of 30-volt Dc 22 Microfarad Capacitor in Solid State Trip Unit.Initially Reported on 840105.Final Rept by 840330.Also Reported Per Part 21 | 9 January 1984 | Interim Deficiency Rept PRD-84/01 Re Incorrect Installation of 30-volt Dc 22 Microfarad Capacitor in Solid State Trip Unit.Initially Reported on 840105.Final Rept by 840330.Also Reported Per Part 21 | Ultimate heat sink |
AECM-84-0043, Suppl to Final Part 21 Rept Re Failure of Qualified Cables on Transamerica Delaval Generators to Pass IEEE Flame Test Due to Inadequate Temp Rating for Cable Insulation. Initially Reported on 821214 | 2 February 1984 | Suppl to Final Part 21 Rept Re Failure of Qualified Cables on Transamerica Delaval Generators to Pass IEEE Flame Test Due to Inadequate Temp Rating for Cable Insulation. Initially Reported on 821214 | |
AECM-84-0063, Final Part 21 Rept PRD 83/08 Re Inability to Maintain Pressurized Water Supply to RHR Pumps & Discharge Piping Supplied by Bechtel.Initially Reported on 830415.Hardware Mods Implemented | 2 March 1984 | Final Part 21 Rept PRD 83/08 Re Inability to Maintain Pressurized Water Supply to RHR Pumps & Discharge Piping Supplied by Bechtel.Initially Reported on 830415.Hardware Mods Implemented | |
AECM-84-0105, Final Deficiency Rept for Unit 1 & Interim Deficiency Rept for Unit 2 Re Cracked Push Rod Balls on Transamerica Delaval Diesel Generators.Initially Reported on 840216.Also Reported Per Part 21 for Unit 1.Next Rept Expected by 840907 | 17 February 1984 | Final Deficiency Rept for Unit 1 & Interim Deficiency Rept for Unit 2 Re Cracked Push Rod Balls on Transamerica Delaval Diesel Generators.Initially Reported on 840216.Also Reported Per Part 21 for Unit 1.Next Rept Expected by 840907 | |
AECM-84-0148, Final Deficiency Rept Re Incorrect Operation of Div I & II Diesel Generator Load Shedding Sequencing Sys Panels. Initially Reported on 830921.Circuit Cards & Card Racks Returned for Mod.Reinstallation Expected by 840427 | 15 March 1984 | Final Deficiency Rept Re Incorrect Operation of Div I & II Diesel Generator Load Shedding Sequencing Sys Panels. Initially Reported on 830921.Circuit Cards & Card Racks Returned for Mod.Reinstallation Expected by 840427 | |
AECM-84-0159, Final Deficiency Rept Re anti-rotational Setscrews in Anchor Darling Glove Valves.Initially Reported on 840213.Setscrew Tightened & Stem Collar Threads Staked Using Ctr Punch. Also Reported Per Part 21 for Unit 1 | 14 March 1984 | Final Deficiency Rept Re anti-rotational Setscrews in Anchor Darling Glove Valves.Initially Reported on 840213.Setscrew Tightened & Stem Collar Threads Staked Using Ctr Punch. Also Reported Per Part 21 for Unit 1 | Anchor Darling |
AECM-84-0195, Final Part 21 Rept PRD-84/01 Re Incorrect Installation by Brown Boveri of 30-volt Dc 22 Microfarad Capacitor in Solid State Trip Unit.Initially Reported on 840105.Defective Trip Unit Replaced | 30 March 1984 | Final Part 21 Rept PRD-84/01 Re Incorrect Installation by Brown Boveri of 30-volt Dc 22 Microfarad Capacitor in Solid State Trip Unit.Initially Reported on 840105.Defective Trip Unit Replaced | Ultimate heat sink |
AECM-84-0209, Final Deficiency Rept for Unit 1 & Interim Rept for Unit 2 Re Calculated Max Temp for Main Feedwater Movement Guides Exceeding Original Design Limitation for Concrete within Auxiliary Bldg G-line Wall.Also Reportable Per 10CFR21 | 2 April 1984 | Final Deficiency Rept for Unit 1 & Interim Rept for Unit 2 Re Calculated Max Temp for Main Feedwater Movement Guides Exceeding Original Design Limitation for Concrete within Auxiliary Bldg G-line Wall.Also Reportable Per 10CFR21 | |
AECM-84-0212, Final Part 21 & Deficiency Rept for Unit 1 & Interim Rept 1 for Unit 2 Re Failure of Deluge Valves Mfg by Automatic Sprinkler Corp of America.Initially Reported on 840319 | 6 April 1984 | Final Part 21 & Deficiency Rept for Unit 1 & Interim Rept 1 for Unit 2 Re Failure of Deluge Valves Mfg by Automatic Sprinkler Corp of America.Initially Reported on 840319 | |
AECM-84-0213, Final Part 21 Rept for Unit 1 & Interim Rept for Unit 2 Re Potential Defect in Spare Piston Skirt Castings. Initially Reported on 840402.Caused by Improper Heat Treating During Mfg.Next Rept Expected by 841005 | 6 April 1984 | Final Part 21 Rept for Unit 1 & Interim Rept for Unit 2 Re Potential Defect in Spare Piston Skirt Castings. Initially Reported on 840402.Caused by Improper Heat Treating During Mfg.Next Rept Expected by 841005 | |
AECM-84-0236, Final Deficiency & Part 21 Rept Re Defect in Positive Positioning Action of GE Type Sbm Switch.Initially Reported on 840416.Switch Repaired & Returned to GE for Further Investigation of Defect | 20 April 1984 | Final Deficiency & Part 21 Rept Re Defect in Positive Positioning Action of GE Type Sbm Switch.Initially Reported on 840416.Switch Repaired & Returned to GE for Further Investigation of Defect | |
AECM-84-0237, Final Part 21 Rept for Unit 1 & Interim Deficiency Rept for Unit 2 Re Containment Personnel Air Lock Seismic Qualification Supplied by Wj Woolley Co.Initially Reported on 840416 | 20 April 1984 | Final Part 21 Rept for Unit 1 & Interim Deficiency Rept for Unit 2 Re Containment Personnel Air Lock Seismic Qualification Supplied by Wj Woolley Co.Initially Reported on 840416 | |
AECM-84-0311, Interim Part 21/deficiency Rept Re Flow Rate in Standby Svc Water Sys Loops a & B & Loss of Standby Svc Water Basin Transfer Capability.Initially Reported on 810303.Larger Capacity Pumps Will Be Installed | 8 June 1984 | Interim Part 21/deficiency Rept Re Flow Rate in Standby Svc Water Sys Loops a & B & Loss of Standby Svc Water Basin Transfer Capability.Initially Reported on 810303.Larger Capacity Pumps Will Be Installed | Safe Shutdown Ultimate heat sink |
AECM-84-0341, Final Part 21 & Deficiency Rept Re Flow Rate in Standby Svc Water Sys Loops a & B & Loss of Standby Svc Water Basin Transfer Capability.Initially Reported on 810303 | 31 July 1984 | Final Part 21 & Deficiency Rept Re Flow Rate in Standby Svc Water Sys Loops a & B & Loss of Standby Svc Water Basin Transfer Capability.Initially Reported on 810303 | Safe Shutdown Ultimate heat sink |
AECM-84-0357, Interim Part 21 & Deficiency Rept 1 Re Pieces of Steel Received for Use from Dubose Steel,Inc.Initially Reported on 840601.Final Determination Underway.Final Rept Expected by 841031 | 6 July 1984 | Interim Part 21 & Deficiency Rept 1 Re Pieces of Steel Received for Use from Dubose Steel,Inc.Initially Reported on 840601.Final Determination Underway.Final Rept Expected by 841031 | |
AECM-84-0405, Final Part 21/Deficiency Rept PRD-84/10 Re Swelling of Gh Bettis Valve Actuator Ethylene Propylene Rubber Elastomer Seals in Contact W/Hydrocarbon Lubricant.Initially Reported on 840730.Reportable Under Part 21 for Unit 1 | 3 August 1984 | Final Part 21/Deficiency Rept PRD-84/10 Re Swelling of Gh Bettis Valve Actuator Ethylene Propylene Rubber Elastomer Seals in Contact W/Hydrocarbon Lubricant.Initially Reported on 840730.Reportable Under Part 21 for Unit 1 | Stroke time |
AECM-84-0456, Final Deficiency & Part 21 Rept PRD-84/08 Re Failure of Wj Woolley Co to Seismically Qualify Personnel Air Locks Pneumatic Supply Sys.Nrc Should Consider Reevaluation of Failure of Potential Generic Effects of Other Plants | 3 October 1984 | Final Deficiency & Part 21 Rept PRD-84/08 Re Failure of Wj Woolley Co to Seismically Qualify Personnel Air Locks Pneumatic Supply Sys.Nrc Should Consider Reevaluation of Failure of Potential Generic Effects of Other Plants | |