Letter Sequence Other |
---|
|
|
MONTHYEARML0333003312003-10-23023 October 2003 E-Mail Transmitting Excerpt from Ginna Probabilistic Safety Assessment (PSA) on Loss of SFP Cooling and FHAs Project stage: Other ML0330903442003-10-31031 October 2003 Preliminary Results of Environmental Review R.E. Ginna Nuclear Plant, Nuclear Regulatory Commission, August 7, 2003 (Encl. 5) Project stage: Other ML0333502942003-11-0505 November 2003 Email Transmitting Information Rg&E Tax Payments to Wayne Central School District Project stage: Other 2003-10-31
[Table View] |
Similar Documents at Ginna |
---|
Category:Slides and Viewgraphs
MONTHYEARML24310A0672024-11-0505 November 2024 Constellation NRC Pre-Submittal Meeting Slides - Proposed Alternative for Reactor Vessel Closure Stud Exam Optimization ML24137A1882024-05-16016 May 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML24100A7672024-04-11011 April 2024 Meeting Slides - Preapplication with Constellation on Planned Fleet Alternative Request to Adopt OMN-2 ML24089A2612024-04-0909 April 2024 Slides - Constellation - Pre-Application Regarding Hooded Masks 4/9/2024 Meeting Slides (L-2024-LLM-0041) ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides NEI 99-01, Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides2023-02-21021 February 2023 Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML23033A6672023-01-30030 January 2023 Public Call with Constellation January 30, 2023 (Slides) ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21165A1942021-06-16016 June 2021 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation ML21165A2882021-06-16016 June 2021 Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) ML21162A3322021-06-11011 June 2021 BWR Fleet Relief Request Associated with RPV Instrument Nozzle Repairs ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20175A8722020-06-23023 June 2020 Risk-Informed Inservice Inspection - U.S Nuclear Regulatory Commission (NRC) - Four Element Risk-Informed Approach ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas ML18054B3592018-02-27027 February 2018 Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli ML16145A0402016-05-16016 May 2016 Problem Identification and Resolution 3/16/2016 Exit Presentation ML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards ML13053A2962013-02-20020 February 2013 NRC Pre-Meeting Presentation 2-20-13 ML1114502502011-05-25025 May 2011 Constellation Meeting Slides for the Ginna 2011 Annual Assessment Meeting ML1113605462011-05-16016 May 2011 NRC Meeting Slides, Ginna 2011 Annual Assessment Meeting ML1022500422010-08-13013 August 2010 Exit and RPM Slides - 2010 ML1022500812010-08-13013 August 2010 Public Meeting 2010 - Ceng Slides ML1006807352010-03-18018 March 2010 Annual Meeting Slides ML0926506772009-09-15015 September 2009 Slides from the Public Meeting with Constellation Energy - Ginna ISFSI Presentation ML0808804062008-03-28028 March 2008 Licensee Slides (Constellation) from Ginna Annual Assessment Meeting ML0807011912008-03-10010 March 2008 Slides for Annual Assessment Public Meeting for Ginna Station ML0712403122007-04-25025 April 2007 Slides from Ginna Annual Assessment Meeting, 04/25/2007 ML0710102262007-04-11011 April 2007 Annual Performance Assessment Meeting Slides ML0609404402006-04-0404 April 2006 NRC Slides for Annual Assessment Public Meeting with R. E. Ginna Nuclear Power Plant, LLC to Discuss CY2005 Performance ML0529208222005-09-15015 September 2005 Presentation for 09/15/2005 Meeting with R. E. Ginna SBLOCA EPU Results Summary ML0525604472005-08-17017 August 2005 B&W Owners Group Reactor Vessel Working Group Summary of the Plans of the B&Wog Reactor Vessel Integrity Program ML0512600932005-04-21021 April 2005 Slides Summary of Annual Assessment Meeting with Constellation Generation Group, Constellation Energy Co ML0508100072005-03-22022 March 2005 Slides for Ginna Annual Assessment Meeting ML0330903442003-10-31031 October 2003 Preliminary Results of Environmental Review R.E. Ginna Nuclear Plant, Nuclear Regulatory Commission, August 7, 2003 (Encl. 5) ML0309901532003-04-0202 April 2003 Region I - Ginna Annual Assessment Meeting Slides ML0232901842002-11-20020 November 2002 Slides for 11/4/2002 Lrsc Meeting ML0235301402002-11-0606 November 2002 Environmental Scoping Meeting R.E. Ginna, NRC, November 6, 2002 (Enclosure 2) ML0228200482002-10-0808 October 2002 Slides and Viewgraphs of September 24, 2002, Summary of Meeting with Rochester Gas and Electric Corporation Proposed Digital Upgrades to the Emergency Control Room Air Treatment System Actuation Instrumentation ML0211201362002-04-17017 April 2002 Attachment 2 to the 04/17/2002 Meeting Summary with R.E.Ginna 2024-05-16
[Table view] |
Text
R.E. Ginna Draft SEIS Meeting FI"WCox Preliminary Results of
- *+ . Ginna Nuclear Plant Nuclear Regulat ssion August , 0 N
> Discuss NRC's license renewal process \
> Describe the environmental review process
> Discuss the results of our review
> Provide the review schedule
> Accept any comments you may have today
> Describe how to submit comments
>1 August 7, 2003 I
R.E. Ginna Draft SEIS Meeting Al 5 R E. Ginna
)/ Numbar Plant License ewal
> Operating license expires in 2009
> Application requests authorization to operate R.E. Ginna Nuclear Plant for up an additional 20 years
- 6 U^L s License I Renew eview
> Safety review
> Environmental review
> Plant inspections
> Advisory Committee on Reactor Safeguards (ACRS)
I)'
August 7, 2003 2
R.E. Ginna Draft SEIS Meeting
> NEPA requires Federal agenciest systematic approach to consider environmental impacts
> Commission has determined that an environmental impact statement (EIS) will be prepared for a license renewal action August 7, 2003 3
R.E. Ginna Draft SEIS Meeting Deci Standard for Environm al Review To determine whether or not the adverse environmental impacts of license renewal for Ginna are so great that preserving the option o license renewal for energy planning decisionmakers would be unreasonable.
August 7, 2003 4
R.E. Ginna Draft SEIS Meeting Atmeplr expertise i
/~~~~~~~~~~~~~~~~~ \
.'< ^.sphett i f -;,-scif~nc
>. amn'^ - l,;;;, l ,, ) , ., . . . . --. ,
-f ~~~~~~~Radiation Rgltr
'Protection eCompi; Socloeconoricat oplac
.~.Environmental JusticJ-..........-.:..-..
E i ;............... --.
~~i:Ecology A rchaeologyhthtoftllResourcs,-,. +.
"Ioro August 7, 2003 5
R.E. Ginna Draft SEIS Meeting a
> NRC-defined impact levels:
> SMALL: Effect is not detectable or too small to destab 'e or noticeably alterany importantattributeof the resource
> MODERATE: Effect is sufficient to alternoticeably, but no destabilize important attributesof the resource
> LARGE: Effect is clearly noticeableand sufficient to destabili importantattributesof the resource
> Consistent with the Council on Environmental Quality guidance for NEPA analyses August 7, 2003 6
R.E. Ginna Draft SEIS Meeting
> Cooling System
> Transmission Lines
> Radiological
> Socioeconomic
> Groundwater Use and Quality
> Threatened or Endangered Species
> Category 2 issues
> Entrainment
> Impingement
> Heat Shock
> Preliminary findings
> Impacts are SMALL
> No additional mitigation required 7.
August 7, 2003 7
. R.E. Ginna Draft SEIS Meeting a
9 Category 1 issues - exposures to th&p and to workers \
> Preliminary findings
> No new and significant information ideni
> GEIS concluded impacts are SMALL OSi P tial New and Significan formation
> No new and significant information iden e
> as a result of the scoping process
> by the licensee
> by the staff
> GEIS Category 1 conclusions not affected by presence of shoreline revetment August 7, 2003 8
R.E. Ginna Draft SEIS Meeting
> Considered impacts of renewal term opeia combined with other past, present, and rea foreseeable future actions
> evaluated to end of 20-year renewal term
> geographic boundaries dependent on resource
> No significant cumulative impacts August 7, 2003 9
R.E. Ginna Draft SEIS Meeting
+ Alm~~ntives
> No-action
> Alternative energy sources
> New generation (Coal, Natural Gas, Nuclear)
> Purchased electrical power
> Other alternatives (Oil, Wind, Solar, Conservation)
> Combination of alternatives reliminary Con ions for Altena es
> Alternatives (including the no-action alt may have environmental effects in at least ,
impact categories that reach MODERATE LARGE significance August 7, 2003 10
R.E. Ginna Draft SEIS Meeting Postu , ccidents
> Design-basis accidents
> Severe accidents
> Severe accident mitigation alternatives (SAMAs)
SA Evaluation
> Characterize overall plant risk
> Identify potential improvements
> Quantify risk reduction potential and implementation costs
> Determine whether implementation of any of improvements is required to support license renewal August 7, 2003 11
R.E. Ginna Draft SEIS Meeting re ary Results of SAMA luation
> Approximately 200 candidate improvements cod
> Set of SAMAs reduced to 8 based on multi-step s eenin process
> Detailed cost/benefit analysis shows that 2 of the 8 candidates are cost beneficial:
> obtain a skid-mounted 480V diesel generator for station blacko events
> modify procedures to allow cross-connection of charging pumps 23 re ary Results of SAMA aluation
> Two SAMAs found to be cost beneficial
> not related to managing the effects of aging
> not required to be implemented as part of license renewal
> entered into Ginna plant change request system for prioritization with other plant improvements 241 August 7, 2003 12
R.E. Ginna Draft SEIS Meeting
- ~~\tminminry 0\-W) Conc ions
> Impacts of license renewal are SMALL for i Ctan
> Impacts of alternatives to license renewal range fr m SMALL to LARGE
> The staff's preliminary recommendation is that the ad environmental impacts of license renewal for Ginna are so great that preserving the option of license renewal for energy planning decisionmakers would be unreasonable August 7, 2003 13
R.E. Ginna Draft SEIS Meeting Po Contact and Reference ocuments
> Agency point of contact:
Robert Schaaf (800) 368-5642, Ext. 1312
> Documents located at the Ontario Public Library, 185 Ridj Road, Ontario, New York, and the Rochester Public Li ary 115 South Street, Rochester, New York
> Draft SEIS can also be viewed at the NRC's Web site (www.nrc.gov) at: www.nrc.gov/reading-rm/doc-collections/nuregs/staff/srl437/supplementl4/
A
/;) ~~~ fitting Cornents
> By mail at: Chief, Rules and Directiv Division of Administrative rv Mailstop T-6D59 U.S. Nuclear Regulatory Commi In person at: 11545 Rockville Pike Rockville, Maryland
> E-mail at: GinnaEIS@nrc.gov August 7, 2003 14
R.E. Ginna Draft SEIS Meeting 0
0 J~
August 7, 2003 15