MONTHYEARML24310A0672024-11-0505 November 2024 Constellation NRC Pre-Submittal Meeting Slides - Proposed Alternative for Reactor Vessel Closure Stud Exam Optimization ML24100A7672024-04-11011 April 2024 Meeting Slides - Preapplication with Constellation on Planned Fleet Alternative Request to Adopt OMN-2 ML24089A2612024-04-0909 April 2024 Slides - Constellation - Pre-Application Regarding Hooded Masks 4/9/2024 Meeting Slides (L-2024-LLM-0041) ML24060A1692024-03-0707 March 2024 NRC Slides for March 7, 2024 Regulatory Conference with Constellation Nuclear Regarding Braidwood ML24057A3032024-02-26026 February 2024 Attachment 1: Braidwood Station Regulatory Conference Information ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML24003A1812024-01-0808 January 2024 Handout - Byron-Braidwood Core Monitoring and Support System LAR Pre-Submittal Meeting January 8,2024 ML23345A0362023-12-11011 December 2023 ATWS Uet December 11, 2023 Pre-submittal Meeting Slides ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23272A0622023-09-29029 September 2023 Ultimate Heat Sink Temperature Tech Spec Limit Change ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23163A1642023-06-12012 June 2023 2022 Braidwood/Byron End-of-Cycle Meeting Presentation NEI 99-01, Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides2023-02-21021 February 2023 Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML23033A6672023-01-30030 January 2023 Public Call with Constellation January 30, 2023 (Slides) ML22159A3332022-06-0909 June 2022 Presentation Slides for Braidwood and Byron 2021 End of Cycle Meeting ML21320A0672021-11-17017 November 2021 NRC Pre-Submittal Meeting - Braidwood, Unit 2, LAR for Removal of Unit 2 License Condition for Closure Stud Hole Location No. 35 (EPID L-2021-LRM-0089) (Slides) ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21166A3722021-06-15015 June 2021 End-of-Cycle Meeting Presentation ML21162A3322021-06-11011 June 2021 BWR Fleet Relief Request Associated with RPV Instrument Nozzle Repairs ML21130A6252021-05-12012 May 2021 NRC Pre-Submittal Meeting - Braidwood LAR for Ultimate Heat Sink (EPID L-2021-LRM-0040) (Slides) ML21078A0952021-03-0808 March 2021 Session W20 - James Petty - Slide Deck 3 ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20209A5322020-07-24024 July 2020 2019 Braidwood and Byron End-of-Cycle Presentation ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20175A8722020-06-23023 June 2020 Risk-Informed Inservice Inspection - U.S Nuclear Regulatory Commission (NRC) - Four Element Risk-Informed Approach ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML20091L0432020-04-0101 April 2020 Public Meeting Handout for Braidwood, Unit 2, April 1, 2020 ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas ML18218A1122018-08-0808 August 2018 Reactor Pressure Vessel Head Penetration Nozzle Post Peening Follow-up Inspection Relief Requests for Byron Unit 2 and Braidwood Unit 1 ML18054B3592018-02-27027 February 2018 Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli ML17132A1772017-05-25025 May 2017 LAR for Control Room Cooling at Byron and Braidwood Stations ML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards ML16062A4222016-03-0202 March 2016 Meeting Slides for March 7, 2016 Public Meeting to Discuss Backfit Appeal ML15232A6832015-08-27027 August 2015 Stations Auxiliary Feedwater System - Unit Cross-tie License Amendment Request ML15209A9722015-07-30030 July 2015 Alloy 600 PWSCC Mitigation Plan for Reactor Vessel Head Penetration Nozzles Utilizing Cavitation Peening at Byron and Braidwood ML15204A4932015-07-23023 July 2015 Bb Station Requests for Relief for Alternate Examination Frequency ML15204A5052015-07-23023 July 2015 EPRI Tech Basis for Brd-Byr Head RR ML15133A4732015-05-20020 May 2015 Digital Upgrades of the Non-Safety Related NSSS Control Systems at Byron and Braidwood Stations ML15135A4262015-05-19019 May 2015 EOC Public Meeting Slides ML15104A4932015-04-14014 April 2015 Preliminary Site-Specific Results of the Environmental Review for Braidwood Station License Renewal ML14342A8122014-12-10010 December 2014 Presentation Slides for December 10, 2014 Meeting on Alloy 600 PWSCC Mitigation for Rvh Nozzles ML14261A1112014-09-22022 September 2014 2014 NEI Fire Protection Information Forum NRC Public Slides ML14251A4852014-09-10010 September 2014 Byron/Braidwood Auxiliary Feedwater Cross-Tie ML14177A6412014-06-23023 June 2014 UHS Pre-submittal Meeting Presentation ML13249A1892013-09-0404 September 2013 ILRT Extension LAR Pre-submittal Meeting Slides 2024-04-09
[Table view] |
Text
Exelon Nuclear Braidwood Generating Station U.S. NRC End Of Cycle Public Meeting April 15,2004
0 0
W
Major Accomplishments - 2003 Unit 1 Continuous Record Run (549 Days)
Unit 2 Continuous Run (535 Days)
Successful Unit 1 & 2 Refueling Outages Solid Industrial Safety Performance
- 2ISARs
- 4 OSHA Recordable Injuries
- Over 1.57 Million Safe Man-Hours Security Program & Facility Enhancements Maintained INPO Excellent Rating (Jan 04) 3
Major Challenges - 2003 Resolution of 1B Auxiliary Feedwater Diesel Issues
- No NRC Findings
- NRC Confirmed Our Root Cause Investigation Was Thorough and Comprehensive Exelon Fundamentals
- Human Performance 4
Current Focus Areas Readiness for Refueling Outage in 2004
- Unit 1: October 4, 2004 Improve Effectiveness of Self-Assessment Program Operational Execution and Safety Equipment Reliability Meeting Commitments in Cost and Generation 5
Major Challenges for 2004 Lake Chemistry Stabilization Meeting New Security Design Basis Threat 6