Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IA-86-430, Further Response to Appeal Re Denial of FOIA Request for Documents Re Facility.Portions of Five Documents Continue to Be Withheld (Ref FOIA Exemption 4) | 8 May 1987 | Further Response to Appeal Re Denial of FOIA Request for Documents Re Facility.Portions of Five Documents Continue to Be Withheld (Ref FOIA Exemption 4) | |
IA-86-512, Responds to FOIA Request.App Documents,Including NUREG-0020, NUREG-0030,NUREG-0090 & 691121 Rept to ACRS, Enrico Fermi Atomic Power Plant, Available in PDR | 24 July 1986 | Responds to FOIA Request.App Documents,Including NUREG-0020, NUREG-0030,NUREG-0090 & 691121 Rept to ACRS, Enrico Fermi Atomic Power Plant, Available in PDR | |
IA-86-519, Final Response to FOIA Request for Documents Re 850701 Control Room Mishap & Probe of Util Confidential Whistleblower Program.Documents Listed in App a in Pdr. Documents Listed in App B Withheld (Ref FOIA Exemption 7) | 16 January 1987 | Final Response to FOIA Request for Documents Re 850701 Control Room Mishap & Probe of Util Confidential Whistleblower Program.Documents Listed in App a in Pdr. Documents Listed in App B Withheld (Ref FOIA Exemption 7) | |
IA-86-550, Final Response to FOIA request.PNO-III-86-069,Reportable Events 05492 & 05491,Daily Rept Riii,Deviation/Event Rept & Slides Re Inadvertent ECCS Actuation Encl & Also Available in PDR | 5 September 1986 | Final Response to FOIA request.PNO-III-86-069,Reportable Events 05492 & 05491,Daily Rept Riii,Deviation/Event Rept & Slides Re Inadvertent ECCS Actuation Encl & Also Available in PDR | Hydrostatic |
IA-86-551, Final Response to FOIA Request Re Facility Dryer.Forwards Documents Listed in App.Documents Also Available in PDR | 4 September 1986 | Final Response to FOIA Request Re Facility Dryer.Forwards Documents Listed in App.Documents Also Available in PDR | |
IR 05000123/2008016 | 10 September 1985 | Forwards Safety Insp Rept 50-341/85-06 on 850123-0816.No Violations or Deviations Noted | |
IR 05000282/1988201 | 15 May 1989 | Advises That NRC Plans to Forward Vendor Interface & Procurement Program Insp Repts 50-282/88-201 & 50-306/88-201 to Other Utils in Region Iii.Ltr Transmitting Rept Sent to Other Utils Encl for Info | |
IR 05000341/1978009 | 16 November 1978 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted During Inspec 50-341/78-09 | |
IR 05000341/1979010 | 12 April 1979 | Forwards IE Insp Rept 50-341/79-10 on 790329-30.No Noncompliance Noted | |
IR 05000341/1982001 | 24 June 1982 | Ack Receipt of 820430 & 0607 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-341/82-01 | |
IR 05000341/1984020 | 12 December 1984 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-341/84-20 | |
IR 05000341/1984038 | 7 November 1984 | Ack Receipt of Informing NRC of Steps Taken to Correct Noncompliance Noted in Insp Rept 50-341/84-38 | |
IR 05000341/1985027 | 24 February 1986 | Advises That Util 851012 Comments on SALP 6 Board Rept 50-341/85-27 Satisfactory.No Changes to Rept Necessary.App to Rept,Summarizing Meeting & Listing Attendees,Encl | Systematic Assessment of Licensee Performance |
IR 05000341/1985040 | 3 July 1986 | Forwards Order Modifying License & Notice of Violation & Proposed Imposition of Civil Penalties in Amount of $300,000 Based on Violations Noted in Insp Rept 50-341/85-40 on 850701-1014 Re Rod Pull Errors & Premature Criticality | |
IR 05000341/1985042 | 31 December 1985 | Forwards Safety Insp Rept 50-341/85-42 on 851001-1130 & Notice of Violation | |
IR 05000341/1986034 | 9 January 1987 | Forwards Safety Insp Rept 50-341/86-34 on 861111-1215 & Notice of Violation | |
IR 05000341/1987021 | 12 May 1988 | Discusses Safety Insp Rept 50-341/87-21 on 870413-1019 & Forwards Notice of Violation.Violation Categorized as Severity Level IV Based on Minimal Safety Significance. Record Copy | |
IR 05000341/1987039 | 11 December 1987 | Forwards Summary of 871116 Special Mgt Meeting W/Util in Glen Ellyn,Il Re Weaknesses Observed in Last Emergency Preparedness Exercise & Planned Corrective Actions to Resolve Concerns Identified in Insp Rept 50-341/87-39 | |
IR 05000341/1987048 | 7 October 1988 | Forwards Notice of Significant Licensee Meeting on 881019 for Enforcement Conference to Discuss Six Apparent Surveillance Programs Documented in Insp Repts 50-341/87-48, 50-341/88-06,50-341/88-12 & 50-341/88-17.Related Info Encl | |
IR 05000341/1988021 | 27 June 1989 | Informs of Postponement of Decision Re Whether or Not to Withdraw Violation Noted in Insp Repts 50-341/88-21 & 50-341/86-39.Listed Values for LPCI & Core Spray Sys Requested within 60 Days of Receipt of Ltr | |
IR 05000341/1988024 | 24 May 1989 | Ack Receipt of 881027 & s Informing NRC of Steps to Correct Violations Noted in Insp Rept 50-341/88-24. Violation Listed in Rept Withdrawn Due to Review of Revised 890302 Response | |
IR 05000341/1989003 | 23 May 1989 | Forwards Insp Rept 50-341/89-03 on 890105-06,13-14 & 25 & Notice of Violation | |
IR 05000341/1989006 | 16 May 1989 | Confirms 890526 Enforcement Conference in Glen Ellyn,Il Re Violations Noted in Insp Rept 50-341/89-06 on Failure to Properly Design Rail Car Door Seals for Flood Protection & Secondary Containment Integrity Requirements | |
IR 05000341/1989008 | 1 June 1989 | Forwards Safety Insp Rept 50-341/89-08 on 890218-0410 & 0517-19 & Notice of Violation | |
IR 05000341/1992001 | 9 September 1992 | Forwards Insp Rept 50-341/92-01 on 920701-0824 & Notice of Violation | |
IR 05000341/1993010 | 30 September 1993 | Ack Receipt of 930728,0901 & 10 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-341/93-10. Corrective Actions Associated W/Unresolved Items Will Be Examined During Future Insps | |
IR 05000341/1993012 | 28 September 1993 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-341/93-12 | |
IR 05000341/1993020 | 7 May 1997 | Forwards Errata to Corrected Insp Rept 50-341/93-20,issued on 970221 | |
IR 05000341/1993023 | 24 May 1994 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-341/93-23 | Power Uprate |
IR 05000341/1996006 | 3 December 1996 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-341/96-06 | |
IR 05000341/1996007 | 20 February 1997 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-341/96-07 | |
IR 05000341/1996013 | 1 August 1997 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-341/96-13 on 970206 | |
IR 05000341/1997002 | 1 August 1997 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-341/97-02 on 970602 | |
IR 05000341/1997003 | 3 September 1997 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-341/97-03 | |
IR 05000341/1997005 | 2 October 1997 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-341/97-05 Issued on 970619.Corrective Actions May Be Examined During Future Inspections | |
IR 05000341/1997011 | 30 April 1998 | Informs of Plans to Meet W/Util on 980506 to Discuss Response Time Testing Issues Documented in Insp Rept 50-341/97-11 | |
IR 05000341/1998002 | 28 May 1998 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-341/98-02 on 980325.Rept Identified Three Violations,Licensee Did Not Contest Two,But Did Contest Violation Concerning HPCI Sys | Design basis earthquake |
IR 05000341/1998005 | 5 August 1998 | Discusses Insp Rept 50-341/98-05 Completed on 970922.Region III Determined That Violations for Failure to Conduct Adequate Response Time Testing Were Direct Result of Inadequate 10CFR50.59 Evaluation | |
IR 05000341/1998007 | 18 June 1998 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-341/98-07 on 980505 | |
IR 05000341/1998014 | 30 September 1998 | Discusses Investigation Rept 3-1998-010 & Forwards NOV to Determine If Waste Supervisor Willfully Violated Regulatory Requirements on 980213.Insp Rept 50-341/98-14 Have Been Designated for Tracking Purposes Only | |
IR 05000341/1999001 | 10 August 1999 | Forwards Insp Rept 50-341/99-01 on 990619-0723 & Nov. Violation of Concern Because Operators Did Not Understand License Requirements & Placed Plant in Configuration Where EDG 11 Was Removed from Service | Zebra Mussel |
IR 05000341/1999012 | 6 August 1999 | Forwards Insp Rept 50-341/99-12 on 990712-0716.No Violations Noted.Insp Focused on Implementation of Plant Chemistry & Radiological Environ Monitoring Programs & Operation of post-accident Sampling Sys | |
IR 05000341/1999013 | 19 August 1999 | Discusses Insp Rept 50-341/99-13 & OI Rept 3-98-039 Conducted Into Potential Misconduct of Operator Formerly Employed by De.Nrc Determined That Violation of NRC Regulations Occurred.Synopsis of IO Rept Encl | Enforcement Discretion Fire Protection Program |
LG-85-000, Forwards Changes to FSAR Table 3.2-1 Re Structures,Sys & Components Classification.Changes Will Be Incorporated Into Next Rev to Updated FSAR | 28 August 1985 | Forwards Changes to FSAR Table 3.2-1 Re Structures,Sys & Components Classification.Changes Will Be Incorporated Into Next Rev to Updated FSAR | Incorporated by reference Liquid penetrant |
LG-85-001, Responds to Violations Noted in Insp Rept 50-341/85-31. Corrective Actions:Maint Instruction MI-M049, Control & Use of Procedures/Instructions within Main Section, Revised to Solicit & Incorporate User Feedback | 19 September 1985 | Responds to Violations Noted in Insp Rept 50-341/85-31. Corrective Actions:Maint Instruction MI-M049, Control & Use of Procedures/Instructions within Main Section, Revised to Solicit & Incorporate User Feedback | |
LG-85-002, Forwards Actions Taken to Improve Regulatory Performance in Fire Protection & in Areas in Which Activity Continuing & SALP 1 Goal Not Achieved,Per SALP 6 Board Rept 50-341/85-27 | 12 October 1985 | Forwards Actions Taken to Improve Regulatory Performance in Fire Protection & in Areas in Which Activity Continuing & SALP 1 Goal Not Achieved,Per SALP 6 Board Rept 50-341/85-27 | Safe Shutdown Fire Protection Program |
LG-85-004, Provides Results of Lake Breeze Study Re Relationship Between Onsite Meteorological Measurements & Thermal Internal Boundary Layer.Formation of Thermal Layer Will Affect Dispersion of Radioactive Releases Per Sser 5 | 30 August 1985 | Provides Results of Lake Breeze Study Re Relationship Between Onsite Meteorological Measurements & Thermal Internal Boundary Layer.Formation of Thermal Layer Will Affect Dispersion of Radioactive Releases Per Sser 5 | |
LG-85-005, Forwards Reg Guide 1.97 Compliance Rept,Providing Description of Requirements & Method of Complying W/ Requirements for Each post-accident Variable Identified in Table 1 of Guide | 30 September 1985 | Forwards Reg Guide 1.97 Compliance Rept,Providing Description of Requirements & Method of Complying W/ Requirements for Each post-accident Variable Identified in Table 1 of Guide | Grab sample Post Accident Monitoring Fuel cladding |
LG-85-006, Informs of Relocation of Alarms to Monitor Water Intrusion & Low Primary Sys Cover Gas Pressure to Unit 2 Control Room. Facility Continuously Manned Under Requirements of License NPF-43 | 24 October 1985 | Informs of Relocation of Alarms to Monitor Water Intrusion & Low Primary Sys Cover Gas Pressure to Unit 2 Control Room. Facility Continuously Manned Under Requirements of License NPF-43 | |
ML17212A642 | 14 July 1981 | Forwards Revision 1, Supplementary Seismic Evaluation Rept. Encl to Be Referenced in Forthcoming FSAR Amend & Satisfies 810611 Commitment |