Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000259/200800530 January 2009IR 05000259-08-005, 05000260-08-005 and 05000296-08-005, on 10/01/2008 - 12/31/2008, Browns Ferry Nuclear Plant, Units 1, 2 and 3; Licensed Operator Requalification ProgramReactor Vessel Water Level
Non-Destructive Examination
Fire Barrier
Internal Flooding
Nondestructive Examination
VT-2
Condition Adverse to Quality
Significance Determination Process
Job Performance Measure
Foreign Material Exclusion
Maintenance Rule Program
EVT-1
Power change
Downpower
IR 05000259/200800722 December 2008IR 05000259-08-07, 05000260-08-007 and 05000296-08-007 on 9/29/2008 - 10/24/2008, Browns Ferry Nuclear Plant, Units 1, 2 and 3, Biennial Inspection of the Identification and Resolution of ProblemsAnchor Darling
Significance Determination Process
Operability Determination
IR 05000259/200800829 August 2008B.5.b
IR 05000259/200800930 May 2008IR 05000259-08-009, 05000260-08-009 and 05000296-08-009, on 04/27/08 - 05/02/08, Browns Ferry Nuclear Plant, Units 1, 2 and 3, Event FollowupAnchor Darling
Condition Adverse to Quality
Significance Determination Process
Operability Determination
Power Uprate
IR 05000259/200801016 January 2009IR 05000259-08-010 on 12/01/2008 - 12/05/2008 for Browns Ferry, Unit 1, Supplemental Inspection IP 95002 for Degraded Initiating Events Cornerstone
IR 05000259/200830119 January 2008Initial Examination 05000259-08-301, 05000260-08-301 and 05000296-08-301 Draft Simulator ScenariosHalf scram
Scram Discharge Volume
Feedwater Controller Failure
Severe Accident Management Guideline
Power change
Failure to Scram
IR 05000259/200830229 January 2009Er 05000259-08-302, Er 05000260-08-302 and Er 05000296-08-302, on 12/8 - 11, 2008 & 12/18, 2008, Browns Ferry Nuclear Plant, Units 1, 2 & 3, Licensed Operator Examinations
IR 05000259/200840116 October 2008IR 05000259-08-401, IR 05000260-08-401, and IR 05000296-08-401, on 07/28/2008 Through 07/31/2008, and 10/02/2008, Browns Ferry Nuclear Plant, NRC InspectionAffidavit
IR 05000259/200850126 June 2008IR 05000259-08-501, 05000260-08-501, and 05000296-08-501, on 06/01/2008 - 06/06/2008, Browns Ferry, Baseline Inspection
IR 05000259/200900230 April 2009IR 05000259-09-002, 05000260-09-002 and 05000296-09-002, on 01/01/2009 - 03/31/2009, Browns Ferry Nuclear Plant, Units 1, 2 and 3; Surveillance Testing, Identification and Resolution of Problems, and Event Follow-upSafe Shutdown
Reactor Vessel Water Level
Packing leak
Fire Barrier
Weld Overlay
Nondestructive Examination
Condition Adverse to Quality
Corrosion bonding
Significance Determination Process
Pressure boundary leak
Through Wall Leak
Downpower
Unidentified leakage
IR 05000259/200900330 July 2009IR 05000259-09-003, 05000260-09-003 and 05000296-09-003, on 04/01/2009 - 06/30/2009, Browns Ferry Nuclear Plant, Units 1, 2 and 3, Maintenance Risk Assessment, Access Control to Radiologically Significant Areas, and Event FollowupPacking leak
High Radiation Area
Non-Destructive Examination
Fire Barrier
Time to boil
Coatings
Nondestructive Examination
Temporary Modification
Locked High Radiation Area
Significance Determination Process
Foreign Material Exclusion
Process Control Program
EVT-1
Liquid penetrant
Scaffolding
Substantial potential for overexposure
Downpower
Power Uprate
Overexposure
IR 05000259/200900430 October 2009IR 05000259-09-004, IR 05000260-09-004, IR 05000296-09-004, on 07/01/09 - 09/31/09, Browns Ferry, Units 1, 2, and 3Reactor Vessel Water Level
Mission time
Fire Barrier
Internal Flooding
Hydrostatic
Past operability
Corrosion bonding
Significance Determination Process
Operability Determination
Through-Wall Leak
Downpower
IR 05000259/20090052 February 2010IR 05000259-09-005, 05000260-09-005, and 05000296-09-005; 10/01/2009 - 12/31/2009; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Event Follow-UpTime of Discovery
Reactor Vessel Water Level
Half scram
Mission time
Fire Barrier
Tornado Generated Missile
Significance Determination Process
Scram Discharge Volume
Power change
Downpower
Power Uprate
IR 05000259/200900621 August 2009IR 05000259-09-006, 05000260-09-006 and 05000296-09-006; 5/29/2009 - 6/17/2009; Browns Ferry Nuclear Plant, Units 1, 2 and 3; Biennial Inspection of the Identification and Resolution of ProblemsTemporary Modification
Significance Determination Process
IR 05000259/200900714 July 2009IR 05000259-09-007, 05000260-09-007 and 05000296-09-007; 04/20 - 24/2009; Browns Ferry Nuclear Plant, Units 1, 2 and 3; Focused Fire Protection Baseline InspectionSafe Shutdown
Enforcement Discretion
Operator Manual Action
Emergency Lighting
Job Performance Measure
Exemption Request
Fire Protection Program
Backfit
Power Uprate
IR 05000259/20090089 February 20100500259-09-008, 05000260-09-008, and 05000296-09-008; on 10/19/09 - 12/28/09; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Component Design Basis InspectionProbabilistic Risk Assessment
Significance Determination Process
Job Performance Measure
Large early release frequency
Power Uprate
IR 05000259/200900920 January 2010IR 05000259-09-009, 05000260-09-009, 05000296-09-009; 09/21/2009 - 09/25/2009; Browns Ferry Nuclear Plant, Units 1, 2, & 3; Triennial Fire Protection InspectionHot Short
Safe Shutdown
Reactor Vessel Water Level
Fire Barrier
Enforcement Discretion
Operator Manual Action
Emergency Lighting
Functionality Assessment
Significance Determination Process
Large early release frequency
Operability Determination
Exemption Request
Fire Protection Program
Backfit
Power Uprate
IR 05000259/20093019 September 2009Er 05000259-09-301, 05000260-09-301, 05000296-09-301, 07/13-17/2009 & 07/22/2009, Browns Ferry Nuclear Plant, Operator License Examinations
IR 05000259/200940227 April 2009NRC Security Inspection Report 05000259/2009402, 05000260/2009402 & 05000296/2009402Affidavit
IR 05000259/20094032 September 2009NRC Security Inspection Report 05000259-09-403, 05000260-09-403 & 05000296-09-403Affidavit
IR 05000259/200950119 November 2009
IR 05000259/201000230 April 2010IR 05000259-10-002, 05000260-10-002 and 05000296-10-002 on 01/01/2010- 03/31/2010 for Browns Ferry, Units 1, 2, and 3, Integrated Inspection ReportSafe Shutdown
High Radiation Area
Non-Destructive Examination
Fire Barrier
Internal Flooding
Hydrostatic
Nondestructive Examination
Temporary Modification
Functionality Assessment
Significance Determination Process
Foreign Material Exclusion
Operability Determination
Earthquake
Scaffolding
Substantial potential for overexposure
Downpower
Overexposure
IR 05000259/201000330 July 2010IR 0500259-10-003, 05000260-10-003, 05000296-10-003, 0500259-10-501, 05000260-10-501, 05000296-10-501 and 07200052-10-002 on 04/01/2010 - 06/30/2010 for Browns Ferry Plant, Integrated InspectionSignificance Determination Process
IR 05000259/201000429 October 2010IR 05000259-10-004, 05000260-10-004, 05000296-10-004 & 07200052-10-003, and Notice of Violation, 07/01/10 - 09/30/10, Browns Ferry, Integrated ReportSafe Shutdown
Packing leak
Fire Barrier
Internal Flooding
Probabilistic Risk Assessment
Temporary Modification
Squib
Significance Determination Process
Excess Flow Check Valve
Incremental Core Damage Probability Deficit
Downpower
Power Uprate
IR 05000259/20100058 April 2011Summary of Meeting with Browns Ferry to Discuss One Preliminary Greater than Green Finding Associated with One Apparent Violation That Was Documented in NRC Inspection Report 05000259-10-005, 05000260-10-005, and 05000296-10-005Safe Shutdown
Fire Barrier
Stroke time
Probabilistic Risk Assessment
Operator Manual Action
Finite Element Analysis
Significance Determination Process
IR 05000259/20100068 November 2010IR 05000259-10-006, 05000260-10-006, 05000296-10-006; on 8/30/2010 - 9/24/2010; Browns Ferry Nuclear Plant, Units 1, 2 and 3; Identification and Resolution of ProblemsPacking leak
Mission time
Condition Adverse to Quality
Significance Determination Process
Maintenance Rule Program
IR 05000259/20100083 December 2010Safe Shutdown
Fitness for Duty
Offsite Dose Calculation Manual
Fire Barrier
Commercial Grade Dedication
Enforcement Discretion
Probabilistic Risk Assessment
Operator Manual Action
B.5.b
Significance Determination Process
Safeguards Contingency Plan
Maintenance Rule Program
Fire Protection Program
IR 05000259/20102014 February 2011IR 05000259-10-201, 05000260-10-201, and 05000296-10-201, 12/17/2010, Brows Ferry Nuclear Plant; Security Inspection (Cover Letter)Affidavit
IR 05000259/20103012 February 2011Operator Licensing Written Examination Approval 05000259-10-301, 05000260-10-301 and 05000296-10-301
IR 05000259/201040219 May 2010IR 05000259-10-402, IR 05000260-10-402, and IR 05000296-10-402, for Browns Ferry, Units 1, 2 & 3, Security
IR 05000259/20105029 March 2011
IR 05000259/201100213 May 2011IR 05000259-11-002, 05000260-11-002, 05000296-11-002 & 07200052-11-002, on 01/01/2011 - 03/31/2011, Browns Ferry, Units 1, 2 & 3, NRC Integrated Inspection and Notice of ViolationSafe Shutdown
Time of Discovery
Packing leak
High Radiation Area
Mission time
Fire Barrier
Weld Overlay
Post Accident Monitoring
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Operator Manual Action
Cyber Security
Condition Adverse to Quality
Significance Determination Process
Foreign Material Exclusion
Operability Determination
Severe Accident Management Guideline
Liquid penetrant
Fatigue Rule
Scaffolding
Grace period
Downpower
Flow Induced Vibration
Weak link
Power Uprate
IR 05000259/20110038 August 2011IR 05000259-11-003, 05000260-11-003, 05000296-11-003; 04/01/2011 - 06/30/2011; Browns Ferry Nuclear Plant, Units 1, 2 and 3; Annual Heat Sink Performance, Operability EvaluationsReactor Vessel Water Level
Fire Barrier
Post Accident Monitoring
Hydrostatic
Past operability
Temporary Modification
Functionality Assessment
Condition Adverse to Quality
B.5.b
Corrosion bonding
Significance Determination Process
Scram Discharge Volume
Excess Flow Check Valve
Operability Determination
Severe Accident Management Guideline
Downpower
IR 05000259/201100414 November 2011IR 05000259-11-004, 05000260-11-004, 05000296-11-004; on 07/01/2011 - 09/30/2011, Browns Ferry, Units 1, 2, and 3; Integrated Inspection ReportSafe Shutdown
Reactor Vessel Water Level
Mission time
Fire Barrier
Time to boil
Internal Flooding
Fire impairment
Temporary Modification
Significance Determination Process
Foreign Material Exclusion
Scram Discharge Volume
Fire Protection Program
Fire Watch
Hourly Fire Watch
Downpower
Flow Induced Vibration
Power Uprate
IR 05000259/201100513 February 2012IR 05000259-11-005, 05000260-11-005, 05000296-11-005; 10/01/2011 -12/31/2011; Browns Ferry Nuclear Plant, Units 1, 2 and 3; Event Follow-upSafe Shutdown
Time of Discovery
Packing leak
Mission time
Fire Barrier
Past operability
Temporary Modification
Tornado Generated Missile
Significance Determination Process
Grace period
Power change
Downpower
Unidentified leakage
IR 05000259/2011008Safe Shutdown
Probabilistic Risk Assessment
Operator Manual Action
Functionality Assessment
Significance Determination Process
IR 05000259/201100913 May 2011NRC Temporary Instruction 2515/183 Inspection Report 05000259/2011009, 05000260/2011009, 05000296/2011009Internal Flooding
B.5.b
Seismically rugged
Severe Accident Management Guideline
Earthquake
IR 05000259/201101016 August 2011
IR 05000259/201101117 November 2011EA-11-018, EA-11-252, IR 05000259-11-011, 05000260-11-011, 05000296-11-011, Browns Ferry Nuclear Plant, Units 1, 2, & 3, 09/12/2011- 09/23/2011, Supplemental Inspection - Inspection Procedure (IP) 95003Condition Adverse to Quality
Significance Determination Process
Cold shutdown justification
IR 05000259/201101228 February 2012IR 05000259-11-012, 05000260-11-012 & 05000296-11-012, Browns Ferry Nuclear Plant, Units 1, 2, and 3, 10/1/2011 - 12/31/2011, Supplemental Inspection - Inspection Procedure (IP) 95003Temporary Modification
Condition Adverse to Quality
Significance Determination Process
Foreign Material Exclusion
License Renewal
Scaffolding
IR 05000259/20113014 April 2011Er 05000259-11-301, 05000260-11-301, and 05000296-11-301; 02/07/2011 - 02/16/2011; Browns Ferry Nuclear Plant, Units 1, 2, and 3 Operator License Examinations
IR 05000259/201130219 September 2011Er 05000259-11-302, 05000260-11-302, and 05000296-11-302, Operating Test August 8 - 12, 2011 & Written Exam August 19, 2011; Browns Ferry Nuclear Plant, Operator License ExaminationsJob Performance Measure
Hardened vent
IR 05000259/201140220 May 2011IR 05000259-11-402, IR 0500260-11-402, and IR 05000296-11-402, on 02/18/2011, (Corporate Office) & 04/21/2011, (K.Polson & Members Staff at Plant), Browns Ferry Nuclear Plant, NRC Security InspectionSignificance Determination Process
Affidavit
IR 05000259/201140314 September 2011IR 05000259-11-403, 05000260-11-403, 05000296-11-403, on 08/18/2011, Brown Ferry Nuclear Plant, NRC Security Inspection ReportAffidavit
IR 05000259/20115016 January 2012IR 05000259-11-501, 05000260-11-501 and 05000296-11-501, on 12/05/2011 - 12/09/2011, for Browns Ferry Nuclear Plant, Units 1, 2, and 3, Exercise and Baseline Inspection
IR 05000259/20115025 March 2012NRC Emergency Preparedness Annual Inspection 05000259/2011502; 05000260/2011502; 05000296/2011502
IR 05000259/20120014 March 2013Annual Assessment Letter for Browns Ferry Nuclear Plant, Units 1, 2 & 3 (IR 05000259-12-001, 05000260-12-001, and 05000296-12-001)License Renewal
IR 05000259/201200227 April 2012IR 05000259-12-002, 05000260-12-002, 05000296-12-002, 07200052-12-001, on 01/01/2012 -03/31/2012, Browns Ferry Nuclear Plant, Units 1, 2 and 3, Fire Protection, Event Follow-up, Other ActivitiesSafe Shutdown
Mission time
Fire Barrier
Internal Flooding
Past operability
Fire impairment
Significance Determination Process
Operability Determination
Severe Accident Management Guideline
Fuel cladding
Continuous fire watch
Fire Protection Program
Grace period
Downpower
IR 05000259/201200319 November 2012Errata for Browns Ferry Nuclear Plant - NRC Integrated Inspection Report, 05000259-12-003, 05000260-12-003, 05000296-12-003, 05000259-12-502, 05000260-12-502, and 05000296-12-502
IR 05000259/201200413 November 2012IR 05000259-12-004, 05000260-12-004, 05000296-12-004, on 07/01/2012 - 09/30/2012, Browns Ferry Nuclear Plant, Units 1, 2 and 3, Identification and Resolution of Problems, and Event Follow-upHot Short
Safe Shutdown
Unanalyzed Condition
Time of Discovery
Packing leak
Mission time
Fire Barrier
Internal Flooding
Past operability
Enforcement Discretion
Operating Basis Earthquake
Operator Manual Action
Multiple Spurious Operation
Fukushima Dai-Ichi
Significance Determination Process
Large early release frequency
Fire Protection Program
Downpower
Power Uprate