Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
05000304/LER-1986-005, Forwards Errata to LER 86-005-00,correcting Rept Number to LER 86-010-0022 April 1986Forwards Errata to LER 86-005-00,correcting Rept Number to LER 86-010-00
05000304/LER-1988-009, Corrects Typo in Transmittal Ltr for LER 88-009-00.Correct Docket Is 50-304 Not 50-20423 November 1988Corrects Typo in Transmittal Ltr for LER 88-009-00.Correct Docket Is 50-304 Not 50-204
05000304/LER-1996-004, Forwards LER 96-004-01 Re Results of Investigation Into Failure of Unit Containment Inner Air Lock Door.Addl Corrective Action Listed in Attachment a5 September 1997Forwards LER 96-004-01 Re Results of Investigation Into Failure of Unit Containment Inner Air Lock Door.Addl Corrective Action Listed in Attachment a
05000304/LER-1997-001, Forwards LER 97-001-00 Per 10CFR50.73(a)(2)(iv) Which Requires Written Rept Using NRC Form 366, License Event Rept, within 90 Days of Discovery of Event.Attachment a Contains Commitments Associated W/Ltr1 October 1997Forwards LER 97-001-00 Per 10CFR50.73(a)(2)(iv) Which Requires Written Rept Using NRC Form 366, License Event Rept, within 90 Days of Discovery of Event.Attachment a Contains Commitments Associated W/Ltr
05000304/LER-1997-002, Forwards LER 97-002-00,per 10CFR50.73(a)(2)(v)(B),which Requires 30 Day Written Rept.Commitments Associated W/Correspondence,Encl11 November 1997Forwards LER 97-002-00,per 10CFR50.73(a)(2)(v)(B),which Requires 30 Day Written Rept.Commitments Associated W/Correspondence,Encl
05000304/LER-1997-003, Forwards LER 97-003-00 Re Unit 2 RHR Sys Declared Inoperable,Per 10CFR50.73(a)(2)(v)(B)13 November 1997Forwards LER 97-003-00 Re Unit 2 RHR Sys Declared Inoperable,Per 10CFR50.73(a)(2)(v)(B)
05000304/LER-1997-004, Forwards LER 97-004-00,per 10CFR50.73(a)(2)(i).Commitments Associated W/Correspondence,Encl14 November 1997Forwards LER 97-004-00,per 10CFR50.73(a)(2)(i).Commitments Associated W/Correspondence,EnclUnanalyzed Condition
05000304/LER-1997-005, Forwards LER 97-005-00 Which Documents Event That Occurred at Zion Nuclear Power Station,Unit 2.Commitment Made within Ltr,Encl21 November 1997Forwards LER 97-005-00 Which Documents Event That Occurred at Zion Nuclear Power Station,Unit 2.Commitment Made within Ltr,Encl
05000304/LER-1997-006, Forwards LER 97-006-00 Per 10CFR50.73(a)92)(ii)(B) Which Requires 30 Day Written Rept When Any Event or Condition Occurs That Resulted in Condition of Nuclear Power Plant. Regulatory Commitments Encl24 November 1997Forwards LER 97-006-00 Per 10CFR50.73(a)92)(ii)(B) Which Requires 30 Day Written Rept When Any Event or Condition Occurs That Resulted in Condition of Nuclear Power Plant. Regulatory Commitments Encl
05000304/LER-1997-007, Forwards LER 97-007-00 Per 10CFR50.73(a)(2)(v)(B) Which Requires Written Rept for Any Event or Condition That Could Prevent Fulfillment of Safety Function of Structures or Sys Needed to Remove Residual Heat.W/Commitments Attach1 December 1997Forwards LER 97-007-00 Per 10CFR50.73(a)(2)(v)(B) Which Requires Written Rept for Any Event or Condition That Could Prevent Fulfillment of Safety Function of Structures or Sys Needed to Remove Residual Heat.W/Commitments Attached
05000304/LER-1997-008, Forwards LER 97-008-00 Per 10CFR50.73(a)(2)(i)(B),which Requires 30 Day Written Rept.Attachment a Provides Commitments Associated W/Correspondence22 December 1997Forwards LER 97-008-00 Per 10CFR50.73(a)(2)(i)(B),which Requires 30 Day Written Rept.Attachment a Provides Commitments Associated W/Correspondence
05000304/LER-1997-009, Forwards LER 97-009-00,re Event Which Occurred at Zion Nuclear Power Station,Unit 2.Commitments Made within Ltr Also Encl22 December 1997Forwards LER 97-009-00,re Event Which Occurred at Zion Nuclear Power Station,Unit 2.Commitments Made within Ltr Also Encl
05000304/LER-1998-001, Forwards LER 98-001-00,per 10CFR50.73(a)(2)(iv) Which Requires 30 Written Rept Following Event That Resulted in Manual or Automatic Actuation of Any Esf,Including Rps. Commitments Also Encl25 March 1998Forwards LER 98-001-00,per 10CFR50.73(a)(2)(iv) Which Requires 30 Written Rept Following Event That Resulted in Manual or Automatic Actuation of Any Esf,Including Rps. Commitments Also Encl
05000304/LER-1998-002, Forwards LER 98-002-00 IAW 10CFR50.73(a)(2)(i)(B). Commitments Made within Ltr,Encl8 May 1998Forwards LER 98-002-00 IAW 10CFR50.73(a)(2)(i)(B). Commitments Made within Ltr,Encl
A97001, Responds to NRC Re Violations Noted in Insp Repts 50-295/96-14,50-304/96-14,50-295/96-17 & 50-304/96-17. Corrective Actions:Equipment Attendant Removed from Assigned Duties6 March 1997Responds to NRC Re Violations Noted in Insp Repts 50-295/96-14,50-304/96-14,50-295/96-17 & 50-304/96-17. Corrective Actions:Equipment Attendant Removed from Assigned DutiesStroke time
Condition Adverse to Quality
Missed surveillance
Scaffolding
Grace period
A97002, Responds to NRC Re Violations Noted in Insp Repts 50-295/96-11 & 50-304/96-11.Corrective Actions:Clarifed Mgt Expectations to Workforce,Revised Procedures & Conducted Enhanced Safety Evaluation Training.Payment Encl.W/O Encl11 April 1997Responds to NRC Re Violations Noted in Insp Repts 50-295/96-11 & 50-304/96-11.Corrective Actions:Clarifed Mgt Expectations to Workforce,Revised Procedures & Conducted Enhanced Safety Evaluation Training.Payment Encl.W/O EnclCondition Adverse to Quality
Maintenance Rule Program
Scaffolding
A97003, Responds to NRC Re Violations Noted in Insp Repts 50-295/96-20 & 50-304/96-20.Corrective Actions:Training Dept Will Include Discussion of Event in Licensed & non-licensed Operator Training Programs30 April 1997Responds to NRC Re Violations Noted in Insp Repts 50-295/96-20 & 50-304/96-20.Corrective Actions:Training Dept Will Include Discussion of Event in Licensed & non-licensed Operator Training ProgramsCondition Adverse to Quality
A97004, Responds to NRC Re Violations Noted in Insp Repts 50-295/97-08 & 50-304/97-08.Corrective Actions:Will Develop Standard Method of Verification for Audits Prior to Next Performance of Each Audit29 May 1997Responds to NRC Re Violations Noted in Insp Repts 50-295/97-08 & 50-304/97-08.Corrective Actions:Will Develop Standard Method of Verification for Audits Prior to Next Performance of Each Audit
A97005, Forwards Response to Violations Noted in Insp Repts 50-295/97-09 & 50-304/97-09.Corrective Actions:Unsecured Hoses & Cords of Concern Secured According to Station Procedures5 June 1997Forwards Response to Violations Noted in Insp Repts 50-295/97-09 & 50-304/97-09.Corrective Actions:Unsecured Hoses & Cords of Concern Secured According to Station Procedures
A97006, Provides Copy of Addendum to Renewal of NPDES Permit IL000276327 May 1997Provides Copy of Addendum to Renewal of NPDES Permit IL0002763Boric Acid
Coatings
A97010, Requests Authorization for Alternative to One Time Augmented Insp of RPV Shell Welds Set Forth in 10CFR50.55a(g)(6)(ii) (A)(2) Per 10CFR50.55a(g)(6)(ii)(A)(5).Authorization to Use Partial Insp Coverage Requested13 August 1997Requests Authorization for Alternative to One Time Augmented Insp of RPV Shell Welds Set Forth in 10CFR50.55a(g)(6)(ii) (A)(2) Per 10CFR50.55a(g)(6)(ii)(A)(5).Authorization to Use Partial Insp Coverage RequestedVT-2
A97012, Requests Authorization to Use Alternative to Repair & Replacement Requirements Specified in 10CFR50.55a(g)(4)(v) for Class Mc & CC Pressure Retaining Components & Integral Attachments3 September 1997Requests Authorization to Use Alternative to Repair & Replacement Requirements Specified in 10CFR50.55a(g)(4)(v) for Class Mc & CC Pressure Retaining Components & Integral AttachmentsCoatings
A97013, Transmits Request for Authorization to Use Alternative Requirements of Article IWA-5242(a) for Insp of Rv Flanges During Current Unit 1 & 2 Outages Z1R15 & Z2R1413 August 1997Transmits Request for Authorization to Use Alternative Requirements of Article IWA-5242(a) for Insp of Rv Flanges During Current Unit 1 & 2 Outages Z1R15 & Z2R14Boric Acid
VT-2
A97014, Responds to RAI Re Third Interval ISI Relief Request CR-13 & New Relief Request CR-2313 August 1997Responds to RAI Re Third Interval ISI Relief Request CR-13 & New Relief Request CR-23Boric Acid
VT-2
Scaffolding
A97016, Provides Response to 970107 RAI Concerning Containment Coatings at Plant5 September 1997Provides Response to 970107 RAI Concerning Containment Coatings at PlantCoatings
Foreign Material Exclusion
Scaffolding
A97018, Provides Current Status of Outstanding NUREG-0737,Item II.D.1 Issues.Calculations Associated W/Unit 2 Porvs,Encl29 August 1997Provides Current Status of Outstanding NUREG-0737,Item II.D.1 Issues.Calculations Associated W/Unit 2 Porvs,Encl
A97019, Updates Record Copy of Current TS Markup,Accompanying Discussion of Differences,Nureg Mark Ups & No Significant Hazards Evaluation Changes to Reflect Recent Review & Comments by Both Util & NRC Personnel6 June 1997Updates Record Copy of Current TS Markup,Accompanying Discussion of Differences,Nureg Mark Ups & No Significant Hazards Evaluation Changes to Reflect Recent Review & Comments by Both Util & NRC Personnel
A97020, Informs That Pf Cantwell,Jk Duff & J Powers No Longer Need to Maintain Operator Licenses at Plant27 May 1997Informs That Pf Cantwell,Jk Duff & J Powers No Longer Need to Maintain Operator Licenses at Plant
A97023, Provides Response to NRC RAI for Addl Info Re Mod Necessary to Address Issues Identified in GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions9 December 1997Provides Response to NRC RAI for Addl Info Re Mod Necessary to Address Issues Identified in GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions
A97025, Responds to NRC Re Violations Noted in Insp Repts 50-295/97-21 & 50-304/97-21.Corrective Actions:Two Operating Personnel Received Remedial Training & Passed Radioactive Matl Shipping Level 1 Training Course & Revised Procedures17 July 1997Responds to NRC Re Violations Noted in Insp Repts 50-295/97-21 & 50-304/97-21.Corrective Actions:Two Operating Personnel Received Remedial Training & Passed Radioactive Matl Shipping Level 1 Training Course & Revised Procedures
A97028, Submits Withdrawal of 10CFR50,App R Exemption Requests. Listing of Util Commitments Made in Submittal,Encl18 August 1997Submits Withdrawal of 10CFR50,App R Exemption Requests. Listing of Util Commitments Made in Submittal,EnclFire Barrier
Exemption Request
A97031, Responds to NRC Re Violations Noted in Insp Repts 50-295/97-03 & 50-304/97-03.Corrective Actions:Revised Procedure PT-19,installed Mod to Isolate Vpc from Fhb When Wall Is Down & Enhanced 10CFR50.59 SE Process8 August 1997Responds to NRC Re Violations Noted in Insp Repts 50-295/97-03 & 50-304/97-03.Corrective Actions:Revised Procedure PT-19,installed Mod to Isolate Vpc from Fhb When Wall Is Down & Enhanced 10CFR50.59 SE Process
A97032, Provides Clarification of Uncertainties of RHR Operation During Nitrogen Gas Accumulation Event on 9703076 August 1997Provides Clarification of Uncertainties of RHR Operation During Nitrogen Gas Accumulation Event on 970307
A97037, Responds to NRC Re Violations Noted in Insp Rept 50-295/97-12.Corrective Actions:Revised Station Procedures Which Required Enhancements & Completed Preventive Maint on Sequence Timers Using Electrical Maint Procedure E023-118 August 1997Responds to NRC Re Violations Noted in Insp Rept 50-295/97-12.Corrective Actions:Revised Station Procedures Which Required Enhancements & Completed Preventive Maint on Sequence Timers Using Electrical Maint Procedure E023-1Safe Shutdown
Condition Adverse to Quality
A97038, Forwards Corrections for Mar & Apr 1996 & Jul 1997 Operating Status Repts for Zion Generating Station14 August 1997Forwards Corrections for Mar & Apr 1996 & Jul 1997 Operating Status Repts for Zion Generating Station
A97040, Forwards Response to NRC Re Violations Noted in Insp Repts 50-295/97-13 & 50-304/97-13.Corrective Actions: Operations Manager Met W/Each Shift Manager & Other Key Supervisors to Point Out Accountability Re Overtime15 September 1997Forwards Response to NRC Re Violations Noted in Insp Repts 50-295/97-13 & 50-304/97-13.Corrective Actions: Operations Manager Met W/Each Shift Manager & Other Key Supervisors to Point Out Accountability Re Overtime
A97047, Responds to NRC Re Violations Noted in Insp Repts 50-295/97-20 & 50-304/97-20.Corrective Actions:Will Develop, Document & Issue Written Expectations Which Enhance Surveying & Posting Contaminated Areas by 97112425 September 1997Responds to NRC Re Violations Noted in Insp Repts 50-295/97-20 & 50-304/97-20.Corrective Actions:Will Develop, Document & Issue Written Expectations Which Enhance Surveying & Posting Contaminated Areas by 971124Grab sample
A97050, Responds to NRC Re Violations Noted in Insp Repts 50-295/97-13 & 50-304/97-13.Corrective Actions:Issued Nuclear Operations Notification to Other Comed Nuclear Facilities & Will Review & Evaluate Training Re Procedures29 September 1997Responds to NRC Re Violations Noted in Insp Repts 50-295/97-13 & 50-304/97-13.Corrective Actions:Issued Nuclear Operations Notification to Other Comed Nuclear Facilities & Will Review & Evaluate Training Re ProceduresForeign Material Exclusion
A97051, Responds to NRC Re Violations Noted in Insp Repts 50-295/97-17 & 50-304/97-17.CAs:unescorted Access Was Placed on Temporary Hold for Director of Fire Protection,Fire Marshal & 2 Firewatch Supervisors Pending Investigation13 February 1998Responds to NRC Re Violations Noted in Insp Repts 50-295/97-17 & 50-304/97-17.CAs:unescorted Access Was Placed on Temporary Hold for Director of Fire Protection,Fire Marshal & 2 Firewatch Supervisors Pending Investigation
A97052, Responds to NRC Re Violations Noted in Insp Repts 50-295/97-02,50-304/97-02,50-295/97-07 & 50-304/97-07, Respectively.Corrective Actions:Placed Both Units in Cold Shutdown & Removed Operators Involved in Event1 October 1997Responds to NRC Re Violations Noted in Insp Repts 50-295/97-02,50-304/97-02,50-295/97-07 & 50-304/97-07, Respectively.Corrective Actions:Placed Both Units in Cold Shutdown & Removed Operators Involved in EventReactor Vessel Water Level
Condition Adverse to Quality
A97055, Forwards Supplemental Info to Annual 10CFR50.46 Rept Re Changes to or Errors Discovered in Acceptable ECCS Cooling Performance Evaluation Model11 November 1997Forwards Supplemental Info to Annual 10CFR50.46 Rept Re Changes to or Errors Discovered in Acceptable ECCS Cooling Performance Evaluation Model
A97061, Informs NRC of Rev to NOV Commitment Made in Responding to Violations Noted in Insp Repts 50-295/96-06 & 50-304/96-06.Test Requirements Are Now Assigned from post- Maint Testing Matrix During Work Planning Effort26 November 1997Informs NRC of Rev to NOV Commitment Made in Responding to Violations Noted in Insp Repts 50-295/96-06 & 50-304/96-06.Test Requirements Are Now Assigned from post- Maint Testing Matrix During Work Planning Effort
A97062, Suppls Previous Submittals W/Proposed Change to LCO 3.3.1 & 3.3.2,adding Info to Bases to Specifically Identify Refs Used in Determining Allowable Values10 November 1997Suppls Previous Submittals W/Proposed Change to LCO 3.3.1 & 3.3.2,adding Info to Bases to Specifically Identify Refs Used in Determining Allowable Values
A97067, Provides Detailed Response as Committed to in Util Ltrs to NRC & 1103 Re Violations Noted in Insp Repts 50-295/97-19 & 50-304/97-19.Corrective Actions:Sys Engineering Personnel Briefed on Need to Ensure Offsite Svc21 November 1997Provides Detailed Response as Committed to in Util Ltrs to NRC & 1103 Re Violations Noted in Insp Repts 50-295/97-19 & 50-304/97-19.Corrective Actions:Sys Engineering Personnel Briefed on Need to Ensure Offsite SvcSafe Shutdown
A97068, Forwards Independent Investigation Rept Assessing Safety Conscious Work Environ at Zion Station.Rept Details Team Investigation,Conclusions & Basis for Conclusions,As Requested in5 December 1997Forwards Independent Investigation Rept Assessing Safety Conscious Work Environ at Zion Station.Rept Details Team Investigation,Conclusions & Basis for Conclusions,As Requested inOpen House
A97071, Provides Response to Request for Addl Info for Evaluation of Third 10-yr Interval Insp Program Plan Request for Relief CR-25,per NRC21 November 1997Provides Response to Request for Addl Info for Evaluation of Third 10-yr Interval Insp Program Plan Request for Relief CR-25,per NRCBoric Acid
Liquid penetrant
A97073, Forwards Zion Station Unit 2 SG ISI Results,Fall 1996 Refueling Outage 14 (Z2R14). List of Commitments Made in Submittal,Attached26 November 1997Forwards Zion Station Unit 2 SG ISI Results,Fall 1996 Refueling Outage 14 (Z2R14). List of Commitments Made in Submittal,Attached
A97075, Responds to NRC Re Violations Noted in Insp Repts 50-295/97-22 & 50-304/97-22.Corrective Actions:Configuration Control Root Cause Investigation Was Completed in Nov 199723 December 1997Responds to NRC Re Violations Noted in Insp Repts 50-295/97-22 & 50-304/97-22.Corrective Actions:Configuration Control Root Cause Investigation Was Completed in Nov 1997Boric Acid
Foreign Material Exclusion
A97079, Responds to NRC Re Violations Noted in Insp Repts 50-295/97-26 & 50-304/97-26.Corrective Actions:All Other R-key Doors in Building Were Verified Closed & Locked22 December 1997Responds to NRC Re Violations Noted in Insp Repts 50-295/97-26 & 50-304/97-26.Corrective Actions:All Other R-key Doors in Building Were Verified Closed & LockedHigh Radiation Area
A98001, Withdraws Three Applications to Amend App a (TS) to Licenses DPR-39 & DPR-48.Requested Amends Proposed Changes to Ts. Determined That Amends Are No Longer Needed12 February 1998Withdraws Three Applications to Amend App a (TS) to Licenses DPR-39 & DPR-48.Requested Amends Proposed Changes to Ts. Determined That Amends Are No Longer Needed