Annual Assessment Meeting Nuclear Regulatory Commission

NRC Performance Goals P Maintain safety and protect the environment P Enhance public confidence P Improve effectiveness, efficiency, and realism of processes and decision making P Reduce unnecessary regulatory burden

Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Inspection Performance Indicator Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response

Key Aspects of the Assessment Program P Objective review of licensee performance P Action Matrix identifies agency response commensurate with safety significance P Increasing safety significance results in:

- Increased levels of inspection

- Involvement of higher levels of NRC and Licensee management

- Increased regulatory action P Plant specific assessment information on NRC public web site

Regional Organization Jim Dyer, Regional Administrator James Caldwell, Deputy Regional Administrator Jan Strasma, Regional Public Affairs Officer Division of Reactor Projects Division of Reactor Safety Geoffrey E. Grant, Director Cynthia Pederson, Director Steven Reynolds, Deputy Director Roy Caniano, Deputy Director Reactor Projects Branch 3 Regional Specialists Ann Marie Stone, Chief Tom Tongue, Project Engineer Jack Rutkowski, Reactor Engineer Jamie Bond, Intern Clinton Resident Inspector Office Pat Louden*, Senior Resident Inspector Carey Brown, Resident Inspector Billy Dickson will be the new SRI in June 2003

Annual Licensee Assessment Meeting P A public forum for discussion of the licensees performance P NRC will address the licensee performance issues identified in the Annual Assessment Letter P Licensee will respond to the information in the letter and inform the NRC of new or existing programs to maintain or improve their performance

ROP Action Matrix Summary for 2002 P Column 1 - Licensee Response P Column 2 - Regulatory Response P Column 3 - Degraded Cornerstone P Column 4 - Multiple/ Repetitive Degraded Cornerstone P Column 5 - Unacceptable Performance (Nationwide number does not contain Davis Besse)

Column 1 Column 2 Column 3 Column 4 Column 5 Nationwide 59 33 7 3 0 Region I 9 14 2 1 0 Region II 26 4 1 1 0 Region III 11 10 2 0 0 Region IV 13 5 2 1 0

Security & Safeguards Update P Creation of Office of Nuclear Security and Incident Response P Top-to-Bottom Review of Security Program Initiated P Issuance of Orders/ Interim Compensatory Measures (ICM)

P Verification of Licensee Actions on ICM

Security & Safeguards Update P Proposed Revisions to Design Basis Threat P Pending Orders on Fatigue/Guard Training P Initiation of Pilot Force-on-Force Excercise Program

P Name of Plant: Clinton Power Station P Plant Operator: AmerGen P Number of Units: 1 P Reactor Type and Vendor: BWR/GE (type 6)

P Location: Clinton, IL P Power Output (electrical): 1062 megawatts P Source of Circulating Water: Clinton Lake

Major Plant Activities in 2002 Clinton Power Station P Reactor shutdown due to refueling outage (4/02/02)

P Reactor shutdown due to a high reactor vessel water level signal (Level 8) caused by a reactor feedpump control system failure (5/13/02)

P Plant shutdown due to a defective main power transformer sudden pressure relay (7/04/02)

Plant Performance Summary Clinton Power Station P 7 GREEN Findings

< Inadequate Procedures

< Inadequate Temporary Modification

< Failure to Follow Procedure

< Corrective Action Concerns P All Performance Indicators Within GREEN Band

Plant Performance Summary Clinton Power Station P Operated Safely P Fully Met All Cornerstone Objectives P Licensee Response Band of NRC Action Matrix

Contacts for additional information for:

Clinton Power Station P Regional Public Affairs Officer:

< Jan Strasma, 630-829-9663 P State Liaison Officer:

< Roland Lickus, 630-829-9660 P Branch Chief:

< Ann Marie Stone, 630-829-9729 P Senior Resident Inspector:

< Billy Dickson (as of June 2003), 217-935-9521 P Resident Inspector:

< Carey Brown, 217-935-9521

Contacting the NRC P Report an emergency

< (301) 816-5100 (call collect)

P Report a safety concern:

< (800) 695-7403

< Allegation@nrc.gov P General information or questions

< www.nrc.gov

< Select What We Do for Public Affairs