05000395/LER-1983-020, Forwards LER 83-020/03L-0.Detailed Event Analysis Encl | 31 March 1983 | Forwards LER 83-020/03L-0.Detailed Event Analysis Encl | Fire Watch |
05000395/LER-1983-021, Forwards LER 83-021/03L-0.Detailed Event Analysis Encl | 6 April 1983 | Forwards LER 83-021/03L-0.Detailed Event Analysis Encl | Grab sample |
05000395/LER-1983-022, Forwards LER 83-022/03L-0.Detailed Event Analysis Encl | 7 April 1983 | Forwards LER 83-022/03L-0.Detailed Event Analysis Encl | Fire Watch Hourly Fire Watch |
05000395/LER-1983-023, Forwards LER 83-023/03L-0.Detailed Event Analysis Encl | 8 April 1983 | Forwards LER 83-023/03L-0.Detailed Event Analysis Encl | |
05000395/LER-1983-024, Forwards LER 83-024/03L-0.Detailed Event Analysis Encl | 8 April 1983 | Forwards LER 83-024/03L-0.Detailed Event Analysis Encl | |
05000395/LER-1983-025, Forwards LER 83-025/03L-0.Detailed Event Analysis Encl | 11 April 1983 | Forwards LER 83-025/03L-0.Detailed Event Analysis Encl | |
05000395/LER-1983-026, Forwards LER 83-026/03L-0 | 12 April 1983 | Forwards LER 83-026/03L-0 | |
05000395/LER-1983-027, Forwards LER 83-027/03L-0.Detailed Event Analysis Encl | 15 April 1983 | Forwards LER 83-027/03L-0.Detailed Event Analysis Encl | Post Accident Monitoring |
05000395/LER-1983-028, Forwards LER 83-028/01T-0.Detailed Event Analysis Encl | 20 April 1983 | Forwards LER 83-028/01T-0.Detailed Event Analysis Encl | |
05000395/LER-1983-029, Forwards LER 83-029/03L-0.Detailed Event Analysis Encl | 20 April 1983 | Forwards LER 83-029/03L-0.Detailed Event Analysis Encl | |
05000395/LER-1983-030, Forwards LER 83-030/03L-0.Detailed Event Analysis Encl | 22 April 1983 | Forwards LER 83-030/03L-0.Detailed Event Analysis Encl | Fire Watch |
05000395/LER-1983-031, Forwards LER 83-031/03L-0.Detailed Event Analysis Encl | 22 April 1983 | Forwards LER 83-031/03L-0.Detailed Event Analysis Encl | |
05000395/LER-1983-034, Forwards LER 83-034/03L-0.Detailed Event Analysis Encl | 2 May 1983 | Forwards LER 83-034/03L-0.Detailed Event Analysis Encl | |
05000395/LER-1983-038, Forwards LER 83-038/03L-0.Detailed Event Analysis Encl | 12 May 1983 | Forwards LER 83-038/03L-0.Detailed Event Analysis Encl | |
05000395/LER-1985-010, Forwards LER 85-010-00 in Response to Violations Noted in Insp Rept 50-395/85-15 | 21 June 1985 | Forwards LER 85-010-00 in Response to Violations Noted in Insp Rept 50-395/85-15 | |
05000395/LER-1985-015, Notifies That Util Agrees W/Alleged Violation 01 in Insp Rept 50-395/85-28.Corrective Actions Documented in Encl LER 85-015,Rev 1.Supervisors Counseled Re Equipment Operability. Util in Full Compliance W/Corrective Action | 20 August 1985 | Notifies That Util Agrees W/Alleged Violation 01 in Insp Rept 50-395/85-28.Corrective Actions Documented in Encl LER 85-015,Rev 1.Supervisors Counseled Re Equipment Operability. Util in Full Compliance W/Corrective Action | Scaffolding |
05000395/LER-1986-003, Forwards LER 86-003-00 (Special Rept Spr 86-006) | 30 April 1986 | Forwards LER 86-003-00 (Special Rept Spr 86-006) | |
05000395/LER-1986-013, Forwards 860815 LER 86-013,responding to Notice of Violation from Insp Rept 50-395/86-13.Util in Full Compliance Re Corrective Action Stated in LER | 5 September 1986 | Forwards 860815 LER 86-013,responding to Notice of Violation from Insp Rept 50-395/86-13.Util in Full Compliance Re Corrective Action Stated in LER | Fire Watch Hourly Fire Watch |
05000395/LER-1987-007, Forwards 870513 LER 87-007 in Response to Violation Noted in Insp Rept 50-395/87-07.Util Agrees W/Alleged Violation. Corrective Action Should Allow Full Compliance by 870630 When Change to Surveillance Test Procedure 404.901 Fi | 17 June 1987 | Forwards 870513 LER 87-007 in Response to Violation Noted in Insp Rept 50-395/87-07.Util Agrees W/Alleged Violation. Corrective Action Should Allow Full Compliance by 870630 When Change to Surveillance Test Procedure 404.901 Finished | |
05000395/LER-1987-018, Forwards 870827 LER 87-018-00 Which Responds to Violation Addressed in Encl 1,Item a of Insp Rept 50-395/87-24.LER Addresses Reason for Violation & Corrective Actions Taken to Prevent Recurrence | 2 November 1987 | Forwards 870827 LER 87-018-00 Which Responds to Violation Addressed in Encl 1,Item a of Insp Rept 50-395/87-24.LER Addresses Reason for Violation & Corrective Actions Taken to Prevent Recurrence | Fire Barrier Continuous fire watch Fire Protection Program Fire Watch Hourly Fire Watch |
05000395/LER-1987-019, Forwards LER 87-019-01.Schedule for Completion of Mod Updated to 871127 Due to Late Arrival of Matl for Mod | 28 October 1987 | Forwards LER 87-019-01.Schedule for Completion of Mod Updated to 871127 Due to Late Arrival of Matl for Mod | |
05000395/LER-1991-006, Forwards LER 91-006 Re Inadvertent ESF Actuation of DG in Response to Violation Noted in Insp Rept 50-395/91-17. Corrective Actions:Operations Staff Briefed on Necessity of Attention to Detail | 14 October 1991 | Forwards LER 91-006 Re Inadvertent ESF Actuation of DG in Response to Violation Noted in Insp Rept 50-395/91-17. Corrective Actions:Operations Staff Briefed on Necessity of Attention to Detail | |
05000395/LER-1994-002, Forwards LER 94-002 in Response to NRC Insp Rept 50-395/94-07 | 5 April 1994 | Forwards LER 94-002 in Response to NRC Insp Rept 50-395/94-07 | |
05000395/LER-1996-004, Responds to Telcon W/G Lippard Re LER 96-004 on Leakage Past Motor Driven EFW Flow Control Valves Discovered During Recently Completed Refueling Outage at Station | 25 July 1996 | Responds to Telcon W/G Lippard Re LER 96-004 on Leakage Past Motor Driven EFW Flow Control Valves Discovered During Recently Completed Refueling Outage at Station | Unanalyzed Condition |
05000395/LER-1998-004, Forwards LER 98-004-01 Re Unanalyzed Condition for Equipment Qualification Beyond Ten Minutes Following High Energy Line Break Outside Containment,Per 10CFR50.73(a)(2)(ii).Suppl Provides Addl Corrective Actions | 5 August 1998 | Forwards LER 98-004-01 Re Unanalyzed Condition for Equipment Qualification Beyond Ten Minutes Following High Energy Line Break Outside Containment,Per 10CFR50.73(a)(2)(ii).Suppl Provides Addl Corrective Actions | Unanalyzed Condition |
05000395/LER-1998-009, Forwards LER 98-009-01 for VC Summer Nuclear Station.Rept Describes Unanalyzed Condition for non-safety Related Component for Which All Failure Mechanisms Had Not Been Evaluated | 28 January 1999 | Forwards LER 98-009-01 for VC Summer Nuclear Station.Rept Describes Unanalyzed Condition for non-safety Related Component for Which All Failure Mechanisms Had Not Been Evaluated | Unanalyzed Condition |
05000395/LER-1999-002, Forwards LER 99-002-00 Re Condition for Exceeding Vsns Design Basis During Surveillance Testing Utilizing Certain ECCS Valves.Simplified Flow Diagram Included to Identify Configurations Discussed by Rept Encl | 12 April 1999 | Forwards LER 99-002-00 Re Condition for Exceeding Vsns Design Basis During Surveillance Testing Utilizing Certain ECCS Valves.Simplified Flow Diagram Included to Identify Configurations Discussed by Rept Encl | |
05000395/LER-1999-004, Submits Suppl 1 to LER 99-004-00 Re Discovery of Several Fuel Assembly Top Nozzle Holdown Screws Which Had Failed. Root Cause Will Not Be Completed by 990829,as Committed.W Analysis Will Be Issued After Fall Outages Are Complet | 24 August 1999 | Submits Suppl 1 to LER 99-004-00 Re Discovery of Several Fuel Assembly Top Nozzle Holdown Screws Which Had Failed. Root Cause Will Not Be Completed by 990829,as Committed.W Analysis Will Be Issued After Fall Outages Are Completed | |
05000395/LER-1999-005, Forwards LER 99-005-00 for VC Summer Nuclear Station.Rept Describes Potential Condition for Exceeding Vsns Plant Design Basis Due to Submergence Qualification Issues for Certain ESF Components | 12 May 1999 | Forwards LER 99-005-00 for VC Summer Nuclear Station.Rept Describes Potential Condition for Exceeding Vsns Plant Design Basis Due to Submergence Qualification Issues for Certain ESF Components | |
05000395/LER-1999-006, Forwards LER 99-006-00,describing Identified Safety Hazard with GE 7.2kV Magne-Blast Circuit Breakers.Event Is Being Reported Per 10CFR21.21a(1) | 17 May 1999 | Forwards LER 99-006-00,describing Identified Safety Hazard with GE 7.2kV Magne-Blast Circuit Breakers.Event Is Being Reported Per 10CFR21.21a(1) | |
05000412/LER-1987-016, Submits Revised Cover Ltr for LER 87-016-00, ESF Actuation- Inadvertent Start of Auxiliary Feedwater Pump. Rept Resubmitted Due to Inaccurate Event Description. Ltr | 21 September 1987 | Submits Revised Cover Ltr for LER 87-016-00, ESF Actuation- Inadvertent Start of Auxiliary Feedwater Pump. Rept Resubmitted Due to Inaccurate Event Description. Ltr | |
05000412/LER-1990-007, Responds to NRC Re Deviation 50-412/90-12-01 Noted in Insp Rept 50-412/90-12.Corrective Actions:Procedure OM 2.20-4.I Revised to Require Removal of Flanges Following Drain Operations & LER 90-007-00 Issued | 23 August 1990 | Responds to NRC Re Deviation 50-412/90-12-01 Noted in Insp Rept 50-412/90-12.Corrective Actions:Procedure OM 2.20-4.I Revised to Require Removal of Flanges Following Drain Operations & LER 90-007-00 Issued | |
05000412/LER-1990-011, Provides Corrected Copy of Licensee Event Rept W/Correct Number (LER-90-011-01) | 15 January 1992 | Provides Corrected Copy of Licensee Event Rept W/Correct Number (LER-90-011-01) | |
05000412/LER-1995-003, Forwards LER 95-003 Re Train B Recirculation Spray Sys Header Cooling Flow Below TS Requirements | 14 August 1995 | Forwards LER 95-003 Re Train B Recirculation Spray Sys Header Cooling Flow Below TS Requirements | |
05000412/LER-1996-003, Forwards LER 96-003-00 Re Inadequate Testing of Safety Related Logic,Per GL 96-01 | 8 July 1996 | Forwards LER 96-003-00 Re Inadequate Testing of Safety Related Logic,Per GL 96-01 | |
05000412/LER-1997-003, Forwards LER 97-003-01 Re Entry of TS 3.0.3 Due to Inoperability of Both Trains of Suppl Leak Collection & Release Sys | 27 April 1998 | Forwards LER 97-003-01 Re Entry of TS 3.0.3 Due to Inoperability of Both Trains of Suppl Leak Collection & Release Sys | |
05000412/LER-1998-002, Forwards LER 98-002-00,re Inadequate Testing of Diesel Fuel Oil Transfer Pumps as Required by TS | 30 March 1998 | Forwards LER 98-002-00,re Inadequate Testing of Diesel Fuel Oil Transfer Pumps as Required by TS | |
05000412/LER-1998-007, Forwards LER 98-007-02 Re Inadequate BVPS Unit 2 Procedures to Ensure Compliance W/Ts | 19 August 1998 | Forwards LER 98-007-02 Re Inadequate BVPS Unit 2 Procedures to Ensure Compliance W/Ts | |
05000412/LER-1998-008, Forwards LER 98-008-01, GL 96-01 TS Instrumentation Surveillance Inadequacies, Per 10CFR50.73(a)(2)(i) | 12 June 1998 | Forwards LER 98-008-01, GL 96-01 TS Instrumentation Surveillance Inadequacies, Per 10CFR50.73(a)(2)(i) | |
05000412/LER-1998-010, Forwards LER 98-010-00, Non-Safety Related Mechanical Seal Assembly Installed in Quench Spray Pump 'A' 2QSS-P21A, Per 10CFR50.73(a)(2)(i) | 12 June 1998 | Forwards LER 98-010-00, Non-Safety Related Mechanical Seal Assembly Installed in Quench Spray Pump 'A' 2QSS-P21A, Per 10CFR50.73(a)(2)(i) | |
05000412/LER-1998-011, Forwards LER 98-011-00, Cross-Connect Piping Installed Between Suction Lines of Hydrogen Recombiners, IAW 10CFR50.73(a)(2)(i) & (II) | 13 July 1998 | Forwards LER 98-011-00, Cross-Connect Piping Installed Between Suction Lines of Hydrogen Recombiners, IAW 10CFR50.73(a)(2)(i) & (II) | |
05000412/LER-1999-007, Forwards LER 99-007-00, Forced Shutdown Due to Inoperable EDG, Per 10CFR50.73(a)(2)(i).Rept Is Delayed Due to Util Needing Addl Three Days to Address Event Issues on Reportability & Provide Addl Safety Implications Info | 19 August 1999 | Forwards LER 99-007-00, Forced Shutdown Due to Inoperable EDG, Per 10CFR50.73(a)(2)(i).Rept Is Delayed Due to Util Needing Addl Three Days to Address Event Issues on Reportability & Provide Addl Safety Implications Info | |
ET-NRC-93-3956, Forwards Nonproprietary & Proprietary VC Summer Nuclear Station SG Pulled Tube Exam Results Presentation Matls from Nrc/Sce&G/Westinghouse Meeting on 930727. Proprietary Matl Withheld,Per 10CFR2.790 | 26 August 1993 | Forwards Nonproprietary & Proprietary VC Summer Nuclear Station SG Pulled Tube Exam Results Presentation Matls from Nrc/Sce&G/Westinghouse Meeting on 930727. Proprietary Matl Withheld,Per 10CFR2.790 | Affidavit |
IA-84-846, Responds to FOIA Request Re 841211 Response to Request for Info Concerning Results of Initial Written Operator Exams Taken by Candidates at Listed Plants.Records Placed in Pdr. Privacy Info Deleted | 27 March 1985 | Responds to FOIA Request Re 841211 Response to Request for Info Concerning Results of Initial Written Operator Exams Taken by Candidates at Listed Plants.Records Placed in Pdr. Privacy Info Deleted | |
IA-84-926, Responds to FOIA Request,Confirming 851001 Telcon Which Advised That NRC 850705 Response to 841214 FOIA Request Re Plant Final | 7 November 1985 | Responds to FOIA Request,Confirming 851001 Telcon Which Advised That NRC 850705 Response to 841214 FOIA Request Re Plant Final | |
IA-85-582, Responds to FOIA Request for Power Plant Exam Results Summary Sheets for 10 Listed Plants.Forwards Summary Sheets for Five Plants.Portions Deleted.Summary Sheets for Stated Plants Destroyed | 20 September 1985 | Responds to FOIA Request for Power Plant Exam Results Summary Sheets for 10 Listed Plants.Forwards Summary Sheets for Five Plants.Portions Deleted.Summary Sheets for Stated Plants Destroyed | |
IA-86-278, Partial Response to FOIA Request.Documents Listed in Apps D & E Available in PDR | 27 June 1986 | Partial Response to FOIA Request.Documents Listed in Apps D & E Available in PDR | Nondestructive Examination |
IA-87-711, Final Response to FOIA Request for LERs for Listed Plants. App a Document Available in Pdr.Forwards Partially Withheld App B Documents (Ref FOIA Exemption 4) | 25 November 1987 | Final Response to FOIA Request for LERs for Listed Plants. App a Document Available in Pdr.Forwards Partially Withheld App B Documents (Ref FOIA Exemption 4) | |
IA-87-807, Final Response to FOIA Request for Documents,Including Johnson Ltr to NRC Transmitting Rev 1 to LER 85-005.Forwards App B Document.App a & B Documents Also in Pdr.Nrc Not in Possession of Item 2 of Request | 14 December 1987 | Final Response to FOIA Request for Documents,Including Johnson Ltr to NRC Transmitting Rev 1 to LER 85-005.Forwards App B Document.App a & B Documents Also in Pdr.Nrc Not in Possession of Item 2 of Request | |
IA-88-505, Final Response to FOIA Request for Records.App a Document Encl & Available in PDR | 17 October 1988 | Final Response to FOIA Request for Records.App a Document Encl & Available in PDR | Stroke time |