Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000219/200430211 March 2005Senior Reactor and Reactor Operator Initial Retake Examination Report No. 05000219/2004302
IR 05000219/200630113 November 2006IR 05000219/2006-301; October 2-9, 2006; Oyster Creek Nuclear Generating Station; Initial Operator Licensing Examination
IR 05000219/200830211 September 2008IR 05000219-08-302; August 21-22, 2008; Oyster Creek Nuclear Generating Station; Retake Operator Licensing Examination Report
IR 05000219/20103018 July 2010Examination Report 05000219/10-301 for Oyster Creek
IR 05000219/201130111 August 2011Er 05000219-11-301, July 11-20, 2011, Oyster Creek Nuclear Generating Station; Initial Operator Licensing Examination Report
IR 05000219/201230118 June 2012Er 05000219-12-301; 5/14/2012 - 5/24/2012; Oyster Creek Nuclear Generating Station; Initial Operator Licensing Examination Report
ML0200903418 January 2002Senior Reactor and Reactor Operator Initial Examinations - Oyster Creek Nuclear Generating Station, Dtd 1/8/02
ML02157018531 May 2002NRC Exam Results Letter Dated 05/31/2002
ML02161020231 May 2002Final Q/A Related FormsJob Performance Measure
ML02161021131 May 2002NRC Comments
ML02161022531 May 2002Draft - Outlines (Facility Ltr Dtd 02/21/02)Half scram
Hardened vent
ML02161027431 May 2002Draft - SRO Written, Oyster Creek 2002 NRC Initial Licensing ExamShutdown Margin
Half scram
Temporary Modification
Squib
Emergency Lighting
Scram Discharge Volume
Hardened vent
Fuel cladding
Continuous fire watch
ML02161030531 May 2002Draft - Section a OperatingShutdown Margin
Job Performance Measure
ML02161032931 May 2002Draft - Section B OperatingJob Performance Measure
Overtravel
Hardened vent
ML02161035831 May 2002Draft - Section C OperatingHalf scram
Power change
ML02161046931 May 2002Final - SRO Written
ML02161048331 May 2002Final - Outlines (Change Summaries - Optional)Containment Hardened Vent
ML02161049031 May 2002Final - Section a OperatingJob Performance Measure
ML02161051831 May 2002Final - Section B OperatingJob Performance Measure
Overtravel
Hardened vent
ML02161053431 May 2002Final - Section C OperatingHalf scram
Power change
ML02183038417 May 2002NRC Ltr Transmitting Certificates Dtd 5/17/02
ML02283027710 October 2002NRC Ltr Transmitting Certificates Dtd 10/10/02
ML03105019715 April 2003Requalification Program Inspection - Oyster Creek During Week of June 2,2003
ML0331004106 November 2003Senior Reactor and Reactor Operator Initial Examinations - Oyster Creek Nuclear Generating Station Dated 11/06/2003
ML04138016919 April 2004Licensee Post Exam Written Comments (Initial Comments)Safe Shutdown
Shutdown Margin
Packing leak
Half scram
Offsite Dose Calculation Manual
Temporary Modification
Overtravel
Continuous fire watch
Power change
ML04138017814 May 2004Licensee Post Exam Written Comments (Revision 1)Safe Shutdown
Shutdown Margin
Packing leak
Offsite Dose Calculation Manual
Stroke time
NJPDES
Temporary Modification
Squib
Scram Discharge Volume
Overtravel
Earthquake
Continuous fire watch
Fire Protection Program
Scaffolding
Power change
Unidentified leakage
ML04160035819 April 2004NRC Resolution of Licensee CommentsPacking leak
Continuous fire watch
Unidentified leakage
ML0417301269 June 2004NRC Exam Notification Letter Dated 06/09/04
ML04175014319 April 2004Final RO & SRO WrittenHot Short
Safe Shutdown
Shutdown Margin
Loop seal
Packing leak
Half scram
Grab sample
Squib
Scram Discharge Volume
Fuel cladding
Continuous fire watch
Fire Protection Program
Unidentified leakage
ML04175014919 April 2004Final Outlines (Change Summaries - Optional)
ML04175015319 April 2004Final Section a OperatingJob Performance Measure
ML04175016019 April 2004Final Section B OperatingSquib
Job Performance Measure
ML04175018319 April 2004Final Section C OperatingHalf scram
Job Performance Measure
ML04189019419 April 2004Final QA, Exam Preparation Checklist/Related Forms
ML04189029919 April 2004Comments on Draft Operating Test
ML04189030819 April 2004Licensee Comments (Written)
ML04189033119 April 2004Draft OutlinesHalf scram
Unidentified leakage
ML04189033619 April 2004Draft RO & SRO WrittenHot Short
Safe Shutdown
Loop seal
Packing leak
Half scram
Grab sample
Squib
Scram Discharge Volume
Fuel cladding
Continuous fire watch
Fire Protection Program
ML04189034119 April 2004Draft Section a OperatingSafe Shutdown
Job Performance Measure
Earthquake
ML04189034419 April 2004Draft Section B OperatingSquib
Job Performance Measure
ML04189034619 April 2004Draft Section C OperatingHalf scram
Power change
ML04204046122 July 2004Exam Certificate Ltr Dtd 7/22/04
ML04265054021 September 2004Senior Reactor and Reactor Operator Initial Retake Examinations - Oyster Creek Nuclear Generating Station
ML04273057724 September 2004Written Exam Impact of SRO Question Deletions on Exam ValidityPacking leak
Fuel cladding
ML0428104487 October 2004Initial Exam Certificates - Ltr. Dated 10/7/04
ML04303070423 September 2004NRC Exam Results Letter W/O Encl. Dtd 9/23/04
ML0434900868 December 2004Operator Licensing Examination Approval (Folder 1)
ML04358042323 December 2004Letter to Mr. C. N. Swenson at Oyster Creek Generating Station Licensed Operator Positive Fitness-For-Duty TestFitness for Duty
ML05025013210 December 2004Draft - Nrc/Facility Comments (Folder 2)Containment Hardened Vent
ML05025014124 January 2005Draft - RO & SRO Written Exam (Folder 2)Half scram
Squib
Scram Discharge Volume
Unidentified leak