PAM Instrumentation 3.3.3 SURVEILLANCE REQUIREMENTS I IV")
r_-
SR 3.3.3.1 and SR 3.3.3.2 apply to each PAM instrumentation Function in Table 3.3.3-1.
SURVEILLANCE FREQUENCY SR 3.3.3.1 Perform CHANNEL CHECK for each required 31 days instrumentation channel.
SR 3.3.3.2 NOTE Neutron detectors are excluded from CHANNEL CALIBRATION.
Perform CHANNEL CALIBRATION.
18 months I
Yogtle Units I and 2
- 3.
3.3.
yogtle~~~~~~~~
Unt3.3d.3-5a~t o 9 Unt1
..A.
, Amendlment No. 96 (Unit 1) '
Amendment No. 74 (Unit 2)
PAM Instrumentation 3.3.3
(
Table 3.3.3-1 (page 1 of 1)
Post Accident Monitonng Instrumentation S
FUNCTION
- 1. Reactor Coolant System (RCS) Pressure (wide range)
- 2. RCS T. (wide range)
- 3. RCS T (wide range)
- 4. Steam Generator (SG) Water Level (wide range)
- 5. SQ Water Level (narrow range)
- 6. Pressurizer.Level
- 7. Containment Pressure
- 8. Steam line Pressure
- 9. Refueling Water Storage Tank (RWST) Level
- 10. Containment Normal Sumps Level (narrow range)
- 11. Containment Water Level (wide range).
- 12. Condensate Storage Tank Level
- 13. AuxIliary Feedwater Flow
- 14. Containment Radiation Level (high range)
- 15. Steam line Radiation Monitor
- 16. RCS Subcooling
- 17. Neutron Flux (extended range)
- 19. Hydrogen Monitors
- 20. Containment Pressure (extended range)
- 21. ContaInment Isolation Valve Position
- 22. Core Exit Temperature - Quadrant I
- 23. Core Exit Temperature - Quadrant 2
- 24. Core Exit Temperature - Quadrant 3
- 25. Core Exit Temperature -Quadrant 4 REQUIRED CHANNELS 2
1/loop 1/loop IISG 2ISG 2
2 2lsteam line 2
2 2
2Jtank
215G 2
1/steam line 2
2 2
2 2
2!penetration flow path(bc) 2(d) 2(d).
CONDITIONS BGH.J CGH.J DGH.J EG.H.J BG.H.J BGH.J BG.H.J 2,G.HJ B.GH.J BG.H.J B.G.H.J B.G.H.J BGHJ B.G.HK FG.HJ BGH.J B.G.H.J B.GH.K 6,Gl.J B.G.H.J B.G.H.J BGH.J BG.H.J BG.HJ B.G.HJ (a)
Only required for the OPERABLE tank.
(b)
Not required for Isolation valves whose assocIated penetration Is Isolated by at least one dosed and deactivated automatic valve, dosed manual valve, blind flange, or check valve with flow through the valve secured.
Applicable for containment isolation valve position Indication designated as post-accident monitoring Instrumentation (containment Isolation valves which receive containment Isolation phase A or containment ventilation isolation signals).
(C)
Only one position indication channel Is required for penetration flow paths with only one installed control room Indication channel.
(d)
A channel consists of two core exit thermocouples (CETs).
C.
C C
C Vogtte Units I add 2 C.
3.3.3-6 Amendment No. 96 (Unit 1)