Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML02072029921 February 2002Technical Specification Pages, Vogtle, Unit 1 Amendment 124 and Unit 2 Amendment 102
ML02338002726 November 2002Request to Revise TS Reactor Trip System Instrumentation Over Temperature Delta Temperature & Over Power Delta Temperature Reactor Trip Functions Request for Additional InformationShutdown Margin
Fuel cladding
ML04014060012 January 2004Amendment to Technical Specification 5.5 Programs & Manuals
ML04055051420 February 2004Technical Specification Amendment 123 & 101 for Vogtle Units 1 & 2
ML04055051820 February 2004Technical Specification Amendment 96 & 74 to Vogtle Units 1 &2Reactor Vessel Water Level
ML04181059628 June 2004Enclosure 1, Amendment Nos. 132 & 111
ML0506302232 March 2005Tech Spec Pages for Amendment Nos. 133 and 112, Adoption of TSTF-360 Rev. 1Safe Shutdown
High Radiation Area
Ultimate heat sink
Anticipated operational occurrence
Post Accident Monitoring
Battery sizing
ML0521303063 August 2005Enclosure, Corrected Tech Spec Page for Amendment Nos. 137 and 116
ML07338010030 November 2007Transmittal of Vogtle, Units 1 and 2 - License Amendment Request to Technical Specification (TS) Sections TS 5.5.9, Steam Generator (SG) Program and TS 5.6.10, Steam Generator Tube Inspection ReportNondestructive Examination
ML08035034927 February 2008Technical Specifications for License Amendments Regarding Measurement Uncertainty Recapture Power Uprate
ML08182020327 June 2008Enclosure 2, Markup of Proposed Technical SpecificationsNondestructive Examination
ML08182020827 June 2008Enclosure 3, Typed Pages for Technical SpecificationNondestructive Examination
ML11207099126 July 2011Vogtle, License Amendment Request to Revise the Minimum Nitrogen Cover Pressure Specified in Technical Specification Surveillance Requirement 3.5.1.3 and Make an Administrative Change to Technical Specification Surveillance Requirement 3.6.
ML18226A0949 August 2018Edwin I. Hatch, Units 1 and 2; and Vogtle, Units 1 and 2 - License Amendment Request to Revise Technical Specification 5.2.2.g and Update Emergency Plan Minimum On-shift Staff TablesSafe Shutdown
Health Physics Network
Shutdown Margin
Minimum staff
ML21102A22230 March 20213 to Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, 10 CFR 50.59 Summary Report and Revised NRC Commitments ReportPost Accident Monitoring
Internal Flooding
Temporary Modification
Fuel cladding
Accident Tolerant Fuel
ML21179A09515 June 20218 to Technical Specifications Bases, List of Effective Sections
ML22179A14815 June 2022Technical Specifications Bases, Revision 70Safe Shutdown
Unanalyzed Condition
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Non-Destructive Examination
Grab sample
Stroke time
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Probabilistic Risk Assessment
Squib
Emergency Lighting
Incorporated by reference
Missed surveillance
Battery sizing
Earthquake
Fuel cladding
Pressure Boundary Leakage
Power change
Coast down
ML22307A0072 November 2022Draft LAR for TS 3.8.3 Inverters Operating Completion Time ExtensionSafe Shutdown
Anticipated operational occurrence
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Maintenance Rule Program
ML22326A10931 October 2022Bases for Improved Technical Specifications
ML23165A21913 June 2023Enclosure 9: Vogtle Electric Generating Plant, Units 3 and 4, Technical Specifications Bases, Revision 73Safe Shutdown
Unanalyzed Condition
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Non-Destructive Examination
Grab sample
Stroke time
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Probabilistic Risk Assessment
Squib
Emergency Lighting
Incorporated by reference
Missed surveillance
Pressure and Temperature Limits Report
Battery sizing
Earthquake
Fuel cladding
Pressure Boundary Leakage
Power change
Coast down
ND-17-1559, Request for License Amendment: Technical Specification Changes to Support Control Rod Testing in Cold Shutdown with Reactor Coolant Pumps Not in Operation (LAR-17-034)22 September 2017Request for License Amendment: Technical Specification Changes to Support Control Rod Testing in Cold Shutdown with Reactor Coolant Pumps Not in Operation (LAR-17-034)Safe Shutdown
Boric Acid
Shutdown Margin
Anticipated operational occurrence
Power change
ND-18-0374, Request for License Amendment: Technical Specification Changes to Support Operability During Mode 5 Vacuum Fill Operations (LAR-18-009)13 April 2018Request for License Amendment: Technical Specification Changes to Support Operability During Mode 5 Vacuum Fill Operations (LAR-18-009)Anticipated operational occurrence
Squib
Earthquake
Turbine Missile
Fuel cladding
ND-18-0647, Request for License Amendment: Technical Specification Changes for Spent Fuel Pool Level - Low 2 and In-Containment Refueling Water Storage Tank (IRWST) Wide Range Level - Low Operability (LAR-18-017)20 July 2018Request for License Amendment: Technical Specification Changes for Spent Fuel Pool Level - Low 2 and In-Containment Refueling Water Storage Tank (IRWST) Wide Range Level - Low Operability (LAR-18-017)Safe Shutdown
Anticipated operational occurrence
Fuel cladding
ND-22-0881, License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002)3 January 2023License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002)Safe Shutdown
Anticipated operational occurrence
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Maintenance Rule Program
ND-22-0894, License Amendment Request for Technical Specification SR 3.0.3 for Never-Performed Surveillances (LAR-22-005)19 December 2022License Amendment Request for Technical Specification SR 3.0.3 for Never-Performed Surveillances (LAR-22-005)Time of Discovery
Missed surveillance
NL-03-1140, Changes to Technical Specification Bases11 June 2003Changes to Technical Specification BasesSafe Shutdown
Unanalyzed Condition
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
Stroke time
Anticipated operational occurrence
Safe Shutdown Earthquake
Missed surveillance
Power Operated Valves
Fuel cladding
Pressure Boundary Leakage
Offsite Circuit
Power change
Unidentified leakage
NL-03-1323, Request to Revise Technical Specifications, DC Sources and TSTF-360, Revision 113 October 2003Request to Revise Technical Specifications, DC Sources and TSTF-360, Revision 1Safe Shutdown
High Radiation Area
Ultimate heat sink
Anticipated operational occurrence
Post Accident Monitoring
Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
Battery sizing
NL-03-1365, Revision to Bases24 June 2003Revision to BasesReactor Vessel Water Level
NL-03-1388, Revision to Technical Requirements Manual24 June 2003Revision to Technical Requirements Manual
NL-03-2067, Request to Revise Surveillance Requirements 3.3.1.2 and 3.3.1.315 December 2003Request to Revise Surveillance Requirements 3.3.1.2 and 3.3.1.3Probabilistic Risk Assessment
NL-03-2451, Request for Surveillance Test Interval Extensions for Components of the Reactor Protection System27 January 2005Request for Surveillance Test Interval Extensions for Components of the Reactor Protection SystemProbabilistic Risk Assessment
Large early release frequency
Maintenance Rule Program
NL-03-2471, Request to Revise Technical Specifications, Administrative Controls 5.2.2.g20 February 2004Request to Revise Technical Specifications, Administrative Controls 5.2.2.g
NL-04-0238, Request to Revise Technical Specifications - Ultimate Heat Sink26 April 2004Request to Revise Technical Specifications - Ultimate Heat SinkUltimate heat sink
NL-04-0548, Request to Revise Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process26 October 2004Request to Revise Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement ProcessBoric Acid
Shutdown Margin
Ultimate heat sink
Grab sample
Post Accident Monitoring
Probabilistic Risk Assessment
Incorporated by reference
Missed surveillance
Offsite Circuit
Power change
NL-04-0564, Joseph M. Farley Nuclear Plant, and Vogtle Electric Generating Plant, Application for Technical Specification Amendment to Eliminate Requirements for Hydrogen Recombiners and Hydrogen/Oxygen Monitors21 May 2004Joseph M. Farley Nuclear Plant, and Vogtle Electric Generating Plant, Application for Technical Specification Amendment to Eliminate Requirements for Hydrogen Recombiners and Hydrogen/Oxygen MonitorsReactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Stroke time
Post Accident Monitoring
Incorporated by reference
Pressure and Temperature Limits Report
Hardened vent
NL-04-0973, Request to Revise Technical Specifications to Reflect Updated Spent Fuel Rack Criticality Analyses for Units 1 and 213 August 2004Request to Revise Technical Specifications to Reflect Updated Spent Fuel Rack Criticality Analyses for Units 1 and 2
NL-04-2205, Changes to Technical Specification Bases10 November 2004Changes to Technical Specification BasesShutdown Margin
Reactor Vessel Water Level
Anticipated operational occurrence
Pressure Boundary Leakage
NL-06-0266, Request for Technical Specification Amendment Re Containment Tendon Surveillance Program29 March 2006Request for Technical Specification Amendment Re Containment Tendon Surveillance ProgramIncorporated by reference
Liquid penetrant
NL-06-0708, Request for License Amendment Related to Technical Specification 5.5.9, Steam Generator (SG) Tube Surveillance Program.20 July 2006Request for License Amendment Related to Technical Specification 5.5.9, Steam Generator (SG) Tube Surveillance Program.
NL-08-0869, Vogtle, Units 1 and 2 - Enclosure 2, Markup of Proposed Technical Specifications27 June 2008Vogtle, Units 1 and 2 - Enclosure 2, Markup of Proposed Technical SpecificationsNondestructive Examination
NL-08-0869, Vogtle, Units 1 and 2 - Enclosure 3, Typed Pages for Technical Specification27 June 2008Vogtle, Units 1 and 2 - Enclosure 3, Typed Pages for Technical SpecificationNondestructive Examination
NL-09-1431, License Amendment Request for Technical Specification Table 3.3.1-12 February 2010License Amendment Request for Technical Specification Table 3.3.1-1Anticipated operational occurrence
NL-10-1609, Emergency Technical Specification Revision Request for TS 3.7.14 Engineered Safety Features (ESF) Room Cooler and Safety-Related Chiller System18 August 2010Emergency Technical Specification Revision Request for TS 3.7.14 Engineered Safety Features (ESF) Room Cooler and Safety-Related Chiller SystemMission time
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
Scaffolding
NL-10-2078, License Amendment Request for Incorporation of Previously NRC Approved Tech Spec Task Force Standard Technical Specification Change Traveler TSTF-361-A, Rev 2, Allow Standby Sdc/Rhr/Dhr Loop to Inoperable to Support Testing.14 March 2011License Amendment Request for Incorporation of Previously NRC Approved Tech Spec Task Force Standard Technical Specification Change Traveler TSTF-361-A, Rev 2, Allow Standby Sdc/Rhr/Dhr Loop to Inoperable to Support Testing.Time to boil
Fuel cladding
NL-11-1004, Vogtle, License Amendment Request to Revise the Minimum Nitrogen Cover Pressure Specified in Technical Specification Surveillance Requirement 3.5.1.3 and Make an Administrative Change to Technical Specification Surveillance Requirement 3.26 July 2011Vogtle, License Amendment Request to Revise the Minimum Nitrogen Cover Pressure Specified in Technical Specification Surveillance Requirement 3.5.1.3 and Make an Administrative Change to Technical Specification Surveillance Requirement 3.6.
NL-12-0561, License Amendment Request to Revise Technical Specification Sections, 5.5.9, Steam Generator (SG) Program and 5.6.10, Steam Generator Tube Inspection Report.22 March 2012License Amendment Request to Revise Technical Specification Sections, 5.5.9, Steam Generator (SG) Program and 5.6.10, Steam Generator Tube Inspection Report.Nondestructive Examination
Coast down
NL-12-1192, Units 1 and 2, Technical Specification Revision Request for TS 3.7.14, Engineered Safety Features (ESF) Room Cooler and Safety-Related Chiller System26 September 2012Units 1 and 2, Technical Specification Revision Request for TS 3.7.14, Engineered Safety Features (ESF) Room Cooler and Safety-Related Chiller SystemMission time
Internal Flooding
Probabilistic Risk Assessment
Earthquake
NL-12-1344, License Amendment Request to Revise Technical Specifications to Implement NEI 06-09, Revision 0, Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications (Rmts) Guidelines.13 September 2012License Amendment Request to Revise Technical Specifications to Implement NEI 06-09, Revision 0, Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications (Rmts) Guidelines.Hot Short
Safe Shutdown
High winds
High Radiation Area
Ultimate heat sink
Mission time
Fire Barrier
Stroke time
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Large early release frequency
Earthquake
Turbine Missile
Offsite Circuit
Fire Protection Program
Fire Watch
Power change
NL-13-0081, Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection,Using the Consolidated Line Item Improvement...23 January 2013Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection,Using the Consolidated Line Item Improvement...Nondestructive Examination
Surveillance Frequency Control Program
Liquid penetrant
NL-13-1727, Response to NRC Request for Additional Information for License Amendment Request to Revise Technical Specification 3.7.9 Ultimate Heat Sink (UHS)7 August 2013Response to NRC Request for Additional Information for License Amendment Request to Revise Technical Specification 3.7.9 Ultimate Heat Sink (UHS)Ultimate heat sink
Tornado Generated Missile
Tornado Missile Protection