Intracompany Correspondence SOUTHERN AA COMPANY Eners to Serve Your We er&
DATE:
June 24,2003 NL-03-1388 RE:
Vogtle Electric Generating Plant Revision to Technical Requ"m5 ntsyanuy FROM:
N. J. Stringfellow f
TO:
Technical Requireme Manua ers Enclosed are revised pages for the Technical Requirements Manual. This revision provides clarification to the required actions, completion times, and instrumentation and surveillance Identified in TRM Table 13.3.2-1. This change was approved with LDCR 2003018.
NJS/TDH
Attachment:
Instructions and Change Pages cc: SNC Document Services - RType: CVA02.002
0-01
VOGTLE ELECTRIC GENERATING PLANT TECHNICAL REQUIREMENTS MANUAL Revision Insertion Instructions June 24, 2003 Page/Section Instructions List of Effective Pages
- p. 13.3-3/-4
- p. 13.3-5 / - 6
- p. 13.3-7/-8 Transmittal letter and these instructions Acknowledgment Receipt Replace.
Replace.
Replace.
Replace.
Discard after use.
Sign and retum.
List of Effective Pages Table of Contents 1 1
10/1397 Table of Contents 2 2
3122/99 Table of Contents 3 1
1013/97 11.0-1 0
12/26/96 11.0-2 0
12/26/96 13.0-1 1
11/22/99 13.0-2 1
11/22/99 13.0-3 1
11/22/99 13.0-4 1
11/22/99 13.1-1 0
12/26196 13.1-2 2
1/8/99 13.1-3 0
12126/96 13.1-4 0
12/16/96 13.1-5 1
1/8/99 13.1-6 2
3117/98 13.1-7 0
12/26/96 13.1-8 0
12126196 13.1-9 0
12126/96 13.1-10 0
12/26196 13.1-11 0
12126196 13.1-12 1
10/22/98 13.1-13 1
2/18/99 13.1-14 1
8/5/97 13.1-15 0
12/26/96 13.3-1 0
12/26/96 13.3-2 0
12/26/96 13.3-3 1
05126199 13.3-4 2
6/24/03 13.3-5 2
6/24/03 13.3-6 2
6/24/03 13.3-7 2
6/24/03 13.3-8 1
05/26/99 13.3-9 0
12/26/96 13.3-10 2
11/22/99 13.3-11 0
12/26/96 13.3-12 2
06/04/02 13.3-13 1
1/21/99 13.3-14 0
12/26/96 13.3-15 0
12/26/96 13.3-16 0
12/26196 13.3-17 0
12/26/96 Vogtle Units 1 and 2 Technical Requirement I
Rev. 10 6/24/03
Ust of Effective Pages (continued) 13.3-18 0
12/26B96 13.4-1 0
12/26196 13.4-2 0
12126/98 13.4-3
'_i_
__0_-_-
122B/9B 13.4-4 0
12126196 13.4-5
_'i O
12/26196 1 3.4B_
'I' '_ ' _
1 '
03/17/00 13.473 1
03117/00 13.48
- 8 0
03/17/00 13.5-1 0
12126/96 13.5-2 0
120/3197 13.5-3 1
10/12100 13.57-0 10/3/97 13.7-1 0
12/26196 13.7-1 1
0 12/22198 13.7-1 0
12/26/96 13.7 C0 12/26/96 13.7-3 0
12/26/96 13.74 01 10/22/98 13.7-5 0
12126/96 13.7-10 1
412/609 13.7-7 0
12126198 13.7-11 0
12/26/96 13.7-12 1
4/11/01 13.7-13 0
12126/96 13.7-14 0
12126/96 13.7-14 0
12/26/96 13.7-15 0
12/26/96 13.7-17 O
12126196 1 3.81 1
10/22198 i3.8-2
'0 12126/97 13.8-3 0
12126196 13.8-4 1
0512/299 13.8-5 0
12/26/96 13.8-8 0
12/26196 13.8-7 0
12/26/96 13.8-10 1
3122/99 13.8-11 1
3122/99 13.9-1 0
12/26/98 13.9-2 0
12/26/96 Vogtle Units I and 2 Technical Requirement 2
Rev. 10 6/24/03
List of Effective Pages (continued) 13.9-3 0
e 12/26/96 13.9-4 1
10/29/97 13.94a.
1
_ 10/29/97 13.9-4b I;..'
10/29197 13.9-5 _
!.,s ;! e
~. __-_
-_ 6/319X 13.9-6 2
10/3/02 13.9-7 2
1013102.
13.9-7a
' i '
1._
6/8/98.
13.9-7b I;
.1.
6/3L98 13.8-8
.j, 0
12126196 13.9-9 P12/26196 13.9-10 1
Q22/97 13.12-1 12/26196 13.12-2 0 0 12/26/96 13.12-3 0 -12/26/96..
13.12-4 12/26196 13.12-5 0
12/26/96 13.12-6 0
12/26/96..
13.12-7 0
12/26/96 13.12-8 0
12/O6,96.
13.12-9 0
12/26t96 15.1-1 0"
0 12/26/96.
15.1-2 0
.126/96 tfl 3
F
'22
- a) s:/vogUe/IrmIAPL.doc a
-
- j
', I.
0
),. 'C F.
C
'1
..'. 1, - 'I I ' r i
Vogfle Units 1 and 2 Technical Requirement 3
Rev. 10 6/24/03
Seismic Monitoring Instrumentation TR 13.3.2 13.3 Instrumentation TR 13.3.2 Seismic Monitoring Instrumentation (common system)
TR 13.3.2 The seismic monitoring instrumentation Identified in Table 13.3.2-1 shall be OPERABLE.
APPLICABILITY:
At all times.
ACTIONS a
WWI I I TR 13.0.3 is not applicable.
CONDITION REQUIRED ACTION COMPLETION TIME NOTE Separate Condition entry Is allowed for each seismic monitoring Instrument.
A.
One or more required A.1 Restore Instrumentation to 30 days seismic monitoring OPERABLE status.
instruments inoperable.
B.
Required ACTION and B.1 Prepare and submit a report 10 days associated Completion to the NRC in accordance Time of Condition A not with 10 CFR 50.4 outlining met.
the cause of the malfunction and the plans for restoring the instrument(s) to OPERABLE status.
(continued)
Vogtle Units 1 and 2 Technical Requirement 13.3-3 Rev.1 05/26/99
Seismic Monitoring Instrumentation TR 13.3.2 ACTIONS (continued)
CONDITION I
REQUIRED ACTION COMPLETION TIME I........._..
C.
One or more required seismic monitoring instruments %'tuated during a seisnic event
Ž 0.01g.
~~~~~~
.?;
C.1 Evaluate data retrieved from" actuated free-field instrumentation.
AND.-
,s
,.-NOTENOTE
-The CHANNEL
-OPERATIONAL TEST conducted after a seismic event shall be supplemented by the instrument-evaluationw described in section 4.3 of
.,.NRC Regiilatory Guides 1.166.
.Condut' a CHANNEL OPERATIONAL TEST or'..i-
actuated free-field inrtrumentation.
AND C.3 Evaluate data retrieved from remaining actuated
.Instrumentation.
co AND C -
,.,O:,
C.4 NOTE 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 14 days I4 hours
..14 days K)j 1,i t
.T T ' CH ANNEL' OPERATIONAL TEST conducted after a seismic event shall be supplemented by the instrument evaluation described in section 4.3 of NRC Regulatory Guide 1.166.
Perform a CHANNEL OPERATIONAL TEST on remaining actuated instrumentation.
14 days (continued)
Vogue Units 1 and 2 Technical Requirement 13.3 -4 Rev.2 6/24103
Seismic Monitoring Instrumentation TR 13.3.2 ACTIONS CONDITION REQUIRED ACTION.
-C, SOMPLETION TIME
~..
,1.
...1. _
C.
(continued)
AD P~repare adsubmit a~ OrpW
- -1.-- -
t thpe and a repot 14 days to the NRC in accordance.,
- 1..
with 10 CFR 50.4 describing the rmdghitude, frequency spectrjum, results of instrument evaluations, and
,, i 4-:.
,resultant effect upon facility features Important to safety.
- , ~
~
- 1 ie t,
_C QE I,
p-i;,,,.
TECHNICAL REQUIREMENT SiXVEILMI4CES
- IT rat.J I Ir-Refer to Tabje 13.3.2-1 todetermline 1yWh.ich,SRs apply for each seismic monitoring instrument.
SURVEIULANE,.
FREQUENCY TRS 13.3.2.1 Perform CHANNEL CHECK 31 days T j TRS 13.3.2.2 Perform CHANNEL OPERATIONAL TEST.
184 days TRS 13.3.2.3 Perform CHANNEL CALIBRATION.
18 months I
'0t 0~*D tit 39d I.X3 e Ptv t
II
'.13I Vogtle Units 1 and 2 Technical Requirement 13.3-5 Rev.2 6/24/03
Seismic Monitoring Instrumentation~~~~~~~~
. J Seismic Monitoning Instrumentation TR 13.3.2 Table 13.3.2-1 (page 1 of 2)
Seismic Monitoring Instrumentation n~~~~
~
-r;
-r~n I
Instruments and Sepnrsor Locations
-Measurement Range Required Number Surveillance oftt.*
.j! ?
or Setting of Instruments and Requirements Tag Number.
- 1. Triaxial Time-History Accelerograph with Internal Force Balance Accelerometer
- a. Free Field (rt24000cft from containnentr
.t
- 2. Triaxial Force Balance Apceferometers
.2, r,
1 9 (AXR-19931)
-1gto+ lg
,tl ;
-19 to +g 19 TRS 13.3.2.1 TRS 13.3.2.2 TRS 13.3.2.3 i,..
(AXT-1g9dd0)-
- a. Field (- 225 ft from containment)
'TRS 13.3.2.1 IRS 13.3.2.2 TRS 13.3.2.3
- b. Unit I Containment Gallery (basemat);:
,,a...
- c. Unit 1 Containtment Operating Floo
- d. Unit I Containment Bioshield Wall
- e. Auxiliary Building Level I
- f. Auxiliary Building Basemat
- g. Diesel Generator Building Slab Floor
-1gto+ lg
-1gto+1g
-1 to + 1g
-g to+ 1g
-g to + 1g I
(AXT-19901)
I (AXT-1 9902)
I (AXT-19903)
I (AXT-19905)
I (AXT-19906)
(AXT-19925)
TRS 13.3.2.1 TRS 13.3.2.2 TRS 13.3.2.3 TRS 13.3.2.1 TRS 13.3.2.2 TRS 13.3.2.3 TRS 13.3.2.1 TRS 13.3.2.2 TRS 13.3.2.3 TRS 13.3.2.1 TRS 13.3.2.2 TRS 13.3.2.3 TRS 13.3.2.1 TRS 13.3.2.2 TRS 13.3.2.3 TRS 13.3.2.1 TRS 13.3.2.2 TRS 13.3.2.3
'",oFf Vogtle Units I and 2 Technical Requirement 13.3-6 Rev. 2 6124/03
Seismic Monitoring Instrumentation TR 13.3.2 Table 13.3.2-1 (page 2 of 2)
Seismic Monitoring Instrumentation Instruimefst and Sensor Lo-cations Measurement Range Required Number of Surveillance
. r e}.or 6etting
> hnstutnents and Tag Requirements
' ; t ^,
- t.
Number
- 3. Triaxial Time-History xli!
Accelerographs (Recorders) a
,fiw ii
- a. Control Room
-Ig to + Ig 4
TRS 13.3.2.1 (AXR-19928A,)
TRS 13.3.2.2 (AXR-1 99288)
(AXR-19928C)
(AXR-19928D)
- 4. Central Controlling Unit to Include a computer, keyboard, LCD display, printer, palarm panel, and
.uninterruptible~power supply.
- a. Control Room' N/A 6
TRS 13.3.2.1 (A-2414-5W-SIPCPI)
TRS 13.3.2.2
- ^ -
(A-2414-Q5-SIPQKB1)'
(AXI-19928)
(A-2414-05-SIP-PRI)
(AXA-19928&fi'rn.
(A-2414-Q:SIP4JPS)
SI j,.
I
'v
~1 1' 4,
1: J! '. -,t r..1,
C. C A I
-i
..: ;, I f _. "I,.,
{
i% \\'
\\,
Vogtle Units 1 and 2 Technical Requirement 13.3-7 Rev. 2 6/24/03
Meteorological Instrumentation TR 13.3.3 13.3 Instrumentation TR 13.3.3 Meteorological Instrumentation (common system)
TR 13.3.3 The meteorological monitoring instrumentation channels identified in Table 13.3.3-1 shall be OPERABLE.
APPLICABILITY:
At all times.
ACTIONS
%11^TrC P4Ij
- 1. TR 13.0.3 is not applicable.
I l
- 2. Separate Condition entry is allowed for each meteorological monitoring instrument channel.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more required A.1 Restore instrumentation to 7 days meteorological monitoring OPERABLE status.
instrument channels inoperable.
B.
Required ACTION and B.1 Prepare and submit a report 10 days associated Completion to the NRC in accordance Time of Condition A not with 10 CFR 50.4 outlining met the cause of the malfunction and the plans for restoring the instrument(s) to OPERABLE status.
TECHNICAL REQUIREMENT SURVEILLANCES SURVEILLANCE FREQUENCY TRS 13.3.3.1 Perform a CHANNEL CHECK on each meteorological 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> monitoring channel Identified in Table 13.3.3-1.
TRS 13.3.3.2 Perform a CHANNEL CALIBRATION on each 184 days meteorological monitoring channel identified in Table 13.3.3-1.
Vogtle Units 1 and 2 Technical Requirement 13.3-8 Rev.1 05/26/99