Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
GO2-00-038, Independent Spent Fuel Storage Installation 2004 Annual Operating Report28 February 2005Independent Spent Fuel Storage Installation 2004 Annual Operating ReportSafe Shutdown
Packing leak
Deep Dose Equivalent
Scaffolding
Downpower
GO2-00-086, Change in Distribution8 May 2002Change in Distribution
GO2-02-013, Security & Training Qualification Plan, Revison 1321 January 2002Security & Training Qualification Plan, Revison 13
GO2-02-014, License Amendment Request - Alternative Source Term Proprietary Versions of Ph & MSLB Calculations23 January 2002License Amendment Request - Alternative Source Term Proprietary Versions of Ph & MSLB Calculations
GO2-02-015, License Amendment Request - Alternative Source Term Non-Proprietary Versions of Ph and MSLB Calculations23 January 2002License Amendment Request - Alternative Source Term Non-Proprietary Versions of Ph and MSLB Calculations
GO2-02-016, Operating License NPF-21 Reply to Final Significance Determination for a Yellow Finding and Notice of Violation (NRC IR 05000397/2001-008)28 February 2002Operating License NPF-21 Reply to Final Significance Determination for a Yellow Finding and Notice of Violation (NRC IR 05000397/2001-008)Significance Determination Process
GO2-02-023, Physical Security Plan, Revision 468 February 2002Physical Security Plan, Revision 46
GO2-02-024, Response to NRC Request for Additional Information Re Request for Amendment Re Unisolable Drain Line Between Control Rod Drive/Condensate Pump & Reactor Core Isolation Cooling Pump Rooms11 February 2002Response to NRC Request for Additional Information Re Request for Amendment Re Unisolable Drain Line Between Control Rod Drive/Condensate Pump & Reactor Core Isolation Cooling Pump RoomsProbabilistic Risk Assessment
Pressure Boundary Leakage
GO2-02-027, Station'S Clarification and Response Regarding NRC IR 05000397/2001-008 and Final Significance Determination Letter21 February 2002Station'S Clarification and Response Regarding NRC IR 05000397/2001-008 and Final Significance Determination LetterHigh winds
GO2-02-035, Emergency Response Data System, Change to Data Point Library28 February 2002Emergency Response Data System, Change to Data Point Library
GO2-02-036, Annual Operating Report 200128 February 2002Annual Operating Report 2001Safe Shutdown
Reactor Vessel Water Level
Packing leak
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Hydrostatic
Temporary Modification
Scram Discharge Volume
Excess Flow Check Valve
Battery sizing
Downpower
Coast down
GO2-02-046, Incoming - J.V. Parrish-Columbia GS-Reply to Response to Order for Interim Safeguards and Security Compensatory Measures18 March 2002Incoming - J.V. Parrish-Columbia GS-Reply to Response to Order for Interim Safeguards and Security Compensatory Measures
GO2-02-047, 2001 Annual Environmental Operating Report19 March 20022001 Annual Environmental Operating Report
GO2-02-049, Request for Enforcement Discretion Re Technical Specification Completion Time for Inoperable Primary Containment Isolation Valves22 March 2002Request for Enforcement Discretion Re Technical Specification Completion Time for Inoperable Primary Containment Isolation ValvesStroke time
Enforcement Discretion
GO2-02-051, Submittal of Financial Protection Amounts for Columbia Generating Station25 March 2002Submittal of Financial Protection Amounts for Columbia Generating Station
GO2-02-054, 14-Day Follow-up Report Regarding a Violation of Operating License Condition 2.E26 March 200214-Day Follow-up Report Regarding a Violation of Operating License Condition 2.E
GO2-02-087, Letter Discussing Columbia Generating Station License Amendment Request - Alternative Source Term & the Need for Approval by November 20028 May 2002Letter Discussing Columbia Generating Station License Amendment Request - Alternative Source Term & the Need for Approval by November 2002
GO2-02-112, License Amendment Request - Alternative Source Term, Non-Proprietary Versions of CRDA, FHA & LOCA Calculations16 July 2002License Amendment Request - Alternative Source Term, Non-Proprietary Versions of CRDA, FHA & LOCA Calculations
GO2-02-113, 2002 Exercise Scenario Submittal17 July 20022002 Exercise Scenario Submittal
GO2-02-115, NRC Inspection Report Notice of Violation Response Extension24 July 2002NRC Inspection Report Notice of Violation Response Extension
GO2-02-119, License Amendment Request - Alternative Source Term, Proprietary Version of LOCA Calculation29 July 2002License Amendment Request - Alternative Source Term, Proprietary Version of LOCA Calculation
GO2-02-134, Energy Northwest, Docket No. 50-397, NRC Inspection Report 50-397/02-05, Response to Notice of Violation21 August 2002Energy Northwest, Docket No. 50-397, NRC Inspection Report 50-397/02-05, Response to Notice of ViolationCondition Adverse to Quality
Significance Determination Process
GO2-02-135, Revised Request for Amendment on the Alternate Source Term27 August 2002Revised Request for Amendment on the Alternate Source TermReactor Vessel Water Level
High Radiation Area
Fuel cladding
Recently irradiated fuel
GO2-02-136, License Amendment Request - Alternative Source Term Response to Request for Additional Information29 August 2002License Amendment Request - Alternative Source Term Response to Request for Additional InformationGOTHIC
GO2-02-138, (WNP-2) Application for Amendment to License NPF-21, for Three Changes to Technical Specifications 4.2.1 & 5.6.5.b3 September 2002(WNP-2) Application for Amendment to License NPF-21, for Three Changes to Technical Specifications 4.2.1 & 5.6.5.bAnticipated operational occurrence
Post Accident Monitoring
Fuel cladding
GO2-02-142, Report of Compliance with Interim Safeguards and Security Compensatory Measures6 September 2002Report of Compliance with Interim Safeguards and Security Compensatory Measures
GO2-02-145, Commitment Related to Inservice Inspection Program Plan Relief Request 2ISI-2510 September 2002Commitment Related to Inservice Inspection Program Plan Relief Request 2ISI-25
GO2-02-158, Physical Security Plan, Revision 483 October 2002Physical Security Plan, Revision 48
GO2-02-159, Report of Pipe Wall Thinning Examination Results4 October 2002Report of Pipe Wall Thinning Examination ResultsUltimate heat sink
Through-Wall Leak
GO2-02-160, Changes to Distribution List8 October 2002Changes to Distribution List
GO2-02-165, Registration of Spent Fuel Cask Use14 October 2002Registration of Spent Fuel Cask Use
GO2-02-166, Operating License NPF-21, Transmittal of Revision 34 to the Columbia Generating Station Emergency Plan15 October 2002Operating License NPF-21, Transmittal of Revision 34 to the Columbia Generating Station Emergency Plan
GO2-02-167, 14-Day Follow-Up Report Pursuant to Operating License Condition 2.F15 October 200214-Day Follow-Up Report Pursuant to Operating License Condition 2.F
GO2-02-177, Registration of Spent Fuel Cask Use29 October 2002Registration of Spent Fuel Cask Use
GO2-02-181, Written Follow-up Report Pursuant to Operating License NPF-21 Condition 2.F6 November 2002Written Follow-up Report Pursuant to Operating License NPF-21 Condition 2.F
GO2-02-189, Registration of Spent Fuel Cask Use20 November 2002Registration of Spent Fuel Cask Use
GO2-02-192, Request for Amendment to TS 4.2.1 and 5.6.5.b, Corrections to Original Submittal27 November 2002Request for Amendment to TS 4.2.1 and 5.6.5.b, Corrections to Original Submittal
GO2-02-193, 14 Day Follow Up Report Pursuant to Operating License Condition 2.F5 December 200214 Day Follow Up Report Pursuant to Operating License Condition 2.F
GO2-02-199, Guarantee of Payment of Deferred Premium13 December 2002Guarantee of Payment of Deferred Premium
GO2-02-201, Registration of Spent Fuel Cask Use13 December 2002Registration of Spent Fuel Cask Use
GO2-03-007, 2002 Annual Financial Report for Columbia Generating Station14 January 20032002 Annual Financial Report for Columbia Generating Station
GO2-03-016, Schedule for Achieving Compliance with Compensatory Measures Related to Access Authorization27 January 2003Schedule for Achieving Compliance with Compensatory Measures Related to Access Authorization
GO2-03-029, Request for Enforcement Discretion from Technical Specification 3.8.1, A.C. Sources - Operating.19 February 2003Request for Enforcement Discretion from Technical Specification 3.8.1, A.C. Sources - Operating.Enforcement Discretion
Offsite Circuit
GO2-03-036, Annual Environmental Operating Report26 February 2003Annual Environmental Operating Report
GO2-03-038, Transmittal of Columbia Generating Station Radioactive Effluent Release Report for 200227 February 2003Transmittal of Columbia Generating Station Radioactive Effluent Release Report for 2002Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
GO2-03-040, Annual Operating Report 200227 February 2003Annual Operating Report 2002Safe Shutdown
Operability Determination
Deep Dose Equivalent
Fuel cladding
Liquid penetrant
GO2-03-055, Level of Financial Protection Annual Reporting Requirement1 April 2003Level of Financial Protection Annual Reporting Requirement
GO2-03-063, Request for Amendment to Technical Specification 4.2.1 & 5.6.5.b, Corrections to Original Submittal17 April 2003Request for Amendment to Technical Specification 4.2.1 & 5.6.5.b, Corrections to Original Submittal
GO2-03-075, Clarification to Response to Order for Compensatory Measures Related to Access Authorization24 April 2003Clarification to Response to Order for Compensatory Measures Related to Access Authorization
GO2-03-082, Docket No. 50-397; Updated Report of Service Water System Pipe Wall Thinning12 May 2003Docket No. 50-397; Updated Report of Service Water System Pipe Wall Thinning