Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
05000395/LER-1983-020, Forwards LER 83-020/03L-0.Detailed Event Analysis Encl31 March 1983Forwards LER 83-020/03L-0.Detailed Event Analysis EnclFire Watch
05000395/LER-1983-021, Forwards LER 83-021/03L-0.Detailed Event Analysis Encl6 April 1983Forwards LER 83-021/03L-0.Detailed Event Analysis EnclGrab sample
05000395/LER-1983-022, Forwards LER 83-022/03L-0.Detailed Event Analysis Encl7 April 1983Forwards LER 83-022/03L-0.Detailed Event Analysis EnclFire Watch
Hourly Fire Watch
05000395/LER-1983-023, Forwards LER 83-023/03L-0.Detailed Event Analysis Encl8 April 1983Forwards LER 83-023/03L-0.Detailed Event Analysis Encl
05000395/LER-1983-024, Forwards LER 83-024/03L-0.Detailed Event Analysis Encl8 April 1983Forwards LER 83-024/03L-0.Detailed Event Analysis Encl
05000395/LER-1983-025, Forwards LER 83-025/03L-0.Detailed Event Analysis Encl11 April 1983Forwards LER 83-025/03L-0.Detailed Event Analysis Encl
05000395/LER-1983-026, Forwards LER 83-026/03L-012 April 1983Forwards LER 83-026/03L-0
05000395/LER-1983-027, Forwards LER 83-027/03L-0.Detailed Event Analysis Encl15 April 1983Forwards LER 83-027/03L-0.Detailed Event Analysis EnclPost Accident Monitoring
05000395/LER-1983-028, Forwards LER 83-028/01T-0.Detailed Event Analysis Encl20 April 1983Forwards LER 83-028/01T-0.Detailed Event Analysis Encl
05000395/LER-1983-029, Forwards LER 83-029/03L-0.Detailed Event Analysis Encl20 April 1983Forwards LER 83-029/03L-0.Detailed Event Analysis Encl
05000395/LER-1983-030, Forwards LER 83-030/03L-0.Detailed Event Analysis Encl22 April 1983Forwards LER 83-030/03L-0.Detailed Event Analysis EnclFire Watch
05000395/LER-1983-031, Forwards LER 83-031/03L-0.Detailed Event Analysis Encl22 April 1983Forwards LER 83-031/03L-0.Detailed Event Analysis Encl
05000395/LER-1983-034, Forwards LER 83-034/03L-0.Detailed Event Analysis Encl2 May 1983Forwards LER 83-034/03L-0.Detailed Event Analysis Encl
05000395/LER-1983-038, Forwards LER 83-038/03L-0.Detailed Event Analysis Encl12 May 1983Forwards LER 83-038/03L-0.Detailed Event Analysis Encl
05000395/LER-1985-010, Forwards LER 85-010-00 in Response to Violations Noted in Insp Rept 50-395/85-1521 June 1985Forwards LER 85-010-00 in Response to Violations Noted in Insp Rept 50-395/85-15
05000395/LER-1985-015, Notifies That Util Agrees W/Alleged Violation 01 in Insp Rept 50-395/85-28.Corrective Actions Documented in Encl LER 85-015,Rev 1.Supervisors Counseled Re Equipment Operability. Util in Full Compliance W/Corrective Action20 August 1985Notifies That Util Agrees W/Alleged Violation 01 in Insp Rept 50-395/85-28.Corrective Actions Documented in Encl LER 85-015,Rev 1.Supervisors Counseled Re Equipment Operability. Util in Full Compliance W/Corrective ActionScaffolding
05000395/LER-1986-003, Forwards LER 86-003-00 (Special Rept Spr 86-006)30 April 1986Forwards LER 86-003-00 (Special Rept Spr 86-006)
05000395/LER-1986-013, Forwards 860815 LER 86-013,responding to Notice of Violation from Insp Rept 50-395/86-13.Util in Full Compliance Re Corrective Action Stated in LER5 September 1986Forwards 860815 LER 86-013,responding to Notice of Violation from Insp Rept 50-395/86-13.Util in Full Compliance Re Corrective Action Stated in LERFire Watch
Hourly Fire Watch
05000395/LER-1987-007, Forwards 870513 LER 87-007 in Response to Violation Noted in Insp Rept 50-395/87-07.Util Agrees W/Alleged Violation. Corrective Action Should Allow Full Compliance by 870630 When Change to Surveillance Test Procedure 404.901 Fi17 June 1987Forwards 870513 LER 87-007 in Response to Violation Noted in Insp Rept 50-395/87-07.Util Agrees W/Alleged Violation. Corrective Action Should Allow Full Compliance by 870630 When Change to Surveillance Test Procedure 404.901 Finished
05000395/LER-1987-018, Forwards 870827 LER 87-018-00 Which Responds to Violation Addressed in Encl 1,Item a of Insp Rept 50-395/87-24.LER Addresses Reason for Violation & Corrective Actions Taken to Prevent Recurrence2 November 1987Forwards 870827 LER 87-018-00 Which Responds to Violation Addressed in Encl 1,Item a of Insp Rept 50-395/87-24.LER Addresses Reason for Violation & Corrective Actions Taken to Prevent RecurrenceFire Barrier
Continuous fire watch
Fire Protection Program
Fire Watch
Hourly Fire Watch
05000395/LER-1987-019, Forwards LER 87-019-01.Schedule for Completion of Mod Updated to 871127 Due to Late Arrival of Matl for Mod28 October 1987Forwards LER 87-019-01.Schedule for Completion of Mod Updated to 871127 Due to Late Arrival of Matl for Mod
05000395/LER-1991-006, Forwards LER 91-006 Re Inadvertent ESF Actuation of DG in Response to Violation Noted in Insp Rept 50-395/91-17. Corrective Actions:Operations Staff Briefed on Necessity of Attention to Detail14 October 1991Forwards LER 91-006 Re Inadvertent ESF Actuation of DG in Response to Violation Noted in Insp Rept 50-395/91-17. Corrective Actions:Operations Staff Briefed on Necessity of Attention to Detail
05000395/LER-1994-002, Forwards LER 94-002 in Response to NRC Insp Rept 50-395/94-075 April 1994Forwards LER 94-002 in Response to NRC Insp Rept 50-395/94-07
05000395/LER-1996-004, Responds to Telcon W/G Lippard Re LER 96-004 on Leakage Past Motor Driven EFW Flow Control Valves Discovered During Recently Completed Refueling Outage at Station25 July 1996Responds to Telcon W/G Lippard Re LER 96-004 on Leakage Past Motor Driven EFW Flow Control Valves Discovered During Recently Completed Refueling Outage at StationUnanalyzed Condition
05000395/LER-1998-004, Forwards LER 98-004-01 Re Unanalyzed Condition for Equipment Qualification Beyond Ten Minutes Following High Energy Line Break Outside Containment,Per 10CFR50.73(a)(2)(ii).Suppl Provides Addl Corrective Actions5 August 1998Forwards LER 98-004-01 Re Unanalyzed Condition for Equipment Qualification Beyond Ten Minutes Following High Energy Line Break Outside Containment,Per 10CFR50.73(a)(2)(ii).Suppl Provides Addl Corrective ActionsUnanalyzed Condition
05000395/LER-1998-009, Forwards LER 98-009-01 for VC Summer Nuclear Station.Rept Describes Unanalyzed Condition for non-safety Related Component for Which All Failure Mechanisms Had Not Been Evaluated28 January 1999Forwards LER 98-009-01 for VC Summer Nuclear Station.Rept Describes Unanalyzed Condition for non-safety Related Component for Which All Failure Mechanisms Had Not Been EvaluatedUnanalyzed Condition
05000395/LER-1999-002, Forwards LER 99-002-00 Re Condition for Exceeding Vsns Design Basis During Surveillance Testing Utilizing Certain ECCS Valves.Simplified Flow Diagram Included to Identify Configurations Discussed by Rept Encl12 April 1999Forwards LER 99-002-00 Re Condition for Exceeding Vsns Design Basis During Surveillance Testing Utilizing Certain ECCS Valves.Simplified Flow Diagram Included to Identify Configurations Discussed by Rept Encl
05000395/LER-1999-004, Submits Suppl 1 to LER 99-004-00 Re Discovery of Several Fuel Assembly Top Nozzle Holdown Screws Which Had Failed. Root Cause Will Not Be Completed by 990829,as Committed.W Analysis Will Be Issued After Fall Outages Are Complet24 August 1999Submits Suppl 1 to LER 99-004-00 Re Discovery of Several Fuel Assembly Top Nozzle Holdown Screws Which Had Failed. Root Cause Will Not Be Completed by 990829,as Committed.W Analysis Will Be Issued After Fall Outages Are Completed
05000395/LER-1999-005, Forwards LER 99-005-00 for VC Summer Nuclear Station.Rept Describes Potential Condition for Exceeding Vsns Plant Design Basis Due to Submergence Qualification Issues for Certain ESF Components12 May 1999Forwards LER 99-005-00 for VC Summer Nuclear Station.Rept Describes Potential Condition for Exceeding Vsns Plant Design Basis Due to Submergence Qualification Issues for Certain ESF Components
05000395/LER-1999-006, Forwards LER 99-006-00,describing Identified Safety Hazard with GE 7.2kV Magne-Blast Circuit Breakers.Event Is Being Reported Per 10CFR21.21a(1)17 May 1999Forwards LER 99-006-00,describing Identified Safety Hazard with GE 7.2kV Magne-Blast Circuit Breakers.Event Is Being Reported Per 10CFR21.21a(1)
05000412/LER-1987-016, Submits Revised Cover Ltr for LER 87-016-00, ESF Actuation- Inadvertent Start of Auxiliary Feedwater Pump. Rept Resubmitted Due to Inaccurate Event Description. Ltr21 September 1987Submits Revised Cover Ltr for LER 87-016-00, ESF Actuation- Inadvertent Start of Auxiliary Feedwater Pump. Rept Resubmitted Due to Inaccurate Event Description. Ltr
05000412/LER-1990-007, Responds to NRC Re Deviation 50-412/90-12-01 Noted in Insp Rept 50-412/90-12.Corrective Actions:Procedure OM 2.20-4.I Revised to Require Removal of Flanges Following Drain Operations & LER 90-007-00 Issued23 August 1990Responds to NRC Re Deviation 50-412/90-12-01 Noted in Insp Rept 50-412/90-12.Corrective Actions:Procedure OM 2.20-4.I Revised to Require Removal of Flanges Following Drain Operations & LER 90-007-00 Issued
05000412/LER-1990-011, Provides Corrected Copy of Licensee Event Rept W/Correct Number (LER-90-011-01)15 January 1992Provides Corrected Copy of Licensee Event Rept W/Correct Number (LER-90-011-01)
05000412/LER-1995-003, Forwards LER 95-003 Re Train B Recirculation Spray Sys Header Cooling Flow Below TS Requirements14 August 1995Forwards LER 95-003 Re Train B Recirculation Spray Sys Header Cooling Flow Below TS Requirements
05000412/LER-1996-003, Forwards LER 96-003-00 Re Inadequate Testing of Safety Related Logic,Per GL 96-018 July 1996Forwards LER 96-003-00 Re Inadequate Testing of Safety Related Logic,Per GL 96-01
05000412/LER-1997-003, Forwards LER 97-003-01 Re Entry of TS 3.0.3 Due to Inoperability of Both Trains of Suppl Leak Collection & Release Sys27 April 1998Forwards LER 97-003-01 Re Entry of TS 3.0.3 Due to Inoperability of Both Trains of Suppl Leak Collection & Release Sys
05000412/LER-1998-002, Forwards LER 98-002-00,re Inadequate Testing of Diesel Fuel Oil Transfer Pumps as Required by TS30 March 1998Forwards LER 98-002-00,re Inadequate Testing of Diesel Fuel Oil Transfer Pumps as Required by TS
05000412/LER-1998-007, Forwards LER 98-007-02 Re Inadequate BVPS Unit 2 Procedures to Ensure Compliance W/Ts19 August 1998Forwards LER 98-007-02 Re Inadequate BVPS Unit 2 Procedures to Ensure Compliance W/Ts
05000412/LER-1998-008, Forwards LER 98-008-01, GL 96-01 TS Instrumentation Surveillance Inadequacies, Per 10CFR50.73(a)(2)(i)12 June 1998Forwards LER 98-008-01, GL 96-01 TS Instrumentation Surveillance Inadequacies, Per 10CFR50.73(a)(2)(i)
05000412/LER-1998-010, Forwards LER 98-010-00, Non-Safety Related Mechanical Seal Assembly Installed in Quench Spray Pump 'A' 2QSS-P21A, Per 10CFR50.73(a)(2)(i)12 June 1998Forwards LER 98-010-00, Non-Safety Related Mechanical Seal Assembly Installed in Quench Spray Pump 'A' 2QSS-P21A, Per 10CFR50.73(a)(2)(i)
05000412/LER-1998-011, Forwards LER 98-011-00, Cross-Connect Piping Installed Between Suction Lines of Hydrogen Recombiners, IAW 10CFR50.73(a)(2)(i) & (II)13 July 1998Forwards LER 98-011-00, Cross-Connect Piping Installed Between Suction Lines of Hydrogen Recombiners, IAW 10CFR50.73(a)(2)(i) & (II)
05000412/LER-1999-007, Forwards LER 99-007-00, Forced Shutdown Due to Inoperable EDG, Per 10CFR50.73(a)(2)(i).Rept Is Delayed Due to Util Needing Addl Three Days to Address Event Issues on Reportability & Provide Addl Safety Implications Info19 August 1999Forwards LER 99-007-00, Forced Shutdown Due to Inoperable EDG, Per 10CFR50.73(a)(2)(i).Rept Is Delayed Due to Util Needing Addl Three Days to Address Event Issues on Reportability & Provide Addl Safety Implications Info
ET-NRC-93-3956, Forwards Nonproprietary & Proprietary VC Summer Nuclear Station SG Pulled Tube Exam Results Presentation Matls from Nrc/Sce&G/Westinghouse Meeting on 930727. Proprietary Matl Withheld,Per 10CFR2.79026 August 1993Forwards Nonproprietary & Proprietary VC Summer Nuclear Station SG Pulled Tube Exam Results Presentation Matls from Nrc/Sce&G/Westinghouse Meeting on 930727. Proprietary Matl Withheld,Per 10CFR2.790Affidavit
IA-84-846, Responds to FOIA Request Re 841211 Response to Request for Info Concerning Results of Initial Written Operator Exams Taken by Candidates at Listed Plants.Records Placed in Pdr. Privacy Info Deleted27 March 1985Responds to FOIA Request Re 841211 Response to Request for Info Concerning Results of Initial Written Operator Exams Taken by Candidates at Listed Plants.Records Placed in Pdr. Privacy Info Deleted
IA-84-926, Responds to FOIA Request,Confirming 851001 Telcon Which Advised That NRC 850705 Response to 841214 FOIA Request Re Plant Final7 November 1985Responds to FOIA Request,Confirming 851001 Telcon Which Advised That NRC 850705 Response to 841214 FOIA Request Re Plant Final
IA-85-582, Responds to FOIA Request for Power Plant Exam Results Summary Sheets for 10 Listed Plants.Forwards Summary Sheets for Five Plants.Portions Deleted.Summary Sheets for Stated Plants Destroyed20 September 1985Responds to FOIA Request for Power Plant Exam Results Summary Sheets for 10 Listed Plants.Forwards Summary Sheets for Five Plants.Portions Deleted.Summary Sheets for Stated Plants Destroyed
IA-86-278, Partial Response to FOIA Request.Documents Listed in Apps D & E Available in PDR27 June 1986Partial Response to FOIA Request.Documents Listed in Apps D & E Available in PDRNondestructive Examination
IA-87-711, Final Response to FOIA Request for LERs for Listed Plants. App a Document Available in Pdr.Forwards Partially Withheld App B Documents (Ref FOIA Exemption 4)25 November 1987Final Response to FOIA Request for LERs for Listed Plants. App a Document Available in Pdr.Forwards Partially Withheld App B Documents (Ref FOIA Exemption 4)
IA-87-807, Final Response to FOIA Request for Documents,Including Johnson Ltr to NRC Transmitting Rev 1 to LER 85-005.Forwards App B Document.App a & B Documents Also in Pdr.Nrc Not in Possession of Item 2 of Request14 December 1987Final Response to FOIA Request for Documents,Including Johnson Ltr to NRC Transmitting Rev 1 to LER 85-005.Forwards App B Document.App a & B Documents Also in Pdr.Nrc Not in Possession of Item 2 of Request
IA-88-505, Final Response to FOIA Request for Records.App a Document Encl & Available in PDR17 October 1988Final Response to FOIA Request for Records.App a Document Encl & Available in PDRStroke time