Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML02078034418 March 2002Slides Used for 3/18/02 Clinton EOC MtgHigh Radiation Area
Temporary Modification
Power change
ML02094032821 March 2002Enclosure 2 - Briefing Package, Summary of March 21, 2002, Meeting with Calvert Cliffs Nuclear Power Plant, Inc. to Discuss Partial Replacement of Post-Accident Monitoring System Instrumentation
ML02112013617 April 2002Attachment 2 to the 04/17/2002 Meeting Summary with R.E.Ginna
ML0221402378 August 2002Summary of July 16-18, 2002, Public Meeting with NMC Staff Regarding Inputs for Use in the Pressurized Thermal Shock (PTS) Risk Analysis of Pnp
ML02227040031 July 2002Presentation Slides - Preliminary Results of Environmental Review Peach Bottom Units 2 and 3, Nuclear Regulatory Commission, July 31, 2002Environmental Justice
ML0228200488 October 2002Slides and Viewgraphs of September 24, 2002, Summary of Meeting with Rochester Gas and Electric Corporation Proposed Digital Upgrades to the Emergency Control Room Air Treatment System Actuation InstrumentationTornado Generated Missile
ML02329018420 November 2002Slides for 11/4/2002 Lrsc MeetingAging Management
ML0235301406 November 2002Environmental Scoping Meeting R.E. Ginna, NRC, November 6, 2002 (Enclosure 2)Environmental Justice
ML03092048616 April 2003Summary of Meeting with Exelon Generation Co., LLC to Discuss Braidwood End of Cycle Plant Performance Assessment. NRC Presentation Slides
ML03092049617 April 2003Summary of Meeting with Exelon Generation Co., LLC to Discuss Clinton End of Cycle Plant Performance Assessment. NRC Presentation SlidesReactor Vessel Water Level
Temporary Modification
ML03099008731 March 2003Region I - Calvert Cliffs Annual Assessment Meeting SlidesSignificance Determination Process
ML0309901532 April 2003Region I - Ginna Annual Assessment Meeting SlidesSignificance Determination Process
ML03106005416 April 2003Summary of Meeting with Exelon Generation Co., LLC to Discuss Braidwood End of Cycle Plant Performance Assessment. Licensee'S Slides
ML03106007317 April 2003Summary of Meeting with Exelon Generation Co., LLC to Discuss Clinton End of Cycle Plant Performance Assessment. Licensee'S Slides
ML03106034815 April 2003Annual Assessment Meeting Slides Re Reactor Oversight Program - Cycle 3Significance Determination Process
ML03113033923 April 2003Enclosure 2 to 03/18/2003 Summary of Meeting with Calvert Cliffs Nuclear Power Plant, Inc. to Discuss Licensee'S Ongoing Unit No. 2 Reactor Pressure Vessel Head Inspection. Presentation Re Reactor Vessel Head Inspection Current Status & Fut
ML0315404263 June 2003Attachment 2 - Presentation Reduction of Unnecessary Regulatory Burden Initiative from 05/13/2003 Meeting Between U.S. Nuclear Regulatory Commission (NRC) Staff & Calvert Cliffs Nuclear Power Plant, IncOffsite Dose Calculation Manual
Nondestructive Examination
Process Control Program
Fire Protection Program
ML03233021115 August 2003(Handouts) - BWROG - Summary of Meeting with BWROG Concerning the Development of a New Reactor Core Stability Limit
ML03309034431 October 2003Preliminary Results of Environmental Review R.E. Ginna Nuclear Plant, Nuclear Regulatory Commission, August 7, 2003 (Encl. 5)
ML03358037220 November 2003and 11/20/2003 Slides, Braidwood Unit 2 Refuel 10 Fall 2003 Stream Generator Inspection Results Summary
ML04055003320 February 2004Reactor Vessel Head Inspections, Calvert Cliffs Nuclear Power Plant, Inc
ML0411108198 April 2004Public Meeting Licensee'S Slide on Clinton 2003 End of Cycle Assessment
ML04112025115 April 2004Public Meeting License Slides; Braidwood 2003 End-of-Cycle Assessment
ML0411301708 April 2004Public Meeting Slides, Clinton 2003 End-of-Cycle Assessment
ML04113037215 April 2004Public Meeting Licensee'S Slides, Braidwood 2003 End-of-Cycle Assessment
ML0411906378 April 2003NRC Region I Slides for the Limerick Annual Assessment Meeting with NRC Re Reactor Oversight Program - Cy 2003
ML0412705048 April 2004NRC Briefing Presentation Risk-informed Technical Specifications - Initiative 5b Relocation of Surveillance Test IntervalsInternal Flooding
Test box
Surveillance Frequency Control Program
Large early release frequency
ML04142048218 May 2004Constellation Energy (Nine Mile Point Nuclear Station) Annual Performance Assessment Meeting Slides
ML05040003428 January 2005IR 05000318-05-006 - Attachment 'B' - Constellation Presentation - January 28, 2005
ML05076047318 March 2005NRC Slides for Calvert Cliffs Annual Assessment Meeting
ML05081000722 March 2005Slides for Ginna Annual Assessment Meeting
ML0508800291 April 2005Slides for 04/28/2005 Annual Assessment Meeting with Nine Mile Point Nuclear Station
ML05094011930 March 2005Handout Used in Meeting Held on March 30, 2005 Between the U.S. Nuclear Regulatory Commission Staff and the Constellation Energy Group, Inc. Representatives
ML05104036629 March 2005NRC Slides for Public Meeting with Exelon Regarding Peach Bottom Annual Assessment
ML05126009321 April 2005Slides Summary of Annual Assessment Meeting with Constellation Generation Group, Constellation Energy Co
ML05126010428 April 2005Summary of Annual Assessment Meeting with Constellation Generation Group, Constellation Energy Slides
ML05126014428 April 2005Summary of Annual Assessment Meeting with Nine Mile Point Nuclear Power Station, Constellation Energy Slides
ML05131035021 April 2005Public Meeting NRC Slides Regarding Clinton End-of-Cycle Plant Performance Assessment
ML05131036321 April 2005Public Meeting Licensee Slides Clinton End-of-Cycle Plant Performance Assessment
ML05137042414 April 2005Notice of Meeting with Exelon Generation Company, Slides
ML05137058511 May 2005Public Meeting Slides Braidwood End-of-Cycle Plant Performance Assessment
ML05144035529 March 2005NRC Annual Assessment Meeting, Peach Bottom Atomic Power Station (Exelon Slides)
ML05144036614 April 2005NRC Annual Assessment Meeting, Limerick Generating Station (Exelon Slides)
ML05159000813 June 2005Recurring Themes
ML0516500869 June 2005Presentation Slides, Nine Mile Point, Units 1 and 2, LRA Status UpdateAging Management
Moisture barrier
ML0522300149 March 2005RIC 2005 Presentation - F4 - Dale Ambler - Rop/Cross Cutting Issues
ML0522300409 March 2005RIC 2005 Presentation - G4 - Eugene M. Kelly - Risk InformedSurveillance Frequency Control Program
ML05256044717 August 2005B&W Owners Group Reactor Vessel Working Group Summary of the Plans of the B&Wog Reactor Vessel Integrity Program
ML05292082215 September 2005Presentation for 09/15/2005 Meeting with R. E. Ginna SBLOCA EPU Results SummaryBoric Acid
Loop seal
ML05346011417 November 2005Preliminary Results of Environmental Review Nine Mile Point Power Station, Units 1 and 2, U.S. Nuclear Regulatory Commission, November 17, 2005Aging Management
Environmental Justice