Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
A05664, Responds to NRC Re Violations Noted in Insp Rept 50-213/86-01.Corrective Actions:Design Changes Made from 1979-1984 Reviewed & Revised.Violations Re Design Change Numbering Sys & QA Procedures Unjustified12 May 1986Responds to NRC Re Violations Noted in Insp Rept 50-213/86-01.Corrective Actions:Design Changes Made from 1979-1984 Reviewed & Revised.Violations Re Design Change Numbering Sys & QA Procedures Unjustified
A05669, Responds to Violations Noted in Insp Rept 50-213/86-02. Corrective Actions:Procedure RAP 6.3-5 Changed to Stress That Compactor to Be Used Only for Normal Compacting Operations Unless Approved by Health Physics Supervisor5 May 1986Responds to Violations Noted in Insp Rept 50-213/86-02. Corrective Actions:Procedure RAP 6.3-5 Changed to Stress That Compactor to Be Used Only for Normal Compacting Operations Unless Approved by Health Physics Supervisor
A05679, Forwards Rev to non-LOCA DBA Analysis on Loss of Normal Feedwater Flow,Per Util 861024 Commitment.Conclusions for Loss of Normal Feedwater Flow Remain Unchanged from 860630 Reanalysis of non-LOCA DBA10 March 1987Forwards Rev to non-LOCA DBA Analysis on Loss of Normal Feedwater Flow,Per Util 861024 Commitment.Conclusions for Loss of Normal Feedwater Flow Remain Unchanged from 860630 Reanalysis of non-LOCA DBA
A05700, Responds to NRC Re Violations Noted in Insp Rept 50-213/86-05.Review of Complete Mod Packages Performed Per Tech Spec 6.5.2 by Plant Operations Review Committee19 May 1986Responds to NRC Re Violations Noted in Insp Rept 50-213/86-05.Review of Complete Mod Packages Performed Per Tech Spec 6.5.2 by Plant Operations Review Committee
A05763, Responds to Violations Noted in Insp Rept 50-213/86-03. Corrective Actions:Procedure NOP 2.19-5 Approved on 860409 to Be Routed to All Licensed Operators & Onsite Engineering Personnel by 8606273 June 1986Responds to Violations Noted in Insp Rept 50-213/86-03. Corrective Actions:Procedure NOP 2.19-5 Approved on 860409 to Be Routed to All Licensed Operators & Onsite Engineering Personnel by 860627
A05775, Forwards Updated List of Completed Isap Topics & List of New Topics to Be Evaluated in Isap Program,Per 860509 Request.Deterministic Reviews of Each Topic Will Be Forwarded16 July 1986Forwards Updated List of Completed Isap Topics & List of New Topics to Be Evaluated in Isap Program,Per 860509 Request.Deterministic Reviews of Each Topic Will Be Forwarded
A05804, Responds to NRC Re Violations Noted in Insp Rept 50-213/86-08.Corrective Actions:Util Submitted Request for Schedular Exemption from Requirements of 10CFR50,App J, Pending Resolution of Integrated Safety Assessment 1.0325 June 1986Responds to NRC Re Violations Noted in Insp Rept 50-213/86-08.Corrective Actions:Util Submitted Request for Schedular Exemption from Requirements of 10CFR50,App J, Pending Resolution of Integrated Safety Assessment 1.03Exemption Request
A05805, Forwards Response to NRC Request for Addl Info Re Plant Crdr Implementation Plan,Per Suppl 1 to NUREG-0737.CRDR Summary Rept Will Be Provided by 88022520 August 1987Forwards Response to NRC Request for Addl Info Re Plant Crdr Implementation Plan,Per Suppl 1 to NUREG-0737.CRDR Summary Rept Will Be Provided by 880225
A05836, Responds to IE Info Notice 86-047, Erratic Behavior of Static O-Ring Differential Pressure Switches. Based on Util Investigations,Switches Not Used in Integrated Safety Application.Issue Inapplicable to Plants3 July 1986Responds to IE Info Notice 86-047, Erratic Behavior of Static O-Ring Differential Pressure Switches. Based on Util Investigations,Switches Not Used in Integrated Safety Application.Issue Inapplicable to Plants
A05884, Suppls 860729 Response to Violations Noted in Insp Rept 50-213/86-15.Nuclear Review Board Audits Conducted Annually Per Tech Spec 6.5.2.8.Tech Specs Implemented on 860101 & Audited in May & June of 198626 September 1986Suppls 860729 Response to Violations Noted in Insp Rept 50-213/86-15.Nuclear Review Board Audits Conducted Annually Per Tech Spec 6.5.2.8.Tech Specs Implemented on 860101 & Audited in May & June of 1986
A05899, Documents 860703 Oral Comments on NRC Isap Review of Facility Operating History Through 1984.All Refs to FSAR Should Be Revised to Facility Description & Safety Analysis19 August 1986Documents 860703 Oral Comments on NRC Isap Review of Facility Operating History Through 1984.All Refs to FSAR Should Be Revised to Facility Description & Safety Analysis
A05911, Responds to IE Bulletin 86-002, Static O-Ring Differential Pressure Switches. Switches Will Not Be Used in safety- Related Applications,Per 860703 Response to IE Info Notice 86-047, Erratic Behavior of Static O-Ring..25 July 1986Responds to IE Bulletin 86-002, Static O-Ring Differential Pressure Switches. Switches Will Not Be Used in safety- Related Applications,Per 860703 Response to IE Info Notice 86-047, Erratic Behavior of Static O-Ring..
A05914, Forwards Comments on NRC Contractor Draft Rept Re Probabilistic Safety Study,Per NRC 860716 Request8 September 1986Forwards Comments on NRC Contractor Draft Rept Re Probabilistic Safety Study,Per NRC 860716 Request
A05946, Forwards Response to Open Items Identified During 860508 Meeting Re Proposed Rev to Pump & Valve Inservice Testing Program.Rev IWV-1 Table for Valve Testing Program, Description of ECCS Full Flow Test & Insp Procedure Encl4 February 1987Forwards Response to Open Items Identified During 860508 Meeting Re Proposed Rev to Pump & Valve Inservice Testing Program.Rev IWV-1 Table for Valve Testing Program, Description of ECCS Full Flow Test & Insp Procedure EnclSafe Shutdown
Boric Acid
Stroke time
Power Operated Valves
A05951, Suppls Response to Violations Noted in Insp Rept 50-213/86-17,per 860903 Mgt Meeting.Info Consisting of Review of Actual Tank Levels & Annunciator Response Procedures for Tank Low Level Alarms Forwarded on 860908-1226 September 1986Suppls Response to Violations Noted in Insp Rept 50-213/86-17,per 860903 Mgt Meeting.Info Consisting of Review of Actual Tank Levels & Annunciator Response Procedures for Tank Low Level Alarms Forwarded on 860908-12
A05959, Forwards Draft Version of Spec for Insp,Evaluation & Repair of Cracks in Safety-Related Concrete Masonry Walls, Per IE Bulletin 80-11.Spec Should Be Incorporated Into Plant Procedures by Jul 198712 March 1987Forwards Draft Version of Spec for Insp,Evaluation & Repair of Cracks in Safety-Related Concrete Masonry Walls, Per IE Bulletin 80-11.Spec Should Be Incorporated Into Plant Procedures by Jul 1987High Radiation Area
A05983, Responds to NRC Re Violations Noted in Insp Rept 50-213/86-19.Corrective Actions:Requirement to Follow Procedures Will Be Emphasized W/All Employees in Dept Meetings Planned for Sept/Oct3 September 1986Responds to NRC Re Violations Noted in Insp Rept 50-213/86-19.Corrective Actions:Requirement to Follow Procedures Will Be Emphasized W/All Employees in Dept Meetings Planned for Sept/Oct
A05988, Advises That Revised Inservice Testing Program & Associated Relief Requests Will Be Submitted by 870228 for Review. Testing Currently Being Performed Should Be Continued Until Code Required Testing Can Be Performed9 October 1986Advises That Revised Inservice Testing Program & Associated Relief Requests Will Be Submitted by 870228 for Review. Testing Currently Being Performed Should Be Continued Until Code Required Testing Can Be Performed
A05996, Remits Class III Fee for 820723 Application,Per18 September 1986Remits Class III Fee for 820723 Application,Per
A06006, Provides Clarification of Issues Raised During 860904 Enforcement Conference & Insp 50-213/86-22 Re Radiation Worker Overexposure Incident.Health Physics Technician Failed to Perform Satisfactorily Due to Inadequate Training11 September 1986Provides Clarification of Issues Raised During 860904 Enforcement Conference & Insp 50-213/86-22 Re Radiation Worker Overexposure Incident.Health Physics Technician Failed to Perform Satisfactorily Due to Inadequate Training
A06023, Forwards Estimated Schedules for Operator Licensing Exams for FY87-90,in Response to Generic Ltr 86-141 October 1986Forwards Estimated Schedules for Operator Licensing Exams for FY87-90,in Response to Generic Ltr 86-14
A06040, Forwards Manual of Containment Boundary Valves Opened During Operation & Assessment of 861008 Event,Per 861014 Commitment in Response to Insp Rept 50-213/86-20.Event Not Reportable as LER Since Intent of Tech Specs Satisfied24 October 1986Forwards Manual of Containment Boundary Valves Opened During Operation & Assessment of 861008 Event,Per 861014 Commitment in Response to Insp Rept 50-213/86-20.Event Not Reportable as LER Since Intent of Tech Specs Satisfied
A06070, Requests That Portion of 850510 Amend Request Re Movement of Fuel within Reactor Pressure Vessel Be Retracted,Per Fm Akstulewicz 860903 Request That Util Reconsider Amend Request22 October 1986Requests That Portion of 850510 Amend Request Re Movement of Fuel within Reactor Pressure Vessel Be Retracted,Per Fm Akstulewicz 860903 Request That Util Reconsider Amend Request
A06097, Submits Addl Info Re SEP Topic III-3.C, Inservice Insp of Water Control Structures, in Response to 860918 Request. Qualified Engineer Will Be Assigned Responsibility for All Phases of Insps4 December 1986Submits Addl Info Re SEP Topic III-3.C, Inservice Insp of Water Control Structures, in Response to 860918 Request. Qualified Engineer Will Be Assigned Responsibility for All Phases of Insps
A06102, Forwards Application Fee for Review & Approval of Interim Acceptance Criteria for Steam Generator Tubes,Per 860724 Submittal,In Response to 860922 Request6 October 1986Forwards Application Fee for Review & Approval of Interim Acceptance Criteria for Steam Generator Tubes,Per 860724 Submittal,In Response to 860922 Request
A06113, Forwards Addl Info Re Spds,In Response to NRC 860924 Request on Isap Topic 1.2015 December 1986Forwards Addl Info Re Spds,In Response to NRC 860924 Request on Isap Topic 1.20
A06149, Forwards Fee for Request for Relief from Insp of Longitudinal & Circumferential Pipe Welds for Facility30 October 1986Forwards Fee for Request for Relief from Insp of Longitudinal & Circumferential Pipe Welds for Facility
A06150, Responds to IE Bulletin 86-003, Potential Failure of Multiple ECCS Pumps Due to Single Failure of Air-Operated Valve in Min Flow Recirculation Line. Safety Concerns Inapplicable to Plants20 November 1986Responds to IE Bulletin 86-003, Potential Failure of Multiple ECCS Pumps Due to Single Failure of Air-Operated Valve in Min Flow Recirculation Line. Safety Concerns Inapplicable to Plants
A06207, Forwards Responses to 861106 Request for Addl Info Re Util Request for Relief from Certain Code Category B-J Weld Inservice Insp Requirements.Isometric Drawings Encl26 January 1987Forwards Responses to 861106 Request for Addl Info Re Util Request for Relief from Certain Code Category B-J Weld Inservice Insp Requirements.Isometric Drawings Encl
A06243, Responds to NRC Re Violations Noted in Insp Rept 50-213/86-27 on 861001-1117.Corrective Actions:Amend Request for Tech Spec Changes Will Be Submitted to Allow Opening of Valve CC-V-884 as Well as Other Identified Valves24 December 1986Responds to NRC Re Violations Noted in Insp Rept 50-213/86-27 on 861001-1117.Corrective Actions:Amend Request for Tech Spec Changes Will Be Submitted to Allow Opening of Valve CC-V-884 as Well as Other Identified ValvesEnforcement Discretion
A06244, Ack Receipt of Invoices for Second Installment of Annual Fees,Per 10CFR171.Fee Will Be Wire Transferred on 870130 in Payment of Invoices.Invoices & Procedures for Electronic Transfer of Funds Encl7 January 1987Ack Receipt of Invoices for Second Installment of Annual Fees,Per 10CFR171.Fee Will Be Wire Transferred on 870130 in Payment of Invoices.Invoices & Procedures for Electronic Transfer of Funds Encl
A06299, Informs That Insp Fees Noted in Encl Invoice Remitted to Ofc of Resource Mgt15 January 1987Informs That Insp Fees Noted in Encl Invoice Remitted to Ofc of Resource Mgt
A06347, Forwards Fee for 861124 Request for Deferrment of Completion of Switchgear Room Halon Sys Mods to 1987 Refueling Outage or First Outage of Last 8 Wk Duration Commencing After 87010119 February 1987Forwards Fee for 861124 Request for Deferrment of Completion of Switchgear Room Halon Sys Mods to 1987 Refueling Outage or First Outage of Last 8 Wk Duration Commencing After 870101
A06374, Responds to Violation Noted in Insp Rept 50-213/87-01. Corrective Actions:Procedure ACP 1.2-6.4 Revised on 870115 by Indicating That Substitutions Could Be Made Only If Substitute Instrumentation Has Equal or Better Accuracy10 March 1987Responds to Violation Noted in Insp Rept 50-213/87-01. Corrective Actions:Procedure ACP 1.2-6.4 Revised on 870115 by Indicating That Substitutions Could Be Made Only If Substitute Instrumentation Has Equal or Better Accuracy
A06384, Informs That Reactor Trip Sys Included in Westinghouse/Util Vendor Interface Program,Per NRC 870224 Request & Generic Ltr 86-38,Item 2.1.25 March 1987Informs That Reactor Trip Sys Included in Westinghouse/Util Vendor Interface Program,Per NRC 870224 Request & Generic Ltr 86-38,Item 2.1.2
A06421, Forwards Response to 870427 Request for Addl Info Re NULAP5. Lack of Water Slug Formation Due to HPI Would Be Independent of Nodalization in Sys Representation2 June 1987Forwards Response to 870427 Request for Addl Info Re NULAP5. Lack of Water Slug Formation Due to HPI Would Be Independent of Nodalization in Sys Representation
A06447, Advises That Third Quarterly Installment of FY87 Annual Fee Per 10CFR171 Will Be Transferred on 870430 in Payment of Encl Invoices24 April 1987Advises That Third Quarterly Installment of FY87 Annual Fee Per 10CFR171 Will Be Transferred on 870430 in Payment of Encl Invoices
A06472, Forwards Response to NRC 870402 Request for Addl Info Re Nusco 140-1, Nusco Thermal Hydraulic Model Qualifcation Vol 1 (Retran). Util Staff Available to Hold Meeting During Wk of 8705187 May 1987Forwards Response to NRC 870402 Request for Addl Info Re Nusco 140-1, Nusco Thermal Hydraulic Model Qualifcation Vol 1 (Retran). Util Staff Available to Hold Meeting During Wk of 870518
A06508, Remits Fee Re 870401 Submittal of Updated Bimonthly Progress Rept & Design Info for New Switchgear Bldg,Per 870422 Request.Fee Required Since NRC Review Requested18 May 1987Remits Fee Re 870401 Submittal of Updated Bimonthly Progress Rept & Design Info for New Switchgear Bldg,Per 870422 Request.Fee Required Since NRC Review Requested
A06518, Ack Receipt of Listed Invoices for Cost Incurred for Review of Facility Submittals.Fee Paid.License Number for Millstone Unit 3 Incorrect on Invoice 1099A18 May 1987Ack Receipt of Listed Invoices for Cost Incurred for Review of Facility Submittals.Fee Paid.License Number for Millstone Unit 3 Incorrect on Invoice 1099A
A06539, Ack Receipt of Encl NRC Invoices for Costs Incurred in Review of Util Submittals for Plants.Fee Will Be Sent to J Rodriquez,Per 10CFR50,55 & 17029 May 1987Ack Receipt of Encl NRC Invoices for Costs Incurred in Review of Util Submittals for Plants.Fee Will Be Sent to J Rodriquez,Per 10CFR50,55 & 170
A06584, Responds to NRC 870527,0602 & 25 Requests for Addl Info Re Util Responses to Generic Ltr 83-28,Item 2.2.Util Will Perform Generic Review of Issue for Haddam Neck & Millstone Units 1,2 & 3 & Submit Addl Info by 87100230 July 1987Responds to NRC 870527,0602 & 25 Requests for Addl Info Re Util Responses to Generic Ltr 83-28,Item 2.2.Util Will Perform Generic Review of Issue for Haddam Neck & Millstone Units 1,2 & 3 & Submit Addl Info by 871002
A06595, Forwards Addl Info Re Generic Ltr 83-28,Item 2.2,per NRC 870527,0602 & 25 Requests25 September 1987Forwards Addl Info Re Generic Ltr 83-28,Item 2.2,per NRC 870527,0602 & 25 Requests
A06635, Advises That Fourth Quarterly Installment of 1987 Annual Fee Will Be Wire Transferred on 870731.Invoices F1269,F1302, F1303 & F1304 Encl14 July 1987Advises That Fourth Quarterly Installment of 1987 Annual Fee Will Be Wire Transferred on 870731.Invoices F1269,F1302, F1303 & F1304 Encl
A06648, Forwards Fee for 870601 Application for Amend to Inservice Insp Programs to Utilize ASME Code Section XI,1983 Edition, Subarticle IWF-3400, Acceptance Stds, Per RM Diggs 870701 Request15 July 1987Forwards Fee for 870601 Application for Amend to Inservice Insp Programs to Utilize ASME Code Section XI,1983 Edition, Subarticle IWF-3400, Acceptance Stds, Per RM Diggs 870701 Request
A06649, Updates 870805 Response to NRC Informing of Steps Taken to Correct Deviation Noted in Insp Rept 50-213/87-10. Review of Emergency Operating Procedures Will Be Completed by 880311.Simulator Training Matls Revised18 December 1987Updates 870805 Response to NRC Informing of Steps Taken to Correct Deviation Noted in Insp Rept 50-213/87-10. Review of Emergency Operating Procedures Will Be Completed by 880311.Simulator Training Matls RevisedProbabilistic Risk Assessment
A06665, Forwards Response to NRC Bulletin 87-001, Thinning of Pipe Walls in Nuclear Power Plants. Util Intends to Meet NUMARC Guidelines on Pipe Wall Thinning in high-energy Piping Sys11 September 1987Forwards Response to NRC Bulletin 87-001, Thinning of Pipe Walls in Nuclear Power Plants. Util Intends to Meet NUMARC Guidelines on Pipe Wall Thinning in high-energy Piping Sys
A06692, Informs of Payment to Ofc of Resource Mgt for Encl Invoices 1507A,1511A,1527A & 1532A14 August 1987Informs of Payment to Ofc of Resource Mgt for Encl Invoices 1507A,1511A,1527A & 1532A
A06748, Forwards Response to NRC Topic Evaluations Status of Integrated Safety Assessment Program Topics & Review of Draft NUREG-1185.Attachment a Provides Discussion on Scope, Evaluation & Prioritization of Each Topic13 November 1987Forwards Response to NRC Topic Evaluations Status of Integrated Safety Assessment Program Topics & Review of Draft NUREG-1185.Attachment a Provides Discussion on Scope, Evaluation & Prioritization of Each TopicHigh Radiation Area
Fire Barrier
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
Nondestructive Examination
Exemption Request
Earthquake
Backfit
Overexposure
A06779, Informs That Util Will Provide Response to NRC 870824,0903 & 04 Requests for Addl Info Re Generic Ltr 83-28,Item 4.2 or Schedule for Addressing Requests by 871215,once Scope of Work Properly Defined8 October 1987Informs That Util Will Provide Response to NRC 870824,0903 & 04 Requests for Addl Info Re Generic Ltr 83-28,Item 4.2 or Schedule for Addressing Requests by 871215,once Scope of Work Properly Defined