GO2-00-038, Independent Spent Fuel Storage Installation 2004 Annual Operating Report | 28 February 2005 | Independent Spent Fuel Storage Installation 2004 Annual Operating Report | Safe Shutdown Packing leak Deep Dose Equivalent Scaffolding Downpower |
GO2-00-086, Change in Distribution | 8 May 2002 | Change in Distribution | |
GO2-02-013, Security & Training Qualification Plan, Revison 13 | 21 January 2002 | Security & Training Qualification Plan, Revison 13 | |
GO2-02-014, License Amendment Request - Alternative Source Term Proprietary Versions of Ph & MSLB Calculations | 23 January 2002 | License Amendment Request - Alternative Source Term Proprietary Versions of Ph & MSLB Calculations | |
GO2-02-015, License Amendment Request - Alternative Source Term Non-Proprietary Versions of Ph and MSLB Calculations | 23 January 2002 | License Amendment Request - Alternative Source Term Non-Proprietary Versions of Ph and MSLB Calculations | |
GO2-02-016, Operating License NPF-21 Reply to Final Significance Determination for a Yellow Finding and Notice of Violation (NRC IR 05000397/2001-008) | 28 February 2002 | Operating License NPF-21 Reply to Final Significance Determination for a Yellow Finding and Notice of Violation (NRC IR 05000397/2001-008) | Significance Determination Process |
GO2-02-023, Physical Security Plan, Revision 46 | 8 February 2002 | Physical Security Plan, Revision 46 | |
GO2-02-024, Response to NRC Request for Additional Information Re Request for Amendment Re Unisolable Drain Line Between Control Rod Drive/Condensate Pump & Reactor Core Isolation Cooling Pump Rooms | 11 February 2002 | Response to NRC Request for Additional Information Re Request for Amendment Re Unisolable Drain Line Between Control Rod Drive/Condensate Pump & Reactor Core Isolation Cooling Pump Rooms | Probabilistic Risk Assessment Pressure Boundary Leakage |
GO2-02-027, Station'S Clarification and Response Regarding NRC IR 05000397/2001-008 and Final Significance Determination Letter | 21 February 2002 | Station'S Clarification and Response Regarding NRC IR 05000397/2001-008 and Final Significance Determination Letter | High winds |
GO2-02-035, Emergency Response Data System, Change to Data Point Library | 28 February 2002 | Emergency Response Data System, Change to Data Point Library | |
GO2-02-036, Annual Operating Report 2001 | 28 February 2002 | Annual Operating Report 2001 | Safe Shutdown Reactor Vessel Water Level Packing leak Ultimate heat sink Grab sample Offsite Dose Calculation Manual Hydrostatic Temporary Modification Scram Discharge Volume Excess Flow Check Valve Battery sizing Downpower Coast down |
GO2-02-046, Incoming - J.V. Parrish-Columbia GS-Reply to Response to Order for Interim Safeguards and Security Compensatory Measures | 18 March 2002 | Incoming - J.V. Parrish-Columbia GS-Reply to Response to Order for Interim Safeguards and Security Compensatory Measures | |
GO2-02-047, 2001 Annual Environmental Operating Report | 19 March 2002 | 2001 Annual Environmental Operating Report | |
GO2-02-049, Request for Enforcement Discretion Re Technical Specification Completion Time for Inoperable Primary Containment Isolation Valves | 22 March 2002 | Request for Enforcement Discretion Re Technical Specification Completion Time for Inoperable Primary Containment Isolation Valves | Stroke time Enforcement Discretion |
GO2-02-051, Submittal of Financial Protection Amounts for Columbia Generating Station | 25 March 2002 | Submittal of Financial Protection Amounts for Columbia Generating Station | |
GO2-02-054, 14-Day Follow-up Report Regarding a Violation of Operating License Condition 2.E | 26 March 2002 | 14-Day Follow-up Report Regarding a Violation of Operating License Condition 2.E | |
GO2-02-087, Letter Discussing Columbia Generating Station License Amendment Request - Alternative Source Term & the Need for Approval by November 2002 | 8 May 2002 | Letter Discussing Columbia Generating Station License Amendment Request - Alternative Source Term & the Need for Approval by November 2002 | |
GO2-02-112, License Amendment Request - Alternative Source Term, Non-Proprietary Versions of CRDA, FHA & LOCA Calculations | 16 July 2002 | License Amendment Request - Alternative Source Term, Non-Proprietary Versions of CRDA, FHA & LOCA Calculations | |
GO2-02-113, 2002 Exercise Scenario Submittal | 17 July 2002 | 2002 Exercise Scenario Submittal | |
GO2-02-115, NRC Inspection Report Notice of Violation Response Extension | 24 July 2002 | NRC Inspection Report Notice of Violation Response Extension | |
GO2-02-119, License Amendment Request - Alternative Source Term, Proprietary Version of LOCA Calculation | 29 July 2002 | License Amendment Request - Alternative Source Term, Proprietary Version of LOCA Calculation | |
GO2-02-134, Energy Northwest, Docket No. 50-397, NRC Inspection Report 50-397/02-05, Response to Notice of Violation | 21 August 2002 | Energy Northwest, Docket No. 50-397, NRC Inspection Report 50-397/02-05, Response to Notice of Violation | Condition Adverse to Quality Significance Determination Process |
GO2-02-135, Revised Request for Amendment on the Alternate Source Term | 27 August 2002 | Revised Request for Amendment on the Alternate Source Term | Reactor Vessel Water Level High Radiation Area Fuel cladding Recently irradiated fuel |
GO2-02-136, License Amendment Request - Alternative Source Term Response to Request for Additional Information | 29 August 2002 | License Amendment Request - Alternative Source Term Response to Request for Additional Information | GOTHIC |
GO2-02-138, (WNP-2) Application for Amendment to License NPF-21, for Three Changes to Technical Specifications 4.2.1 & 5.6.5.b | 3 September 2002 | (WNP-2) Application for Amendment to License NPF-21, for Three Changes to Technical Specifications 4.2.1 & 5.6.5.b | Anticipated operational occurrence Post Accident Monitoring Fuel cladding |
GO2-02-142, Report of Compliance with Interim Safeguards and Security Compensatory Measures | 6 September 2002 | Report of Compliance with Interim Safeguards and Security Compensatory Measures | |
GO2-02-145, Commitment Related to Inservice Inspection Program Plan Relief Request 2ISI-25 | 10 September 2002 | Commitment Related to Inservice Inspection Program Plan Relief Request 2ISI-25 | |
GO2-02-158, Physical Security Plan, Revision 48 | 3 October 2002 | Physical Security Plan, Revision 48 | |
GO2-02-159, Report of Pipe Wall Thinning Examination Results | 4 October 2002 | Report of Pipe Wall Thinning Examination Results | Ultimate heat sink Through-Wall Leak |
GO2-02-160, Changes to Distribution List | 8 October 2002 | Changes to Distribution List | |
GO2-02-165, Registration of Spent Fuel Cask Use | 14 October 2002 | Registration of Spent Fuel Cask Use | |
GO2-02-166, Operating License NPF-21, Transmittal of Revision 34 to the Columbia Generating Station Emergency Plan | 15 October 2002 | Operating License NPF-21, Transmittal of Revision 34 to the Columbia Generating Station Emergency Plan | |
GO2-02-167, 14-Day Follow-Up Report Pursuant to Operating License Condition 2.F | 15 October 2002 | 14-Day Follow-Up Report Pursuant to Operating License Condition 2.F | |
GO2-02-177, Registration of Spent Fuel Cask Use | 29 October 2002 | Registration of Spent Fuel Cask Use | |
GO2-02-181, Written Follow-up Report Pursuant to Operating License NPF-21 Condition 2.F | 6 November 2002 | Written Follow-up Report Pursuant to Operating License NPF-21 Condition 2.F | |
GO2-02-189, Registration of Spent Fuel Cask Use | 20 November 2002 | Registration of Spent Fuel Cask Use | |
GO2-02-192, Request for Amendment to TS 4.2.1 and 5.6.5.b, Corrections to Original Submittal | 27 November 2002 | Request for Amendment to TS 4.2.1 and 5.6.5.b, Corrections to Original Submittal | |
GO2-02-193, 14 Day Follow Up Report Pursuant to Operating License Condition 2.F | 5 December 2002 | 14 Day Follow Up Report Pursuant to Operating License Condition 2.F | |
GO2-02-199, Guarantee of Payment of Deferred Premium | 13 December 2002 | Guarantee of Payment of Deferred Premium | |
GO2-02-201, Registration of Spent Fuel Cask Use | 13 December 2002 | Registration of Spent Fuel Cask Use | |
GO2-03-007, 2002 Annual Financial Report for Columbia Generating Station | 14 January 2003 | 2002 Annual Financial Report for Columbia Generating Station | |
GO2-03-016, Schedule for Achieving Compliance with Compensatory Measures Related to Access Authorization | 27 January 2003 | Schedule for Achieving Compliance with Compensatory Measures Related to Access Authorization | |
GO2-03-029, Request for Enforcement Discretion from Technical Specification 3.8.1, A.C. Sources - Operating. | 19 February 2003 | Request for Enforcement Discretion from Technical Specification 3.8.1, A.C. Sources - Operating. | Enforcement Discretion Offsite Circuit |
GO2-03-036, Annual Environmental Operating Report | 26 February 2003 | Annual Environmental Operating Report | |
GO2-03-038, Transmittal of Columbia Generating Station Radioactive Effluent Release Report for 2002 | 27 February 2003 | Transmittal of Columbia Generating Station Radioactive Effluent Release Report for 2002 | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report |
GO2-03-040, Annual Operating Report 2002 | 27 February 2003 | Annual Operating Report 2002 | Safe Shutdown Operability Determination Deep Dose Equivalent Fuel cladding Liquid penetrant |
GO2-03-055, Level of Financial Protection Annual Reporting Requirement | 1 April 2003 | Level of Financial Protection Annual Reporting Requirement | |
GO2-03-063, Request for Amendment to Technical Specification 4.2.1 & 5.6.5.b, Corrections to Original Submittal | 17 April 2003 | Request for Amendment to Technical Specification 4.2.1 & 5.6.5.b, Corrections to Original Submittal | |
GO2-03-075, Clarification to Response to Order for Compensatory Measures Related to Access Authorization | 24 April 2003 | Clarification to Response to Order for Compensatory Measures Related to Access Authorization | |
GO2-03-082, Docket No. 50-397; Updated Report of Service Water System Pipe Wall Thinning | 12 May 2003 | Docket No. 50-397; Updated Report of Service Water System Pipe Wall Thinning | |