AECM-83-020, Final Deficiency Rept PRD-82/37 Re Failure of Qualified Cables to Pass IEEE Flame Test.Initially Reported on 821214. Design Change DCP-82/3196 Initiated.Also Reported Per Part 2113 January 1983Final Deficiency Rept PRD-82/37 Re Failure of Qualified Cables to Pass IEEE Flame Test.Initially Reported on 821214. Design Change DCP-82/3196 Initiated.Also Reported Per Part 21
AECM-83-0215, Seventh Interim Deficiency Rept PRD-81/44 Re Valves & Actuators Not Mfg Under QA Program.Initially Reported on 811029.Actuators & Appurtenances Not Mfg Under QA Program Qualified by Tests.Final Rept Expected by 83070831 March 1983Seventh Interim Deficiency Rept PRD-81/44 Re Valves & Actuators Not Mfg Under QA Program.Initially Reported on 811029.Actuators & Appurtenances Not Mfg Under QA Program Qualified by Tests.Final Rept Expected by 830708
AECM-83-0220, Interim Deficiency Rept Re Stress Relieving of Sockets by Vendor Absent from Ae Supplier List.Initially Reported on 830308.Investigation Continuing.Final Rept Will Be Submitted by 8306067 April 1983Interim Deficiency Rept Re Stress Relieving of Sockets by Vendor Absent from Ae Supplier List.Initially Reported on 830308.Investigation Continuing.Final Rept Will Be Submitted by 830606
AECM-83-0236, Interim Deficiency Rept PRD-83/07 Re Improperly Routed Div II Cables.Initially Reported on 830412.Also Reported Per Part 21 for Unit 1.Investigation in Progress to Determine Applicability to Unit 2.Final Rept Expected Prior to Heatup13 April 1983Interim Deficiency Rept PRD-83/07 Re Improperly Routed Div II Cables.Initially Reported on 830412.Also Reported Per Part 21 for Unit 1.Investigation in Progress to Determine Applicability to Unit 2.Final Rept Expected Prior to HeatupSafe Shutdown
AECM-83-0243, Interim Deficiency Rept Re Inability to Maintain Pressurized Water Supply to RHR Jockey Pumps & Discharge Piping.Design Change Package DCP-83/5006 Will Be Implemented.Final Rept Expected by 830613.Also Reportable Per Part 21 for Unit 115 April 1983Interim Deficiency Rept Re Inability to Maintain Pressurized Water Supply to RHR Jockey Pumps & Discharge Piping.Design Change Package DCP-83/5006 Will Be Implemented.Final Rept Expected by 830613.Also Reportable Per Part 21 for Unit 1
AECM-83-0244, Final Deficiency Rept PRD-83/01 Re Potential Failure of GE Hea Relays to Operate When Trip Solenoid Energized.Initially Reported on 830217.Suspect Relays in Unit 2 Will Perform Satisfactorily.Not Reportable Under 10CFR50.55(e)18 April 1983Final Deficiency Rept PRD-83/01 Re Potential Failure of GE Hea Relays to Operate When Trip Solenoid Energized.Initially Reported on 830217.Suspect Relays in Unit 2 Will Perform Satisfactorily.Not Reportable Under 10CFR50.55(e)
AECM-83-0245, Final Deficiency Rept PRD-83/02 Re Possible Defect W/Liberty Control Co Telephone Relays Used in GE Protective Relays. Initially Reported on 830217.Relays Will Be Replaced. Item Not Reportable Per 10CFR50.55(e)18 April 1983Final Deficiency Rept PRD-83/02 Re Possible Defect W/Liberty Control Co Telephone Relays Used in GE Protective Relays. Initially Reported on 830217.Relays Will Be Replaced. Item Not Reportable Per 10CFR50.55(e)
AECM-83-0246, Final Deficiency Rept PRD-83/03 Re Omitted Specified Insulation Wraps from GE Iac Overcurrent Relays.Initially Reported on 830217.Deficiency Not Reportable for Unit 1. Nonconforming Relay Replacement to Be Completed by 83101518 April 1983Final Deficiency Rept PRD-83/03 Re Omitted Specified Insulation Wraps from GE Iac Overcurrent Relays.Initially Reported on 830217.Deficiency Not Reportable for Unit 1. Nonconforming Relay Replacement to Be Completed by 831015
AECM-83-0321, Sixth Interim Deficiency Rept PRD-82/14 Re Sheared Bolts on Diesel Generator Rear Crankcase Cover.Initially Reported on 820322.Deficiency Reportable Under 10CFR50.55(e) & Part 21 for Unit 1,Div II Diesel Generator Only1 June 1983Sixth Interim Deficiency Rept PRD-82/14 Re Sheared Bolts on Diesel Generator Rear Crankcase Cover.Initially Reported on 820322.Deficiency Reportable Under 10CFR50.55(e) & Part 21 for Unit 1,Div II Diesel Generator Only
AECM-83-0322, Final Deficiency Rept PRD-82/27 Re Potential for Plant Flooding Based on PMP Flood Level.Watertight Door Seals,Toe Plate & Curb to Be Installed & Two Penetrations Raised.Also Reportable Under Part 2131 May 1983Final Deficiency Rept PRD-82/27 Re Potential for Plant Flooding Based on PMP Flood Level.Watertight Door Seals,Toe Plate & Curb to Be Installed & Two Penetrations Raised.Also Reportable Under Part 21Safe Shutdown
Internal Flooding
AECM-83-0324, Final Deficiency Rept PRD-83/06 Re Failure to Provide corrosion-resistant Matl in Carbon Steel Instrument Air Penetration.Initially Reported on 830315.Util Preparing Design Change Package.Also Reportable Per Part 216 June 1983Final Deficiency Rept PRD-83/06 Re Failure to Provide corrosion-resistant Matl in Carbon Steel Instrument Air Penetration.Initially Reported on 830315.Util Preparing Design Change Package.Also Reportable Per Part 21Coatings
AECM-83-0325, Final Deficiency Rept PRD-83/05 Re Stress Relieving of Rsos Sockets by Vendor Not Appearing on Ae Evaluated Supplier List.Initially Reported on 830308.Condition Not Reportable Per 10CFR50.55(e)6 June 1983Final Deficiency Rept PRD-83/05 Re Stress Relieving of Rsos Sockets by Vendor Not Appearing on Ae Evaluated Supplier List.Initially Reported on 830308.Condition Not Reportable Per 10CFR50.55(e)
AECM-83-0326, Second Interim Part 21 Rept PRD-83/08 Re Inability to Maintain Pressurized Water Supply to RHR Pumps & Discharge Piping.Initially Reported on 830415.Final Rept Expected by 84020113 June 1983Second Interim Part 21 Rept PRD-83/08 Re Inability to Maintain Pressurized Water Supply to RHR Pumps & Discharge Piping.Initially Reported on 830415.Final Rept Expected by 840201
AECM-83-0329, Interim Deficiency Rept 3 Re Nelson Stud Failures on Type 86 Embed Plates.Initially Reported on 821221.Unit 1 Embed Plates Replaced W/Surface Mounted Plates.Final Rept to Be Submitted by 830705.Also Reported Per Part 217 June 1983Interim Deficiency Rept 3 Re Nelson Stud Failures on Type 86 Embed Plates.Initially Reported on 821221.Unit 1 Embed Plates Replaced W/Surface Mounted Plates.Final Rept to Be Submitted by 830705.Also Reported Per Part 21Safe Shutdown
Weak link
AECM-83-033, Interim Deficiency Rept Re Nelson Stud Failures on Embedded Plates.Initially Reported on 821221.Lab Testing of Plates in Progress.Deficiency Reported Per 10CFR21 for Unit 1 & 10CFR50.55(e) for Unit 2.Final Rept Expected by 83031520 January 1983Interim Deficiency Rept Re Nelson Stud Failures on Embedded Plates.Initially Reported on 821221.Lab Testing of Plates in Progress.Deficiency Reported Per 10CFR21 for Unit 1 & 10CFR50.55(e) for Unit 2.Final Rept Expected by 830315Safe Shutdown
AECM-83-0352, Final Deficiency Rept PRD-83/07 Re Two Div II Cables Improperly Routed Outside Scheduled Conduit.Initially Reported on 830412.Design Change Package Issued to Rework Cables.Also Reportable Per Part 21 for Unit 114 June 1983Final Deficiency Rept PRD-83/07 Re Two Div II Cables Improperly Routed Outside Scheduled Conduit.Initially Reported on 830412.Design Change Package Issued to Rework Cables.Also Reportable Per Part 21 for Unit 1Safe Shutdown
AECM-83-0386, Final/Interim Deficiency Rept PRD-82/14 for Units 1/2, Respectively Re Sheared Bolts on Rear Crankcase Cover of Delaval Diesel Generators.Unit 1 Bolts Not Defective.Unit 2 Rept Due on 850130.Also Reportable Per Part 215 July 1983Final/Interim Deficiency Rept PRD-82/14 for Units 1/2, Respectively Re Sheared Bolts on Rear Crankcase Cover of Delaval Diesel Generators.Unit 1 Bolts Not Defective.Unit 2 Rept Due on 850130.Also Reportable Per Part 21
AECM-83-0405, Final Deficiency Rept PRD-81/44 Re Valves & Actuators Not Mfg Under QA Program.Initially Reported on 811029.Seals, Lubricants & Coating on Pins & Rollers Upgraded.Corrective Action Completed.Item Not Reportable Per 10CFR50.55(e)8 July 1983Final Deficiency Rept PRD-81/44 Re Valves & Actuators Not Mfg Under QA Program.Initially Reported on 811029.Seals, Lubricants & Coating on Pins & Rollers Upgraded.Corrective Action Completed.Item Not Reportable Per 10CFR50.55(e)
AECM-83-0445, Interim Deficiency Rept Re Asco Spare Part Kits for Scram Pilot Valve Solenoids.Initially Reported on 830804.Kits to Be Inspected & Air Supply to Be Flushed.Also Reportable Per Part 21.Next Rept by 8309095 August 1983Interim Deficiency Rept Re Asco Spare Part Kits for Scram Pilot Valve Solenoids.Initially Reported on 830804.Kits to Be Inspected & Air Supply to Be Flushed.Also Reportable Per Part 21.Next Rept by 830909
AECM-83-0484, Final Deficiency Rept for Unit 1 & Interim Deficiency Rept for Unit 2 Re Failure of Agastat CR0095 Relay Bases.Bases Which Failed Push Test in Unit 1 Replaced.Investigation of Unit 2 Underway.Also Reportable Per Part 21 for Unit 120 August 1983Final Deficiency Rept for Unit 1 & Interim Deficiency Rept for Unit 2 Re Failure of Agastat CR0095 Relay Bases.Bases Which Failed Push Test in Unit 1 Replaced.Investigation of Unit 2 Underway.Also Reportable Per Part 21 for Unit 1
AECM-83-0516, Final Deficiency Rept PRD-83/09 Re Comsip,Inc Containment Gas Analyzer Panels.Initially Reported on 830727.Catalyst Bed Replacement Kits Ordered.Also Reportable Per Part 21 for Unit 126 August 1983Final Deficiency Rept PRD-83/09 Re Comsip,Inc Containment Gas Analyzer Panels.Initially Reported on 830727.Catalyst Bed Replacement Kits Ordered.Also Reportable Per Part 21 for Unit 1
AECM-83-0551, First Interim Part 21 Rept PRD-83/12 Re Failure of Agastat GP Series Relays to Switch.Initially Reported on 830902. Malfunctioning Relays Sent to GE for Evaluation. Applicability to Unit 2 Under Review.Final Rept by 8311076 September 1983First Interim Part 21 Rept PRD-83/12 Re Failure of Agastat GP Series Relays to Switch.Initially Reported on 830902. Malfunctioning Relays Sent to GE for Evaluation. Applicability to Unit 2 Under Review.Final Rept by 831107
AECM-83-0561, Part 21 Rept 2 Re Improperly Assembled Automatic Switch Co Spare Part Kits for Scram Pilot Valve Solenoids.Initially Reported on 830804.Investigation Continuing.Final Rept Will Be Provided by 8402249 September 1983Part 21 Rept 2 Re Improperly Assembled Automatic Switch Co Spare Part Kits for Scram Pilot Valve Solenoids.Initially Reported on 830804.Investigation Continuing.Final Rept Will Be Provided by 840224
AECM-83-0596, Final Deficiency Rept for Unit 1 & Interim Deficiency Rept for Unit 2 Re Asco Spare Parts Kits for Scram Pilot Valve Solenoids.Initially Reported on 830804.Valves Reworked.Next Rept by 840224.Also Reportable Per Part 21 for Unit 116 September 1983Final Deficiency Rept for Unit 1 & Interim Deficiency Rept for Unit 2 Re Asco Spare Parts Kits for Scram Pilot Valve Solenoids.Initially Reported on 830804.Valves Reworked.Next Rept by 840224.Also Reportable Per Part 21 for Unit 1
AECM-83-0609, Final & Interim Deficiency Rept for Units 1 & 2,respectively Re Incorrect Operation of Div I & II Diesel Generator Load Shedding & Sequencing Sys Panels W/Automatic Test Feature on Line.Initially Reported 830921.Also Reportable Per Part21 September 1983Final & Interim Deficiency Rept for Units 1 & 2,respectively Re Incorrect Operation of Div I & II Diesel Generator Load Shedding & Sequencing Sys Panels W/Automatic Test Feature on Line.Initially Reported 830921.Also Reportable Per Part 21
AECM-83-0610, Second Interim Part 21 Rept Re Failure of Agastat GP Series Relays to Change State When Called to Operate.Caused by Svc Aging in Mild Environ in Combination W/Mechanical Configurations & Tolerances of Internal Parts22 September 1983Second Interim Part 21 Rept Re Failure of Agastat GP Series Relays to Change State When Called to Operate.Caused by Svc Aging in Mild Environ in Combination W/Mechanical Configurations & Tolerances of Internal Parts
AECM-83-0664, Final Deficiency Rept for Unit 1 & Interim Deficiency Rept for Unit 2 Re Potential Rupture of High Pressure Fuel Injection Lines on Div I & II Diesel Generators During Engine Operation.Also Reportable Under Part 21 for Unit 15 October 1983Final Deficiency Rept for Unit 1 & Interim Deficiency Rept for Unit 2 Re Potential Rupture of High Pressure Fuel Injection Lines on Div I & II Diesel Generators During Engine Operation.Also Reportable Under Part 21 for Unit 1
AECM-83-0666, Final Deficiency Rept PRD-83/15 Re Defective Sprague Type 40D Capacitor on Brown Boveri Electric Low Voltage Circuit Breakers Equipped W/Solid State Trip Devices.Initially Reported on 831002.Also Reportable Per Part 2110 October 1983Final Deficiency Rept PRD-83/15 Re Defective Sprague Type 40D Capacitor on Brown Boveri Electric Low Voltage Circuit Breakers Equipped W/Solid State Trip Devices.Initially Reported on 831002.Also Reportable Per Part 21
AECM-83-0668, Final Deficiency Rept PRD-83/12 for Unit 1 & Interim Rept for Unit 2 Re Failure of Agastat GP Series Relays to Switch. Initially Reported on 830902.Deficiency Reportable Per Part 21 for Unit 1.Investigation Ongoing for Unit 217 October 1983Final Deficiency Rept PRD-83/12 for Unit 1 & Interim Rept for Unit 2 Re Failure of Agastat GP Series Relays to Switch. Initially Reported on 830902.Deficiency Reportable Per Part 21 for Unit 1.Investigation Ongoing for Unit 2
AECM-83-0674, Part 21 Rept Re Potentially Defective Presray Airlock Seal in Drywell Personnel Airlock Supplied by Wj Woolley. Initially Reported by Vendor on 830919.New Seal Being Designed by Presray Corp Will Be Installed When Available24 October 1983Part 21 Rept Re Potentially Defective Presray Airlock Seal in Drywell Personnel Airlock Supplied by Wj Woolley. Initially Reported by Vendor on 830919.New Seal Being Designed by Presray Corp Will Be Installed When Available
AECM-83-0706, Interim Deficiency Rept Re Possible Defect on Wj Woolley Co Drywell Personnel Airlock Seals.Evaluation of Reportability Per Part 21 Continuing16 November 1983Interim Deficiency Rept Re Possible Defect on Wj Woolley Co Drywell Personnel Airlock Seals.Evaluation of Reportability Per Part 21 Continuing
AECM-83-0759, Final Part 21 Rept PRD-83/16 for Unit 1 & Interim Part 21 Rept for Unit 2 Re Failure of Internal Coating of Automatic Depressurization Sys,Main Steam Safety Relief Valve & MSIV Accumulators.Final Rept Expected by 84053118 November 1983Final Part 21 Rept PRD-83/16 for Unit 1 & Interim Part 21 Rept for Unit 2 Re Failure of Internal Coating of Automatic Depressurization Sys,Main Steam Safety Relief Valve & MSIV Accumulators.Final Rept Expected by 840531
AECM-83-0822, Interim Part 21 Rept Re Failure of Fuel Oil Mfg by Transamerica Delaval Adjacent to Male Branch Tee on Div I Diesel Generator.Initially Reported on 831230.Fuel Oil Line Support Installed.Next Rept by 8404133 January 1984Interim Part 21 Rept Re Failure of Fuel Oil Mfg by Transamerica Delaval Adjacent to Male Branch Tee on Div I Diesel Generator.Initially Reported on 831230.Fuel Oil Line Support Installed.Next Rept by 840413
AECM-84-0022, Interim Deficiency Rept PRD-84/01 Re Incorrect Installation of 30-volt Dc 22 Microfarad Capacitor in Solid State Trip Unit.Initially Reported on 840105.Final Rept by 840330.Also Reported Per Part 219 January 1984Interim Deficiency Rept PRD-84/01 Re Incorrect Installation of 30-volt Dc 22 Microfarad Capacitor in Solid State Trip Unit.Initially Reported on 840105.Final Rept by 840330.Also Reported Per Part 21Ultimate heat sink
AECM-84-0043, Suppl to Final Part 21 Rept Re Failure of Qualified Cables on Transamerica Delaval Generators to Pass IEEE Flame Test Due to Inadequate Temp Rating for Cable Insulation. Initially Reported on 8212142 February 1984Suppl to Final Part 21 Rept Re Failure of Qualified Cables on Transamerica Delaval Generators to Pass IEEE Flame Test Due to Inadequate Temp Rating for Cable Insulation. Initially Reported on 821214
AECM-84-0063, Final Part 21 Rept PRD 83/08 Re Inability to Maintain Pressurized Water Supply to RHR Pumps & Discharge Piping Supplied by Bechtel.Initially Reported on 830415.Hardware Mods Implemented2 March 1984Final Part 21 Rept PRD 83/08 Re Inability to Maintain Pressurized Water Supply to RHR Pumps & Discharge Piping Supplied by Bechtel.Initially Reported on 830415.Hardware Mods Implemented
AECM-84-0105, Final Deficiency Rept for Unit 1 & Interim Deficiency Rept for Unit 2 Re Cracked Push Rod Balls on Transamerica Delaval Diesel Generators.Initially Reported on 840216.Also Reported Per Part 21 for Unit 1.Next Rept Expected by 84090717 February 1984Final Deficiency Rept for Unit 1 & Interim Deficiency Rept for Unit 2 Re Cracked Push Rod Balls on Transamerica Delaval Diesel Generators.Initially Reported on 840216.Also Reported Per Part 21 for Unit 1.Next Rept Expected by 840907
AECM-84-0148, Final Deficiency Rept Re Incorrect Operation of Div I & II Diesel Generator Load Shedding Sequencing Sys Panels. Initially Reported on 830921.Circuit Cards & Card Racks Returned for Mod.Reinstallation Expected by 84042715 March 1984Final Deficiency Rept Re Incorrect Operation of Div I & II Diesel Generator Load Shedding Sequencing Sys Panels. Initially Reported on 830921.Circuit Cards & Card Racks Returned for Mod.Reinstallation Expected by 840427
AECM-84-0159, Final Deficiency Rept Re anti-rotational Setscrews in Anchor Darling Glove Valves.Initially Reported on 840213.Setscrew Tightened & Stem Collar Threads Staked Using Ctr Punch. Also Reported Per Part 21 for Unit 114 March 1984Final Deficiency Rept Re anti-rotational Setscrews in Anchor Darling Glove Valves.Initially Reported on 840213.Setscrew Tightened & Stem Collar Threads Staked Using Ctr Punch. Also Reported Per Part 21 for Unit 1Anchor Darling
AECM-84-0195, Final Part 21 Rept PRD-84/01 Re Incorrect Installation by Brown Boveri of 30-volt Dc 22 Microfarad Capacitor in Solid State Trip Unit.Initially Reported on 840105.Defective Trip Unit Replaced30 March 1984Final Part 21 Rept PRD-84/01 Re Incorrect Installation by Brown Boveri of 30-volt Dc 22 Microfarad Capacitor in Solid State Trip Unit.Initially Reported on 840105.Defective Trip Unit ReplacedUltimate heat sink
AECM-84-0209, Final Deficiency Rept for Unit 1 & Interim Rept for Unit 2 Re Calculated Max Temp for Main Feedwater Movement Guides Exceeding Original Design Limitation for Concrete within Auxiliary Bldg G-line Wall.Also Reportable Per 10CFR212 April 1984Final Deficiency Rept for Unit 1 & Interim Rept for Unit 2 Re Calculated Max Temp for Main Feedwater Movement Guides Exceeding Original Design Limitation for Concrete within Auxiliary Bldg G-line Wall.Also Reportable Per 10CFR21
AECM-84-0212, Final Part 21 & Deficiency Rept for Unit 1 & Interim Rept 1 for Unit 2 Re Failure of Deluge Valves Mfg by Automatic Sprinkler Corp of America.Initially Reported on 8403196 April 1984Final Part 21 & Deficiency Rept for Unit 1 & Interim Rept 1 for Unit 2 Re Failure of Deluge Valves Mfg by Automatic Sprinkler Corp of America.Initially Reported on 840319
AECM-84-0213, Final Part 21 Rept for Unit 1 & Interim Rept for Unit 2 Re Potential Defect in Spare Piston Skirt Castings. Initially Reported on 840402.Caused by Improper Heat Treating During Mfg.Next Rept Expected by 8410056 April 1984Final Part 21 Rept for Unit 1 & Interim Rept for Unit 2 Re Potential Defect in Spare Piston Skirt Castings. Initially Reported on 840402.Caused by Improper Heat Treating During Mfg.Next Rept Expected by 841005
AECM-84-0236, Final Deficiency & Part 21 Rept Re Defect in Positive Positioning Action of GE Type Sbm Switch.Initially Reported on 840416.Switch Repaired & Returned to GE for Further Investigation of Defect20 April 1984Final Deficiency & Part 21 Rept Re Defect in Positive Positioning Action of GE Type Sbm Switch.Initially Reported on 840416.Switch Repaired & Returned to GE for Further Investigation of Defect
AECM-84-0237, Final Part 21 Rept for Unit 1 & Interim Deficiency Rept for Unit 2 Re Containment Personnel Air Lock Seismic Qualification Supplied by Wj Woolley Co.Initially Reported on 84041620 April 1984Final Part 21 Rept for Unit 1 & Interim Deficiency Rept for Unit 2 Re Containment Personnel Air Lock Seismic Qualification Supplied by Wj Woolley Co.Initially Reported on 840416
AECM-84-0311, Interim Part 21/deficiency Rept Re Flow Rate in Standby Svc Water Sys Loops a & B & Loss of Standby Svc Water Basin Transfer Capability.Initially Reported on 810303.Larger Capacity Pumps Will Be Installed8 June 1984Interim Part 21/deficiency Rept Re Flow Rate in Standby Svc Water Sys Loops a & B & Loss of Standby Svc Water Basin Transfer Capability.Initially Reported on 810303.Larger Capacity Pumps Will Be InstalledSafe Shutdown
Ultimate heat sink
AECM-84-0341, Final Part 21 & Deficiency Rept Re Flow Rate in Standby Svc Water Sys Loops a & B & Loss of Standby Svc Water Basin Transfer Capability.Initially Reported on 81030331 July 1984Final Part 21 & Deficiency Rept Re Flow Rate in Standby Svc Water Sys Loops a & B & Loss of Standby Svc Water Basin Transfer Capability.Initially Reported on 810303Safe Shutdown
Ultimate heat sink
AECM-84-0357, Interim Part 21 & Deficiency Rept 1 Re Pieces of Steel Received for Use from Dubose Steel,Inc.Initially Reported on 840601.Final Determination Underway.Final Rept Expected by 8410316 July 1984Interim Part 21 & Deficiency Rept 1 Re Pieces of Steel Received for Use from Dubose Steel,Inc.Initially Reported on 840601.Final Determination Underway.Final Rept Expected by 841031
AECM-84-0405, Final Part 21/Deficiency Rept PRD-84/10 Re Swelling of Gh Bettis Valve Actuator Ethylene Propylene Rubber Elastomer Seals in Contact W/Hydrocarbon Lubricant.Initially Reported on 840730.Reportable Under Part 21 for Unit 13 August 1984Final Part 21/Deficiency Rept PRD-84/10 Re Swelling of Gh Bettis Valve Actuator Ethylene Propylene Rubber Elastomer Seals in Contact W/Hydrocarbon Lubricant.Initially Reported on 840730.Reportable Under Part 21 for Unit 1Stroke time
AECM-84-0456, Final Deficiency & Part 21 Rept PRD-84/08 Re Failure of Wj Woolley Co to Seismically Qualify Personnel Air Locks Pneumatic Supply Sys.Nrc Should Consider Reevaluation of Failure of Potential Generic Effects of Other Plants3 October 1984Final Deficiency & Part 21 Rept PRD-84/08 Re Failure of Wj Woolley Co to Seismically Qualify Personnel Air Locks Pneumatic Supply Sys.Nrc Should Consider Reevaluation of Failure of Potential Generic Effects of Other Plants