 Issue dateTitleTopic
05000277/LER-2016-00111 November 2016Leak in High Pressure Service Water Pipe Results in Condition Prohibited by Technical Specifications
LER 16-001-00 for Peach Bottom, Unit 2, Regarding Leak in High Pressure Service Water Pipe Results in Condition Prohibited by Technical Specifications
Through-Wall Leak
05000277/LER-2017-0018 March 2017Emergency Diesel Generator Exhaust Stacks Nonconforming Design for Tornado Missile Protection
LER 17-001-00 for Peach Bottom Atomic Power Station (PBAPS), Unit 2 Regarding Emergency Diesel Generator Exhaust Stacks Nonconforming Design for Tornado Missile Protection
Unanalyzed Condition
Tornado Missile
Enforcement Discretion
FLEX
Tornado-Generated Missile
Tornado Generated Missile
Tornado Missile Protection
Earthquake
05000278/LER-2015-00126 February 2016Loss of High Pressure Coolant Injection System Function as a Result of Failed Flow Controller Signal Converter
LER 15-001-00 for Peach Bottom, Unit 3, Regarding Loss of High Pressure Coolant Injection System Function as a Result of Failed Flow Controller Signal Converter
05000278/LER-2016-00122 November 2016Leak in High Pressure Coolant Injection Drain Pipe Results in a Loss of Safety Function
LER 16-001-00 for Peach Bottom, Unit 3, Regarding Leak in High Pressure Coolant Injection Drain Pipe Results in a Loss of Safety Function
05000278/LER-2017-00120 December 2017Reactor Pressure Boundary Leakage Due to Weld Failure in One-Inch Diameter Instrument Line
LER 17-001-00 for Peach Bottom Atomic Power Station (PBAPS), Unit 3 Regarding Reactor Pressure Boundary Leakage Due to Weld Failure in One-Inch Diameter Instrument Line
Time of Discovery
Pressure Boundary Leakage
05000289/LER-2017-0013 February 2017Low Temperature Over-Pressurization (LTOP) Technical Specification Requirements Were Not Met
LER 17-001-00 for Three Mile Island Unit 1 Regarding Low Temperature Over-Pressurization (LTOP) Technical Specification Requirements Were Not Met
05000289/LER-2017-0026 February 20171 OF 5
LER 17-002-00 for Three Mile Island, Unit 1 Regarding Leak at High Pressure Connection on Reactor Coolant Pump "A" Thermal Barrier
Safe Shutdown
Time of Discovery
VT-2
Finite Element Analysis
05000289/LER-2017-0036 November 2017Primary Containment Declared Inoperable Due to Both Airlock Doors Open Simultaneously
LER 17-003-00 for Three Mile Island, Unit 1 Regarding Primary Containment Declared Inoperable Due to Both Airlock Doors Open Simultaneously
05000289/LER-2017-0045 February 2018Items Nonconforming to Design for Tornado Missile Protection
LER 17-004-00 for Three Mile Island, Unit 1, Regarding Items Nonconforming to Design for Tornado Missile Protection
Safe Shutdown
Unanalyzed Condition
Enforcement Discretion
Tornado Generated Missile
Tornado Missile Protection
05000352/LER-2016-00123 March 2016Inoperable Reactor Enclosure Secondary Containment Integrity Due to Open Airlock
LER 16-001-00 for Limerick, Unit 1, Regarding Condition That Could Have Prevented Fulfillment of the Reactor Enclosure Secondary Containment Integrity Safety Function
05000352/LER-2016-00211 April 2016Condition Prohibited by Technical Specifications Due to Inoperable Safeguard Batteries During Cell Replacements
LER 16-002-00 for Limerick, Unit 1 & 2, Regarding Condition Prohibited by Technical Specifications Due to Inoperable Safeguard Batteries During Cell Replacements
05000352/LER-2016-00318 May 2016Plant Shutdown Required by Technical Specification Due to a Pressure Boundary Leak
LER 16-003-00 for Limerick, Unit 1, Regarding Plant Shutdown Required by Technical Specification Due to a Pressure Boundary Leak
Pressure Boundary Leakage
Pressure boundary leak
Flow Induced Vibration
05000352/LER-2017-00127 January 2017Condition Prohibited by TS due to Parts Quality Issue
LER 17-001-00 for Limerick Generating Station, Units 1 and 2 Regarding Condition Prohibited by TS due to Parts Quality Issue
05000353/LER-2016-00127 July 2016Manual Actuation of the Reactor Protection System When Critical Due to Wiring Design Error
LER 16-001-00 for Limerick, Unit 2 Regarding Manual Actuation of the Reactor Protection System When Critical Due to Wiring Design Error
CNL-15-213, Compliance with Three Mile Island (TMI) Action Plan Requirements for an Operating License7 October 2015Compliance with Three Mile Island (TMI) Action Plan Requirements for an Operating License
CY-92-223, G20110523/LTR-11-0411/EDATS: SECY-2011-0411 - Ltr. from Rep. E.J. Markey to Chairman Jaczko NRC Safety Requirements for Reactors Granted Construction Permits Prior to 197114 July 2011G20110523/LTR-11-0411/EDATS: SECY-2011-0411 - Ltr. from Rep. E.J. Markey to Chairman Jaczko NRC Safety Requirements for Reactors Granted Construction Permits Prior to 1971Fukushima Dai-Ichi
Significance Determination Process
Earthquake
Backfit
IR 05000002/19772786 January 2009EA-08-298, Peach Bottom - Notice of Violation with Proposed Imposition of Civil Penalty - $65,000 (Peach Bottom Atomic Power Station - NRC Investigation Report No. 1-2008-001 and NRC Inspection Report Nos. 05000277-278/2007404; and 05000277Safeguards Contingency Plan
Inattentive
IR 05000003/195201030 June 2010IR 05000352-10-0405 & 05000353-10-0405 on 06/15/10 - 06/17/10 for Limerick Generating Station; Security Baseline InspectionAffidavit
IR 05000027/19770063 November 2006IR 050002777-06-004, 05000278-06-004; Exelon Generation Company, LLC; 07/01/2006 - 09/30/2006; Peach Bottom Atomic Power StationHigh winds
High Radiation Area
Non-Destructive Examination
Offsite Dose Calculation Manual
Fire Barrier
Internal Flooding
Temporary Modification
Significance Determination Process
Scram Discharge Volume
Hourly Fire Watch
Scaffolding
Unidentified leakage
IR 05000027/20134066 June 2013U.S. Nuclear Regulatory Commission Material Control and Accounting Program Inspection Report No. 0500027-13-406 and 05000278-13-406Affidavit
IR 05000035/202101119 December 2011IR 050003521-11-007, 050003531-11-007, 10/17/2011 - 11/04/2011, Limerick Generating Station, Units 1 and 2, Evaluations of Changes, Tests, or Experiments and Permanent Plant ModificationsHot Short
Safe Shutdown
Coatings
Significance Determination Process
Reasonable doubt of operability
Power Uprate
IR 05000053/200840212 February 2008IR 05000352-08-402, 0500053-08-402, on 01/18/2008, Limerick Generating Station, NRC Physical Baseline Inspection, Cover LetterAffidavit
IR 05000171/200500710 August 2005IR 05000171-05-007, on 07/06/05 - 07/07/05; Peach Bottom Atomic Power Station, Unit 1, Verification of the Licensee'S Controls for Safe Storage of Radioactive Material
IR 05000171/200601315 September 2006IR 05000171-06-013, on July 5-6, 2006, Peach Bottom Atomic Power Station, Exelon Generation Company, LLC Delta, Pennsylvania
IR 05000171/200700719 November 2007IR 05000171-07-007; on 07/03-05/2007 and 09/23/2007; Peach Bottom Atomic Power Station Unit 1; Safstor Inspection
IR 05000171/20120083 August 2012IR 05000171-12-008, on July 24-25, 2012, Peach Bottom Atomic Power Station, Unit 1Hydrostatic
Process Control Program
Earthquake
IR 05000171/201300924 May 2013IR 05000171-13-009, on 5/13/13 - 5/15/13, Exelon Generation Company, LLC, Peach Bottom Atomic Power Station Unit 1Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
IR 05000171/201400821 October 2014NRC Inspection Report No. 05000171/2014008Process Control Program
IR 05000171/20150093 September 2015IR 05000171/2015009 on 8/24 - 27/15, Exelon Generation Company, LLC, Peach Bottom Atomic Power Station Unit 1 - NRC Inspection Report No. 05000171/2015009Annual Radioactive Effluent Release Report
Process Control Program
IR 05000171/20160086 July 2016NRC Inspection Report No. 05000171/2016008Grab sample
Hydrostatic
Annual Radioactive Effluent Release Report
Process Control Program
Fire Protection Program
IR 05000171/201700928 August 2017NRC Inspection Report No. 05000171/2017009
IR 05000171/201800123 May 2018NRC Inspection Report No. 05000171/2018001Hydrostatic
Annual Radioactive Effluent Release Report
Process Control Program
Fire Protection Program
IR 05000171/201900130 May 2019Delta, Pennsylvania, NRC Inspection Report 05000171/2019001Annual Radioactive Effluent Release Report
Process Control Program
IR 05000171/202000110 November 2020NRC Inspection Report No. 05000171/2020001, Exelon Generation Company, LLC, Peach Bottom Atomic Power Station, Unit 1Process Control Program
COVID-19
IR 05000171/202100112 January 2022Safstor Inspection Report 05000171/2021001Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Coronavirus
IR 05000171/20220014 January 2023Constellation Energy Generation, LLC, Peach Bottom Atomic Power Station, Unit 1 - NRC Inspection Report 05000171/2022001Process Control Program
IR 05000219/20120121 May 2014Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC
IR 05000219/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000227/20060023 May 2006IR 05000227-06-002, & IR 05000278-06-002 on 01/01/2006 - 03/31/2006 for Peach Bottom Atomic Power Station (Pbaps); Units 2 and 3; Post-Maintenance TestingTime of Discovery
Packing leak
Fire Barrier
Operating Basis Earthquake
Temporary Modification
Significance Determination Process
Earthquake
Fuel cladding
Pressure Boundary Leakage
Unidentified leakage
IR 05000227/20160014 May 2016IR 05000227/2016001 & 05000278/2016001 - Peach Bottom Atomic Power Station - Integrated Inspection Report (Jan 1 2016 - Mar 31 2016)High Radiation Area
Fire Barrier
Temporary Modification
Functionality Assessment
Significance Determination Process
Operability Determination
Maintenance Rule Program
Power change
Downpower
IR 05000237/20120121 May 2014Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC
IR 05000237/201320231 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000254/20120121 May 2014Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC
IR 05000254/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000272/20120121 May 2014Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC
IR 05000272/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000277/20020011 March 20022002 Annual Assessment Letter - Peach Bottom Atomic Power Station (Report 50-277/02-01, 50-278/02-01License Renewal
Siren
IR 05000277/200200423 July 2002IR 05000277-02-004, IR 05000278-02-004, on 05/19-06/29/2002; Exelon Generation Company; Peach Bottom Atomic Power Station; Units 2 and 3. Equipment AlignmentFire Barrier
Temporary Modification
Emergency Lighting
Significance Determination Process
Job Performance Measure
Operability Determination
Power change
IR 05000277/20020058 November 2002IR 05000277-02-005, IR 05000278-02-005; on 06/30-09/28/2002; Exelon Generation Company; Peach Bottom Atomic Power Station; Units 2 and 3. Refueling and Other Outage ActivitiesHigh winds
Packing leak
High Radiation Area
Offsite Dose Calculation Manual
Fire Barrier
Internal Flooding
Temporary Modification
Locked High Radiation Area
Significance Determination Process
Foreign Material Exclusion
Operability Determination
Control of Heavy Loads
Liquid penetrant
Preliminary White Finding
Scaffolding
Siren
IR 05000277/200200824 December 2002IR 05000277-02-008, IR 05000278-02-008, on 11/19-21/2002, Peach Bottom Atomic Power Station, Units 2 & 3. Emergency Preparedness Exercise Report