A05664, Responds to NRC Re Violations Noted in Insp Rept 50-213/86-01.Corrective Actions:Design Changes Made from 1979-1984 Reviewed & Revised.Violations Re Design Change Numbering Sys & QA Procedures Unjustified | 12 May 1986 | Responds to NRC Re Violations Noted in Insp Rept 50-213/86-01.Corrective Actions:Design Changes Made from 1979-1984 Reviewed & Revised.Violations Re Design Change Numbering Sys & QA Procedures Unjustified | |
A05669, Responds to Violations Noted in Insp Rept 50-213/86-02. Corrective Actions:Procedure RAP 6.3-5 Changed to Stress That Compactor to Be Used Only for Normal Compacting Operations Unless Approved by Health Physics Supervisor | 5 May 1986 | Responds to Violations Noted in Insp Rept 50-213/86-02. Corrective Actions:Procedure RAP 6.3-5 Changed to Stress That Compactor to Be Used Only for Normal Compacting Operations Unless Approved by Health Physics Supervisor | |
A05679, Forwards Rev to non-LOCA DBA Analysis on Loss of Normal Feedwater Flow,Per Util 861024 Commitment.Conclusions for Loss of Normal Feedwater Flow Remain Unchanged from 860630 Reanalysis of non-LOCA DBA | 10 March 1987 | Forwards Rev to non-LOCA DBA Analysis on Loss of Normal Feedwater Flow,Per Util 861024 Commitment.Conclusions for Loss of Normal Feedwater Flow Remain Unchanged from 860630 Reanalysis of non-LOCA DBA | |
A05700, Responds to NRC Re Violations Noted in Insp Rept 50-213/86-05.Review of Complete Mod Packages Performed Per Tech Spec 6.5.2 by Plant Operations Review Committee | 19 May 1986 | Responds to NRC Re Violations Noted in Insp Rept 50-213/86-05.Review of Complete Mod Packages Performed Per Tech Spec 6.5.2 by Plant Operations Review Committee | |
A05763, Responds to Violations Noted in Insp Rept 50-213/86-03. Corrective Actions:Procedure NOP 2.19-5 Approved on 860409 to Be Routed to All Licensed Operators & Onsite Engineering Personnel by 860627 | 3 June 1986 | Responds to Violations Noted in Insp Rept 50-213/86-03. Corrective Actions:Procedure NOP 2.19-5 Approved on 860409 to Be Routed to All Licensed Operators & Onsite Engineering Personnel by 860627 | |
A05775, Forwards Updated List of Completed Isap Topics & List of New Topics to Be Evaluated in Isap Program,Per 860509 Request.Deterministic Reviews of Each Topic Will Be Forwarded | 16 July 1986 | Forwards Updated List of Completed Isap Topics & List of New Topics to Be Evaluated in Isap Program,Per 860509 Request.Deterministic Reviews of Each Topic Will Be Forwarded | |
A05804, Responds to NRC Re Violations Noted in Insp Rept 50-213/86-08.Corrective Actions:Util Submitted Request for Schedular Exemption from Requirements of 10CFR50,App J, Pending Resolution of Integrated Safety Assessment 1.03 | 25 June 1986 | Responds to NRC Re Violations Noted in Insp Rept 50-213/86-08.Corrective Actions:Util Submitted Request for Schedular Exemption from Requirements of 10CFR50,App J, Pending Resolution of Integrated Safety Assessment 1.03 | Exemption Request |
A05805, Forwards Response to NRC Request for Addl Info Re Plant Crdr Implementation Plan,Per Suppl 1 to NUREG-0737.CRDR Summary Rept Will Be Provided by 880225 | 20 August 1987 | Forwards Response to NRC Request for Addl Info Re Plant Crdr Implementation Plan,Per Suppl 1 to NUREG-0737.CRDR Summary Rept Will Be Provided by 880225 | |
A05836, Responds to IE Info Notice 86-047, Erratic Behavior of Static O-Ring Differential Pressure Switches. Based on Util Investigations,Switches Not Used in Integrated Safety Application.Issue Inapplicable to Plants | 3 July 1986 | Responds to IE Info Notice 86-047, Erratic Behavior of Static O-Ring Differential Pressure Switches. Based on Util Investigations,Switches Not Used in Integrated Safety Application.Issue Inapplicable to Plants | |
A05884, Suppls 860729 Response to Violations Noted in Insp Rept 50-213/86-15.Nuclear Review Board Audits Conducted Annually Per Tech Spec 6.5.2.8.Tech Specs Implemented on 860101 & Audited in May & June of 1986 | 26 September 1986 | Suppls 860729 Response to Violations Noted in Insp Rept 50-213/86-15.Nuclear Review Board Audits Conducted Annually Per Tech Spec 6.5.2.8.Tech Specs Implemented on 860101 & Audited in May & June of 1986 | |
A05899, Documents 860703 Oral Comments on NRC Isap Review of Facility Operating History Through 1984.All Refs to FSAR Should Be Revised to Facility Description & Safety Analysis | 19 August 1986 | Documents 860703 Oral Comments on NRC Isap Review of Facility Operating History Through 1984.All Refs to FSAR Should Be Revised to Facility Description & Safety Analysis | |
A05911, Responds to IE Bulletin 86-002, Static O-Ring Differential Pressure Switches. Switches Will Not Be Used in safety- Related Applications,Per 860703 Response to IE Info Notice 86-047, Erratic Behavior of Static O-Ring.. | 25 July 1986 | Responds to IE Bulletin 86-002, Static O-Ring Differential Pressure Switches. Switches Will Not Be Used in safety- Related Applications,Per 860703 Response to IE Info Notice 86-047, Erratic Behavior of Static O-Ring.. | |
A05914, Forwards Comments on NRC Contractor Draft Rept Re Probabilistic Safety Study,Per NRC 860716 Request | 8 September 1986 | Forwards Comments on NRC Contractor Draft Rept Re Probabilistic Safety Study,Per NRC 860716 Request | |
A05946, Forwards Response to Open Items Identified During 860508 Meeting Re Proposed Rev to Pump & Valve Inservice Testing Program.Rev IWV-1 Table for Valve Testing Program, Description of ECCS Full Flow Test & Insp Procedure Encl | 4 February 1987 | Forwards Response to Open Items Identified During 860508 Meeting Re Proposed Rev to Pump & Valve Inservice Testing Program.Rev IWV-1 Table for Valve Testing Program, Description of ECCS Full Flow Test & Insp Procedure Encl | Safe Shutdown Boric Acid Stroke time Power Operated Valves |
A05951, Suppls Response to Violations Noted in Insp Rept 50-213/86-17,per 860903 Mgt Meeting.Info Consisting of Review of Actual Tank Levels & Annunciator Response Procedures for Tank Low Level Alarms Forwarded on 860908-12 | 26 September 1986 | Suppls Response to Violations Noted in Insp Rept 50-213/86-17,per 860903 Mgt Meeting.Info Consisting of Review of Actual Tank Levels & Annunciator Response Procedures for Tank Low Level Alarms Forwarded on 860908-12 | |
A05959, Forwards Draft Version of Spec for Insp,Evaluation & Repair of Cracks in Safety-Related Concrete Masonry Walls, Per IE Bulletin 80-11.Spec Should Be Incorporated Into Plant Procedures by Jul 1987 | 12 March 1987 | Forwards Draft Version of Spec for Insp,Evaluation & Repair of Cracks in Safety-Related Concrete Masonry Walls, Per IE Bulletin 80-11.Spec Should Be Incorporated Into Plant Procedures by Jul 1987 | High Radiation Area |
A05983, Responds to NRC Re Violations Noted in Insp Rept 50-213/86-19.Corrective Actions:Requirement to Follow Procedures Will Be Emphasized W/All Employees in Dept Meetings Planned for Sept/Oct | 3 September 1986 | Responds to NRC Re Violations Noted in Insp Rept 50-213/86-19.Corrective Actions:Requirement to Follow Procedures Will Be Emphasized W/All Employees in Dept Meetings Planned for Sept/Oct | |
A05988, Advises That Revised Inservice Testing Program & Associated Relief Requests Will Be Submitted by 870228 for Review. Testing Currently Being Performed Should Be Continued Until Code Required Testing Can Be Performed | 9 October 1986 | Advises That Revised Inservice Testing Program & Associated Relief Requests Will Be Submitted by 870228 for Review. Testing Currently Being Performed Should Be Continued Until Code Required Testing Can Be Performed | |
A05996, Remits Class III Fee for 820723 Application,Per | 18 September 1986 | Remits Class III Fee for 820723 Application,Per | |
A06006, Provides Clarification of Issues Raised During 860904 Enforcement Conference & Insp 50-213/86-22 Re Radiation Worker Overexposure Incident.Health Physics Technician Failed to Perform Satisfactorily Due to Inadequate Training | 11 September 1986 | Provides Clarification of Issues Raised During 860904 Enforcement Conference & Insp 50-213/86-22 Re Radiation Worker Overexposure Incident.Health Physics Technician Failed to Perform Satisfactorily Due to Inadequate Training | |
A06023, Forwards Estimated Schedules for Operator Licensing Exams for FY87-90,in Response to Generic Ltr 86-14 | 1 October 1986 | Forwards Estimated Schedules for Operator Licensing Exams for FY87-90,in Response to Generic Ltr 86-14 | |
A06040, Forwards Manual of Containment Boundary Valves Opened During Operation & Assessment of 861008 Event,Per 861014 Commitment in Response to Insp Rept 50-213/86-20.Event Not Reportable as LER Since Intent of Tech Specs Satisfied | 24 October 1986 | Forwards Manual of Containment Boundary Valves Opened During Operation & Assessment of 861008 Event,Per 861014 Commitment in Response to Insp Rept 50-213/86-20.Event Not Reportable as LER Since Intent of Tech Specs Satisfied | |
A06070, Requests That Portion of 850510 Amend Request Re Movement of Fuel within Reactor Pressure Vessel Be Retracted,Per Fm Akstulewicz 860903 Request That Util Reconsider Amend Request | 22 October 1986 | Requests That Portion of 850510 Amend Request Re Movement of Fuel within Reactor Pressure Vessel Be Retracted,Per Fm Akstulewicz 860903 Request That Util Reconsider Amend Request | |
A06097, Submits Addl Info Re SEP Topic III-3.C, Inservice Insp of Water Control Structures, in Response to 860918 Request. Qualified Engineer Will Be Assigned Responsibility for All Phases of Insps | 4 December 1986 | Submits Addl Info Re SEP Topic III-3.C, Inservice Insp of Water Control Structures, in Response to 860918 Request. Qualified Engineer Will Be Assigned Responsibility for All Phases of Insps | |
A06102, Forwards Application Fee for Review & Approval of Interim Acceptance Criteria for Steam Generator Tubes,Per 860724 Submittal,In Response to 860922 Request | 6 October 1986 | Forwards Application Fee for Review & Approval of Interim Acceptance Criteria for Steam Generator Tubes,Per 860724 Submittal,In Response to 860922 Request | |
A06113, Forwards Addl Info Re Spds,In Response to NRC 860924 Request on Isap Topic 1.20 | 15 December 1986 | Forwards Addl Info Re Spds,In Response to NRC 860924 Request on Isap Topic 1.20 | |
A06149, Forwards Fee for Request for Relief from Insp of Longitudinal & Circumferential Pipe Welds for Facility | 30 October 1986 | Forwards Fee for Request for Relief from Insp of Longitudinal & Circumferential Pipe Welds for Facility | |
A06150, Responds to IE Bulletin 86-003, Potential Failure of Multiple ECCS Pumps Due to Single Failure of Air-Operated Valve in Min Flow Recirculation Line. Safety Concerns Inapplicable to Plants | 20 November 1986 | Responds to IE Bulletin 86-003, Potential Failure of Multiple ECCS Pumps Due to Single Failure of Air-Operated Valve in Min Flow Recirculation Line. Safety Concerns Inapplicable to Plants | |
A06207, Forwards Responses to 861106 Request for Addl Info Re Util Request for Relief from Certain Code Category B-J Weld Inservice Insp Requirements.Isometric Drawings Encl | 26 January 1987 | Forwards Responses to 861106 Request for Addl Info Re Util Request for Relief from Certain Code Category B-J Weld Inservice Insp Requirements.Isometric Drawings Encl | |
A06243, Responds to NRC Re Violations Noted in Insp Rept 50-213/86-27 on 861001-1117.Corrective Actions:Amend Request for Tech Spec Changes Will Be Submitted to Allow Opening of Valve CC-V-884 as Well as Other Identified Valves | 24 December 1986 | Responds to NRC Re Violations Noted in Insp Rept 50-213/86-27 on 861001-1117.Corrective Actions:Amend Request for Tech Spec Changes Will Be Submitted to Allow Opening of Valve CC-V-884 as Well as Other Identified Valves | Enforcement Discretion |
A06244, Ack Receipt of Invoices for Second Installment of Annual Fees,Per 10CFR171.Fee Will Be Wire Transferred on 870130 in Payment of Invoices.Invoices & Procedures for Electronic Transfer of Funds Encl | 7 January 1987 | Ack Receipt of Invoices for Second Installment of Annual Fees,Per 10CFR171.Fee Will Be Wire Transferred on 870130 in Payment of Invoices.Invoices & Procedures for Electronic Transfer of Funds Encl | |
A06299, Informs That Insp Fees Noted in Encl Invoice Remitted to Ofc of Resource Mgt | 15 January 1987 | Informs That Insp Fees Noted in Encl Invoice Remitted to Ofc of Resource Mgt | |
A06347, Forwards Fee for 861124 Request for Deferrment of Completion of Switchgear Room Halon Sys Mods to 1987 Refueling Outage or First Outage of Last 8 Wk Duration Commencing After 870101 | 19 February 1987 | Forwards Fee for 861124 Request for Deferrment of Completion of Switchgear Room Halon Sys Mods to 1987 Refueling Outage or First Outage of Last 8 Wk Duration Commencing After 870101 | |
A06374, Responds to Violation Noted in Insp Rept 50-213/87-01. Corrective Actions:Procedure ACP 1.2-6.4 Revised on 870115 by Indicating That Substitutions Could Be Made Only If Substitute Instrumentation Has Equal or Better Accuracy | 10 March 1987 | Responds to Violation Noted in Insp Rept 50-213/87-01. Corrective Actions:Procedure ACP 1.2-6.4 Revised on 870115 by Indicating That Substitutions Could Be Made Only If Substitute Instrumentation Has Equal or Better Accuracy | |
A06384, Informs That Reactor Trip Sys Included in Westinghouse/Util Vendor Interface Program,Per NRC 870224 Request & Generic Ltr 86-38,Item 2.1.2 | 5 March 1987 | Informs That Reactor Trip Sys Included in Westinghouse/Util Vendor Interface Program,Per NRC 870224 Request & Generic Ltr 86-38,Item 2.1.2 | |
A06421, Forwards Response to 870427 Request for Addl Info Re NULAP5. Lack of Water Slug Formation Due to HPI Would Be Independent of Nodalization in Sys Representation | 2 June 1987 | Forwards Response to 870427 Request for Addl Info Re NULAP5. Lack of Water Slug Formation Due to HPI Would Be Independent of Nodalization in Sys Representation | |
A06447, Advises That Third Quarterly Installment of FY87 Annual Fee Per 10CFR171 Will Be Transferred on 870430 in Payment of Encl Invoices | 24 April 1987 | Advises That Third Quarterly Installment of FY87 Annual Fee Per 10CFR171 Will Be Transferred on 870430 in Payment of Encl Invoices | |
A06472, Forwards Response to NRC 870402 Request for Addl Info Re Nusco 140-1, Nusco Thermal Hydraulic Model Qualifcation Vol 1 (Retran). Util Staff Available to Hold Meeting During Wk of 870518 | 7 May 1987 | Forwards Response to NRC 870402 Request for Addl Info Re Nusco 140-1, Nusco Thermal Hydraulic Model Qualifcation Vol 1 (Retran). Util Staff Available to Hold Meeting During Wk of 870518 | |
A06508, Remits Fee Re 870401 Submittal of Updated Bimonthly Progress Rept & Design Info for New Switchgear Bldg,Per 870422 Request.Fee Required Since NRC Review Requested | 18 May 1987 | Remits Fee Re 870401 Submittal of Updated Bimonthly Progress Rept & Design Info for New Switchgear Bldg,Per 870422 Request.Fee Required Since NRC Review Requested | |
A06518, Ack Receipt of Listed Invoices for Cost Incurred for Review of Facility Submittals.Fee Paid.License Number for Millstone Unit 3 Incorrect on Invoice 1099A | 18 May 1987 | Ack Receipt of Listed Invoices for Cost Incurred for Review of Facility Submittals.Fee Paid.License Number for Millstone Unit 3 Incorrect on Invoice 1099A | |
A06539, Ack Receipt of Encl NRC Invoices for Costs Incurred in Review of Util Submittals for Plants.Fee Will Be Sent to J Rodriquez,Per 10CFR50,55 & 170 | 29 May 1987 | Ack Receipt of Encl NRC Invoices for Costs Incurred in Review of Util Submittals for Plants.Fee Will Be Sent to J Rodriquez,Per 10CFR50,55 & 170 | |
A06584, Responds to NRC 870527,0602 & 25 Requests for Addl Info Re Util Responses to Generic Ltr 83-28,Item 2.2.Util Will Perform Generic Review of Issue for Haddam Neck & Millstone Units 1,2 & 3 & Submit Addl Info by 871002 | 30 July 1987 | Responds to NRC 870527,0602 & 25 Requests for Addl Info Re Util Responses to Generic Ltr 83-28,Item 2.2.Util Will Perform Generic Review of Issue for Haddam Neck & Millstone Units 1,2 & 3 & Submit Addl Info by 871002 | |
A06595, Forwards Addl Info Re Generic Ltr 83-28,Item 2.2,per NRC 870527,0602 & 25 Requests | 25 September 1987 | Forwards Addl Info Re Generic Ltr 83-28,Item 2.2,per NRC 870527,0602 & 25 Requests | |
A06635, Advises That Fourth Quarterly Installment of 1987 Annual Fee Will Be Wire Transferred on 870731.Invoices F1269,F1302, F1303 & F1304 Encl | 14 July 1987 | Advises That Fourth Quarterly Installment of 1987 Annual Fee Will Be Wire Transferred on 870731.Invoices F1269,F1302, F1303 & F1304 Encl | |
A06648, Forwards Fee for 870601 Application for Amend to Inservice Insp Programs to Utilize ASME Code Section XI,1983 Edition, Subarticle IWF-3400, Acceptance Stds, Per RM Diggs 870701 Request | 15 July 1987 | Forwards Fee for 870601 Application for Amend to Inservice Insp Programs to Utilize ASME Code Section XI,1983 Edition, Subarticle IWF-3400, Acceptance Stds, Per RM Diggs 870701 Request | |
A06649, Updates 870805 Response to NRC Informing of Steps Taken to Correct Deviation Noted in Insp Rept 50-213/87-10. Review of Emergency Operating Procedures Will Be Completed by 880311.Simulator Training Matls Revised | 18 December 1987 | Updates 870805 Response to NRC Informing of Steps Taken to Correct Deviation Noted in Insp Rept 50-213/87-10. Review of Emergency Operating Procedures Will Be Completed by 880311.Simulator Training Matls Revised | Probabilistic Risk Assessment |
A06665, Forwards Response to NRC Bulletin 87-001, Thinning of Pipe Walls in Nuclear Power Plants. Util Intends to Meet NUMARC Guidelines on Pipe Wall Thinning in high-energy Piping Sys | 11 September 1987 | Forwards Response to NRC Bulletin 87-001, Thinning of Pipe Walls in Nuclear Power Plants. Util Intends to Meet NUMARC Guidelines on Pipe Wall Thinning in high-energy Piping Sys | |
A06692, Informs of Payment to Ofc of Resource Mgt for Encl Invoices 1507A,1511A,1527A & 1532A | 14 August 1987 | Informs of Payment to Ofc of Resource Mgt for Encl Invoices 1507A,1511A,1527A & 1532A | |
A06748, Forwards Response to NRC Topic Evaluations Status of Integrated Safety Assessment Program Topics & Review of Draft NUREG-1185.Attachment a Provides Discussion on Scope, Evaluation & Prioritization of Each Topic | 13 November 1987 | Forwards Response to NRC Topic Evaluations Status of Integrated Safety Assessment Program Topics & Review of Draft NUREG-1185.Attachment a Provides Discussion on Scope, Evaluation & Prioritization of Each Topic | High Radiation Area Fire Barrier Tornado Missile Internal Flooding Probabilistic Risk Assessment Nondestructive Examination Exemption Request Earthquake Backfit Overexposure |
A06779, Informs That Util Will Provide Response to NRC 870824,0903 & 04 Requests for Addl Info Re Generic Ltr 83-28,Item 4.2 or Schedule for Addressing Requests by 871215,once Scope of Work Properly Defined | 8 October 1987 | Informs That Util Will Provide Response to NRC 870824,0903 & 04 Requests for Addl Info Re Generic Ltr 83-28,Item 4.2 or Schedule for Addressing Requests by 871215,once Scope of Work Properly Defined | |