Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML020780344 | 18 March 2002 | Slides Used for 3/18/02 Clinton EOC Mtg | High Radiation Area Temporary Modification Power change |
ML020940328 | 21 March 2002 | Enclosure 2 - Briefing Package, Summary of March 21, 2002, Meeting with Calvert Cliffs Nuclear Power Plant, Inc. to Discuss Partial Replacement of Post-Accident Monitoring System Instrumentation | |
ML021120136 | 17 April 2002 | Attachment 2 to the 04/17/2002 Meeting Summary with R.E.Ginna | |
ML022140237 | 8 August 2002 | Summary of July 16-18, 2002, Public Meeting with NMC Staff Regarding Inputs for Use in the Pressurized Thermal Shock (PTS) Risk Analysis of Pnp | |
ML022270400 | 31 July 2002 | Presentation Slides - Preliminary Results of Environmental Review Peach Bottom Units 2 and 3, Nuclear Regulatory Commission, July 31, 2002 | Environmental Justice |
ML022820048 | 8 October 2002 | Slides and Viewgraphs of September 24, 2002, Summary of Meeting with Rochester Gas and Electric Corporation Proposed Digital Upgrades to the Emergency Control Room Air Treatment System Actuation Instrumentation | Tornado Generated Missile |
ML023290184 | 20 November 2002 | Slides for 11/4/2002 Lrsc Meeting | Aging Management |
ML023530140 | 6 November 2002 | Environmental Scoping Meeting R.E. Ginna, NRC, November 6, 2002 (Enclosure 2) | Environmental Justice |
ML030920486 | 16 April 2003 | Summary of Meeting with Exelon Generation Co., LLC to Discuss Braidwood End of Cycle Plant Performance Assessment. NRC Presentation Slides | |
ML030920496 | 17 April 2003 | Summary of Meeting with Exelon Generation Co., LLC to Discuss Clinton End of Cycle Plant Performance Assessment. NRC Presentation Slides | Reactor Vessel Water Level Temporary Modification |
ML030990087 | 31 March 2003 | Region I - Calvert Cliffs Annual Assessment Meeting Slides | Significance Determination Process |
ML030990153 | 2 April 2003 | Region I - Ginna Annual Assessment Meeting Slides | Significance Determination Process |
ML031060054 | 16 April 2003 | Summary of Meeting with Exelon Generation Co., LLC to Discuss Braidwood End of Cycle Plant Performance Assessment. Licensee'S Slides | |
ML031060073 | 17 April 2003 | Summary of Meeting with Exelon Generation Co., LLC to Discuss Clinton End of Cycle Plant Performance Assessment. Licensee'S Slides | |
ML031060348 | 15 April 2003 | Annual Assessment Meeting Slides Re Reactor Oversight Program - Cycle 3 | Significance Determination Process |
ML031130339 | 23 April 2003 | Enclosure 2 to 03/18/2003 Summary of Meeting with Calvert Cliffs Nuclear Power Plant, Inc. to Discuss Licensee'S Ongoing Unit No. 2 Reactor Pressure Vessel Head Inspection. Presentation Re Reactor Vessel Head Inspection Current Status & Fut | |
ML031540426 | 3 June 2003 | Attachment 2 - Presentation Reduction of Unnecessary Regulatory Burden Initiative from 05/13/2003 Meeting Between U.S. Nuclear Regulatory Commission (NRC) Staff & Calvert Cliffs Nuclear Power Plant, Inc | Offsite Dose Calculation Manual Nondestructive Examination Process Control Program Fire Protection Program |
ML032330211 | 15 August 2003 | (Handouts) - BWROG - Summary of Meeting with BWROG Concerning the Development of a New Reactor Core Stability Limit | |
ML033090344 | 31 October 2003 | Preliminary Results of Environmental Review R.E. Ginna Nuclear Plant, Nuclear Regulatory Commission, August 7, 2003 (Encl. 5) | |
ML033580372 | 20 November 2003 | and 11/20/2003 Slides, Braidwood Unit 2 Refuel 10 Fall 2003 Stream Generator Inspection Results Summary | |
ML040550033 | 20 February 2004 | Reactor Vessel Head Inspections, Calvert Cliffs Nuclear Power Plant, Inc | |
ML041110819 | 8 April 2004 | Public Meeting Licensee'S Slide on Clinton 2003 End of Cycle Assessment | |
ML041120251 | 15 April 2004 | Public Meeting License Slides; Braidwood 2003 End-of-Cycle Assessment | |
ML041130170 | 8 April 2004 | Public Meeting Slides, Clinton 2003 End-of-Cycle Assessment | |
ML041130372 | 15 April 2004 | Public Meeting Licensee'S Slides, Braidwood 2003 End-of-Cycle Assessment | |
ML041190637 | 8 April 2003 | NRC Region I Slides for the Limerick Annual Assessment Meeting with NRC Re Reactor Oversight Program - Cy 2003 | |
ML041270504 | 8 April 2004 | NRC Briefing Presentation Risk-informed Technical Specifications - Initiative 5b Relocation of Surveillance Test Intervals | Internal Flooding Test box Surveillance Frequency Control Program Large early release frequency |
ML041420482 | 18 May 2004 | Constellation Energy (Nine Mile Point Nuclear Station) Annual Performance Assessment Meeting Slides | |
ML050400034 | 28 January 2005 | IR 05000318-05-006 - Attachment 'B' - Constellation Presentation - January 28, 2005 | |
ML050760473 | 18 March 2005 | NRC Slides for Calvert Cliffs Annual Assessment Meeting | |
ML050810007 | 22 March 2005 | Slides for Ginna Annual Assessment Meeting | |
ML050880029 | 1 April 2005 | Slides for 04/28/2005 Annual Assessment Meeting with Nine Mile Point Nuclear Station | |
ML050940119 | 30 March 2005 | Handout Used in Meeting Held on March 30, 2005 Between the U.S. Nuclear Regulatory Commission Staff and the Constellation Energy Group, Inc. Representatives | |
ML051040366 | 29 March 2005 | NRC Slides for Public Meeting with Exelon Regarding Peach Bottom Annual Assessment | |
ML051260093 | 21 April 2005 | Slides Summary of Annual Assessment Meeting with Constellation Generation Group, Constellation Energy Co | |
ML051260104 | 28 April 2005 | Summary of Annual Assessment Meeting with Constellation Generation Group, Constellation Energy Slides | |
ML051260144 | 28 April 2005 | Summary of Annual Assessment Meeting with Nine Mile Point Nuclear Power Station, Constellation Energy Slides | |
ML051310350 | 21 April 2005 | Public Meeting NRC Slides Regarding Clinton End-of-Cycle Plant Performance Assessment | |
ML051310363 | 21 April 2005 | Public Meeting Licensee Slides Clinton End-of-Cycle Plant Performance Assessment | |
ML051370424 | 14 April 2005 | Notice of Meeting with Exelon Generation Company, Slides | |
ML051370585 | 11 May 2005 | Public Meeting Slides Braidwood End-of-Cycle Plant Performance Assessment | |
ML051440355 | 29 March 2005 | NRC Annual Assessment Meeting, Peach Bottom Atomic Power Station (Exelon Slides) | |
ML051440366 | 14 April 2005 | NRC Annual Assessment Meeting, Limerick Generating Station (Exelon Slides) | |
ML051590008 | 13 June 2005 | Recurring Themes | |
ML051650086 | 9 June 2005 | Presentation Slides, Nine Mile Point, Units 1 and 2, LRA Status Update | Aging Management Moisture barrier |
ML052230014 | 9 March 2005 | RIC 2005 Presentation - F4 - Dale Ambler - Rop/Cross Cutting Issues | |
ML052230040 | 9 March 2005 | RIC 2005 Presentation - G4 - Eugene M. Kelly - Risk Informed | Surveillance Frequency Control Program |
ML052560447 | 17 August 2005 | B&W Owners Group Reactor Vessel Working Group Summary of the Plans of the B&Wog Reactor Vessel Integrity Program | |
ML052920822 | 15 September 2005 | Presentation for 09/15/2005 Meeting with R. E. Ginna SBLOCA EPU Results Summary | Boric Acid Loop seal |
ML053460114 | 17 November 2005 | Preliminary Results of Environmental Review Nine Mile Point Power Station, Units 1 and 2, U.S. Nuclear Regulatory Commission, November 17, 2005 | Aging Management Environmental Justice |