Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML19309F82630 April 1980Amend 29 to Application for Ol,Submitted as Amend 29 to FSAR
ML19332B08618 September 1980Amend 30 to Application for License for Purpose of Transmitting Addl Info Requested by NRC
ML19340D67730 December 1980Amend 32 to Amended & Substituted Application for Licenses, Consisting of Additions & Mods to FSAR
ML19345G85815 April 1981Amend 34 to Application for Ol.Transmits Addl Financial Info Requested by Nrc,Including FSAR Revisions & Additions
ML19348A00719 May 1981Amend 35 to Amended & Substituted OL Application, Transmitting Addl Info Requested by Nrc,Including Revisions & Additions to FSAR
ML19352B26025 June 1981Application for Amend to OL Submitted as Amend 37 to FSAR
ML20004E22110 June 1981Amend Application for Ol,Including Amend 36 to FSAR
ML20009F91827 July 1981Amend to Application for Ol.Transmits Addl Info Requested by Nrc,Including Revisions & Additions to FSAR
ML20024A91430 June 1983Amend 49 to Application for OL
ML20040F1541 February 1982Amend 41 to Amended & Substituted Application for Licenses, Consisting of Amend 41 to FSAR
ML20055A78213 July 1982Application for Amend 43 to Amended & Substituted Application for Ol,Consisting of Amend 43 to FSAR
ML20062L73411 August 1982Application to Amend CPPR-87 Authorizing Substitution of Wolverine for Northern Interest in Project Following Statutory Merger.Following Merger,Name Wolverine Will Be Changed to Wolverine Power Supply Cooperative,Inc
ML20065F23828 September 1982Amend 44 to Application for OL
ML20067A06624 November 1982Amend 45 to Amended & Substituted Application for OL, Consisting of Amend 45 to FSAR
ML20072N47729 March 1983Amend 47 to Amended & Substituted Application for OL, Consisting of Amend 47 to FSAR
ML20076E63123 May 1983Amend 48 to Amended & Substituted OL Application,Consisting of Amend 48 to FSAR
ML20076H10029 August 1983Application for Amend 50 to Application for Ol,Consisting of Amend 50 to Fsar,Adding Wolverine Power Supply Corp as co-applicant,requesting Issuance of OL for 40 Yrs & Refs 830629 Revised Physical Security Plan
ML20080P86913 February 1984Amend 53 to Amended & Substituted Application for Licenses
ML20080R47712 October 1983Amend 51 to Amended & Substituted Application for License, Consisting of Amend 51 to FSAR
ML20082U1328 December 1983Amend 52 to Amended & Substituted Application for Licenses, Consisting of Amend 52 to FSAR
ML20083D6566 December 1983Application to Amend CPPR-87,deleting Ref to Respective Percentage Ownership Shares of Util & Wolverine Power Supply Cooperative,Inc.Draft Fifth Amend to Participation Agreement Encl
ML20083M63726 January 1983Amend 46 to Amended & Substituted Application for License, Consisting of Amend 46 to FSAR
ML20084E19019 April 1984Amend 56 to Amended & Substituted Application for Licenses, Consisting of Amend 56 to FSAR
ML20087C39822 February 1984Amend 54 to Amended & Substituted Application for Licenses, Consisting of Amend 54 to FSAR
ML20087N34712 March 1984Amend 55 to Amended & Substituted Application for Licenses, Consisting of Amend 55 to FSAR
ML20091A0567 May 1984Application to Amend CPPR-87,extending Completion Date to 850630.Fee Encl
ML20095K42121 December 1995Application for Amend to License NPF-43,incorporating 10CFR50,App J,Option BExemption Request
ML20098F20327 September 1984Amend 59 to Amended & Substituted Application for Licenses, Consisting of Amend 59 to FSAR
ML20101A05314 December 1984Amend 60 to Amended & Substituted Application for Licenses, Consisting of Amend 60 to Fsar,Transmitting Addl Info Requested by NRC Re TMI Item II.K.3.18,preoperational Tests,Use of Portable Radwaste Sys & Revised Figures
ML20112E69310 January 1985Amend to Application for Ol,Correcting & Clarifying Draft Tech Specs.Justification for Changes Provided
ML20113J02222 January 1985Amend to Application for Ol,Changing Draft Tech Spec Figure 3.1.5-1 to Revise Ref Level in Standby Liquid Control Sys Storage Tank.Revised Figure Encl
ML20125E4135 February 1980Amend 28 to Application for Ol,Containing Additions & Mods to Fsar,Amend 28
ML20127G91021 June 1985Application for Amend to License NPF-33,revising Tech Specs to Reflect Organizational Mod,Per 850614 Meeting W/Region III & Two Minor Technical Changes
ML20127M57327 June 1985Application to Amend License NPF-33,correcting Oversight Re Radwaste Monitoring Instrumentation
ML20127N33715 May 1985Application for Amend to License DPR-9,reflecting Extension of Expiration Date for Possession Only License Until Mar 2025.Safety Evaluation & Status Description EnclGrab sample
ML20129F06125 September 1996Application for Amend to License NPF-43,revising Tech Spec 4.8.4.3 Re Periodic Testing Requirement for Thermal Overload Protection Devices
ML20133B05727 September 1985Application for Amend to License NPF-43,revising Tech Specs Re Alternative Shutdown Sys.Technical Justification Encl. Fee PaidFire Watch
ML20133G7749 October 1985Application for Amend to License NPF-23,changing Tech Spec 3.10.5 to Delay Inerting of Containment Until 120 EFPDs Achieved.Fee Paid
ML20133L6172 January 1997Amend 11 to License DPR-9,allowing Certain Equipment & Instruments to Be Removed from Svc for Short Periods of Time Allowing for Maint,Testing,Insp & Account for Equipment FailuresGrab sample
ML20137P67830 January 1986Rev to 850927 Application for Amend to License NPF-43, Revising Table 3.3.10 by Including Transfer Switch & Two Pushbutton Controls on Shutdown Panel for Alternative Shutdown Sys
ML20137R0054 February 1986Application for Amend to License NPF-43,revising Tech Specs to Delete Containment Isolation Valves T50-F406A & T50-4068 from Table 3.6.3-1.Fee Paid
ML20137R0674 February 1986Rev to 851223 Application for Amend to License NPF-43, Revising Tech Spec 3/4.9.2 Refueling Operations/ Instrumentation & Clarifying Control Rod Withdrawal Process
ML20138P37223 December 1985Application for Amend to License NPF-43,revising Tech Specs to Lower Source Range Monitor Rod Block Trip Setpoint to 0.3 Counts Per Minute.Fee Paid
ML20147H21115 January 1988Application for Amend to License NPF-43,revising Tech Specs to Allow LPCI Sys Cross Tie Valve to Be Placed in Closed Position During Plant Shutdowns.Fee Paid
ML20151N81931 December 1985Application for Amend to License NPF-43,reflecting Exemption from GDC 56 Re Traversing in-core Probe Nitrogen Purge Line to Allow Operation from Restart from Current Outage Until First Scheduled Refueling Outage
ML20151P1934 August 1988Application for Amend to License NPF-43,revising Tech Spec to Include Single Recirculation Loop Operation (Slo).Safety Evaluation Concluded That Operation Up to 70% Power W/Recirculation Loop Out Is Possible.Fee PaidFuel cladding
ML20154R22521 October 1998Amend 13 to License DPR-9,allowing Access Control Flexibility,Establishing Compensatory Provisions Re PA Boundary,Eliminating Redundancy Between Ts,Revising Figure B-1 & Correcting TyposTemporary Modification
ML20154S6933 April 1986Application for Amend to License NPF-43,amending Tech Spec 3.6.1.7, Containment Sys - Drywell Average Air Temp, Clarifying That Thermocouple Locations Defined in Spec Are for Ref Only.Fee Paid
ML20198S3276 January 1999Amend 15 to License DPR-9,consisting of Changes to TS
ML20198T1757 June 1986Supplemental Application for Amend to License NPF-43, Removing Primary Containment Monitoring Sys Valves T50-F406A & T50-F406B from Tech Spec Table 3.6.3-1Nondestructive Examination