Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML17347A86530 September 1988Monthly Operating Repts for Sept 1988 for Turkey Point Units 3 & 4 & St Lucie Units 1 & 2.W/881017 Ltr
ML17347A91031 December 1988Monthly Operating Repts for Dec 1988 for Turkey Point Units 3 & 4 & St Lucie Units 1 & 2.W/890117 Ltr
ML17347A97131 January 1989Monthly Operating Repts for Jan 1989 for Turkey Point Units 3 & 4 & St.Lucie Units 1 & 2.W/890213 Ltr
ML17347B02728 February 1989Monthly Operating Repts for Feb 1989 for Turkey Point Units 3 & 4 & St Lucie Units 1 & 2.W/890314 Ltr
ML17347B09831 March 1989Monthly Operating Repts for Mar 1989 for Turkey Point Units 3 & 4 & St Lucie Units 1 & 2.W/890414 Ltr
ML17347B18530 June 1989Monthly Operating Repts for June 1989 for St Lucie Units 1 & 2 & Turkey Point Units 3 & 4.W/890717 Ltr
ML17347B27331 July 1989Monthly Operating Repts for Jul 1989 for Turkey Point Units 3 & 4 & St Lucie Units 1 & 2
ML17347B27430 June 1989Corrected Monthly Operating Repts for June 1989 for Turkey Point Units 3 & 4
ML17347B33431 August 1989Monthly Operating Repts for Aug 1989 for Turkey Point Units 3 & 4 & St Lucie Units 1 & 2.W/890913 Ltr
ML17347B38230 September 1989Monthly Operating Repts for Sept 1989 for Turkey Point Units 3 & 4 & St Lucie Units 1 & 2.W/891016 Ltr
ML17347B46231 December 1989App a to USI A-46 & Generic Ltr 87-02.Safe Shutdown
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Earthquake
Backfit
ML18008A03131 July 1989NTH-TR-01 Decrease in Heat Removal by Secondary Sys.Safe Shutdown
Rod Drop Event
ML18041A12514 September 1984Rev 4 to, 180-Day Rept in Response to IE Bulletin 80-11 for Dresden Nuclear Power Station Units 2 & 3.Safe Shutdown
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Tornado Generated Missile
Earthquake
ML18047A32227 April 1982Hot License Program - Reactor Operator.Fuel cladding
Power change
ML18047A3233 May 1982Hot License Program - Senior Reactor Operator.
ML18092A13831 December 1983Annual Financial Rept 1983
ML18092A13931 December 1983Annual Financial Rept 1983
ML18092A14031 December 1983Annual Financial Rept 1983Weld Overlay
ML18092A14131 December 1983Annual Financial Rept 1983
ML18092A33531 May 1984App XI to Salem Generating Station 316(b) Demonstration, Weakfish (Cynoscion Regalis): Synthesis of Info of Natural History,W/Ref to Occurrence in Delaware River & Estuary & Involvement W/Salem Generating Station.
ML18092A33631 May 1984Vols 1 & 2 to App XII to Salem Generating Station 316(b) Demonstration, Bay Anchovy (Anchoa Mitchilli): Synthesis of Info of Natural History,W/Ref to Occurrence in Delaware River....Hydrostatic
Veliger
ML18092A33731 May 1984App XIII to Salem Generating Station 316(b) Demonstration, Intake Technologies & Practices.Frazil ice
Biofouling
ML18092B46231 December 1986Delmarva Power,1986 Annual Rept.
ML18092B46631 December 1986Public Svc Enterprise Group 1986 Annual Rept.
ML18092B46831 December 1986Philadelphia Electric Co,1986 Annual Rept.
ML18092B46931 December 1986Atlantic Electric 1986 Annual Rept.
ML18092B4973 April 1987S-C-E500-NSE-0675-R-1, Justification for Operation of All Three Units at Artificial Island at Increased Power During Hope Creek-Keeney Line Outage.
ML18093A17919 June 1987Installation of Trip-A-Unit Protection Scheme Suppl Info Salem & Hope Creek Generating Stations.
ML18093A73831 December 1987Philadelphia Electric Co Annual Rept,1987.
ML18093A73931 December 1987Delmarva 1987 Annual Rept.
ML18093A74031 December 1987Public Svc Enterprise Group Inc 1987 Annual Rept.Exemption Request
ML18093A74131 December 1987Atlantic Energy 1987 Annual Rept.Safe Shutdown
Systematic Assessment of Licensee Performance
ML18093A80031 December 19871987 Annual Rept,Public Svc Enterprise Group,Inc. W/880422 Ltr
ML18093A8286 May 1988Part 21 & Deficiency Rept Re Asea Brown Boveri,Power Distribution,Inc Low Voltage K-Line Circuit Breakers. Efforts Underway to Define Quantity & Type of Component Parts That May Need to Be Replaced
ML18093B33731 December 1988Artificial Island Emergency Plan,Annual Exercise, Conducted on 881123-1202
ML18094A35530 April 1989Assessment of Impacts of Salem & Hope Creek Generating Stations on Kemps Ridley (Lepidochelys Kempi) & Loggerhead (Carretta Caretta) Sea Turtles.Safe Shutdown
Earthquake
ML18094B14725 October 1989Emergency Plan Annual Exercise 1989 for Artificial Island on 891025. W/One Oversize Drawing
ML18094B32128 February 1990Annual Operating Repts for 1989 for Salem & Hope Creek Generating Stations
ML18095B01731 December 19881988 Annual Rept. W/890406 LtrFuel cladding
ML18101A49313 June 1989Radiological Emergency Preparedness Exercise Evaluation Rept.
ML18113A77131 October 1978Vepco Flame Model. Util Developed 3 Dimensional(X,Y,Z) Modified Diffusion Therory Calculational Model Designated as Vepco Flame Model.Accuracy of Model Is Demonstrated Through Comparisons Taken at Units 1 & 2
ML18130A35226 March 1982Annual Financial Rept 1981.Financial Statements Attached
ML18130A39510 November 1983VEPCO North Anna Power Station & Surry Power Station Compliance W/10CFR50.49(b)(2).
ML18139B81931 March 1982Nine-Month Response to NRC Ltr Dtd 801220 on Control of Heavy Loads for VEPCO North Anna Units 1 & 2.Control of Heavy Loads
ML18139B92530 June 1982PWR Safety & Relief Valve Adequacy Rept for North Anna Units 1 & 2.Loop seal
Stroke time
ML18139C01031 August 1982PWR Safety & Relief Valve Test Program,Porv Block Valve Adequacy Rept for Vepco,North Anna Unit 1 & Unit 2.Stroke time
Control of Heavy Loads
ML18139C02631 October 1982Final Draft of Amend 4 to QA Program-Operations Phase, Topical ReptHydrostatic
Early Warning Fire Detection
ML18139C0614 October 1982Errata to VEPCO Reactor Core Thermal Hydraulic Analysis Using COBRA-IIIc/MIT Computer Code.
ML18139C29130 April 1982Evaluation of Online Boron Analyzers, Final ReptBoric Acid
High Radiation Area
Grab sample
ML18141A25831 October 1983Revised Reactor Core Thermal-Hydraulic Analysis Using Cobra Iiic/Mit Computer Code.Fuel cladding