Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000259/2008005 | 30 January 2009 | IR 05000259-08-005, 05000260-08-005 and 05000296-08-005, on 10/01/2008 - 12/31/2008, Browns Ferry Nuclear Plant, Units 1, 2 and 3; Licensed Operator Requalification Program | Reactor Vessel Water Level Non-Destructive Examination Fire Barrier Internal Flooding Nondestructive Examination VT-2 Condition Adverse to Quality Significance Determination Process Job Performance Measure Foreign Material Exclusion Maintenance Rule Program EVT-1 Power change Downpower |
IR 05000259/2008007 | 22 December 2008 | IR 05000259-08-07, 05000260-08-007 and 05000296-08-007 on 9/29/2008 - 10/24/2008, Browns Ferry Nuclear Plant, Units 1, 2 and 3, Biennial Inspection of the Identification and Resolution of Problems | Anchor Darling Significance Determination Process Operability Determination |
IR 05000259/2008008 | 29 August 2008 | B.5.b | |
IR 05000259/2008009 | 30 May 2008 | IR 05000259-08-009, 05000260-08-009 and 05000296-08-009, on 04/27/08 - 05/02/08, Browns Ferry Nuclear Plant, Units 1, 2 and 3, Event Followup | Anchor Darling Condition Adverse to Quality Significance Determination Process Operability Determination Power Uprate |
IR 05000259/2008010 | 16 January 2009 | IR 05000259-08-010 on 12/01/2008 - 12/05/2008 for Browns Ferry, Unit 1, Supplemental Inspection IP 95002 for Degraded Initiating Events Cornerstone | |
IR 05000259/2008301 | 19 January 2008 | Initial Examination 05000259-08-301, 05000260-08-301 and 05000296-08-301 Draft Simulator Scenarios | Half scram Scram Discharge Volume Feedwater Controller Failure Severe Accident Management Guideline Power change Failure to Scram |
IR 05000259/2008302 | 29 January 2009 | Er 05000259-08-302, Er 05000260-08-302 and Er 05000296-08-302, on 12/8 - 11, 2008 & 12/18, 2008, Browns Ferry Nuclear Plant, Units 1, 2 & 3, Licensed Operator Examinations | |
IR 05000259/2008401 | 16 October 2008 | IR 05000259-08-401, IR 05000260-08-401, and IR 05000296-08-401, on 07/28/2008 Through 07/31/2008, and 10/02/2008, Browns Ferry Nuclear Plant, NRC Inspection | Affidavit |
IR 05000259/2008501 | 26 June 2008 | IR 05000259-08-501, 05000260-08-501, and 05000296-08-501, on 06/01/2008 - 06/06/2008, Browns Ferry, Baseline Inspection | |
IR 05000259/2009002 | 30 April 2009 | IR 05000259-09-002, 05000260-09-002 and 05000296-09-002, on 01/01/2009 - 03/31/2009, Browns Ferry Nuclear Plant, Units 1, 2 and 3; Surveillance Testing, Identification and Resolution of Problems, and Event Follow-up | Safe Shutdown Reactor Vessel Water Level Packing leak Fire Barrier Weld Overlay Nondestructive Examination Condition Adverse to Quality Corrosion bonding Significance Determination Process Pressure boundary leak Through Wall Leak Downpower Unidentified leakage |
IR 05000259/2009003 | 30 July 2009 | IR 05000259-09-003, 05000260-09-003 and 05000296-09-003, on 04/01/2009 - 06/30/2009, Browns Ferry Nuclear Plant, Units 1, 2 and 3, Maintenance Risk Assessment, Access Control to Radiologically Significant Areas, and Event Followup | Packing leak High Radiation Area Non-Destructive Examination Fire Barrier Time to boil Coatings Nondestructive Examination Temporary Modification Locked High Radiation Area Significance Determination Process Foreign Material Exclusion Process Control Program EVT-1 Liquid penetrant Scaffolding Substantial potential for overexposure Downpower Power Uprate Overexposure |
IR 05000259/2009004 | 30 October 2009 | IR 05000259-09-004, IR 05000260-09-004, IR 05000296-09-004, on 07/01/09 - 09/31/09, Browns Ferry, Units 1, 2, and 3 | Reactor Vessel Water Level Mission time Fire Barrier Internal Flooding Hydrostatic Past operability Corrosion bonding Significance Determination Process Operability Determination Through-Wall Leak Downpower |
IR 05000259/2009005 | 2 February 2010 | IR 05000259-09-005, 05000260-09-005, and 05000296-09-005; 10/01/2009 - 12/31/2009; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Event Follow-Up | Time of Discovery Reactor Vessel Water Level Half scram Mission time Fire Barrier Tornado Generated Missile Significance Determination Process Scram Discharge Volume Power change Downpower Power Uprate |
IR 05000259/2009006 | 21 August 2009 | IR 05000259-09-006, 05000260-09-006 and 05000296-09-006; 5/29/2009 - 6/17/2009; Browns Ferry Nuclear Plant, Units 1, 2 and 3; Biennial Inspection of the Identification and Resolution of Problems | Temporary Modification Significance Determination Process |
IR 05000259/2009007 | 14 July 2009 | IR 05000259-09-007, 05000260-09-007 and 05000296-09-007; 04/20 - 24/2009; Browns Ferry Nuclear Plant, Units 1, 2 and 3; Focused Fire Protection Baseline Inspection | Safe Shutdown Enforcement Discretion Operator Manual Action Emergency Lighting Job Performance Measure Exemption Request Fire Protection Program Backfit Power Uprate |
IR 05000259/2009008 | 9 February 2010 | 0500259-09-008, 05000260-09-008, and 05000296-09-008; on 10/19/09 - 12/28/09; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Component Design Basis Inspection | Probabilistic Risk Assessment Significance Determination Process Job Performance Measure Large early release frequency Power Uprate |
IR 05000259/2009009 | 20 January 2010 | IR 05000259-09-009, 05000260-09-009, 05000296-09-009; 09/21/2009 - 09/25/2009; Browns Ferry Nuclear Plant, Units 1, 2, & 3; Triennial Fire Protection Inspection | Hot Short Safe Shutdown Reactor Vessel Water Level Fire Barrier Enforcement Discretion Operator Manual Action Emergency Lighting Functionality Assessment Significance Determination Process Large early release frequency Operability Determination Exemption Request Fire Protection Program Backfit Power Uprate |
IR 05000259/2009301 | 9 September 2009 | Er 05000259-09-301, 05000260-09-301, 05000296-09-301, 07/13-17/2009 & 07/22/2009, Browns Ferry Nuclear Plant, Operator License Examinations | |
IR 05000259/2009402 | 27 April 2009 | NRC Security Inspection Report 05000259/2009402, 05000260/2009402 & 05000296/2009402 | Affidavit |
IR 05000259/2009403 | 2 September 2009 | NRC Security Inspection Report 05000259-09-403, 05000260-09-403 & 05000296-09-403 | Affidavit |
IR 05000259/2009501 | 19 November 2009 | ||
IR 05000259/2010002 | 30 April 2010 | IR 05000259-10-002, 05000260-10-002 and 05000296-10-002 on 01/01/2010- 03/31/2010 for Browns Ferry, Units 1, 2, and 3, Integrated Inspection Report | Safe Shutdown High Radiation Area Non-Destructive Examination Fire Barrier Internal Flooding Hydrostatic Nondestructive Examination Temporary Modification Functionality Assessment Significance Determination Process Foreign Material Exclusion Operability Determination Earthquake Scaffolding Substantial potential for overexposure Downpower Overexposure |
IR 05000259/2010003 | 30 July 2010 | IR 0500259-10-003, 05000260-10-003, 05000296-10-003, 0500259-10-501, 05000260-10-501, 05000296-10-501 and 07200052-10-002 on 04/01/2010 - 06/30/2010 for Browns Ferry Plant, Integrated Inspection | Significance Determination Process |
IR 05000259/2010004 | 29 October 2010 | IR 05000259-10-004, 05000260-10-004, 05000296-10-004 & 07200052-10-003, and Notice of Violation, 07/01/10 - 09/30/10, Browns Ferry, Integrated Report | Safe Shutdown Packing leak Fire Barrier Internal Flooding Probabilistic Risk Assessment Temporary Modification Squib Significance Determination Process Excess Flow Check Valve Incremental Core Damage Probability Deficit Downpower Power Uprate |
IR 05000259/2010005 | 8 April 2011 | Summary of Meeting with Browns Ferry to Discuss One Preliminary Greater than Green Finding Associated with One Apparent Violation That Was Documented in NRC Inspection Report 05000259-10-005, 05000260-10-005, and 05000296-10-005 | Safe Shutdown Fire Barrier Stroke time Probabilistic Risk Assessment Operator Manual Action Finite Element Analysis Significance Determination Process |
IR 05000259/2010006 | 8 November 2010 | IR 05000259-10-006, 05000260-10-006, 05000296-10-006; on 8/30/2010 - 9/24/2010; Browns Ferry Nuclear Plant, Units 1, 2 and 3; Identification and Resolution of Problems | Packing leak Mission time Condition Adverse to Quality Significance Determination Process Maintenance Rule Program |
IR 05000259/2010008 | 3 December 2010 | Safe Shutdown Fitness for Duty Offsite Dose Calculation Manual Fire Barrier Commercial Grade Dedication Enforcement Discretion Probabilistic Risk Assessment Operator Manual Action B.5.b Significance Determination Process Safeguards Contingency Plan Maintenance Rule Program Fire Protection Program | |
IR 05000259/2010201 | 4 February 2011 | IR 05000259-10-201, 05000260-10-201, and 05000296-10-201, 12/17/2010, Brows Ferry Nuclear Plant; Security Inspection (Cover Letter) | Affidavit |
IR 05000259/2010301 | 2 February 2011 | Operator Licensing Written Examination Approval 05000259-10-301, 05000260-10-301 and 05000296-10-301 | |
IR 05000259/2010402 | 19 May 2010 | IR 05000259-10-402, IR 05000260-10-402, and IR 05000296-10-402, for Browns Ferry, Units 1, 2 & 3, Security | |
IR 05000259/2010502 | 9 March 2011 | ||
IR 05000259/2011002 | 13 May 2011 | IR 05000259-11-002, 05000260-11-002, 05000296-11-002 & 07200052-11-002, on 01/01/2011 - 03/31/2011, Browns Ferry, Units 1, 2 & 3, NRC Integrated Inspection and Notice of Violation | Safe Shutdown Time of Discovery Packing leak High Radiation Area Mission time Fire Barrier Weld Overlay Post Accident Monitoring Internal Flooding Hydrostatic Probabilistic Risk Assessment Coatings Nondestructive Examination Operator Manual Action Cyber Security Condition Adverse to Quality Significance Determination Process Foreign Material Exclusion Operability Determination Severe Accident Management Guideline Liquid penetrant Fatigue Rule Scaffolding Grace period Downpower Flow Induced Vibration Weak link Power Uprate |
IR 05000259/2011003 | 8 August 2011 | IR 05000259-11-003, 05000260-11-003, 05000296-11-003; 04/01/2011 - 06/30/2011; Browns Ferry Nuclear Plant, Units 1, 2 and 3; Annual Heat Sink Performance, Operability Evaluations | Reactor Vessel Water Level Fire Barrier Post Accident Monitoring Hydrostatic Past operability Temporary Modification Functionality Assessment Condition Adverse to Quality B.5.b Corrosion bonding Significance Determination Process Scram Discharge Volume Excess Flow Check Valve Operability Determination Severe Accident Management Guideline Downpower |
IR 05000259/2011004 | 14 November 2011 | IR 05000259-11-004, 05000260-11-004, 05000296-11-004; on 07/01/2011 - 09/30/2011, Browns Ferry, Units 1, 2, and 3; Integrated Inspection Report | Safe Shutdown Reactor Vessel Water Level Mission time Fire Barrier Time to boil Internal Flooding Fire impairment Temporary Modification Significance Determination Process Foreign Material Exclusion Scram Discharge Volume Fire Protection Program Fire Watch Hourly Fire Watch Downpower Flow Induced Vibration Power Uprate |
IR 05000259/2011005 | 13 February 2012 | IR 05000259-11-005, 05000260-11-005, 05000296-11-005; 10/01/2011 -12/31/2011; Browns Ferry Nuclear Plant, Units 1, 2 and 3; Event Follow-up | Safe Shutdown Time of Discovery Packing leak Mission time Fire Barrier Past operability Temporary Modification Tornado Generated Missile Significance Determination Process Grace period Power change Downpower Unidentified leakage |
IR 05000259/2011008 | Safe Shutdown Probabilistic Risk Assessment Operator Manual Action Functionality Assessment Significance Determination Process | ||
IR 05000259/2011009 | 13 May 2011 | NRC Temporary Instruction 2515/183 Inspection Report 05000259/2011009, 05000260/2011009, 05000296/2011009 | Internal Flooding B.5.b Seismically rugged Severe Accident Management Guideline Earthquake |
IR 05000259/2011010 | 16 August 2011 | ||
IR 05000259/2011011 | 17 November 2011 | EA-11-018, EA-11-252, IR 05000259-11-011, 05000260-11-011, 05000296-11-011, Browns Ferry Nuclear Plant, Units 1, 2, & 3, 09/12/2011- 09/23/2011, Supplemental Inspection - Inspection Procedure (IP) 95003 | Condition Adverse to Quality Significance Determination Process Cold shutdown justification |
IR 05000259/2011012 | 28 February 2012 | IR 05000259-11-012, 05000260-11-012 & 05000296-11-012, Browns Ferry Nuclear Plant, Units 1, 2, and 3, 10/1/2011 - 12/31/2011, Supplemental Inspection - Inspection Procedure (IP) 95003 | Temporary Modification Condition Adverse to Quality Significance Determination Process Foreign Material Exclusion License Renewal Scaffolding |
IR 05000259/2011301 | 4 April 2011 | Er 05000259-11-301, 05000260-11-301, and 05000296-11-301; 02/07/2011 - 02/16/2011; Browns Ferry Nuclear Plant, Units 1, 2, and 3 Operator License Examinations | |
IR 05000259/2011302 | 19 September 2011 | Er 05000259-11-302, 05000260-11-302, and 05000296-11-302, Operating Test August 8 - 12, 2011 & Written Exam August 19, 2011; Browns Ferry Nuclear Plant, Operator License Examinations | Job Performance Measure Hardened vent |
IR 05000259/2011402 | 20 May 2011 | IR 05000259-11-402, IR 0500260-11-402, and IR 05000296-11-402, on 02/18/2011, (Corporate Office) & 04/21/2011, (K.Polson & Members Staff at Plant), Browns Ferry Nuclear Plant, NRC Security Inspection | Significance Determination Process Affidavit |
IR 05000259/2011403 | 14 September 2011 | IR 05000259-11-403, 05000260-11-403, 05000296-11-403, on 08/18/2011, Brown Ferry Nuclear Plant, NRC Security Inspection Report | Affidavit |
IR 05000259/2011501 | 6 January 2012 | IR 05000259-11-501, 05000260-11-501 and 05000296-11-501, on 12/05/2011 - 12/09/2011, for Browns Ferry Nuclear Plant, Units 1, 2, and 3, Exercise and Baseline Inspection | |
IR 05000259/2011502 | 5 March 2012 | NRC Emergency Preparedness Annual Inspection 05000259/2011502; 05000260/2011502; 05000296/2011502 | |
IR 05000259/2012001 | 4 March 2013 | Annual Assessment Letter for Browns Ferry Nuclear Plant, Units 1, 2 & 3 (IR 05000259-12-001, 05000260-12-001, and 05000296-12-001) | License Renewal |
IR 05000259/2012002 | 27 April 2012 | IR 05000259-12-002, 05000260-12-002, 05000296-12-002, 07200052-12-001, on 01/01/2012 -03/31/2012, Browns Ferry Nuclear Plant, Units 1, 2 and 3, Fire Protection, Event Follow-up, Other Activities | Safe Shutdown Mission time Fire Barrier Internal Flooding Past operability Fire impairment Significance Determination Process Operability Determination Severe Accident Management Guideline Fuel cladding Continuous fire watch Fire Protection Program Grace period Downpower |
IR 05000259/2012003 | 19 November 2012 | Errata for Browns Ferry Nuclear Plant - NRC Integrated Inspection Report, 05000259-12-003, 05000260-12-003, 05000296-12-003, 05000259-12-502, 05000260-12-502, and 05000296-12-502 | |
IR 05000259/2012004 | 13 November 2012 | IR 05000259-12-004, 05000260-12-004, 05000296-12-004, on 07/01/2012 - 09/30/2012, Browns Ferry Nuclear Plant, Units 1, 2 and 3, Identification and Resolution of Problems, and Event Follow-up | Hot Short Safe Shutdown Unanalyzed Condition Time of Discovery Packing leak Mission time Fire Barrier Internal Flooding Past operability Enforcement Discretion Operating Basis Earthquake Operator Manual Action Multiple Spurious Operation Fukushima Dai-Ichi Significance Determination Process Large early release frequency Fire Protection Program Downpower Power Uprate |